TEESTA DAM
1/37
INDIA
TEESTA DAM
2/37
INDIA
TEESTA DAM
3/37
INDIA
TEESTA DAM
General Presentation
LOCATION : Sikkim
RIVER : Teesta
TECHNICAL FEATURES :
- Concrete Gravity Dam, 9.5 m dia, 17.78
km long Head Race Tunnel.
- Height of dam from deepest = 96m
- Length of crest dam = 183m
HYDRO POWER GENERATION
Underground power house
- Capacity 510 MW (3 x 170 MW)
4/37
INDIA - TEESTA
DAM
5/37
INDIA
TEESTA DAM
Cutoff
GROUND CONDITIONS
Permeable bouldary material encountered down to 50m deep
Bedrock mainly composed of quartzo - phyllite ( 70 - 120
Mpa )
6/37
INDIA
TEESTA DAM
LEFT BANK
A1
WORKING PLATFORM
EL:540.00
A2
DDH06
A3
A4
TEESTA RIVER
A6 A7
DDH07
A5
subject to NHPC
dierctive
LEGEND:
NOTE
25/10/2002
ROCK PROFILE
(EXPLORATORY HOLES)
NOTE
A1 - A7 : EXPLORATORY HOLES
DDH06 - DDH07 : PREVIOUS GEOLOGICAL INVESTIGATION HOLES
802503 -
7/37
INDIA
TEESTA DAM
RIGHT BANK
WORKING PLATFORM
EL: 543.00
B
A
WORKING PLATFORM
EL: 535.00
D4
TEESTA RIVER
D3
WORKING PLATFORM
EL: 544.00
FALL = 1.5 %
D1A
DDH09
LEGEND:
ROCK PROFILE
(EXPLORATORY HOLES)
NOTE
D1A- D4 : EXPLORATORY HOLES
DDH09 : PREVIOUS GEOLOGICAL INVESTIGATION HOLE
AREA OF JET GROUT CUT-OFF WALL: 2797 m
DIMENSION A to B = 58.77m
DIMENSION B to C = 39.23m
DIMENSION C to D = 33.75m
DIMENSION D to E = 9.89m
TOTAL LENGTH = 141.64 m
8/37
TEESTA DAM
(Works Site)
9/37
INDIA
TEESTA DAM
10/37
INDIA - TEESTA
DAM
11/37
INDIA - TEESTA
DAM
12/37
INDIA
TEESTA DAM
- 7000 m2
- Maximum depth = 70m
- Diameter of columns = 120cm to 260cm
- Average deviation = 1,5 %
13/37
INDIA
TEESTA DAM
PERMEATION GROUTING
Systematic complementary treatment
- 1 line at 1.2m spacing
- Systematic first phase of grouting BC + Gel
- Final phase based on the following factors :
- results of the first phase
- deviation and diameter of the jet
columns
- deviation of the grout holes
- mapping of the boulders
14/37
INDIA
TEESTA DAM
ROCK GROUTING
- Rock permeability to be investigated
- Grouting with stable mix Bentonite / Cement to be
performed according to the investigation
15/37
INDIA
TEESTA DAM
US Plan view
AUL
IN G H
E XIST
EL:555
M IN .
D
A
O
R
WP
PZ
A1
D DH06
PZ
A2
WP
PZ
A3
A4
PZ
PZ
WP
A5
PZ
N
TE
IVE
AR
T
S
A6
D DH07
PZ
WP
A7
PZ
WP
PZ
PZ
PZ
PZ
16/37
INDIA
TEESTA DAM
17/37
TEESTA DAM
INDIA
18/37
INDIA
TEESTA DAM
19/37
INDIA -
TEESTA
Upstream Cofferdam
20/37
INDIA - TEESTA
DAM
21/37
INDIA
TEESTA DAM
Shaft in plot test
22/37
air
ENCAPSULATED by air )
HP
HPGROUT
GROUT
HP
HPGROUT
GROUT
air + LP grout )
air
HP
HPWATER
WATER
HP
HPWATER
WATER
LP
LPGROUT
GROUT
LP
LPGROUT
GROUT
23/37
INDIA - TEESTA
DAM
(Diversion Tunnels)
24/37
INDIA
TEESTA DAM
Works Site
25/37
INDIA - TEESTA
DAM
Works Site
26/37
INDIA - TEESTA
DAM
27/37
INDIA - TEESTA
28/37
INDIA - TEESTA
Upstream Cofferdam
29/37
INDIA - TEESTA
Upstream Cofferdam
30/37
INDIA - TEESTA
Downstream Cofferdam
31/37
INDIA - TEESTA
32/37
INDIA
TEESTA DAM
Image from PICODI
33/37
INDIA
TEESTA DAM
Pumping test
Upstream
34/37
INDIA - TEESTA
DAM
35/37
INDIA - TEESTA
DAM
36/37
INDIA - TEESTA
QUANTITIES
Cutoff walls
8500m2
420u
Grouted holes n
360u
Drilling
18 000lm
9 300lm
14 500m3
1 100m3
900m3
37/37