You are on page 1of 122

STATION

K0419 +000.00
K0419 +010.00
K0419 +020.00
K0419 +030.00
K0419 +040.00
K0419 +047.00

R
R
R
R
R
R

WIDTH
2.00

THICKNESS
0.15

2.10
1.90
1.90
1.70
0.80

0.10
0.10
0.10
0.10
0.10

AREA

0.30
0.21
0.19
0.19
0.17
0.08

SUB-TOTAL
STATION

K0419 +000.00
K0419 +010.00
K0419 +020.00
K0419 +030.00
K0419 +040.00
K0419 +050.00
K0419 +060.00
K0419 +070.00
K0419 +081.00

WIDTH

L
L
L
L
L
L
L
L
L

1.50
1.60
1.10
2.40
2.00
2.20
2.80

2.20
2.00

THICKNESS
0.15
0.15
0.13
0.13

0.15
0.15
0.10
0.10
0.10

AREA

0.23
0.24
0.14
0.31
0.30
0.33
0.28
0.22
0.20

SUB-TOTAL
STATION

K0419 +058.00
K0432 +068.00
K0432 +072.00

WIDTH

R
R
R

1.60
1.70

1.70

THICKNESS
0.10

0.10
0.10

AREA

0.16
0.17
0.17

SUB-TOTAL
STATION

K0419 +140.00
K0419 +150.00
K0419 +160.00
K0419 +170.00
K0419 +180.00
K0419 +190.00
K0419 +200.00
K0419 +203.00

R
R
R
R
R
R
R
R

WIDTH
1.40
1.60
1.40
1.10
0.80

THICKNESS
0.10
0.13
0.15
0.15
0.13

1.10
1.40
1.30

0.13
0.15
0.15

AREA

0.14
0.21
0.21
0.17
0.10
0.14
0.21
0.20

SUB-TOTAL

THIS CERTIFICATE QTY:


CUMULATIVE QTY:

42.70
42.70

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of t
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA

Project Manager
(Contractor)

VOLUME
2.55
2.00
1.90
1.80
0.88
9.13
VOLUME
2.33
1.92
2.28
3.06
3.15
3.05
2.50
2.31
20.59
VOLUME
1.65
0.68
2.33
VOLUME
1.74
2.09
1.88
1.35
1.24
1.77
0.61
10.66

ation on work accomplished on the above mentioned project for the period
at we have found that the quality of materials in the specified work item
he Standard Specification and Special Provisions of the contract. We also certify
d in this calculation.

ARLON DON G. BARBERO


Project Engineer I

WIDTH
2.00
2.90
1.80
1.70
1.70
2.00
2.10
1.80
1.70
1.75
1.80
1.80
1.55
1.50
1.30
1.25
1.20
1.20
1.40
1.10
1.05
1.00
1.20
1.55
1.60
1.80
2.20
2.20
2.25
2.30
2.40
2.40
2.60

STATION

K0419 +087.00
K0419 +097.00
K0419 +107.00
K0419 +117.00
K0419 +127.00
K0419 +137.00
K0419 +147.00
K0419 +157.00
K0419 +167.00
K0419 +177.00
K0419 +187.00
K0419 +197.00
K0419 +207.00
K0419 +217.00
K0419 +227.00
K0419 +237.00
K0419 +247.00
K0419 +257.00
K0419 +267.00
K0419 +277.00
K0419 +287.00
K0419 +297.00
K0419 +307.00
K0419 +317.00
K0419 +327.00
K0419 +337.00
K0419 +347.00
K0419 +357.00
K0419 +367.00
K0419 +377.00
K0419 +387.00
K0419 +397.00
K0419 +407.00

L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L

THICKNESS
0.05
0.10
0.10
0.12
0.12
0.15
0.15
0.15
0.13
0.13
0.10
0.10
0.12
0.12
0.14
0.14
0.15
0.13
0.12
0.10
0.15
0.15
0.15
0.15
0.13
0.12
0.10
0.13
0.15
0.15
0.12
0.10
0.10

AREA
0.10
0.29
0.18
0.20
0.20
0.30
0.32
0.27
0.22
0.23
0.18
0.18
0.19
0.18
0.18
0.18
0.18
0.16
0.17
0.11
0.16
0.15
0.18
0.23
0.21
0.22
0.22
0.29
0.34
0.35
0.29
0.24
0.26

SUB-TOTAL

THIS CERTIFICATE QTY:


CUMULATIVE QTY:

69.49
112.19

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.
Submitted By:

Checked and Verified By:

ALEXANDER B. BAROA

Project Manager
(Contractor)

VOLUME
1.95
2.35
1.92
2.04
2.52
3.08
2.93
2.46
2.24
2.04
1.80
1.83
1.83
1.81
1.79
1.78
1.68
1.62
1.39
1.34
1.54
1.65
2.06
2.20
2.12
2.18
2.53
3.12
3.41
3.17
2.64
2.50
69.49

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

WIDTH
2.60
2.50
2.25
2.20
2.20
1.80
1.70
2.10
1.65
2.00
2.00
2.50
2.40
2.60
2.60
2.40
2.40
2.40
2.50
2.20
1.60
1.70
1.50
2.70
2.35
2.20
2.00
1.55
1.50
1.50
1.50
1.40
1.55

STATION

K0419 +407.00
K0419 +417.00
K0419 +427.00
K0419 +437.00
K0419 +447.00
K0419 +457.00
K0419 +467.00
K0419 +477.00
K0419 +487.00
K0419 +497.00
K0419 +507.00
K0419 +517.00
K0419 +527.00
K0419 +537.00
K0419 +547.00
K0419 +557.00
K0419 +567.00
K0419 +577.00
K0419 +587.00
K0419 +597.00
K0419 +607.00
K0419 +617.00
K0419 +627.00
K0419 +637.00
K0419 +647.00
K0419 +657.00
K0419 +667.00
K0419 +677.00
K0419 +687.00
K0419 +697.00
K0419 +707.00
K0419 +717.00
K0419 +727.00

L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L

THICKNESS
0.10
0.15
0.13
0.10
0.10
0.12
0.12
0.14
0.15
0.15
0.12
0.12
0.10
0.10
0.10
0.12
0.12
0.10
0.10
0.10
0.13
0.15
0.15
0.12
0.10
0.10
0.10
0.10
0.13
0.15
0.15
0.15
0.13

AREA
0.26
0.38
0.29
0.22
0.22
0.22
0.20
0.29
0.25
0.30
0.24
0.30
0.24
0.26
0.26
0.29
0.29
0.24
0.25
0.22
0.21
0.26
0.23
0.32
0.24
0.22
0.20
0.16
0.20
0.23
0.23
0.21
0.20

SUB-TOTAL

THIS CERTIFICATE QTY:


CUMULATIVE QTY:

78.63
190.82

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA

Project Manager
(Contractor)

VOLUME
3.18
3.34
2.56
2.20
2.18
2.10
2.49
2.71
2.74
2.70
2.70
2.70
2.50
2.60
2.74
2.88
2.64
2.45
2.35
2.14
2.32
2.40
2.75
2.80
2.28
2.10
1.78
1.75
2.10
2.25
2.18
2.06
78.63

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0419 +727.00
K0419 +737.00
K0419 +747.00
K0419 +757.00
K0419 +767.00
K0419 +777.00
K0419 +787.00
K0419 +797.00
K0419 +807.00
K0419 +817.00
K0419 +827.00
K0419 +837.00
K0419 +845.00

WIDTH
1.55
1.60
1.60
1.75
1.45
1.60
1.30
1.40
1.50
1.50
1.80
1.90
1.40

L
L
L
L
L
L
L
L
L
L
L
L
L

THICKNESS
0.10
0.12
0.13
0.13
0.15
0.15
0.15
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.16
0.19
0.21
0.23
0.22
0.24
0.20
0.14
0.15
0.15
0.18
0.19
0.14

THICKNESS
0.05
0.05
0.05
0.10
0.10
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.13
0.13
0.10

AREA
0.07
0.09
0.10
0.19
0.23
0.30
0.29
0.30
0.29
0.26
0.27
0.21
0.20
0.20
0.25
0.19

SUB-TOTAL

STATION
K0419 +449.00
K0419 +459.00
K0419 +469.00
K0419 +479.00
K0419 +489.00
K0419 +499.00
K0419 +509.00
K0419 +519.00
K0419 +529.00
K0419 +539.00
K0419 +549.00
K0419 +559.00
K0419 +569.00
K0419 +579.00
K0419 +589.00
K0419 +601.00

WIDTH
1.30
1.80
2.00
1.90
2.30
2.00
1.90
2.00
1.90
1.70
1.80
1.40
1.30
1.50
1.90
1.90

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

SUB-TOTAL

THIS CERTIFICATE QTY:


CUMULATIVE QTY:

55.28
246.09

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.
Submitted By:

Checked and Verified By:

ALEXANDER B. BAROA

Project Manager
(Contractor)

VOLUME
1.74
2.00
2.18
2.23
2.29
2.18
1.68
1.45
1.50
1.65
1.85
1.32
22.05
VOLUME
0.78
0.95
1.45
2.10
2.65
2.93
2.93
2.93
2.70
2.63
2.40
2.03
1.95
2.21
2.62
33.23

