ED-131 Re-Submittal of Hooks, Development Length and Splices Rev 01, dated
28th July 2016. Replied vide letter LI/GHCB/1294.

ED-132 Submittal of HVAC Panel Ordering Diagram (Rev.00) dated 18th June
2016.
ED-133, Submittal of Desander - Layout Plan and Section (Rev. 00), dated 28 th June
2016, replied vide letter LI/GHCB/1298

3
4

ED-134 Re-Submittal of Excavation and Support of Headworks Structure (Rev. 05)


dated 3rd July 2016.
ED-135, Re-Submittal of Stability Analysis on Left Slope of Sand Basin (Rev.01). Dated
3rd July 2016.
ED-136, Submittal of Check Calculation Sheet of Initial Support Measures for 1#
Bifurcation Construction Adit D-D Section & Support of Tunnel at Junction. Dated
10th July, 2016.

5
6

ED-137, Submittal of the 1# & 2# Bifurcation Details and Steelwork (Rev.00) Dated
12th July, 2016.

9
10
11
12

13
14
15
16
17
18
19
20
21

ED-138, Submittal of Penstock-Main Pipe-Steel Lining Details (Rev.00) Dated 18th


July, 2016.
ED-139, Submittal of Penstock-manifold-steel Lining Details (Rev. 00) dated 4 th August
2016.
ED-140, Submittal of Calculation of Inlet Submergence Depth, Head Loss and Hydraulic
Power of Surge Tank (Rev. 01), dated 7th August 2016.
ED-141, Submittal of Auxiliary Powerhouse Elevator Shaft Concrete Outline Details
(Rev. 00), dated 9th August 2016.
ED-142, Re-Submittal of Layout Plan, Sections & Support of Vertical Shaft and High
Pressure Tunnel (Rev. 03) and Reply to Your letter 1186 & 1206, dated 10th August
2016.
ED-143 Submittal of Anticorrosion Technology Requirements (Rev.00), dated 19 th August
2016.
ED-144 Submittal of Finite Element Analysis on Lining and Support of Headrace Tunnel on
the Flat Section (Rev.00) dated 19th August 2016.
ED-145 Submittal of Surge Tank Detail of Throttled Orifice Steel Lining with letter
GHCB/MBKHEP/, dated 19th August 2016. This is still under consideration;
ED-146 Re-Submittal of First Stage Concrete Outline of Main Powerhouse below EL.
912.95 (Rev.02), dated 20th August 2016.
ED-147 Re-Submittal of Structure Layout and Supporting of Headrace Tunnel (Rev.05)
dated 25th August 2016.
ED-148 Submittal of Schematic Drawing of water supply system (Rev.00) dated 25 th
August 2016.
ED-149 Submittal of Auxiliary Powerhouse -concrete outline of the wall and details at
EL911.20m (Rev. 00), dated 25th August 2016.
ED-150, Submittal of Structural Calculation on Steel Penstock of high-pressure section
in tunnel (Rev.03), dated 31st August 2016.
ED-151Re-Submittal of Layout of Powerhouse Area (Rev.02), dated 31st August 2016.
Page 1 of 2

22
23
24
25
26
27

28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

ED-152, Re-Submittal of Layout of Excavation of Powerhouse Area (Rev.05) dated 31 st


August 2016.
ED-153, Re submittal of Stability Analysis of Slope behind Power House (Rev.02) dated
1st September, 2016.
ED-154, Submittal of Layout Drawing of 3#Stair of Powerhouse, dated 4th September,
2016.
ED-155, Submittal of Layout Drawing of 3#Stair of Powerhouse, dated 4th September,
2016.
ED-156, Submittal of Powerhouse air Conditioning; Cooling Load and Equipment
Selection Calculation (Rev.00), dated14th September, 2016.
ED-157, Submittal of Powerhouse Air Conditioning Fresh Air System pressure drop
calculation and selection of equipment calculation (Rev. 00), dated 14th September,
2016.
ED-158, S58 Submittal of Powerhouse resistance calculation and equipment selection of
air conditioning water system (Rev00), dated 16th September, 2016.
ED-159, Submittal of Layout of Dam Curtain Grouting (Rev.00) & Calculation of
Permeability (Rev00), dated 16th September, 2016.
ED-160, Reply to Your Letter LI-GHCB-1322, dated 19th September, 2016.
ED-161, Re-Submittal of Design Drawings of Adit 3 (Rev.05), dated 19th September,
2016.
ED-162, Submittal of General Arrangement Drawings of Tailrace Bulkhead Gate of
Powerhouse, dated 20th September, 2016.
ED-163, Submittal of General Arrangement Drawings of Desander Flushing Gate, dated
20th September, 2016.
ED-164, Submittal of the General Arrangement Drawings of the Desander Outlet Stop
log, dated 20th September, 2016.
ED-165, Submittal of the General Arrangement Drawings of the Desander Inlet Gate,
dated 20th September, 2016.
ED-166, Submittal of the General Arrangement Drawings of the Under Sluice Spillway
for Radial Gate, dated 20th September, 2016.
ED-167, Submittal of under Sluice General Arrangement Drawing for Upstream Stop log,
dated 20th September, 2016.
ED-168, Submittal of the General Arrangement Drawings of the Intake Trash rack, dated
20th September, 2016.
ED-169, Submittal of the General Arrangement Drawings of the Spillway Radial Gate,
dated 20th September, 2016.
ED-170, Submittal of the General Arrangement Drawings of the Spillway Upstream Stop
log, dated 20th September, 2016.
ED-171, Submittal of General Arrangement Drawings of Headrace Tunnel Inlet Gate,
dated 20th September, 2016.
ED-172, Submittal of General Arrangement Drawings of Headrace Tunnel Inlet Fine
Trash rack, dated 20th September, 2016.