You are on page 1of 119

Piles On Clay(Coh

Pt

1
1 ###
###
2
0
1.9
3 1.5
1.5
4 1.5
1.5

0
25
10
10
10
10
10
9

2
3
4
5

25
25
50
50
100
100
150
150
200

5
6
7
8
9
10
11
12
13
14

2.3
2.3
2.3
4.3
1.9
2.3
1.9
2.3
1.9
2.3
2.5
2.5
2.5
3
3
3
0
0
0
0

0
25
10
10
25
25
0
0
0
0
10m
0
10m
2m
0
2m
0
0
0
0

200
6
250
250
7
300
300
8
100
100
9
150
150
Water Table Height from NGl
0
0
0
0

p for soft fined grained


soil
1.0471976
p for dense coarse
grained soil
1.5707963

Dc

Pt
1 0.09
0.09
2 0.1
0.1
3 0.11

150
150
125
125
100

4
5
6
7
8

0.11
0.12
0.12
0.13
0.13
0.15
0.15
0.4
0.4
0
0.4

100
75
75
50
50
25
25
0
0
25
25

iles On Clay(Cohesive Soil)

Pile Height
Soil Height
Pile Diameter

Ultimate Bearing Capacity of Pile

Qb=CNcAp
C=cohesion of soil

C=qu/2
qu=unconfined compressive strength of soil or undisturbed soil compressive strength
Ap=area of Pile
Nc= Bearing Capacity Factor
qu=
C=
AP=
Nc=
Qb=
Ultimate Frictional Capacity of Pile
Method

Qs=CPerimeter L
=alpha factor
C=Cohesion of Soil
Perimeter=Side Perimeter of Piles
L=Length
=
C=
P=
L=
Qs

Factor Of Safety
FS=

Qallowable=(Qb+Qs)/FS
Qallowable=

Method

Qs = PeremiterL(ave + 2C)
P=Perimeter
L=Length
=frictional factor
v=average vertical pressure at mid height of the pile being analyzed
v=s(L/2)
C=cohesion

C=qu/2
qu =
C=
s=

v=
P=
L=
=
Qs=

0.7
0.7
0.
0.
0.3
0.3
0.2

0.2
0.2
0.2
0.2
0.2

ight from NGl

2.718281828
0.095310179

Normal Consolidated Clay


Over Consolidated Clay

25m
10m
0.4m

150KN/m2
75KN/m2
0.125663706143592m2
9
84.8230016469244KN

18KN/m2
31.4159265358979m2
25m
7068.58347057703KN

3
2384.46882407465KN

250KN/m2
26KN/m2
18KN/m2
135kN/m2
31.4159265358979m2
25m
0.1
14686.9456555323kN

100
0.5
250
250

1
0

9.857143
10.14286

9
9.285714

0.285714

9.571429

10.42857
10.71429
11

Sheet2!$B$2:$B$277
VLOOKUP(G265,B2:C277,2,FALSE)
#N/A

25

Project Name:

Project No.

Client:

Designed By:

CR
Section of the project

Date:

Single Pile Analysis


CLAY
I Propeties
= 30degree
soil= 18

Over Consolidated Clay


OverConsolidatedRatio= 1.5

sat= 20

IV Ultimate Frictional Capacity of Pile


Case 1 method
Qs=

###

water= 9.81
qu= 200
C= 100
Nc= 9

Case 2 Method

= 0.5
v=

= 0.35355339
= 0.15

Qs=

225KN/m2
###

Case 3 Method

II Geometry
Pile Length= 25m
Soil Height= 10m

Water Level= 0
S1 = 0

Cross section= Circle

normal consolidated clay

D= 0.4m
D= 0.4m

Ap=
###
P= 1.2566371

over consolidated clay

Qs=

V Design Capacity

F.S.= 2
Qb= ###
Qs= ###
Qall= ###

III Ultimate Bearing Capacity of Pile


Qb=

###

###

VI Pile Settlement
1
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0

Se1=elastic settlement
Se2=settlement of pile caused by
the load at the pile tip.
Se3=settlement of pile caused by

C
0

50

100

150

200

250

300

the load transmitted along the pile sh


Ep=modulus elasticity of the pile ma
=constant value of the unit friction
depending of the unit resistancs
distribution (f) along the pile shaft