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0419 +672.00
K0419 +682.00
K0419 +692.00
K0419 +702.00
K0419 +712.00
K0419 +722.00
K0419 +732.00
K0419 +742.00
K0419 +752.00
K0419 +760.00

WIDTH
0.90
1.40
1.50
1.60
1.50
1.70
1.50
1.20
2.30
1.80

R
R
R
R
R
R
R
R
R
R

THICKNESS
0.05
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.05

AREA
0.05
0.14
0.15
0.16
0.15
0.17
0.15
0.12
0.23
0.09

THICKNESS
0.05
0.05
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.05

AREA
0.09
0.10
0.22
0.22
0.21
0.26
0.22
0.20
0.24
0.22
0.23
0.20
0.20
0.21
0.20
0.24
0.24
0.07

SUB-TOTAL

STATION
K0421 +582.00
K0421 +592.00
K0421 +602.00
K0421 +612.00
K0421 +622.00
K0421 +632.00
K0421 +642.00
K0421 +652.00
K0421 +662.00
K0421 +672.00
K0421 +682.00
K0421 +692.00
K0421 +702.00
K0421 +712.00
K0421 +722.00
K0421 +732.00
K0421 +742.00
K0421 +752.00

WIDTH
1.70
2.00
2.20
2.20
2.10
2.60
2.20
2.00
2.40
2.20
2.30
2.00
2.00
2.10
2.00
2.40
2.40
1.40

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

SUB-TOTAL

THIS CERTIFICATE QTY:


CUMULATIVE QTY:

47.93
294.02

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.
Submitted By:

Checked and Verified By:

ALEXANDER B. BAROA

Project Manager
(Contractor)

VOLUME
0.93
1.45
1.55
1.55
1.60
1.60
1.35
1.75
1.28
13.06
VOLUME
0.93
1.60
2.20
2.15
2.35
2.40
2.10
2.20
2.30
2.25
2.15
2.00
2.05
2.05
2.20
2.40
1.55
34.88

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0421 +794.00
K0421 +804.00
K0421 +814.00
K0421 +824.00
K0421 +834.00
K0421 +844.00
K0421 +854.00
K0421 +864.00
K0421 +874.00
K0421 +884.00
K0421 +894.00
K0421 +904.00
K0421 +914.00
K0421 +924.00
K0421 +934.00
K0421 +944.00
K0421 +954.00
K0421 +964.00
K0421 +974.00

WIDTH
1.40
1.50
1.90
1.80
1.70
1.70
1.60
1.60
1.50
1.60
1.40
0.90
0.90
1.50
1.50
1.90
1.70
1.60
1.40

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

THICKNESS
0.05
0.08
0.08
0.06
0.05
0.08
0.10
0.10
0.10
0.08
0.06
0.08
0.10
0.10
0.10
0.08
0.05
0.05
0.05

AREA
0.07
0.12
0.15
0.11
0.09
0.14
0.16
0.16
0.15
0.13
0.08
0.07
0.09
0.15
0.15
0.15
0.09
0.08
0.07

THICKNESS
0.05
0.05
0.10
0.15
0.15
0.10
0.10
0.05
0.05

AREA
0.08
0.11
0.20
0.30
0.38
0.25
0.25
0.09
0.04

SUB-TOTAL

STATION
K0422 +000.00
K0422 +010.00
K0422 +020.00
K0422 +030.00
K0422 +040.00
K0422 +050.00
K0422 +060.00
K0422 +070.00
K0422 +076.00

WIDTH
1.50
2.10
2.00
2.00
2.50
2.50
2.50
1.70
0.80

R
R
R
R
R
R
R
R
R

SUB-TOTAL

THIS CERTIFICATE QTY:


CUMULATIVE QTY:

37.30
331.32

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.
Submitted By:

Checked and Verified By:

ALEXANDER B. BAROA

Project Manager
(Contractor)

VOLUME
0.95
1.36
1.30
0.97
1.11
1.48
1.60
1.55
1.39
1.06
0.78
0.81
1.20
1.50
1.51
1.19
0.83
0.75
21.32
VOLUME
0.90
1.53
2.50
3.38
3.13
2.50
1.68
0.38
15.98

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0422 +097.00
K0422 +107.00
K0422 +117.00
K0422 +127.00
K0422 +137.00
K0422 +147.00
K0422 +157.00
K0422 +167.00
K0422 +177.00
K0422 +187.00
K0422 +197.00
K0422 +207.00
K0422 +217.00
K0422 +227.00
K0422 +237.00
K0422 +243.00

WIDTH
1.30
2.10
2.60
2.50
2.10
1.90
1.70
1.40
1.60
1.60
1.60
1.80
1.60
1.60
1.70
1.60

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.13
0.21
0.26
0.25
0.21
0.19
0.17
0.14
0.16
0.16
0.16
0.18
0.16
0.16
0.17
0.16

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.14
0.15
0.14
0.13
0.12
0.24
0.24
0.21
0.22
0.15

SUB-TOTAL

STATION
K0422 +260.00
K0422 +270.00
K0422 +280.00
K0422 +290.00
K0422 +300.00
K0422 +310.00
K0422 +320.00
K0422 +330.00
K0422 +340.00
K0422 +348.00

WIDTH
1.40
1.50
1.40
1.30
1.20
2.40
2.40
2.10
2.20
1.50

R
R
R
R
R
R
R
R
R
R

SUB-TOTAL

THIS CERTIFICATE QTY:


CUMULATIVE QTY:

42.17
373.49

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA

Project Manager

(Contractor)

VOLUME
1.70
2.35
2.55
2.30
2.00
1.80
1.55
1.50
1.60
1.60
1.70
1.70
1.60
1.65
0.99
26.59
VOLUME
1.45
1.45
1.35
1.25
1.80
2.40
2.25
2.15
1.48
15.58

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0422 +292.00
K0422 +302.00
K0422 +312.00
K0422 +322.00
K0422 +332.00
K0422 +342.00
K0422 +352.00
K0422 +362.00
K0422 +372.00
K0422 +382.00
K0422 +392.00
K0422 +402.00
K0422 +412.00
K0422 +422.00

WIDTH
2.10
2.10
2.00
2.20
2.20
1.60
1.80
1.90
1.60
1.60
1.60
1.60
2.00
1.30

R
R
R
R
R
R
R
R
R
R
R
R
R
R

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.21
0.21
0.20
0.22
0.22
0.16
0.18
0.19
0.16
0.16
0.16
0.16
0.20
0.13

THICKNESS
0.05
0.10
0.20
0.20
0.15
0.15
0.15
0.20
0.20
0.15
0.10
0.10
0.10
0.10
0.20
0.20
0.25
0.10
0.10

AREA
0.06
0.19
0.44
0.44
0.26
0.36
0.36
0.42
0.48
0.36
0.22
0.18
0.28
0.28
0.62
0.56
0.68
0.28
0.18

SUB-TOTAL

STATION
K0422 +457.00
K0422 +467.00
K0422 +477.00
K0422 +487.00
K0422 +497.00
K0422 +507.00
K0422 +517.00
K0422 +527.00
K0422 +537.00
K0422 +547.00
K0422 +557.00
K0422 +567.00
K0422 +577.00
K0422 +587.00
K0422 +597.00
K0422 +607.00
K0422 +617.00
K0422 +627.00
K0422 +637.00

WIDTH
1.20
1.90
2.20
2.20
1.70
2.40
2.40
2.10
2.40
2.40
2.20
1.80
2.80
2.80
3.10
2.80
2.70
2.80
1.80

L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L

SUB-TOTAL

THIS CERTIFICATE QTY:


CUMULATIVE QTY:

89.10
462.59

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA

Project Manager
(Contractor)

VOLUME
2.10
2.05
2.10
2.20
1.90
1.70
1.85
1.75
1.60
1.60
1.60
1.80
1.65
23.90
VOLUME
1.25
3.15
4.40
3.48
3.08
3.60
3.90
4.50
4.20
2.90
2.00
2.30
2.80
4.50
5.90
6.18
4.78
2.30
65.20

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0422 +637.00
K0422 +647.00
K0422 +657.00
K0422 +667.00
K0422 +677.00
K0422 +687.00
K0422 +697.00
K0422 +707.00
K0422 +717.00
K0422 +727.00
K0422 +737.00
K0422 +747.00
K0422 +757.00
K0422 +767.00
K0422 +777.00
K0422 +787.00
K0422 +797.00
K0422 +807.00
K0422 +817.00
K0422 +827.00
K0422 +837.00
K0422 +847.00
K0422 +857.00
K0422 +867.00
K0422 +877.00
K0422 +887.00
K0422 +897.00
K0422 +907.00
K0422 +917.00
K0423 +927.00
K0424 +937.00
K0425 +947.00
K0426 +957.00
K0427 +967.00
K0428 +977.00
K0429 +984.00

WIDTH
1.80
2.00
2.10
2.00
1.90
1.60
2.20
2.00
2.00
2.50
2.40
2.60
2.50
2.70
3.00
2.70
3.00
2.70
2.60
2.10
2.50
2.50
2.50
2.10
2.00
2.30
2.00
2.30
2.50
2.50
2.50
2.40
1.90
2.10
2.20
2.00

L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L

SUB-TOTAL

THIS CERTIFICATE QTY:


CUMULATIVE QTY:

84.16
546.74

cu.m.
cu.m.

