Professional Documents
Culture Documents
-(V200R003)
Issue: 04
Part Number: 3150G2CX
Date: 2015-05-12
04
3150G2CX
2015-05-12
Safety Information
During power-on, do not insert or remove controllers, management modules, or cables to avoid
data loss.
2015
Installation Flow
Start
Initial Configuration
Help
Page 3
3
Device Introduction
Page 5
5
Page 6
6
Installing Devices
Page 9
9
Connecting Cables
Page 13
13
Page 14
14
Powering On
Page 17
17
Page 17
17
Page 18
18
End
Device Introduction
OceanStor VIS6600T virtual intelligent storage system (hereinafter referred to as the VIS6600T)
applies dual-node redundant configurations. A single VIS6600T has two nodes. A VIS6600T
cluster supports up to eight nodes. The VIS6600T cluster with more than two nodes has better
performance.
The VIS6600T is an open and flexible virtual storage product that targets mid-range and highend customers (such as government data centers, financial institutions, carriers, and big
enterprises and institutions). It can implement storage consolidation in a heterogeneous
environment and provide data protection and local (remote) data disaster recovery. The
VIS6600T consists of modular components such as the system enclosure, controllers, fan
modules, power modules, and interface modules.
OceanStor VIS6600TVIS6600T
VIS6600TVIS6600TVIS6600T
VIS6600T
VIS6600T
Before installing the VIS6600T, check whether the external environment meets the operating
conditions of the VIS6600T (such as power supply, heat dissipation).
Rated AC voltage: 100 V to 127 V or 200 V to 240 V
Rated DC voltage: -48 V to -60 V
Operating temperature: 5 - 40 (when the altitude is lower than 1,800 m)
5 - 30 (when the altitude is between 1,800 m - 3,000 m)
Operating altitude: 3,000 m
Relative operating humidity: 5% RH-90% RH
VIS6600TVIS6600T
100V127V200V240V
48V60V
5401800m
5301800m 3000m
3000m
5%RH90%RH
VIS6600T
VIS6600T
Value/
Height/
17.5 cm
Width/
44.6 cm
Depth/
50.2 cm
Weight/
43.6 kg
Power Parameter/
Parameter/
Value/
Power/
480 W
Input voltage/
Frequency/
50 ~ 60 Hz
Value/
Height/
4.8 cm
Width/
43.2 cm
Depth/
50.0 cm
Weight/
8.0 kg
Power Parameter/
Parameter/
Value/
Power/
120 W
Input voltage/
100 V ~ 240 V AC
Frequency/
47 ~ 63 Hz
Verifying Materials
VIS6600T(4U)
Front panel(4U
4U
Network cable
Cable tie
The above table only includes part of the materials to be used during the installation. For information about all the
materials, see the Packing List.
Installing Devices
Before the planning, you need to calculate the required cabinet space, as listed in the following table.
Installation Item
VIS6600T
Required Space
4U
(1+1)U
*Cable rack: 1U
Remarks: The total of the required cabinet space can be calculated through the following formula:
4U * (number of VIS6600T) + 2U*2.
Based on the calculated cabinet space, you can plan the installation positions of the data coffer and service
controller enclosures for the convenience of the installation and expansion.
VIS6600T
VIS6600T
4U
(1+1)U
*: 1U
VIS6600T
4U*VIS6600T+ 2U*2
If you do not have a floating nut mount bar, you can use a flat-head
screwdriver instead. When using a flat-head screwdriver to install
the floating nuts, handle it gently; otherwise, the flat-head
screwdriver may skid, and thus injure the hands or storage devices.
Scenario 1
Installation position of a 4U device
(shown as the shade)
1
VIS6600T
For VIS6600T, the floating nuts for the two upper M6 fixing screws need to be installed.
VIS6600T2M6
If you do not have a floating nut mount bar, you can use a flat-head screwdriver instead. When using a
flat-head screwdriver to install the floating nuts, handle it gently; otherwise, the flat-head screwdriver
may skid, and thus injure the hands or storage devices.
The length of the adjustable guide rail ranges from 600 mm (23.64 inches) to 900 mm (35.46 inches),
and it can be installed in the cabinet with a depth from 800 mm (31.50 inches) to 1100 mm (43.34
inches).
