Professional Documents
Culture Documents
Architectural Technologist
Introduction
I am working towards becoming a Chartered Architectural Technologist. Currently, I have applied for membership and am working to bolster or fill in gaps in my abilities.
Self
Assessment
CV
CV
Self
Assessment
Applying the requirements of the Chartered Institute of Architectural Technologists, I have assessed my abilities in detail.
1 Client and User Requirements
1.1 Identifying, assessing, and challenging client requirements
2 Feasibility Studies
2.1 Assessing survey requirements, data standards, and outputs
2.3 Investigating and evaluating development factors, likely problems, and potential solutions
3 Sustainable Development
3.1 Identifying and evaluating resource availability
4 Project Planning
4.1 Selecting and agreeing procurement procedures with clients
6 Regulations
6.1 Assessing regulatory requirements and constraints
6.4 Confirming statutory control and consent requirements as well as their implications
7.2 Developing design programmes which meet the requirements of the brief
7.3 Assessing and developing significant parameters affecting the project design
8 Design Proposals
8.1 Presenting and justifying project design recommendations
11 Specifications
11.1 Drafting prescriptive technical specifications
13 Control Compliance
13.1 Controlling contracts against agreed quality standards
14 Project Completion
14.1 Managing project handover and completion
14.3 Specifying information and guidance to support and use property, systems, and services
14.4 Maintenance planning of property, systems, and services
15 Management of Meetings
15.1 Managing meetings
16 Professional Relationships
16.1 Developing and maintaining relationships with people who are affected by your work
1
2
3
4
5
6
7
Summary
CV
SCORE DESCRIPTION
Unit 1 2
5 6
8 9
10 11 12
Most of my ratings draw on my experience working across a variety of teams within engineering disciplines, specialist subcontractors, and architectural design
teams. Many of my ratings in units 1, 4, 6, 7, and 8 stem from my experience working on timber frame homes in Canada. Taking all of this on board, you will
find that I am best employed supporting an architectural design team with my eagerness and excitement making good use of my best abilities.
13 14 15 16
17
CV
gurpreetsinghlehal@hotmail.com
07802 845583
Self Assessment
Self
Assessment
CV
Introduction
Over my combined five years of post-graduate experience in Canada and the UK, I have worked to learn about architectural design and construction. I have
developed competencies through the design-build cycle of projects of varying scope and size, and I have the ability to work within all RIBA Stages. I graduated
with an Architectural Technology Diploma from the Northern Alberta Institute of Technology in 2010. Much of my experience has been quite focussed and
specialised. I am working towards developing into an accredited Architectural Technologist. My long term goal is to become an accredited Architect through
work and self-study.
Professional Experience
February 2016 August 2016
Create Design + Architecture (London, UK)
Senior Architectural Technologist
Project Experience Gained:
Residential/retail (mixed-use) project of 15,500,000 value with 263 no. residential units (contributed to the tender and construction phase)
[Kellogg Tower]
PRIBA stages of work: Project 1-7, Gurpreet 3-4
PContribution: Work on building envelope, record drawings, existing building, atrium, landscaping
Residential project of 3,100,000 value with 53 studio flats (contributed to the planning phase) [Bartley House]
PContribution: Work on flat layouts
Residential project of 16 units (contributed to the tender phase) [74 Putney Bridge Road]
PRIBA stages of work: Project 1-7, Gurpreet 3-4
PContribution: Work on building envelope, external works, bathrooms, kitchens, access ladders, cycle storage, bin store, and internal doors
Residential project of 100,000 value and 35m2 floor area (contributed to the tender phase) [336 Hook Rise]
PRIBA stages of work: Project 1-4, Gurpreet 3-4
PContribution: Development of key details alongside other technicians and Architects
Residential project of 10,000,000 value with 124 no. residential units (contributed to the tender phase) [Southbury House]
PRIBA stages of work: Project 1-4, Gurpreet 4
PContribution: Development of external details including specification of materials
u Develop designs and drawings through the application of technical content provided by specialists working within AutoCAD on a Macintosh machine
v Develop both tender and construction issue architectural drawings to programme deadlines
w Rapidly filter the content of standards, regulations, and guides into comprehensive lists so as to develop effective details efficiently
x Apply NHBC standards and UK Building Regulations
y Develop flat layouts, process OS maps, process flat schedules and finishes schedules
z Process archived record drawings into a well-organised, easily accessed, and searchable format