THICKNESS
0.10
0.15
0.15
0.15
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.15
0.10

AREA
0.18
0.30
0.32
0.30
0.19
0.16
0.22
0.20
0.20
0.25
0.24
0.26
0.25
0.27
0.30
0.27
0.30
0.27
0.26
0.21
0.25
0.25
0.25
0.21
0.20
0.23
0.20
0.23
0.25
0.25
0.25
0.24
0.19
0.21
0.33
0.20

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA

Project Manager
(Contractor)

VOLUME
2.40
3.08
3.08
2.45
1.75
1.90
2.10
2.00
2.25
2.45
2.50
2.55
2.60
2.85
2.85
2.85
2.85
2.65
2.35
2.30
2.50
2.50
2.30
2.05
2.15
2.15
2.15
2.40
2.50
2.50
2.45
2.15
2.00
2.70
1.86
84.16

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0423 +000.00
K0423 +010.00
K0423 +020.00
K0423 +030.00
K0423 +040.00
K0423 +050.00
K0423 +060.00
K0423 +070.00
K0423 +080.00
K0423 +090.00
K0423 +100.00
K0423 +110.00
K0423 +117.00

WIDTH
2.00
1.70
2.30
2.20
1.50
2.20
2.40
1.90
1.80
1.70
1.50
1.70
1.30

L
L
L
L
L
L
L
L
L
L
L
L
L

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.15
0.20
0.15
0.10
0.10
0.10
0.10
0.10

AREA
0.20
0.17
0.23
0.22
0.15
0.33
0.48
0.29
0.18
0.17
0.15
0.17
0.13

THICKNESS
0.05
0.05
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.09
0.11
0.23
0.23
0.20
0.17
0.13
0.20
0.20
0.20
0.24
0.20
0.17
0.16
0.17
0.10
0.13
0.21
0.20
0.19

SUB-TOTAL

STATION
K0422 +457.00
K0422 +467.00
K0422 +477.00
K0422 +487.00
K0422 +497.00
K0422 +507.00
K0422 +517.00
K0422 +527.00
K0422 +537.00
K0422 +547.00
K0422 +557.00
K0422 +567.00
K0422 +577.00
K0422 +587.00
K0422 +597.00
K0422 +607.00
K0422 +617.00
K0422 +627.00
K0422 +637.00
K0422 +647.00

WIDTH
1.80
2.10
2.30
2.30
2.00
1.70
1.30
2.00
2.00
2.00
2.40
2.00
1.70
1.60
1.70
1.00
1.30
2.10
2.00
1.90

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

33.85
580.59

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.
Submitted By:

Checked and Verified By:

ALEXANDER B. BAROA

Project Manager
(Contractor)

VOLUME
1.85
2.00
2.25
1.85
2.40
4.05
3.83
2.33
1.75
1.60
1.60
1.05
26.55
VOLUME
0.98
1.68
2.30
2.15
1.85
1.50
1.65
2.00
2.00
2.20
2.20
1.85
1.65
1.65
1.35
1.15
1.70
2.05
1.95
33.85

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

AGENCY
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
ABRA DISTRICT ENGINEERING OFFICE

STATION
K0422 +647.00
K0422 +657.00
K0422 +667.00
K0422 +677.00
K0422 +687.00
K0422 +697.00
K0422 +707.00
K0422 +717.00
K0422 +727.00
K0422 +737.00
K0422 +747.00
K0422 +757.00
K0422 +767.00
K0422 +777.00
K0422 +787.00
K0422 +797.00
K0422 +807.00
K0422 +817.00
K0422 +827.00
K0422 +837.00
K0422 +847.00
K0422 +857.00
K0422 +867.00
K0422 +877.00
K0422 +887.00
K0422 +897.00
K0422 +907.00
K0422 +917.00
K0422 +927.00
K0422 +937.00
K0422 +947.00
K0422 +957.00
K0422 +967.00
K0422 +977.00
K0422 +984.00

WIDTH
1.90
2.30
2.50
2.80
2.50
2.60
2.70
2.50
2.30
2.50
2.50
2.40
2.30
18.00
2.10
0.80
1.10
2.60
2.40
2.40
2.50
2.30
1.70
1.80
2.50
2.40
2.00
2.10
2.20
2.20
2.20
2.40
2.30
2.30
2.20

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

101.20
681.79

cu.m.
cu.m.

THICKNESS
0.10
0.10
0.15
0.20
0.20
0.15
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.05
0.05
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.20
0.20
0.20
0.20
0.20
0.20

MO. CERTIFICATE N
AREA
0.19
0.23
0.38
0.56
0.50
0.39
0.27
0.25
0.23
0.25
0.25
0.24
0.23
0.90
0.11
0.08
0.11
0.26
0.24
0.24
0.25
0.23
0.17
0.18
0.25
0.24
0.20
0.21
0.22
0.44
0.44
0.48
0.46
0.46
0.44

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA

Project Manager
(Contractor)

MONTH:
MO. CERTIFICATE NO.:
VOLUME
2.10
3.03
4.68
5.30
4.45
3.30
2.60
2.40
2.40
2.50
2.45
2.35
5.65
5.03
0.93
0.95
1.85
2.50
2.40
2.45
2.40
2.00
1.75
2.15
2.45
2.20
2.05
2.15
3.30
4.40
4.60
4.70
4.60
3.15
101.20

December 14, 2015


1

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0423 +334.00
K0423 +344.00
K0423 +354.00
K0423 +364.00
K0423 +374.00
K0423 +384.00
K0423 +394.00
K0423 +404.00
K0423 +414.00
K0423 +424.00
K0423 +434.00
K0423 +444.00
K0423 +454.00
K0423 +464.00
K0423 +474.00
K0423 +484.00
K0423 +494.00
K0423 +504.00
K0423 +514.00
K0423 +524.00
K0423 +534.00
K0423 +544.00

WIDTH
1.40
1.90
2.50
2.80
2.40
2.20
2.30
2.50
2.10
2.20
2.20
2.40
2.20
2.40
2.40
2.40
2.60
2.00
1.80
2.10
2.10
2.10

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

THICKNESS
0.05
0.10
0.12
0.15
0.25
0.25
0.30
0.30
0.20
0.17
0.15
0.10
0.10
0.08
0.06
0.05
0.05
0.05
0.05
0.05
0.05
0.05

AREA
0.07
0.19
0.30
0.42
0.60
0.55
0.69
0.75
0.42
0.37
0.33
0.24
0.22
0.19
0.14
0.12
0.13
0.10
0.09
0.11
0.11
0.11

THICKNESS
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

AREA
0.08
0.16
0.12
0.13
0.14
0.09
0.12
0.10
0.09
0.08

SUB-TOTAL

STATION
K0423 +166.00
K0423 +176.00
K0423 +186.00
K0423 +196.00
K0423 +206.00
K0423 +216.00
K0423 +226.00
K0423 +236.00
K0423 +246.00
K0423 +262.00

WIDTH
1.60
3.20
2.40
2.50
2.80
1.70
2.40
2.00
1.70
1.50

L
L
L
L
L
L
L
L
L
L

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

72.18
753.97

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.
Submitted By:

Checked and Verified By:

ALEXANDER B. BAROA

Project Manager
(Contractor)

VOLUME
1.30
2.45
3.60
5.10
5.75
6.20
7.20
5.85
3.97
3.52
2.85
2.30
2.06
1.68
1.32
1.25
1.15
0.95
0.98
1.05
1.05
61.58
VOLUME
1.20
1.40
1.23
1.33
1.13
1.03
1.10
0.93
1.28
10.61

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0423 +438.00
K0423 +448.00
K0423 +458.00
K0423 +468.00
K0423 +478.00
K0423 +484.00

WIDTH
2.00
1.60
1.70
1.90
1.90
2.00

L
L
L
L
L
L

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.20
0.16
0.17
0.19
0.19
0.20

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.26
0.23
0.22
0.20
0.20
0.20

THICKNESS
0.05
0.05
0.05
0.10
0.10
0.15
0.15
0.15
0.13
0.13
0.15
0.15
0.20
0.20
0.30

AREA
0.08
0.09
0.09
0.15
0.15
0.29
0.24
0.17
0.17
0.29
0.35
0.30
0.36
0.34
0.69

SUB-TOTAL

STATION
K0423 +497.00
K0423 +507.00
K0423 +517.00
K0423 +527.00
K0423 +537.00
K0423 +547.00

WIDTH
2.60
2.30
2.20
2.00
2.00
2.00

L
L
L
L
L
L

SUB-TOTAL

STATION
K0423 +580.00
K0423 +590.00
K0423 +600.00
K0423 +610.00
K0423 +620.00
K0423 +630.00
K0423 +640.00
K0423 +650.00
K0423 +660.00
K0423 +670.00
K0423 +680.00
K0423 +690.00
K0423 +700.00
K0423 +710.00
K0423 +720.00

