Professional Documents
Culture Documents
VOLMEN DE LA CISTERNA
N DE RECAMARAS:
ALTURA DE LA
CONSTRUCCIN:
DOTACION:
TIEMPO DE SUMINISTRO:
INTERVALO DE SUMINISTRO:
V
3
5.20
200 l/has/da
12 horas
7 das
1 l/s
Qmd=
No . de personas x Dotacion
=
86 400 s
8 personas(200
Qmd=
86 400 s
l
)
dia
=0.0185l/ s
l
QMD =0.0185 1.40=0.0259 l/ s
s
CALCULO DE LA BOMBA
Hp=
(Qb x xCDT )
(76 X )
Donde
Qb=Gasto a bombear en
lts
s
Qb=0.0224
lts
s
(0.016
Hp=
lts 1 kg
x
x 11.04 m)
s
(76 X 0.7)
Hp= 0.007939 HP