150
125
100

Se1=

75
50
25

0 Factor
0
0.05
0.1

0.15

0.2

0.25

0.3

0.35

0.4

SAND
I Properties
Dc= 8m

criitical depth

K= 0.6
= 0.57735027

II Ultimate Bearing Capacity of Pile


p for soft fined grained soil
1.04719755
Nq= bearing Capacity Factor
Nq= 10.0524046
Pv= 72kN/m2 Soil Pressure at critical depth

Qb=

Qs=

###

###

III Design Capacity

Fs= 3
Qall=

###

Shet No.
Checked By:

CR
Date:

rictional Capacity of Pile

normal consolidated clay

over consolidated clay

Case 2 Method

e Settlement

settlement

ment of pile caused by

the pile tip.


ment of pile caused by

nsmitted along the pile shaft


s elasticity of the pile material.
value of the unit friction
of the unit resistancs
(f) along the pile shaft

Project Name:

Project No.

Client:

Designed By:

CR
Section of the project

Date:

Drilled Pile Analysis


CLAY
I Propeties

III Ultimate Bearing Capacity of Pile

= 30degree
soil= 18

Over Consolidated Clay


OverConsolidatedRatio= 1.5

sat= 20
water= 9.81
qu= 300
C= 150
Nc= 9

qp=
Qb=

= 0.35

1350KN
###

IV Ultimate Frictional Capacity of Pile


Case 1 method
Qs=

II Geometry
Pile Length=

7m

Water Level= 0

Soil Height= 5m

S1 = 0

###

V Design Capacity

Dia.shaft=

0.5

Dia.bell=

F.S.= 2

Length of bell=

Qb= ###

Cross section= Circle


D= 1m
D= 1m

Ap=
P=

###
###

Qs= ###
Qall= ###

1
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
0

50

C100

150

200

25

SAND
I Properties
Nvalue=
PressureVertical=

63Kpa

Peremeter=

###

II Ultimate Frictional Capacity of Pile


Pa= 100Kpa
Nvalue= 40

Qs= ###

n= 0.245
z= 3.5m
III Design Capacity

Drilled Shaft in Sand


Drilled Shaft in Gravel
For N Value less than 15

F.S.=
Qb=
Qs=
Qall=

For Nvalue<50
For Nvalue>50
Drilled Shaft in Gravel

II Ultimate Bearing Capacity of Pile


Qp=qpAbase
qp= 2300Kpa
Qb=

###

= 1.7193757

2
###
###
###

Shet No.
Checked By:

CR
Date:

earing Capacity of Pile

rictional Capacity of Pile

50

Case 2 Method

C100

150

200

250

300

ctional Capacity of Pile

Project Name:

Project No.Shet No.

Client:

Designed BChecked By:

Section of the project

CR

CR

Date:

Date:

Group Piles
I Propeties
= 30degree
soil= 18

Normal Consolidated Clay


OverConsolidatedRatio= 1.5

sat= 20

S2

water= 9.81
Qu= 400
C= 250kPa
Nc= 9
= 0.23
= 0.35355339
= 0.37
II Geometry
PileLength= 3m

Number

0
-

B1
B

PileDia= 0.4m

L= 800mm
L1= 600mm
S1= 200mm
Pile= 5

III Ultimate Bearing Capacity


(Coyle and Sulaiman)
Qb= 270kN
IV Ultimate Frictional Capacity of Pile
(Coyle and Sulaiman)
Qs= 276kN

S1
0

t= 500mm
B= 800mm
B1= 200mm

0.75

0.5

0.25

0
0

100

200

300

L1

Pile Length

0
0
0

0
1
0

0
0
0

Project Name:

Project No.

Client:

Designed By:

CR
Section of the project

Date:

Combined Footing

5
4
3
2
1
0
0

I Propeties
= 30degree
soil= 18

Over Consolidated Clay


OverConsolidatedRatio=
1.5

sat= 20
water= 9.81
concrete= 23.54

Concretecover= 75mm

C= 150
Center of Gravity
z= ###
Area of combined footing =

10

10

II Geometry
C1
b=

1m

d=

0.5m

C2

qallowable= 300

x= ###

b=

2m

d=

1.5m

Combined Footing F1
Ix= 93.75

b=

9m

Iz= 303.75

d=

5m

45m2
Forces(Due To Load Combination Service and Ultimate)
Fy=
-398.261kN
Mx=
847.654kN-m
Mz= ###
ex'=
###
ez'=
###
Fy=
1000kN
Mx=
847.654kN-m
Mz= ###
ex'=
###
ez'=
0.1m
1 Trial Thickness
t=
300mm
2 Established Dimension of footing
qallnet= qall - ct - c(H-t)
qallnet= 262.338kPa
3 Pressure
ex'=Mx/Ft ###
ez'=Mz/Ft ###

ex=b/6
1.5m
ez=d/6
###
used
qmax= 2Fy/3x
qmax= 2Fy/(BL)
Underneath Pressure at Foundation
At x Direction
(Fy/A)+(MxCx/Ix)
(Fy/A)-(MxCx/Ix)
2Fy/3x
2Fy/(BL)

