Nirmal Acharyaa, Oblique Shresthaa, Bhola Thapab, Hari Pd. Neopaneb, Young- Ho Leec
aTurbine
Contents
Background
Project Purpose
Project Description
TTL & KMOU Activities
CRHT V, 2015
Kathmandu University
Planning)
Korean national funding agency dedicated for innovative energys research &
development.
At the forefront of realizing the vision Low Carbon, Green Growth
Works with the Korean government to plan and implement effective national R&D
programs that support domestic as well as international researchers, universities,
and private companies to bring innovative energy technology to life.
CRHT V, 2015
Kathmandu University
Fig: Damaged CFT runner of Daram khola MHP (Kandebas, Baglung, Nepal)
MHP sector in Nepal: matured technically and substantially over past 40 years.
Extensive research & design accomplished during this course of time- [T1 model (1976)
T-15 model CFT].
Yet lacks R&D in the field of effect of sediments on MH turbines.
Efficiency plus sediment consideration design approach might be useful for overall
efficiencies of MHPs.
CRHT V, 2015
Kathmandu University
Partners
Leading Company:
Donggu Infra Co. Ltd., Busan, Republic of Korea
Research Partners:
Flow Informatics Lab, Korea Maritime and Ocean University,
Busan, Republic of Korea
KETEP has awarded a grant of 1,218,181 USD [Korean Won (KRW) 1,340 million (1 USD=
1,100 KRW as per 29/12/2014)] to KMOU, Donggu Infra Co. Ltd., and TTL (KU) for the
implementation of the project.
CRHT V, 2015
Kathmandu University
Aims for the international collaboration in micro- hydropower sector which will strengthen
the research and technology transfer.
Boost up TTL towards becoming a center of excellence for research activities regarding
turbines and hydropowers in Nepal.
Project Period:
Feb 2014- September 2017
Project Duration:
32 months
CRHT V, 2015
Kathmandu University
Signing Program
Agreement letter was signed on 17th March 2015 among Donggu Infra Co. Ltd., TTL
(KU) and KMOU at KMOU premises, Busan, Korea.
Signed by Yong- Moon KIM (President, on behalf of Donggu), Hari Pd. Neopane (HoD,
MED, on behalf of TTL, KU) and Young- Ho LEE (Prof., on behalf of KMOU)
CRHT V, 2015
Kathmandu University
Project Description
RDA literature,
design and
drawing
Delivery of the 5 kW
runner at TTL (KU),
installation and
performance analysis
Fabrication and
Experiment (Korea
& Nepal) of RDA
(considering coating
as well)
Fabrication of 5 kW
dedicated test set up
and performance
analysis at KMOU
Fabrication of 20 kW
CFT
CRHT V, 2015
Kathmandu University
TTL activities
Overall project has been divided into 3 phases;
Phase I
RDA design with CFD analysis and detail drawing.
Fabrication and testing of RDA at TTL, KU.
Detail design and drawing of sediment friendly (optimized) 5 kW CFT.
Phase II
Laboratory setup design and testing of 5 kW cross- flow turbine (runner
provided from Korea).
Scale up design of 20 kW turbine, drawing and CFD works of the same.
Site survey for the 20 kW turbine.
Phase III
Installation of the 20 kW turbine.
Testing and commissioning of the same.
Final report submission & closing of the project.
CRHT V, 2015
Kathmandu University
KMOU activities
CFD and FSI analysis of 5 kW Cross-flow hydro turbine with single phase
working fluid (water).
Experimental performance analysis of 5 kW Cross-flow hydro turbine.
Comparison of experimental and CFD results for 5 kW Cross-flow hydro
turbine.
Design review and all the fabrication works will be done by Donggu Infra. Co.
CRHT V, 2015
Kathmandu University
10
Kathmandu University