Z3 Filter area -HP 12 filter sub bank

1 Balance fence work (1/4th) (behind) to be completed


2 Optical CT erection and laying of optical cable -ABB supervisor is required
3 All arresters surge counter connection to rod electrode
4 Levelling and PCC of complete HP12 sub bank
5 All HV Capacitors copper link connections
6 Common fence between HP12 & HP12B filters earthing and raisers
7 Pipe electrode pits -2nos
8 Rusting of CAPCO make CT
9 Damaged pool pit to be repaired for Optical CT
10 Resistor (all) connections, connection pad (L type Al connector) for resistor is not supplie
11 Zinc rich paint to be applied at cutting portion of GI Flat
12 Damaged support insulator for Reactor (R-Phase) to be repaired

Z3 Filter area -HP 12B filter sub bank


1 Balance fence work (1/4th) (behind) to be completed
2 Optical CT erection and laying of optical cable -ABB supervisor is required
3 All arresters surge counter connection to rod electrode
4 Levelling and PCC of complete HP12 sub bank
5 All HV Capacitors copper link connections
6 Pipe electrode pits -2nos
7 Rusting of CAPCO make CT
8 Damaged pool pit to be repaired for Optical CT
9 Surge arrester (R Phase) surge counter to be fixed
10 Zinc rich paint to be applied at cutting portion of GI Flat

Z3 Filter area -HP 24/36B filter sub bank

1 Balance fence work (1/4th) (behind) to be completed


2 Optical CT erection and laying of optical cable -ABB supervisor is required
3 All arresters surge counter connection to rod electrode
4 Levelling and PCC of complete HP12 sub bank
5 All HV Capacitors copper link connections
6 balance fence earthing and raisers
7 Pipe electrode pits -2nos
8 Rusting of CAPCO make CT
9 Damaged pool pit to be repaired for Optical CT
10 Resistor (all) connections, connection pad (L type Al connector) for resistor is not supplie
11 Zinc rich paint to be applied at cutting portion of GI Flat
12 Damaged support insulator for Reactor (R-Phase) to be repaired
13 Modification work for LA (F2) mounting plate
14 Bird barrier fixing for one resistor
15 Connection of filter neutral to pipe electrode

16 LV capacitor connection with copper links


17 Repair of minar damage of equipment foundations

Z3 Filter area -Shunt capacitor with damping reactor filter sub bank
1 HV capacitor copper cable connections
2 LA (1 no) installation
3 2 no Pipe elctrodes for neutral bus
4 Junper connections, connector fixing & balance termination
5 Optical CT erection
6 Completer levelling and PCC
7 Repair of connecting trench
8 GI pipe laying in cable trench for fibre optic cable
9 Pool pit
10 Equipement foundation grouting

Z3 Filter area
1 Levelling and PCC at starting of Z3 (towards boundary wall)
2 Shielding tower earthing with riser & electrode for shielding wire ( 2 towers)
3 Gate fixing and inter locking for all filter sub banks
4 Structures cleaning
5 Replacement of damaged self standing earth switch operating MOM
6 Fixing of copper braid for earth switch (all)
7 Screw fixing of corona ring for all isolators
8 After testing, pipe sealing and hole punching of JBs/MOM boxes
9 Identification mark of all equipments
10 Levelling and gravelling
11 Clamping of breaker cabling
12 pad for earthing terminal isolator box (1 no) to be rectified
13 remaining grouting work of MKs/Equipment foundation
14 Cable support in cable trench at road crossing
15 Cable dressing
16 Surge counter of 400kV class arrester fixing and connection to rod electrodes
17 Electrode pit for two towers of gantry
18 MOM box cap to be fixed for all isolators
19 Dressing of breaker cables
20 Cable trench earthing
21

FRB 3
1 Fixing of roxtec and sealing
2 Cable support in trench
3 Ground filling at entrance of FRB building
4 Trench earthing
5 Cable termination
6 Channel support and channel painting
7 Fixing of relay building panel for illumination and fixing of lamps

8 AC commission (2 nos)
9 AC opening sealing
10 Erection of fire detector & JB/box
11 Fixing of interlocking of panels
12 MCB box for illumination is to be fixed as right position
13 Tiles fitting in remaining area of wall
14 Chekkar plate fixing
15 Door closer & locking arragement for door & door closure, to be fixed/repaired
16 Proper bolting of AC DB/DC DB
17 35 sq. mm copper for panel earthing
18 Rusting of DC DB & AC DB to be rectified

Z3 dia
1 Remaining earthing of equipment earthing of Isolators & CTs
2 riser for common cubicle of breaker & GI flat earthing
3 Sealing of CT pipe on ground (1no)
4 Copper braid for earth switch for Isolator
5 Z3 dia jumper connection with existing bus
6 screw for corona rings
7 MK grouting and earthing
8 cable pipe sealing and hole plugging
9 zinc rich paint on GI flat joint
10

Z3 & Z4 Tie
1 3 nos of MOM boxes are damamaged to repaired

resistor is not supplied

resistor is not supplied

filter sub bank

2 towers)

electrodes

ed/repaired