(Fy/A)+(MzCz/Iz)
(Fy/A)+(MzCz/Iz)
2Fy/(BL)
2Fy/3z

x=
z=

###
###

0
0
1
###
###
100m
100

###
###
###

Area Required
Areq=

II Ultimate Bearing Capacity of Pile


Qp=qpAbase
qp= 0Kpa
Qb=

#VALUE!

Shet No.
Checked By:

CR
Date:

10

10

X=

2m

Z=

1.5m

X=

2m

Z=

3m

ooting F1
Pedestal Height=

Soil Height= 2

###
###
###
###

1
2

P/A
MxCx/Ix
MzCz/Iz

IF(B67=B71,"2Fy/3x",IF(AND(B67<B71,B67>B71),"(Fy/A)+-(MxC/I)+-(Mz

1),"(Fy/A)+-(MxC/I)+-(MzC/I)","2Fy/BL"))

Project Name:

Project No.

Client:

Designed By:

CR
Section of the project

Pile Settlement

Se1=elastic settlement
Se2=settlement of pile caused by
the load at the pile tip.
Se3=settlement of pile caused by
the load transmitted along the pile shaft

Date:

Shet No.
Checked By:

CR
Date:

1
2
3
4
5
6
7
8
9
10
11
12

0
0
2
2
3
3
5
5
7
7
9
9
9
0
9
0
3
2
3
2
5
7
5
7

0
5
1.5
2
1.5
2
3
4.5
3
4.5
0
5
5
5
0
0
1.5
1.5
2
2
4.5
4.5
3
3

1
2
3
4

2
0
7
9
2.5
2.5
6
6

1.75
1.75
3.75
3.75
1.5
0
3
0

footing size
b
d

distance x1
distance y1

square 1
b
d

9
5

2
1.5

distance x2
distance y2

1
0.5

Square 2
b
d

2
3

2
1.5

1
2
3
4
5
6
7
8
9

9
0
3
2
5
7
2
2
3
3
5
5
7
7
0
0
9
9

0.3
0.3
2
2
2
2
0.3
2
0.3
2
0.3
2
0.3
2
0
0.3
0
0.3

11
12

13

10

9
0

2
2

14
15
16
17

Pedestal Height
2
Soil Height
2

9.4
9.4
9.15
9.15
0
9

0
2
0
0.3
2
-4

-100kPa
200kPa

0
0
9
9
0
0
9
9

2kPa
0
-4kPa
0
2kPa
2kPa
-4kPa
-4kPa

Ultimate Loads

Node
190

Node
190

101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133

101
102
103
104

L/C
1.2D+1.6L
1.2D+0.8W(+Z)
1.2D+0.8W(-Z)
1.2D+0.8W(+X)
1.2D+0.8W(-X)
1.2D+1.6W(+Z)+1.0L
1.2D+1.6W(-Z)+1.0L
1.2D+1.6W(+X)+1.0L
1.2D+1.6W(-X)+1.0L
1.475D+1.0E(+Z)+1.0L
1.475D+1.0E(-Z)+1.0L
1.475D+1.0E(+X)+1.0L
1.475D+1.0E(-X)+1.0L
0.9D+1.6W(+Z)
0.9D+1.6W(-Z)
0.9D+1.6W(+X)
0.9D+1.6W(-X)
1.175D+1.0E(+Z)
1.175D+1.0E(-Z)
1.175D+1.0E(+X)
1.175D+1.0E(-X)
1.2D+2.8E(+Z)+1.0L
1.2D+2.8E(-Z)+1.0L
1.2D+2.8E(+X)+1.0L
1.2D+2.8E(-X)+1.0L
0.9D+2.8E(+Z)
0.9D+2.8E(-Z)
0.9D+2.8E(+X)
0.9D+2.8E(-X)
0.9D-2.8E(+Z)
0.9D-2.8E(-Z)
0.9D-2.8E(+X)
0.9D-2.8E(-X)