WIDTH
1.60
1.70
1.80
1.50
1.50
1.90
1.60
1.10
1.30
2.20
2.30
2.00
1.80
1.70
2.30

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

52.62
806.59

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA

Project Manager
(Contractor)

VOLUME
1.80
1.65
1.80
1.90
1.17
8.32
VOLUME
2.45
2.25
2.10
2.00
2.00
10.80
VOLUME
0.83
0.88
1.20
1.50
2.18
2.63
2.03
1.67
2.28
3.16
3.23
3.30
3.50
5.15
33.50

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO

Project Engineer I

STATION
K0423 +720.00
K0423 +730.00
K0423 +740.00
K0423 +750.00
K0423 +760.00
K0423 +770.00
K0423 +780.00
K0423 +790.00
K0423 +800.00
K0423 +810.00
K0423 +820.00
K0423 +830.00
K0423 +840.00
K0423 +850.00
K0423 +860.00
K0423 +870.00
K0423 +880.00
K0423 +890.00
K0423 +900.00
K0423 +910.00
K0423 +920.00
K0423 +930.00
K0423 +940.00
K0423 +950.00
K0423 +959.00

WIDTH
2.30
3.30
2.70
1.80
3.00
2.70
2.80
3.00
2.90
3.00
2.40
2.30
2.40
2.30
2.00
2.00
2.00
2.20
1.50
1.80
2.20
2.80
2.90
2.90
2.00

L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L

THICKNESS
0.30
0.30
0.20
0.15
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.05
0.05
0.10
0.05
0.05
0.05
0.05
0.05
0.05

AREA
0.69
0.99
0.54
0.27
0.30
0.27
0.28
0.30
0.29
0.30
0.24
0.23
0.24
0.23
0.20
0.20
0.10
0.11
0.15
0.09
0.11
0.14
0.15
0.15
0.10

THICKNESS
0.05
0.10
0.10
0.10
0.05

AREA
0.12
0.31
0.31
0.18
0.06

SUB-TOTAL

STATION
K0423 +918.00
+928.00
+938.00
+948.00
+955.00

WIDTH
2.30
3.10
3.10
1.80
1.20

L
L
L
L
L

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

71.04
877.63

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA

Project Manager
(Contractor)

VOLUME
8.40
7.65
4.05
2.85
2.85
2.75
2.90
2.95
2.95
2.70
2.35
2.35
2.35
2.15
2.00
1.50
1.05
1.30
1.20
1.00
1.25
1.43
1.45
1.10
62.53
VOLUME
2.13
3.10
2.45
0.84
8.52

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO

Project Engineer I

STATION
K0424 +144.00
K0424 +154.00
K0424 +164.00
K0424 +174.00
K0424 +184.00
K0424 +194.00
K0424 +204.00
K0424 +214.00
K0424 +225.00

WIDTH
1.90
1.80
1.50
1.80
2.00
2.00
2.20
2.00
1.80

R
R
R
R
R
R
R
R
R

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.19
0.18
0.15
0.18
0.20
0.20
0.22
0.20
0.18

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.23
0.22
0.20
0.15
0.19
0.21
0.18
0.20
0.24
0.22
0.19
0.24
0.27
0.27

SUB-TOTAL

STATION
K0424 +380.00
K0424 +390.00
K0424 +400.00
K0424 +410.00
K0424 +420.00
K0424 +430.00
K0424 +440.00
K0424 +450.00
K0424 +460.00
K0424 +470.00
K0424 +480.00
K0424 +490.00
K0424 +500.00
K0424 +508.00

WIDTH
2.30
2.20
2.00
1.50
1.90
2.10
1.80
2.00
2.40
2.20
1.90
2.40
2.70
2.70

L
L
L
L
L
L
L
L
L
L
L
L
L
L

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

42.40
920.03

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA

Project Manager
(Contractor)

VOLUME
1.85
1.65
1.65
1.90
2.00
2.10
2.10
2.09
15.34

VOLUME
2.25
2.10
1.75
1.70
2.00
1.95
1.90
2.20
2.30
2.05
2.15
2.55
2.16
27.06

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0424 +649.00
K0424 +659.00
K0424 +669.00
K0424 +679.00
K0424 +689.00
K0424 +699.00
K0424 +709.00
K0424 +719.00
K0424 +729.00
K0424 +734.00

WIDTH
2.10
1.90
1.90
1.30
1.80
1.60
1.60
1.70
1.50
1.20

L
L
L
L
L
L
L
L
L
L

THICKNESS
0.05
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.11
0.19
0.19
0.13
0.18
0.16
0.16
0.17
0.15
0.12

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.21
0.30
0.27
0.31
0.32
0.27
0.27
0.26
0.27
0.18

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.25
0.24
0.26
0.24
0.29
0.23

SUB-TOTAL

STATION
K0425 +000.00
K0425 +010.00
K0425 +020.00
K0425 +030.00
K0425 +040.00
K0425 +050.00
K0425 +060.00
K0425 +070.00
K0425 +080.00
K0425 +090.00

WIDTH
2.10
3.00
2.70
3.10
3.20
2.70
2.70
2.60
2.70
1.80

R
R
R
R
R
R
R
R
R
R

SUB-TOTAL

STATION
K0425 +170.00
K0425 +180.00
K0425 +190.00
K0425 +200.00
K0425 +210.00
K0425 +220.00

WIDTH
2.50
2.40
2.60
2.40
2.90
2.30

R
R
R
R
R
R

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

51.10
971.13

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA

Project Manager
(Contractor)

VOLUME
1.48
1.90
1.60
1.55
1.70
1.60
1.65
1.60
0.68
13.75

VOLUME
2.55
2.85
2.90
3.15
2.95
2.70
2.65
2.65
2.25
24.65
VOLUME
2.45
2.50
2.50
2.65
2.60
12.70

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO

Project Engineer I

STATION
K0425 +220.00
K0425 +230.00
K0425 +240.00
K0425 +250.00
K0425 +260.00
K0425 +270.00
K0425 +280.00
K0425 +290.00
K0425 +300.00
K0425 +310.00
K0425 +320.00
K0425 +330.00
K0425 +340.00
K0425 +350.00
K0425 +360.00
K0425 +370.00
K0425 +380.00
K0425 +390.00
K0425 +400.00
K0425 +410.00
K0425 +415.00

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

WIDTH
2.30
2.60
2.40
2.50
2.30
2.00
2.40
2.50
2.40
2.00
2.70
2.20
2.40
2.30
2.00
2.00
2.90
2.50
2.20
1.80
1.40

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.15
0.15
0.15
0.20
0.25
0.15
0.10

AREA
0.23
0.26
0.24
0.25
0.23
0.20
0.24
0.25
0.24
0.20
0.27
0.22
0.24
0.23
0.30
0.30
0.44
0.50
0.55
0.27
0.14

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.15
0.15
0.20
0.15
0.15
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.20
0.15
0.16
0.18
0.15
0.12
0.14
0.20
0.20
0.20
0.24
0.29
0.36
0.21
0.24
0.20
0.23
0.30
0.35
0.22
0.16

SUB-TOTAL

STATION
K0425 +434.00
K0425 +444.00
K0425 +454.00
K0425 +464.00
K0425 +474.00
K0425 +484.00
K0425 +494.00
K0425 +504.00
K0425 +514.00
K0425 +524.00
K0425 +534.00
K0425 +544.00
K0425 +554.00
K0425 +564.00
K0425 +574.00
K0425 +584.00
K0425 +594.00
K0425 +604.00
K0425 +614.00
K0425 +624.00
K0425 +629.00

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

WIDTH
2.00
1.50
1.60
1.80
1.50
1.20
1.40
2.00
2.00
2.00
1.60
1.90
1.80
1.40
1.60
2.00
2.30
3.00
3.50
2.20
1.60
SUB-TOTAL

THIS CERTIFICATE QTY:


CUMULATIVE QTY:

97.28
1,068.41

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
2.45
2.50
2.45
2.40
2.15
2.20
2.45
2.45
2.20
2.35
2.45
2.30
2.35
2.65
3.00
3.68
4.68
5.25
4.10
1.03
55.08
VOLUME
1.75
1.55
1.70
1.65
1.35
1.30
1.70
2.00
2.00
2.20
2.63
3.23
2.85
2.25
2.20
2.15
2.65
3.25
2.85
0.95
42.20

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0425 +834.00
K0425 +844.00
K0425 +854.00
K0425 +864.00
K0425 +874.00
K0425 +884.00
K0425 +888.00

