ENGINE WEEKLY MAINTENANCE REPORT 01-09 NOV 2014

A. MAIN ENGINE AND TURBOCHARGER:


01.CARRIED OUT DRY CLEANING OF M/E T/C WITH WALNUT GRANULATE.
02.CARRIED OUT WET CLEAN OF M/E T/C COMPRESSOR WITH FRESH WATER.
03.REPLACED DIRTY T/C AIR FILTER AT BLOWER SIDE.
B. DIESEL GENERATOR ENGINE AND TURBOCHARGER:
01.RENEWED T/C AIR FILTER OF D/G NO.2&3.
C. AUXILIARY MACHINERIES AND EQUIPMENTS:
01.CARRIED OUT SAFETY CHECK AND RUN TESTED OF ALL EMERGENCY MACHINERIES AS PER
EMM FORM TE383G1110M6 CHECKLIST.
02.CALIBRATED OWS TO ZERO PPM WITH FW & CONDUCTED SIMULATION TEST FOUND IN GOOD
ORDER.
03.CLEANED M.E/D.G F.O 2ND AUTO BACKWASH FILTER & MANUAL FILTER.
04.CLEANED/INSPECTED S.W LOW/HIGH SEA CHEST STRAINER.
05.CLEANED/INSPECTED NO 1 & 2 L.T COOLER S.W LINE FILTER.
06.CLEANED BILGE PUMP SUC.FILTER.
07.CLEANED SUC FILTER OF F.O PURIFIER NO.1&2.
D. VARIOUS WORKS:
01.HOUSEKEEPING AND WASHED PAINT E/R SURROUNDINGS & MOPPED FLOORINGS.
02.CARRIED OUT INITIAL DOSING OF CHEMICALS TO H.T. COOLING SYSTEM, L.T. COOLING
SYSTEM AND BOILER.
03. STANDBY FOR ARRIVAL & DEPARTURE PORT OF HONGKONG 01-02 NOV 14.
04. ATTENDED BUNKERING OPERATION IN HONGKONG ANCHORAGE, 01-02 NOV 14.
05. STANDBY FOR ARRIVAL & DEPARTURE PORT OF SHANGHAI,CHINA 07-08 NOV 14.
06. STANDBY FOR ARRIVAL & DEPARTURE PORT OF NINGBO,CHINA 08-09 NOV 14.
07. ATTENDED BUNKERING OPERATION AT PORT OF NINGBO 08/11/14.
08. INSPECTED FIRE DAMPERS OF E/R SUPPLY FAN NO.1,2,3,4 &
PURIFIER ROOM FAN DAMPERS & EMERGENCY GEN.FIRE DAMPERS.
09. PULLED OUT & OVERHAULED STUCK UP DISCHARGE VALVE(STP 204V) OF GREY WATER.
10. TRANSFERRED AN SECURED ANGLE BARS, PIPES, ETC FROM DECK TO STEERING ROOM.
11. PULLED OUT & INSPECTED BILGE WELL STBD SUC PIPE.
12. ARRANGED SPARE PARTS & TOOLS AT SPARE ROOM, SEGREGATE IN EACH DESIGNATED
BOX.
13. CLEANED/UNCLOGGED DRAIN PIPE OF L.T COOLER.
14. RECTIFIED STEAM LEAKING OF M.E SUPPLY TRACING PIPE INLET.
15. ATTENDED FOR FAMILIARIZATION OF ENGINE & DECK CREW WITH THE PRESENSE OF PORT
CAPT. NIKOS
16. REPAINTING DIRTY DRIP PANS & FLOORING AT E/R.
E) DECK ACCOM MACHINERIES AND EQUIPMENT:
01.TESTED RUN RESCUE BOAT & FREE FALL LIFEBOAT ENGINE AND EMCY GENERATOR
ENGINE.
F) ELECTRICAL & ELECTRONICS
01. CARRIED OUT DAILY ROUTINE CHECK AND READING OF RUNNING MACHINERIES.
02. CARRIED OUT WEEKLY SAFETY ROUTINE CHECK AS PER EMM FORM TE383G CHECKLIST.
03. PLUGGED AND CHECKED REEFER CONTAINERS ON DECK.
04. REPLACED BUSTED LAMPS ON DECK.
05. CHECKED AND TIGHTENED CONNECTION OF M/E CROSSHEAD PRESSURE SWITCH AND PLC
CIRCUIT FOR STANDBY PUMP.
06. REPLACED POWER PLUGS OF GALLEY , OFFICER AND CREW MESSROOM EQUIPMENTS.
07. ASSEMBLED 220V EXTENSION SOCKETS FOR DECK USE.
08. INSTALLED HEADSETS FOR AUTO AND EMERGENCY TELEPHONE UNITS.

09.
10.
11.
12.
13.
14.

INSTALLED AND SECURED PRINTER/FAX/SCANNER AT THE BRIDGE.


ASSEMBLED WELDING MACHINE CABLES.
ARRANGE RECEIVED ELECTRICAL STORES AT ELECTRICAL WORKSHOP.
CHECK AND TIGHTENED CONNECTIONS OF REEFER SOCKETS ON DECK.
CHECK CARGOHOLD BILGE HIGH LEVEL ALARM NO.1 AND 3 STARBOARDSIDE NOT WORKING.
CHECK AND RETIGHTENED CONNECTIONS OF D/G NO.3 CYLINDER NO.7 HAVE UNSTABLE
EXHAUST GAS TEMPERATURE READING.
15. CHECK AND CLEANED SMOKE DETECTOR SENSOR FA15-4 ENGINE CASING FREQUENTLY
ACTIVATED FALSE FIRE ALARM.
G) HULL & ENGINE ROOM PIPINGS (NEXT INSPECTION DEC.)
LAST INSPECTED: NOV. 2014 (PIPE DUCT/DUCT KEEL & CABLE DUCT P/S)
1. FO FILLING & TRANSFER SYSTEM.
2. FO SERVICE SYSTEM FOR ME,DG & AUX BOILER.
3. LO SERVICE SYSTEM FOR ME.
4. CSW SYSTEM , HT CFW SYSTEM , LT CFW SYSTEM.
5. DRINKING , FW & HOT WATER SERVICE SYSTEM.
6. BILGE AND FIRE & GS SYSTEM.
7. STEAM SERVICE SYSTEM.
8. LOCAL FIRE EXTINGUISHING SYSTEM (PIPE DUCT).
9. BALLAST PIPING LINE
(PIPE DUCT).
10. BILGE , FO/DO FILLING LINE
(PIPE DUCT).
11. STEAM LINE.
(PIPE DUCT).
NEXT WEEK JOB

MAINTENANCE PLAN:

1. CARRY OUT VARIOUS JOB AS PER PMS SCHEDULE.