Horizontal
Fx kN
0
0
0
-80.8
80.8
0
0
-161.6
161.6
1500
-2000
-9.173
9.173
0
0
-161.6
161.6
0
0
-9.173
9.173
0
0
-25.684
25.684
0
0
-25.684
25.684
0
0
-25.684
25.684

Vertical
Fy kN
280.926
-103.586
-103.581
-130.899
-106.272
-209.648
-209.638
-264.01
-215.005
241.741
241.633
244.494
238.881
-344.136
-344.126
-398.261
-349.627
82.121
82.015
84.834
79.301
216.753
216.452
224.433
208.771
82.217
81.92
89.814
74.322
82.217
81.92
89.814
74.322

Horizontal
Fz kN
144.4
-70.8
87.6
32.4
32.4
-104
212.8
102.4
102.4
100.652
118.998
109.825
109.825
-182.1
134.7
24.3
24.3
15.127
33.473
24.3
24.3
76.716
128.084
102.4
102.4
-1.384
49.984
24.3
24.3
-1.384
49.984
24.3
24.3

L/C
1.2D+1.6L
1.2D+0.8W(+Z)
1.2D+0.8W(-Z)
1.2D+0.8W(+X)

Horizontal
Fx kN
0
0
0
-80.8

Vertical
Fy kN
280.926
-103.586
-103.581
-130.899

Horizontal
Fz kN
144.4
-70.8
87.6
32.4

105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133

1.2D+0.8W(-X)
1.2D+1.6W(+Z)+1.0L
1.2D+1.6W(-Z)+1.0L
1.2D+1.6W(+X)+1.0L
1.2D+1.6W(-X)+1.0L
1.475D+1.0E(+Z)+1.0L
1.475D+1.0E(-Z)+1.0L
1.475D+1.0E(+X)+1.0L
1.475D+1.0E(-X)+1.0L
0.9D+1.6W(+Z)
0.9D+1.6W(-Z)
0.9D+1.6W(+X)
0.9D+1.6W(-X)
1.175D+1.0E(+Z)
1.175D+1.0E(-Z)
1.175D+1.0E(+X)
1.175D+1.0E(-X)
1.2D+2.8E(+Z)+1.0L
1.2D+2.8E(-Z)+1.0L
1.2D+2.8E(+X)+1.0L
1.2D+2.8E(-X)+1.0L
0.9D+2.8E(+Z)
0.9D+2.8E(-Z)
0.9D+2.8E(+X)
0.9D+2.8E(-X)
0.9D-2.8E(+Z)
0.9D-2.8E(-Z)
0.9D-2.8E(+X)
0.9D-2.8E(-X)

80.8
0
0
-161.6
161.6
1500
-2000
-9.173
9.173
0
0
-161.6
161.6
0
0
-9.173
9.173
0
0
-25.684
25.684
0
0
-25.684
25.684
0
0
-25.684
25.684

-106.272
-209.648
-209.638
-264.01
-215.005
241.741
241.633
244.494
238.881
-344.136
-344.126
-398.261
-349.627
82.121
82.015
84.834
79.301
216.753
216.452
224.433
208.771
82.217
81.92
89.814
74.322
82.217
81.92
89.814
74.322

32.4
-104
212.8
102.4
102.4
100.652
118.998
109.825
109.825
-182.1
134.7
24.3
24.3
15.127
33.473
24.3
24.3
76.716
128.084
102.4
102.4
-1.384
49.984
24.3
24.3
-1.384
49.984
24.3
24.3

Moment
Mx kNm
580.04
-282.561
349.61
129.287
129.287
-414.267
847.654
407.763
407.763
404.144
477.525
440.835
440.835
-723.851
535.435
96.562
96.562
60.702
133.904
97.303
97.303
308.198
513.597
410.898
410.898
-5.181
199.787
97.303
97.303
-5.181
199.787
97.303
97.303

My kNm
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Mz kNm
0
0
0
0
0
0
0
100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Moment
Mx kNm
580.04
-282.561
349.61
129.287

My kNm
0
0
1
0

Mz kNm
0
0
0
0

129.287
-414.267
847.654
407.763
407.763
404.144
477.525
440.835
440.835
-723.851
535.435
96.562
96.562
60.702
133.904
97.303
97.303
308.198
513.597
410.898
410.898
-5.181
199.787
97.303
97.303
-5.181
199.787
97.303
97.303