WIDTH
2.20
2.00
2.20
2.40
1.90
1.30
1.00

L
L
L
L
L
L
L

THICKNESS
0.20
0.15
0.20
0.25
0.25
0.20
0.10

AREA
0.44
0.30
0.44
0.60
0.48
0.26
0.10

THICKNESS
0.30
0.25
0.25
0.20
0.20
0.15
0.15
0.20
0.20
0.40
0.45
0.45
0.50
0.50
0.50
0.40
0.40
0.30
0.20

AREA
0.60
0.43
0.35
0.50
0.50
0.47
0.45
0.40
0.44
0.96
0.99
0.90
1.10
0.95
1.20
0.84
0.72
0.60
0.30

SUB-TOTAL

STATION
K0425 +947.00
K0425 +957.00
K0425 +967.00
K0425 +977.00
K0425 +987.00
K0425 +997.00
K0426 +1005.00
K0426 +010.00
K0426 +020.00
K0426 +030.00
K0426 +040.00
K0426 +050.00
K0426 +060.00
K0426 +070.00
K0426 +080.00
K0426 +090.00
K0426 +100.00
K0426 +110.00
K0426 +120.00

WIDTH
2.00
1.70
1.40
2.50
2.50
3.10
3.00
2.00
2.20
2.40
2.20
2.00
2.20
1.90
2.40
2.10
1.80
2.00
1.50

L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

139.61
1,208.01

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
3.70
3.70
5.20
5.38
3.68
0.72
22.37
VOLUME
5.13
3.88
4.25
5.00
4.83
3.66
4.20
7.00
9.75
9.45
10.00
10.25
10.75
10.20
7.80
6.60
4.50
117.24

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0425 +947.00
K0425 +957.00
K0425 +967.00
K0425 +977.00
K0425 +987.00
K0425 +997.00

WIDTH
2.30
2.50
2.20
2.20
2.00
1.60

R
R
R
R
R
R

THICKNESS
0.15
0.10
0.10
0.10
0.05
0.05

AREA
0.35
0.25
0.22
0.22
0.10
0.08

THICKNESS
0.15
0.15
0.15
0.13
0.15
0.15
0.15
0.15
0.13
0.13
0.10
0.10
0.10

AREA
0.14
0.21
0.24
0.22
0.14
0.15
0.15
0.14
0.18
0.13
0.20
0.10
0.17

SUB-TOTAL

STATION
K0426 +077.00
K0426 +087.00
K0426 +097.00
K0426 +107.00
K0426 +117.00
K0426 +127.00
K0426 +137.00
K0426 +147.00
K0426 +157.00
K0426 +167.00
K0426 +177.00
K0426 +187.00
K0426 +197.00

WIDTH
0.90
1.40
1.60
1.70
0.90
1.00
1.00
0.90
1.40
1.00
2.00
1.00
1.70

R
R
R
R
R
R
R
R
R
R
R
R
R

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

30.08
1,238.09

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
2.98
2.35
2.20
1.60
0.90
10.03
VOLUME
1.73
2.25
2.31
1.78
1.43
1.50
1.43
1.59
1.56
1.65
1.50
1.35
20.06

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0428 +000.00
K0428 +010.00
K0428 +020.00
K0428 +030.00
K0428 +040.00
K0428 +050.00
K0428 +060.00
K0428 +070.00
K0428 +080.00
K0428 +090.00
K0428 +100.00
K0428 +110.00
K0428 +120.00
K0428 +130.00
K0428 +140.00
K0428 +150.00
K0428 +160.00
K0428 +170.00
K0428 +180.00
K0428 +190.00
K0428 +200.00
K0428 +210.00
K0428 +220.00
K0428 +230.00
K0428 +240.00
K0428 +250.00
K0428 +260.00
K0428 +270.00
K0428 +280.00
K0428 +290.00
K0428 +300.00
K0428 +310.00
K0428 +320.00
K0428 +330.00
K0428 +340.00
K0428 +350.00
K0428 +360.00
K0428 +370.00
K0428 +380.00
K0428 +390.00
K0428 +400.00
K0428 +410.00
K0428 +420.00
K0428 +430.00
K0428 +440.00
K0428 +450.00

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

WIDTH
1.60
1.70
1.60
1.90
2.00
2.10
2.40
2.30
2.70
2.90
2.60
2.40
2.00
1.60
2.50
2.80
2.20
2.00
2.20
2.80
3.00
0.80
1.60
1.60
1.00
2.20
2.20
2.20
2.40
2.00
2.40
2.20
2.30
2.40
2.70
2.20
2.10
1.70
1.70
2.20
2.20
2.50
2.60
2.40
2.30
2.40
SUB-TOTAL

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.16
0.17
0.16
0.19
0.20
0.21
0.24
0.23
0.27
0.29
0.26
0.24
0.20
0.16
0.25
0.28
0.22
0.20
0.22
0.28
0.30
0.08
0.16
0.16
0.10
0.22
0.22
0.22
0.24
0.20
0.24
0.22
0.23
0.24
0.27
0.22
0.21
0.17
0.17
0.22
0.22
0.25
0.26
0.24
0.23
0.24

THIS CERTIFICATE QTY:


CUMULATIVE QTY:

97.60
1,335.69

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
1.65
1.65
1.75
1.95
2.05
2.25
2.35
2.50
2.80
2.75
2.50
2.20
1.80
2.05
2.65
2.50
2.10
2.10
2.50
2.90
1.90
1.20
1.60
1.30
1.60
2.20
2.20
2.30
2.20
2.20
2.30
2.25
2.35
2.55
2.45
2.15
1.90
1.70
1.95
2.20
2.35
2.55
2.50
2.35
2.35
97.60

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0428 +450.00
K0428 +460.00
K0428 +470.00
K0428 +480.00
K0428 +490.00
K0428 +500.00
K0428 +510.00
K0428 +520.00
K0428 +530.00
K0428 +540.00
K0428 +550.00
K0428 +560.00
K0428 +570.00
K0428 +580.00
K0428 +590.00
K0428 +600.00
K0428 +610.00
K0428 +620.00
K0428 +630.00
K0428 +640.00
K0428 +650.00
K0428 +660.00
K0428 +670.00
K0428 +680.00
K0428 +690.00
K0428 +700.00
K0428 +710.00
K0428 +720.00
K0428 +730.00
K0428 +740.00
K0428 +750.00
K0428 +760.00
K0428 +770.00
K0428 +780.00
K0428 +790.00
K0428 +800.00
K0428 +810.00
K0428 +820.00
K0428 +830.00
K0428 +840.00
K0428 +850.00
K0428 +860.00
K0428 +870.00
K0428 +880.00
K0428 +890.00
K0428 +900.00
K0428 +910.00

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

WIDTH
2.40
2.30
1.90
1.80
1.80
2.10
1.90
2.20
2.10
2.20
2.20
2.20
2.20
2.20
2.00
2.10
2.10
2.00
1.60
1.90
1.70
1.90
1.70
1.50
1.30
1.20
1.50
1.70
1.80
1.80
1.60
1.90
1.80
1.60
1.60
1.50
1.60
1.80
1.80
1.90
2.00
2.10
1.70
1.90
1.50
1.40
2.00

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.15

AREA
0.24
0.23
0.19
0.18
0.18
0.21
0.19
0.22
0.21
0.22
0.22
0.22
0.22
0.22
0.20
0.21
0.21
0.20
0.16
0.19
0.17
0.19
0.17
0.15
0.13
0.12
0.15
0.17
0.18
0.18
0.16
0.19
0.18
0.16
0.16
0.15
0.16
0.18
0.18
0.19
0.20
0.21
0.17
0.19
0.15
0.14
0.30

K0428 +920.00
K0428 +930.00
K0428 +940.00
K0428 +948.00

1.90
2.50
2.10
2.20

R
R
R
R

0.20
0.20
0.15
0.10

0.38
0.50
0.32
0.22

SUB-TOTAL

THIS CERTIFICATE QTY:


CUMULATIVE QTY:

99.32
1,435.01

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
2.35
2.10
1.85
1.80
1.95
2.00
2.05
2.15
2.15
2.20
2.20
2.20
2.20
2.10
2.05
2.10
2.05
1.80
1.75
1.80
1.80
1.80
1.60
1.40
1.25
1.35
1.60
1.75
1.80
1.70
1.75
1.85
1.70
1.60
1.55
1.55
1.70
1.80
1.85
1.95
2.05
1.90
1.80
1.70
1.45
2.20

3.40
4.40
4.08
2.14
99.32

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0428 +065.00
K0428 +075.00
K0428 +085.00
K0428 +095.00
K0428 +105.00
K0428 +115.00
K0428 +125.00
K0428 +135.00
K0428 +145.00
K0428 +155.00
K0428 +165.00
K0428 +175.00
K0428 +185.00
K0428 +195.00
K0428 +205.00
K0428 +215.00
K0428 +225.00
K0428 +235.00
K0428 +245.00
K0428 +255.00
K0428 +265.00
K0428 +275.00
K0428 +285.00
K0428 +295.00
K0428 +305.00
K0428 +315.00
K0428 +325.00
K0428 +335.00
K0428 +345.00
K0428 +355.00
K0428 +365.00
K0428 +375.00
K0428 +385.00
K0428 +395.00
K0428 +405.00
K0428 +415.00
K0428 +425.00
K0428 +435.00
K0428 +445.00
K0428 +455.00
K0428 +465.00
K0428 +475.00
K0428 +485.00
K0428 +495.00
K0428 +505.00
K0428 +515.00
K0428 +525.00

