FAKULTI KEJURUTERAAN

COURSE CODE
COURSE NAME
LECTURER
CREDIT HOUR
PREREQUISITE
SESSION

:
:
:
:
:
:

KA21102
CONTRACTS AND ESTIMATIONS

Sr. Asmawan Mohd Sarman


2
1-2016/2017

GROUP PROJECT PROBLEMS (Presentation : 30/11/2016 & Submission: 30/11/2016)


Construction Management Reports (Case Study)
1. Select your own real construction contract (private or government agencies) for case
study. Prepare a complete procedure and guideline for administrative and
management of contract.
2. The report has to include all contract elements (pre-contract and post-contract) from
beginning until completion of the project, calculation, bill of quantities (BQ) and build
up rate (BR).
3. Bills of quantities = you are need to prepare all the elements for suitable type of
building from Works Below Lowers Floor Finish until Frame. All measurement must
clearly explain and indicate at reference drawings.
4. Build up rate = you are need to prepare build up rate for major construction item and
all calculation must clearly explain and support with relevant documents.
5. Compile all Procedures, Guidelines, Bills of Quantities and Build Up Rate in one report.
The report has to include all plans, drawings, sketches, figure, photo, and dispute and
court cases and any relevant document to supports the study.
6. References should be indicated in the text by consecutive numbers in the brackets, as
follows:
a. Other results have been achieved by Asad and Kristiawan [6] and Setiono
[12].
b. All references should appear together at the end of the text. The references
are cited in a numbered list in alphabetic order of the references author with
the following styles :
i. 1. Banthia, N, C. Yan and S. Mindess (1996), Restrained shrinkage
cracking in fibre reinforced concrete, a novel test technique, Cement
and Concrete Research. Vol. 26. No.1 pp. 9-14.
ii. 2. Bentur, A and K. Kovler (2003), Evaluation of early age cracking in
cementitious systems, Material and Structures, Vol. 36. pp. 183-190.
7. The reports must have at least 3 to 5 suggestions for improvement at the final chapter.

8. Smart Report.
9. Smart cd.

10. Table Of Contents


a. Chapter 01
i. Literature Review of Contract (backgrounds, characteristic, element,
types, guidelines, process, procedure, advantages and disadvantages
and etc.)
ii. Literature Review of Tendering (backgrounds, characteristic, element,
types, guidelines, process, procedure, advantages and disadvantages
and etc.)
b. Chapter 02
i. Private Project Background and Details (Type of contract and tender,
process, procedure and guidelines for administrative and
management of contract and tender)
c. Chapter 03
i. Government Project Background and Details (Type of contract and
tender, process, procedure and guidelines for administrative and
management of contract and tender)
ii. Comparison the practice and implementations for both of project.
(Private and Government)
d. Chapter 04
i. Bill of Quantity For Structure Works (Piling, Footing, Pile Cap, Ground
Beam, Column, Floor Beam, Roof Beam)
e. Chapter 05
i. Build up Rate For Concrete Grade 20, 25, 30 & 35 (m3 & m2[100mm
thick])
ii. Build up Rate For Reinforcement
iii. Build up Rate For Brickworks (Half Bricks & One Bricks)
iv. Build up Rate For Tiling Works (200mmx200mm ceramic tiles &
200mmx200mm homogeneous tiles)
f.

Chapter 06
i. Suggestions for improvement.
ii. Conclusions.

g. Appendix
i. Drawings
ii. Sketches
iii. Table
iv. Calculations
v. Etc.