0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

111
116
107
107
101
108

L/C
1.475D+1.0E(-Z)+1.0L
0.9D+1.6W(+X)
1.2D+1.6W(-Z)+1.0L
1.2D+1.6W(-Z)+1.0L
1.2D+1.6L
1.2D+1.6W(+X)+1.0L

Fx kN
Fy kN
-2000
241.633
-161.6 -398.261
0 -209.638
0 -209.638
0
280.926
-161.6
-264.01

Fz kN
Mx kNm
My kNm
118.998
477.525
0
24.3
96.562
0
212.8
847.654
0
212.8 847.654
0
144.4
580.04
0
102.4
407.763
0

111
116
107
107

L/C
1.475D+1.0E(-Z)+1.0L
0.9D+1.6W(+X)
1.2D+1.6W(-Z)+1.0L
1.2D+1.6W(-Z)+1.0L

Fx kN
Fy kN
-2000
241.633
-161.6 -398.261
0 -209.638
0 -209.638

Fz kN
Mx kNm
My kNm
118.998
477.525
0
24.3
96.562
0
212.8
847.654
0
212.8 847.654
0

106 1.2D+1.6W(+Z)+1.0L
108 1.2D+1.6W(+X)+1.0L

0
-161.6

280.926
-264.01

144.4
102.4

580.04
407.763

2
0

Service

Mz kNm
0
0
0
0
0

Node
190

100

Mz kNm
0
0
0
0

Node
190

L/C
200
201
202
203
204
205
206
207
208
209
210

D
D+L
D+0.75L
D+W(+Z)
D+W(-Z)
D+W(+X)
D+W(-X)
1.1964D+0.714E(+Z)
1.1964D+0.714E(-Z)
1.1964D+0.714E(+X)
1.1964D+0.714E(-X)

L/C
200
201
202
203

D
D+L
D+0.75L
D+W(+Z)

0
100

204
205
206
207
208
209
210

D+W(-Z)
D+W(+X)
D+W(-X)
1.1964D+0.714E(+Z)
1.1964D+0.714E(-Z)
1.1964D+0.714E(+X)
1.1964D+0.714E(-X)

Horizontal
Fx kN
0
0
0
0
0
-101
101
0
0
-6.549
6.549

Vertical
Fy kN
91.187
198.358
171.562
-175.107
-175.1
-209.157
-178.489
109.136
109.06
111.08
107.115

Horizontal
Fz kN
27
97
79.5
-102
96
27
27
25.753
38.852
32.303
32.303

Moment
Mx kNm
108.127
389.138
318.793
-406.612
382.694
107.611
107.611
103.251
155.536
129.393
129.393

My kNm
1
2
3
4
5
6
7
8
9
10
11

Mz kNm
3
4
5
-25
7
8
9
10
11
12
13

Horizontal
Fx kN
0
0
0
0

Vertical
Fy kN
91.187
198.358
171.562
1000

Horizontal
Fz kN
27
97
79.5
-102

Moment
Mx kNm
108.127
389.138
318.793
-406.612

My kNm
1
2
3
4

Mz kNm
3
4
5
-25

0
-101
101
0
0
-6.549
6.549

-175.1
-209.157
-178.489
109.136
109.06
111.08
107.115

96
27
27
25.753
38.852
32.303
32.303

382.694
107.611
107.611
103.251
155.536
129.393
129.393

5
6
7
8
9
10
11

7
8
9
10
11
12
13

Fx kN
Fy kN
-101
-209.157
-101 -209.157
0 -175.107
0 -175.107
6.549
107.115
0 -175.107

Fz kN

205
205
203
203
210
203

L/C
D+W(+X)
D+W(+X)
D+W(+Z)
D+W(+Z)
1.1964D+0.714E(-X)
D+W(+Z)

Fx kN
-101

Fz kN

205
203
203
203

L/C
D+W(+X)
D+W(+Z)
D+W(+Z)
D+W(+Z)

0
0
0

Fy kN
-209.157
1000
-175.107
-175.107

27
27
-102
-102
32.303
-102

Mx kNm
My kNm
107.611
6
107.611
6
-406.612
4
-406.612
4
129.393
11
-406.612
4

Mx kNm
My kNm
27
107.611
6
-102 -406.612
4
-102
-406.612
4
-102 -406.612
4

210 1.1964D+0.714E(-X)
203 D+W(+Z)

6.549
0

107.115
-175.107

32.303
-102

129.393
-406.612

11
4

Mz kNm
8
8
-25
-25
13
-25

Mz kNm
8
-25
-25
-25

13
-25

You might also like