L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L

WIDTH
2.40
2.40
2.50
2.10
1.70
1.50
1.50
1.90
2.00
2.40
2.20
2.30
2.20
2.90
2.40
1.70
2.10
2.20
1.80
1.80
2.30
2.40
2.40
2.20
1.90
2.00
2.10
2.60
2.20
2.10
2.00
2.40
2.40
2.80
2.80
2.60
2.80
2.40
3.10
2.00
2.00
2.00
2.30
2.20
2.00
1.60
1.80

THICKNESS
0.10
0.10
0.10
0.13
0.13
0.10
0.10
0.10
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.10
0.13
0.13
0.10
0.10
0.13
0.13
0.10
0.10
0.13
0.15
0.15
0.10
0.13
0.13
0.13
0.10
0.10
0.13
0.13
0.13
0.10
0.10
0.10
0.15
0.15
0.15
0.10
0.10
0.10
0.10
0.10

AREA
0.24
0.24
0.25
0.27
0.22
0.15
0.15
0.19
0.30
0.36
0.33
0.35
0.33
0.44
0.36
0.17
0.27
0.29
0.18
0.18
0.30
0.31
0.24
0.22
0.25
0.30
0.32
0.26
0.29
0.27
0.26
0.24
0.24
0.36
0.36
0.34
0.28
0.24
0.31
0.30
0.30
0.30
0.23
0.22
0.20
0.16
0.18

K0428 +535.00
K0428 +545.00
K0428 +558.00

2.00
2.20
1.30

L
L
L

0.10
0.10
0.10

0.20
0.22
0.13

SUB-TOTAL

THIS CERTIFICATE QTY:


CUMULATIVE QTY:

129.59
1,564.59

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
2.40
2.45
2.62
2.47
1.86
1.50
1.70
2.45
3.30
3.45
3.38
3.38
3.83
3.98
2.65
2.22
2.80
2.33
1.80
2.40
3.06
2.76
2.30
2.34
2.74
3.08
2.88
2.73
2.80
2.67
2.50
2.40
3.02
3.64
3.51
3.09
2.60
2.75
3.05
3.00
3.00
2.65
2.25
2.10
1.80
1.70

1.90
2.10
2.28
129.59

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0428 +580.00
K0428 +590.00
K0428 +600.00
K0428 +610.00
K0428 +620.00
K0428 +630.00
K0428 +640.00
K0428 +650.00
K0428 +660.00
K0428 +670.00
K0428 +680.00
K0428 +690.00
K0428 +700.00
K0428 +710.00
K0428 +720.00
K0428 +730.00
K0428 +740.00
K0428 +755.00

WIDTH
1.60
1.50
1.50
1.80
1.30
0.90
1.20
1.20
1.30
2.00
1.50
2.20
2.50
2.90
2.20
2.50
3.30
2.60

L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.16
0.15
0.15
0.18
0.13
0.09
0.12
0.12
0.13
0.20
0.15
0.22
0.25
0.29
0.22
0.25
0.33
0.26

THICKNESS
0.10
0.10
0.10
0.10
0.10

AREA
0.17
0.21
0.24
0.20
0.18

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.15
0.20
0.17
0.16
0.17
0.16
0.16
0.15
0.18
0.17

SUB-TOTAL

STATION
K0429 +000.00
K0429 +010.00
K0429 +020.00
K0429 +030.00
K0429 +040.00

WIDTH
1.70
2.10
2.40
2.00
1.80

R
R
R
R
R

SUB-TOTAL

STATION
K0429 +110.00
K0429 +120.00
K0429 +130.00
K0429 +140.00
K0429 +150.00
K0429 +160.00
K0429 +170.00
K0429 +180.00
K0429 +190.00
K0429 +200.00

WIDTH
1.50
2.00
1.70
1.60
1.70
1.60
1.60
1.50
1.80
1.70

R
R
R
R
R
R
R
R
R
R

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

56.73
1,621.32

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
1.55
1.50
1.65
1.55
1.10
1.05
1.20
1.25
1.65
1.75
1.85
2.35
2.70
2.55
2.35
2.90
4.43
33.38
VOLUME
1.90
2.25
2.20
1.90
8.25
VOLUME
1.75
1.85
1.65
1.65
1.65
1.60
1.55
1.65
1.75
15.10

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0429 +200.00
K0429 +210.00
K0429 +220.00
K0429 +230.00
K0429 +240.00
K0429 +250.00
K0429 +260.00
K0429 +270.00
K0429 +280.00
K0429 +290.00
K0429 +300.00
K0429 +310.00
K0429 +320.00
K0429 +330.00
K0429 +340.00
K0429 +350.00
K0429 +360.00
K0429 +370.00
K0429 +380.00
K0429 +390.00
K0429 +400.00
K0429 +410.00
K0429 +420.00
K0429 +430.00
K0429 +440.00
K0429 +450.00
K0429 +460.00
K0429 +470.00
K0429 +480.00
K0429 +490.00
K0429 +500.00
K0429 +510.00
K0429 +520.00
K0429 +530.00
K0429 +540.00
K0429 +550.00
K0429 +560.00
K0429 +570.00
K0429 +580.00
K0429 +590.00
K0429 +600.00
K0429 +610.00
K0429 +620.00
K0429 +630.00
K0429 +640.00
K0429 +650.00
K0429 +660.00

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

WIDTH
1.70
1.90
2.30
2.00
1.70
2.20
2.40
2.20
2.10
2.30
2.20
2.30
2.30
2.80
2.60
2.40
2.60
2.60
2.50
2.80
2.80
2.60
3.10
3.00
3.10
2.70
1.20
2.00
1.70
2.40
2.60
2.60
2.50
2.80
2.90
2.40
2.70
2.70
3.00
2.70
2.80
2.60
2.80
2.90
2.70
2.30
2.00

THICKNESS
0.10
0.10
0.10
0.13
0.13
0.10
0.10
0.10
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.10
0.13
0.13
0.10
0.10
0.13
0.13
0.10
0.10
0.13
0.15
0.15
0.10
0.13
0.13
0.10
0.10
0.13
0.13
0.13
0.10
0.10
0.10
0.15
0.15
0.15
0.10
0.10

0.10

AREA
0.17
0.19
0.23
0.26
0.22
0.22
0.24
0.22
0.32
0.35
0.33
0.35
0.35
0.42
0.39
0.24
0.34
0.34
0.25
0.28
0.36
0.34
0.31
0.30
0.40
0.41
0.18
0.20
0.00
0.31
0.34
0.26
0.25
0.36
0.38
0.31
0.27
0.27
0.30
0.41
0.42
0.39
0.28
0.29
0.00
0.00
0.20

K0429 +670.00
K0429 +680.00
K0429 +690.00

2.00
1.70
2.00

R
R
R

0.10
0.10
0.10

0.20
0.17
0.20

SUB-TOTAL

THIS CERTIFICATE QTY:


CUMULATIVE QTY:

136.10
1,757.42

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
1.80
2.10
2.45
2.41
2.21
2.30
2.30
2.68
3.30
3.38
3.38
3.45
3.83
4.05
3.15
2.89
3.38
2.94
2.65
3.22
3.51
3.24
3.05
3.52
4.04
2.93
1.90
1.00
1.56
3.25
2.99
2.55
3.07
3.71
3.45
2.91
2.70
2.85
3.53
4.13
4.05
3.35
2.85
1.45
0.00
1.00

2.00
1.85
1.85
136.10

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0430 +212.00
K0430 +222.00
K0430 +232.00
K0430 +242.00
K0430 +252.00
K0430 +262.00
K0430 +272.00
K0430 +278.00

WIDTH
1.90
2.50
2.40
2.80
2.80
2.70
2.30
1.00

R
R
R
R
R
R
R
R

THICKNESS
0.20
0.20
0.20
0.20
0.20
0.20
0.15
0.10

AREA
0.38
0.50
0.48
0.56
0.56
0.54
0.35
0.10

THICKNESS
0.10
0.15
0.20
0.30
0.40
0.20
0.30
0.20
0.30
0.20
0.20
0.20
0.15
0.10
0.10
0.10
0.10
0.10

AREA
0.22
0.36
0.44
0.72
0.96
0.36
0.75
0.38
0.60
0.44
0.44
0.42
0.20
0.22
0.20
0.20
0.23
0.13

THICKNESS
0.10
0.20
0.40
0.30
0.20
0.10

AREA
0.10
0.40
0.76
0.69
0.40
0.13

SUB-TOTAL

STATION
K0430 +405.00
K0430 +415.00
K0430 +425.00
K0430 +435.00
K0430 +445.00
K0430 +455.00
K0430 +465.00
K0430 +475.00
K0430 +485.00
K0430 +495.00
K0430 +505.00
K0430 +515.00
K0430 +525.00
K0430 +535.00
K0430 +545.00
K0430 +555.00
K0430 +565.00
K0430 +573.00