The adjustable guide rails are initially equipped with positioning pins applicable to square installation
holes only. For round installation holes, replace the positioning pins.
After the left adjustable guide rail is installed, install the right adjustable guide rail in the same method.
6009008001100
Positioning pins
rail.
rack at both ends with two
M6
Connecting Cables
The preceding figure shows the heartbeat network for a eight nodes cluster of VIS6600T. You can adjust
the number of used VIS6600T based on the actual application scenario.
On the VIS6600T heartbeat network, the heartbeat network ports of a cluster with more than two nodes
use GE switch cards (switching network) for connections.
Two GE switch cards must be installed in slot A3 and A4 on controller A of a VIS6600T and slot B3 and
B4 on controller B of another VIS6600T.
VIS6600TVIS6600T
VIS6600TGE
GEVIS6600TAVIS6600TB
A3A4B3B4
10
The two internal Fibre Channel interconnection ports of each node are connected to different Fibre
Channel switches.
FC
11
Ensure the power modules of VIS6600T are connected to different external power supplies for
powering redundancy.
12
Check Item
Normal
Abnormal
VIS6600T
Check Item
Normal
Abnormal
Ground cable
Optical transceiver
Optical fibre
Heartbeat cable
Network cable
power cable
13
Powering On
Check the status indicators of the VIS6600T virtual intelligent storage system about ten minutes after
the devices are powered on.
If a certain status indicator runs abnormally, check that the devices are correctly cabled. The faults
and alarms that occur during power-on can be solved later when the Integrated Storage Manager
(ISM) is installed and available to troubleshoot the system.
When the storage system is powered on, the colors of the indicators vary with the port speeds. For
details, please see the OceanStor VIS6600T Virtual Intelligent Storage System Installation Guide.
10VIS6600T
ISMIntegrated Storage Manager
ISM
VIS6600T
OceanStor VIS6600T
Power off the VIS6600T virtual intelligent storage system in the following sequence: application service
VIS6600T disk array Fibre Channel switch external power sources
VIS6600T VIS6600T
Power on the VIS6600T virtual intelligent storage system in the following sequence: external power sources
Fibre Channel switch disk array VIS6600T
VIS6600T
VIS6600T
The VIS6600T has two power buttons as shown in the figure below. Press either of them to power on
the VIS6600T.
VIS6600TVIS6600T
14
Green on
Off
Green on
Off
Green on
Green on
Green on
Green on/blink
Blue on/blink
/
/
Orange blink
Green on/blink
/
Green on/blink
/
Orange on/blink
/
Green on/blink
Blue on/blink
/
/
15
Checking the Status Indicators on the Fibre Channel Switch (Rear View)
Green on
Off
Checking the Status Indicators on the Fibre Channel Switch (Front View)
Green on
Off
Green on
Orange on
16
16
Initial Configuration
After the VIS6600T virtual intelligent storage system is powered on, do the following to initialize it.
1. Initially Configuring the IP Address of the Management Network Port.
2. Configuring the Heartbeat Mode for the Cluster.
3. Configuring Fibre Channel Switch.
4. Installing the ISM (on the maintenance terminal).
VIS6600T
1. IP
2.
3.
4. ISM
For details on how to initialize the virtual intelligent storage system, see the OceanStor VIS6600T
Virtual Intelligent Storage System Installation Guide.
OceanStor VIS6600T
After the VIS6600T virtual intelligent storage system is initialized, you are recommended to install the
following host software on the application server.
UltraPath: for how to install the UltraPath, see the OceanStor UltraPath for Windows User Guide,
OceanStor UltraPath for Linux User Guide , and OceanStor UltraPath for AIX User Guide.
VIS6600T
UltraPathOceanStor UltraPath for Windows OceanStor UltraPath for
Linux OceanStor UltraPath for AIX
If faults occur during power-on, seek help from the OceanStor VIS6600T Virtual Intelligent Storage System
Troubleshooting.
For questions about technical support and service, contact your service provider.
For questions about upgrades, contact your local sales office.
OceanStor VIS6600T
17
518129
enterprise.huawei.com
18