{ Develop experience working with British Standards, Eurocode EN Standards, Planning Considerations and Processes, The London Plan, Accredited
Construction Details from the Planning Portal, and technical guidance from specialist literature
April 2015 December 2015
Drytech Facades (Bexley, Kent, UK)
Designer Roof Copings, Cladding Panels, Curtain Wall
Project Experience Gained:
Residential/commercial (mixed-use) project of 60,000,000 value with 144 no. residential units and 480m2 commercial floor space (contributed to the
construction phase of the building envelope subcontract) [South Kilburn]
PRIBA stages of work: Project 4-7, Gurpreet 4-5
PContribution: Work on building envelope
u Develop construction issue architectural drawings and schedules into production issue installation/manufacture drawings and schedules
v Produce drawings of detailed installations to programme deadlines using AutoCAD for 2D and 3D drafting
w Design roof coping, curtain wall, metal cladding, and cladding panel installations (including backing structure)
x Apply NHBC standards, British and Eurocode Standards, UK Building Regulations, and technical literature
y Freehand draft
z Coordinate structural, architectural, and specialty subcontractor drawings during the design phase
November 2014 March 2015
Prater (Salfords, Surrey, UK)
Quality Assurance Manager - Glulam Beams, Timber Roof Cassettes, Derbigum Flat Roof Membrane, Curtain Wall, Rainscreen Support Panels
Project Experience Gained:
Commercial project of 100,000,000 value with 41,000m2 of floor space (contributed to the construction phase of the building envelope subcontract)
[BSKYB Phase 2]
PRIBA stages of work: Project 4-7, Gurpreet 5
u Ensure the delivery of design intent into the final build sequence by verifying installations with construction issue drawings and schedules
v Ensure adherence to all guidance provided by technical literature, codes, standards, and input from technical advisors
w Assist in the transition to the installation phase of a project from design
August 2013 October 2014
Fleetwood Architectural Aluminium (Slough, Berks, UK)
Designer Curtain Wall, Aluminium Windows, Aluminium Doors, Aluminium Rainscreen Panels
Project Experience Gained:
Residential/commercial project of 85,000,000 value consisting of three buildings (six blocks) rising up to 19 storeys with 605 no. residential units and
6,273 m2 of commercial floor space (contributed to the construction phase of the building envelope subcontract) [Embassy Gardens]
PRIBA stages of work: Project 4-7, Gurpreet 4-5
PContribution: Design work on building envelope
u Develop the detailed design of aluminium curtain walling, windows, and doors for manufacture and installation
v Develop construction issue architectural drawings and schedules into production issue installation/manufacture drawings and schedules
w Produce manufacture and construction issue drawings and schedules by working with clients, consultants, suppliers, production staff, design staff, and site
staff
x Apply NHBC standards, Lifetime Homes requirements, Secured by Design requirements, and British/Eurocode Standards as well as UK Building
Regulations
y Co-ordinate works with all interfacing and related building components through ongoing communication with subcontractor teams, architectural teams,
and engineering teams
z Ensure optimized and complete handovers of detailed design work into production
{ Give attention to technical insight from product specification and literature to alleviate manufacture and construction concerns pre-emptively
| Help communicate the minutiae of design work to site during construction
} Liaise with site teams and provide effective follow-up support thereby guaranteeing the performance of installed works to performance specifications and
requirements laid out by the client and consultants during the tender and design phase
CV
gurpreetsinghlehal@hotmail.com
07802 845583
Architectural Technologist
gurpreetsinghlehal@hotmail.com
07802 845583
Self
Assessment
CV
design of residential projects in the UK and subsequently processed several planning applications
MS Office
Familiarized myself with numerous standards and codes relevant to the design and delivery of
MS Excel
Attended then co-hosted several seminars on safer working practices on construction sites
InDesign
Completed IPAF training course MEWPS For Managers with assistance from management
Revit
Curtain Wall, Glass, and Door/Window courses
Milton Keynes, Schuco
Dreamweaver
Structural Use of Glass in Buildings
Imperial College London
3D Rendering
RIBA (Royal Institute of British Architects) CPD
RIBA, London
ArchiCAD
Managing The Cladding Package (2 day)
CWCT, Bath University
CPU Hardware
Construction Expo 2014 Kent
CPU Software
Key Attributes
BSRIA Briefing: Smarter Ways To Better Buildings
London
Work ethic
Completed the Site Management Safety Training Scheme (SMSTS course)
Focus
Interests
Systematic approach
Cycling
Attention to detail
Motorcycling
Developmental drive
Boxing
Quality focus
Kickboxing
Enthusiasm
Thai Kickboxing
Motivation
Camping
Passion
Hiking
Creativity
CV
gurpreetsinghlehal@hotmail.com
07802 845583
Architectural Technologist