WIDTH
2.20
2.40
2.20
2.40
2.40
1.80
2.50
1.90
2.00
2.20
2.20
2.10
1.30
2.20
2.00
2.00
2.30
1.30

L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L

SUB-TOTAL

STATION
K0430 +603.00
K0426 +613.00
K0426 +623.00
K0426 +633.00
K0426 +643.00
K0426 +653.00

WIDTH
1.00
2.00
1.90
2.30
2.00
1.30

L
L
L
L
L
L

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

125.55
1,882.97

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
4.40
4.90
5.20
5.60
5.50
4.43
1.34
31.36
VOLUME
2.90
4.00
5.80
8.40
6.60
5.55
5.65
4.90
5.20
4.40
4.30
3.08
2.08
2.10
2.00
2.15
1.44
70.54
VOLUME
2.50
5.80
7.25
5.45
2.65
23.65

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0430 +535.00
K0430 +545.00
K0430 +555.00
K0430 +565.00
K0430 +575.00
K0430 +585.00
K0430 +595.00
K0430 +605.00
K0430 +615.00
K0430 +625.00
K0430 +635.00
K0430 +645.00
K0430 +655.00
K0430 +665.00
K0430 +675.00
K0430 +685.00
K0430 +695.00
K0430 +705.00
K0430 +715.00
K0430 +725.00
K0430 +735.00
K0430 +745.00
K0430 +755.00
K0430 +765.00
K0430 +775.00
K0430 +785.00
K0430 +795.00
K0430 +805.00
K0430 +815.00
K0430 +825.00
K0430 +835.00
K0430 +845.00
K0430 +855.00
K0430 +865.00
K0430 +875.00
K0430 +885.00
K0430 +895.00
K0430 +905.00
K0430 +915.00
K0430 +925.00
K0430 +935.00
K0430 +945.00
K0430 +955.00
K0430 +965.00
K0430 +975.00
K0430 +985.00

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

WIDTH
0.70
1.00
1.60
2.00
2.70
2.20
2.10
2.10
1.80
2.00
2.50
2.60
2.00
2.30
2.10
2.40
2.30
2.20
2.20
2.40
2.50
2.20
2.20
2.00
2.00
1.80
2.10
1.60
1.40
2.00
2.00
2.10
2.00
2.00
1.80
1.90
1.60
1.30
1.40
1.40
1.70
1.50
2.20
2.50
3.10
3.00

THICKNESS
0.05
0.05
0.10
0.15
0.25
0.25
0.15
0.15
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.15
0.20
0.30
0.30
0.30
0.20
0.20
0.20
0.20
0.20
0.15
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.04
0.05
0.16
0.30
0.68
0.55
0.32
0.32
0.18
0.20
0.25
0.26
0.20
0.23
0.21
0.24
0.23
0.22
0.22
0.24
0.25
0.22
0.33
0.40
0.60
0.54
0.63
0.32
0.28
0.40
0.40
0.42
0.30
0.20
0.18
0.19
0.16
0.13
0.14
0.14
0.17
0.15
0.22
0.25
0.31
0.30

K0430 +995.00
K0430 +1005.00
K0430 +1016.00

2.90
2.90
2.20

R
R
R

0.10
0.10
0.10

0.29
0.29
0.22

SUB-TOTAL

THIS CERTIFICATE QTY:


CUMULATIVE QTY:

134.08
2,017.05

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
0.43
1.05
2.30
4.88
6.13
4.33
3.15
2.48
1.90
2.25
2.55
2.30
2.15
2.20
2.25
2.35
2.25
2.20
2.30
2.45
2.35
2.75
3.65
5.00
5.70
5.85
4.75
3.00
3.40
4.00
4.10
3.60
2.50
1.90
1.85
1.75
1.45
1.35
1.40
1.55
1.60
1.85
2.35
2.80
3.05

2.95
2.90
2.81
134.08

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0430 +925.00
K0430 +935.00
K0430 +945.00
K0430 +950.00

WIDTH
1.60
2.10
1.30
1.50

L
L
L
L

THICKNESS
0.40
0.40
0.30
0.20

AREA
0.64
0.84
0.39
0.30

THICKNESS
0.15
0.20
0.20
0.20
0.20
0.15
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.29
0.46
0.58
0.40
0.30
0.23
0.24
0.28
0.26
0.28
0.22
0.31
0.22
0.22
0.21
0.19
0.20
0.25
0.18
0.25
0.25
0.24
0.20
0.20
0.28
0.28
0.23
0.22
0.25

SUB-TOTAL

STATION
K0430 +985.00
K0430 +995.00
K0430 +1005.00
K0431 +1016.00
K0431 +010.00
K0431 +020.00
K0431 +030.00
K0431 +040.00
K0431 +050.00
K0431 +060.00
K0431 +070.00
K0431 +080.00
K0431 +090.00
K0431 +100.00
K0431 +110.00
K0431 +120.00
K0431 +130.00
K0431 +140.00
K0431 +150.00
K0431 +160.00
K0431 +170.00
K0431 +180.00
K0431 +190.00
K0431 +200.00
K0431 +210.00
K0431 +220.00
K0431 +230.00
K0431 +240.00
K0431 +250.00

WIDTH
1.90
2.30
2.90
2.00
1.50
1.50
2.40
2.80
2.60
2.80
2.20
3.10
2.20
2.20
2.10
1.90
2.00
2.50
1.80
2.5
2.50
2.40
2.00
2.00
2.80
2.80
2.30
2.20
2.50

L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

89.52
2,106.57

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
7.40
6.15
1.73
15.28
VOLUME
3.73
5.20
5.39
2.83
2.63
2.33
2.60
2.70
2.70
2.50
2.65
2.65
2.20
2.15
2.00
1.95
2.25
2.15
2.15
2.50
2.45
2.20
2.00
2.40
2.80
2.55
2.25
2.35
74.25

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0431 +250.00
K0431 +260.00
K0431 +270.00
K0431 +280.00
K0431 +290.00
K0431 +300.00
K0431 +310.00
K0431 +320.00
K0431 +330.00
K0431 +340.00
K0431 +350.00
K0431 +360.00
K0431 +370.00
K0431 +380.00
K0431 +390.00
K0431 +400.00
K0431 +410.00

WIDTH
2.50
2.80
2.80
2.70
1.60
2.00
2.00
2.40
3.10
3.20
2.70
3.20
2.50
2.40
2.80
2.50
2.70

L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.25
0.28
0.28
0.27
0.16
0.20
0.20
0.24
0.31
0.32
0.27
0.32
0.25
0.24
0.28
0.25
0.27

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.20
0.16
0.15
0.22
0.21
0.26
0.28
0.22
0.21

SUB-TOTAL

STATION
K0431 +000.00
K0431 +010.00
K0431 +020.00
K0431 +030.00
K0431 +040.00
K0431 +050.00
K0431 +060.00
K0431 +070.00
K0431 +080.00

WIDTH
2.00
1.60
1.50
2.20
2.10
2.60
2.80
2.20
2.10

R
R
R
R
R
R
R
R
R

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

58.35
2,164.92

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
2.65
2.80
2.75
2.15
1.80
2.00
2.20
2.75
3.15
2.95
2.95
2.85
2.45
2.60
2.65
2.60
41.30
VOLUME
1.80
1.55
1.85
2.15
2.35
2.70
2.50
2.15
17.05

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0431 +090.00
K0431 +100.00
K0431 +110.00
K0431 +120.00
K0431 +130.00
K0431 +140.00
K0431 +150.00
K0431 +160.00
K0431 +170.00
K0431 +180.00
K0431 +190.00
K0431 +200.00
K0431 +210.00
K0431 +220.00
K0431 +230.00
K0431 +240.00
K0431 +250.00
K0431 +260.00
K0431 +270.00
K0431 +280.00
K0431 +290.00
K0431 +300.00
K0431 +310.00
K0431 +320.00
K0431 +330.00
K0431 +340.00
K0431 +350.00
K0431 +360.00
K0431 +370.00
K0431 +380.00
K0431 +390.00
K0431 +400.00
K0431 +410.00
K0431 +420.00
K0431 +425.00

WIDTH
2.60
2.40
2.20
2.40
2.40
2.20
2.00
2.10
1.90
2.10
2.60
2.50
2.60
2.80
2.50
2.60
2.40
2.30
2.50
2.50
2.60
2.40
2.00
1.90
1.60
1.90
2.00
1.80
2.60
1.40
2.00
1.80
1.20
1.20
0.80

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.26
0.24
0.22
0.24
0.24
0.22
0.20
0.21
0.19
0.21
0.26
0.25
0.26
0.28
0.25
0.26
0.24
0.23
0.25
0.25
0.26
0.24
0.20
0.19
0.16
0.19
0.20
0.18
0.26
0.14
0.20
0.18
0.12
0.12
0.08

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

72.60
2,237.52

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.
Submitted By:

Checked and Verified By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
2.50
2.30
2.30
2.40
2.30
2.10
2.05
2.00
2.00
2.35
2.55
2.55
2.70
2.65
2.55
2.50
2.35
2.40
2.50
2.55
2.50
2.20
1.95
1.75
1.75
1.95
1.90
2.20
2.00
1.70
1.90
1.50
1.20
0.50
72.60

