You are on page 1of 25

OPTIMA ENGINEERS

&
DEVELOPERS

PACKAGED SEWAGE TREATMENT


PLANT

INTRODUCTION

We undertake detailed engineering works for design, manufacture,


supply, erection, testing and commissioning of water and
wastewater Treatment Plants and Projects of Water Distribution as
well as Waste Water Collection and Storm Water Disposal Systems.
Our Environmental consultancy includes the following services,
Treatability and Feasibility studies related to Sewage and Effluent
treatment plants.
Modifications and up-gradations in existing ETP/STP.
Basic and detailed engineering for setting of new STP/ETP including
tender documentation.
Design of sewage/effluent collection and conveyance system
Provision of packaged sewage treatment plants.
Rainwater harvesting systems.
Turnkey execution of RCC/MS sewage treatment plant with zero
discharge concepts.
Environmental clearance services for building projects.

CONVENTIONAL FLOW CHART FOR PACKAGED STP


BASED ON ASP TECHNOLOGY

PACKAGED SEWAGE TREATMENT PLANT BASED ON


ACTIVATED SLUDGE PROCESS

The Extended Aeration Process, a modification of the Activated Sludge Process,


effectively treats the contaminants in wastewaters. The standard basis of design
includes an aeration system, providing a 24-hour detention time and a final settling
tank, with an effective 4-hour detention time.
Diffused air is introduced into the aeration tank. This provides the proper
environment for the development of aerobic bacteria. These bacteria thrive on the
materials contained in the wastewater. The prolonged period of aeration, in addition,
oxidizes a portion of the solids in the system. Oxygenation by diffused aeration
provides operating flexibility and standby reserve to meet the demanding
requirements of the varied package plant applications.

Separation of the solids from the mixed liquor developed in the aeration tank takes
place in the settling compartment. The clarified effluent is withdrawn for reuse or
discharged into a receiving stream from the top of the settling tank. The settled solids
are rapidly pumped from the bottom of the settling tank back to the aeration system.
These Extended Aeration Plants are proven workhorses, providing excellent
Biochemical Oxygen Demand (BOD) and Total Suspended Solids (TSS) removal
efficiencies. Only minimal routine housekeeping and operational tasks are required
of the plant operator.

PACKAGED SEWAGE TREATMENT PLANT

Key Features

Sample Applications

Economy
Ease of Installation
Simplicity of Operation &
Proven Reliability
Fulfils Regulatory
Requirements

Small Communities
Schools
Hotels and Resorts
Housing Developments
Hospitals
Shopping Malls
Industrial Parks & Factories

BASIC DESIGN PARAMETERS OF PACKAGED STP


BASED ON ASP

Since this unit is an extended aeration system, its (BOD5/MLSS)


F/M loading is in the range of 0.042 to 0.153. This F/M ratio
establishes the MLSS concentration in the range of 2500 to
approximately 6000 mg/L.
Aeration compartment volume has been established to provide a
detention period of 24 hours at design flow.
The clarifiers are designed to produce solids separation under all
hydraulic loading conditions.
Air is supplied to the diffusers by positive displacement blowers.
These blowers are designed to provide sufficient air to ensure that
the dissolved oxygen content of the aeration chambers can always be
maintained within the range of 1.0 to 2.0 mg/L.

BASIC UNITS OF PACKAGED STP

Screen (optional)
Oil & grease removal tank (optional)
Equalization tank
Primary settling tank (optional)
Aeration tank
Secondary clarifier
Disinfection tank
Pressure sand filters
Activated carbon filters
Treated water tank
Sludge drying beds or filter press for sludge disposal

SCREEN
1.
2.
3.
4.
5.
6.
7.

Inlet Pipe
Debris
Muck
Grill
Screened Sewage
Outlet Pipe
Platform With Weep Holes

OIL & GREASE TANK


1.

2.
3.
4.
5.
6.
7.

T Joint (Avoiding the


Disturbance by Falling
Water)
Level Till Which the Tank is
Filled
Fat and Scum
Grit and Solids
Baffle Plate
Wastewater (Free from Oil)
Outlet

EQUALIZATION TANK

1. Inlet Pipe
2. Sewage
3. Raw Sewage Lift Pumps
(1w + 1s)
4. Delivery Pipe
5. Course Bubble Diffusers
6. Air Supply Pipe Lines

PRIMARY & SECONDARY SETTLING TANKS

1. Inlet Pipe
2. Center feed well
3. Steeply sloped walls of the
tank
4. Bacterial flocs
5. Sludge pipe
6. Sludge Pumps (1w + 1s)
7. Header Assembly
8. Clear water
9. Launders
10. Clarified water pipe

