Professional Documents
Culture Documents
CHAPTER -1
EARTH WORK
ITEM
NO.
DESCRIPTION
Sl. No.
Description of works
1.1
EARTHWORK IN EXCAVATION
Earthwork in excavation for foundation trenches of walls,
retaining walls, footings of column, steps, septic tank etc.
including refilling (return filling) the quantity as necessary after
completion of work, breaking clods in return filling, dressing,
watering and ramming etc. and removal of surplus earth with
all lead and lifts as directed and specified in the following
classification of soils including bailing out water where
necessary as directed and specified.
(A) Upto a depth of 2.00 m below the existing G.L.
(a)
In ordinary soil
cum
Rs.64.67
(b)
cum
Rs.82.03
(c)
cum
Rs.152.20
(d)
(i)
cum
Rs.383.90
(ii)
cum
Rs.316.24
(e)
(i)
In hard rock
Using blasting materials
cum
Rs.538.36
(ii)
cum
Rs.483.48
(B)
cum
Rs.26.87
1.2
sqm
Rs.64.40
sqm
Rs.68.30
Unit
Rate
In Figure
Page 2 of 6
sqm
Rs.69.04
sqm
Rs.71.71
cum
Rs.69.89
1.3
(A) With earth or silt or sand obtained by head load with lead upto
90m and lift upto 2m
(i )
Extra for each 30m lead or part thereof beyond the initial lead
of 90m (by head load)
cum
Rs.12.09
(ii)
Extra for each 1.50m lift or part thereof beyond the initial lift of
2.00m (by head load)
cum
Rs.6.05
(B)
cum
Rs.291.56
(C)
cum
Rs.322.75
(D)
cum
Rs.358.09
Extra cost for lifting of sand for filling of sunk floor for each
subsequent floors above the ground floor as directed and
specified.
(i)
from 3m up to 6m
cum
Rs.13.30
(ii)
beyond 6m
cum
Rs.26.60
1.4
cum
Rs.338.06
cum
Rs.205.52
cum/ km
Rs.7.04
Page 3 of 6
(B)
1.5
cum
cum
Rs.86.00
Rs.193.36
cum
Rs.661.77
1.6(B) Extra lead per km truck carriage for sand gravel beyond the cum/Km
initial lead of 8 km.
Rs.7.04
Page 4 of 6
Rate
In Words
Page 5 of 6
(Rupees sixty nine and paise four) only
(Rupees seventy
seventy one) only
one
and
paise
Page 6 of 6
(Rupees eighty six) only
(Rupees one hundred ninety three and
paise thirty six) only