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0431 +440.00
K0431 +450.00
K0431 +460.00
K0431 +470.00
K0431 +480.00
K0431 +490.00
K0431 +500.00

WIDTH
2.10
1.70
1.80
1.40
1.90
2.30
1.80

R
R
R
R
R
R
R

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.21
0.17
0.18
0.14
0.19
0.23
0.18

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.12
0.10
0.10
0.13
0.19
0.25
0.22
0.18
0.21
0.22
0.24
0.25
0.26
0.25
0.28
0.24
0.19
0.12

THICKNESS
0.10
0.20
0.30
0.20
0.10
0.10

AREA
0.14
0.38
0.57
0.60
0.31
0.28

SUB-TOTAL

STATION
K0431 +550.00
K0431 +560.00
K0431 +570.00
K0431 +580.00
K0431 +590.00
K0431 +600.00
K0431 +610.00
K0431 +620.00
K0431 +630.00
K0431 +640.00
K0431 +650.00
K0431 +660.00
K0431 +670.00
K0431 +680.00
K0431 +690.00
K0430 +700.00
K0430 +710.00
K0430 +720.00

WIDTH
1.20
1.00
1.00
1.30
1.90
2.50
2.20
1.80
2.10
2.20
2.40
2.50
2.60
2.50
2.80
2.40
1.90
1.20

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

SUB-TOTAL

STATION
K0431 +450.00
K0431 +460.00
K0431 +470.00
K0431 +480.00
K0431 +490.00
K0431 +500.00

WIDTH
1.40
1.90
1.90
3.00
3.10
2.80

L
L
L
L
L
L

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

66.05
2,303.57

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
1.90
1.75
1.60
1.65
2.10
2.05
11.05
VOLUME
1.10
1.00
1.15
1.60
2.20
2.35
2.00
1.95
2.15
2.30
2.45
2.55
2.55
2.65
2.60
2.15
1.55
34.30
VOLUME
2.60
4.75
5.85
4.55
2.95
20.70

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0431 +500.00
K0431 +510.00
K0431 +520.00
K0431 +530.00
K0431 +540.00
K0431 +550.00
K0431 +560.00
K0431 +570.00
K0431 +580.00
K0431 +590.00
K0431 +600.00
K0431 +610.00
K0431 +620.00

WIDTH
2.80
2.10
1.60
2.10
2.20
2.20
2.30
2.80
2.60
2.50
2.10
1.60
1.60

L
L
L
L
L
L
L
L
L
L
L
L
L

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.28
0.21
0.16
0.21
0.22
0.22
0.23
0.28
0.26
0.25
0.21
0.16
0.16

THICKNESS
0.10
0.10
0.10
0.15
0.15
0.15
0.10
0.10
0.10
0.10
0.15
0.15
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.20
0.20
0.22
0.36
0.30
0.17
0.09
0.13
0.12
0.21
0.33
0.18
0.20
0.18
0.24
0.24
0.24
0.25

SUB-TOTAL

STATION
K0431 +700.00
K0431 +710.00
K0431 +720.00
K0431 +730.00
K0431 +740.00
K0431 +750.00
K0431 +760.00
K0431 +770.00
K0431 +780.00
K0431 +790.00
K0431 +800.00
K0431 +810.00
K0431 +820.00
K0431 +830.00
K0431 +840.00
K0431 +850.00
K0431 +860.00
K0431 +870.00

WIDTH
2.00
2.00
2.20
2.40
2.00
1.10
0.90
1.25
1.20
2.10
2.20
1.20
2.00
1.80
2.40
2.40
2.40
2.50

L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

62.55
2,366.12

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.
Submitted By:

Checked and Verified By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
2.45
1.85
1.85
2.15
2.20
2.25
2.55
2.70
2.55
2.30
1.85
1.60
26.30
VOLUME
2.00
2.10
2.90
3.30
2.33
1.28
1.08
1.23
1.65
2.70
2.55
1.90
1.90
2.10
2.40
2.40
2.45
36.25

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I

STATION
K0431 +750.00
K0431 +760.00
K0431 +770.00
K0431 +780.00
K0431 +790.00
K0431 +800.00
K0431 +810.00
K0431 +820.00
K0431 +830.00
K0431 +840.00
K0431 +850.00
K0431 +860.00
K0431 +870.00
K0431 +880.00
K0431 +885.00

WIDTH
1.70
2.60
2.30
2.40
2.50
1.80
1.60
2.30
2.40
2.30
2.10
1.70
1.40
1.60
1.80

R
R
R
R
R
R
R
R
R
R
R
R
R
R
R

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.17
0.26
0.23
0.24
0.25
0.18
0.16
0.23
0.24
0.23
0.21
0.17
0.14
0.16
0.18

WIDTH
2.00
1.80
1.10
1.00
1.00
1.30
0.90
0.90
1.50
2.10
3.20
3.20
1.80
2.30

THICKNESS
0.10
0.20
0.20
0.20
0.20
0.20
0.20
0.20
0.15
0.15
0.10
0.10
0.10
0.10

AREA
0.20
0.36
0.22
0.20
0.20
0.26
0.18
0.18
0.23
0.32
0.32
0.32
0.18
0.23

WIDTH

THICKNESS
0.20
0.20
0.60
0.20
0.10
0.10

AREA
0.46
0.56
2.04
0.66
0.18
0.20

SUB-TOTAL

STATION
K0431 +1013.00
K0432 +1021.00
K0432 +010.00
K0432 +020.00
K0432 +030.00
K0432 +040.00
K0432 +050.00
K0432 +060.00
K0432 +070.00
K0432 +080.00
K0432 +090.00
K0432 +100.00
K0432 +110.00
K0430 +120.00

STATION
K0432 +187.00
K0432 +197.00
K0432 +207.00
K0432 +217.00
K0432 +227.00
K0432 +232.00

THIS CERTIFICATE QTY:


CUMULATIVE QTY:

R
R
R
R
R
R
R
R
R
R
R
R
R
R
SUB-TOTAL

2.30
R
2.80
R
3.40
R
3.30
R
1.80
R
2.00
R
SUB-TOTAL
95.94
2,462.06

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the specified
the quantity accomplished conforms with the Standard Specification and Special Provisions of the contract. We als
work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
2.15
2.45
2.35
2.45
2.15
1.70
1.95
2.35
2.35
2.20
1.90
1.55
1.50
0.85
27.90
VOLUME
2.24
3.00
2.10
2.00
2.30
2.20
1.80
2.03
2.70
3.18
3.20
2.50
2.05
31.29
VOLUME
5.10
13.00
13.50
4.20
0.95
36.75

n on work accomplished on the above mentioned project for the period October
found that the quality of materials in the specified work item corresponding to
ation and Special Provisions of the contract. We also certify that unacceptable

ARLON DON G. BARBERO


Project Engineer I

STATION
K0429 +160.00
K0429 +170.00
K0429 +180.00
K0429 +190.00
K0429 +200.00
K0429 +210.00
K0429 +220.00
K0429 +230.00
K0429 +240.00
K0429 +250.00
K0429 +260.00
K0429 +270.00

WIDTH
1.60
1.60
1.60
1.50
1.50
1.60
1.20
1.80
2.00
1.70
1.20
0.90

R
R
R
R
R
R
R
R
R
R
R
R

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.16
0.16
0.16
0.15
0.15
0.16
0.12
0.18
0.20
0.17
0.12
0.09

THICKNESS
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

AREA
0.19
0.25
0.22
0.23
0.21
0.17
0.23
0.20
0.21
0.24
0.21
0.19

SUB-TOTAL

STATION
K0429 +500.00
K0429 +510.00
K0429 +520.00
K0429 +530.00
K0429 +540.00
K0429 +550.00
K0429 +560.00
K0429 +570.00
K0429 +580.00
K0429 +590.00
K0429 +600.00
K0429 +610.00

WIDTH
1.90
2.50
2.20
2.30
2.10
1.70
2.30
2.00
2.10
2.40
2.10
1.90

L
L
L
L
L
L
L
L
L
L
L
L

SUB-TOTAL
THIS CERTIFICATE QTY:
CUMULATIVE QTY:

40.55
2,502.61

cu.m.
cu.m.

We certify that we have conducted an inspection and verification on work accomplished on the above mentioned
October 05, 2015 - December 14, 2015.We further certify that we have found that the quality of materials in the
corresponding to the quantity accomplished conforms with the Standard Specification and Special Provisions of th
that unacceptable work has been deducted, and not included in this calculation.

Checked and Verified By:

Submitted By:

ALEXANDER B. BAROA
Project Manager
(Contractor)

VOLUME
1.60
1.60
1.55
1.50
1.55
1.40
1.50
1.90
1.85
1.45
1.05
16.95
VOLUME
2.20
2.35
2.25
2.20
1.90
2.00
2.15
2.05
2.25
2.25
2.00
23.60

ion on work accomplished on the above mentioned project for the period
t we have found that the quality of materials in the specified work item
e Standard Specification and Special Provisions of the contract. We also certify
in this calculation.

ARLON DON G. BARBERO


Project Engineer I