AERATION TANK

1. Inlet Pipe
2. Baffle Wall
3. Sewage Level (Which is Set
by Top of the Launder
4. Outlet Launder
5. Net (Prevents the Entry of
Debris)
6. Outlet Pipe
7. Fine Bubble Diffusers
8. Header Pipe (Air Supply)
9. Sludge Recirculation Pipe

CHLORINE DOSAGE TANK

Chlorine is Dosed in A
Controlled Manner for the
Disinfection of Treated
Water
Separate Dosing Tank
(HDPE) is Provided for
the Chlorine Solution
Disinfected Effluent is
Passed Through PSF And
ACF by Means of Pressure
Pumps

PRESSURE SAND FILTERS

The Filter vessel is designed as a


pressure vessel (it consists of a straight
cylindrical shell, with convex dishshaped ends welded to the top and
bottom). A typical vessel is designed to
withstand a pressure of 5 kg/cm2.
A set of pipes, valves, bypass line,
backwash waste line etc. are also
provided to facilitate operations such as
filtration, bypass (during servicing),
backwash etc. Pressure gauges are
provided at the inlet and outlet, to
monitor the pressure drop across the
filter.

ACTIVATED CARBON FILTERS

Activated carbon is typically


manufactured from coconut shell
or charcoal, the activation
process creating a highly porous
material with a very large surface
area. Organic pollutant molecules
are physically adsorbed and held
fast within the catacomb-like
porous structure of the activated
carbon. Granular activated carbon
is typically used for this purpose.

SLUDGE DRYING BEDS OR FILTER PRESS

Quantity of sludge will be considered


as .. For extended aeration
technology.
Sludge drying beds are the cheapest
and easiest way to dispose off the extra
sludge.
Generally sludge drying beds are
provided in multiple of two.
Filter press
1.
Filter plates
2. End plate
3. Rails
4. Hydraulic jack
5. Plunger
6. Inlet pipe
7. Filtrate discharge pipe
8. Frame

PARAMETERS OF RAW SEWAGE AND EXPECTED


PARAMETERS AFTER TREATMENT

Raw parameters of Sewage


& Grey water
Sr. No.

Parameters

pH

Inlet
Characteristics
(Values in mg/lit
except pH)
6.0 8.0

COD

Expected parameters of
wastewater after treatment
Sr. No.

Parameters

pH

Outlet
Characteristics
(Values in mg/lit
except pH)
6.5 8.5

350 - 450

COD

<100

BOD

250 - 350

BOD

<30

SS

150 - 250

SS

<10

Oil & Grease

10 - 20

Oil & Grease

<10

* Range mentioned for treated parameters are accepted by MOEF for Gardening and flushing purpose.

TREATMENT SCHEME FOR PACKAGED STP

BLOCK DIAGRAM

Capital Cost

COSTING

Cost will depend on following


factors
Make
RCC
MS
SS

FRP coating
Epoxy paint
Automation
Transportation
Scope of work
Degree of treatment

Generally Rs. 30 to 40 per liter will


be the installation cost for plants
having capacity up to 100 KLD
Capital cost decreases if the
capacity of plant increases

Running Cost

Major cost of operation will be


considered as electrical and power
expenses
Running cost will depend on the
capacity of Mechanical equipments
Maintenance cost is not even 2 %
of capital cost per year.

SPACE REQUIREMENT

Packaged sewage treatment plants are compact and based on the


extended aeration system.
RCC plants can be flushed with the finished ground level by
constructing under ground RCC tanks.
Approximately 1 Sq. Ft. is required for treating 1 Cum of sewage.
Sludge disposal space requirements will be reduced by providing
filter press.

MAXIMUM AND MINIMUM CAPACITY

Packaged Sewage treatment plants can be made up to capacity of


250 KLD in Mild Steel.
RCC sewage treatment plants can be made up to any capacity
required.
In case of Mild steel plants (Pre-fabricated plants) transportation
should be given due importance.
Practically minimum capacity of packaged sewage treatment plants
should be 20 KLD.

MAJOR MECHANICAL, ELECTRICAL, PIPING &


INSTRUMENTATION UNITS

Mechanical units Electrical units Piping units

Instrumentation
units

Pumps

MCC panel

Pipes

Level Switches

Air Blowers

Cabling

Valves

Flow meters

Filters

Switches

Gates

UV filters

Fabricated water
tanks

Elbows

Dosing pumps

Canopies

Bends

COMPUTERIZED MODEL

COMPLETED PROJECTS
L & T, Baroda.

Agro Tech Foods, Jhagadia.

THANK YOU.
(Queries are Invited if Any.)

You might also like