You are on page 1of 115

LIST OF PARTICULARS SUBMITTED FOR THE PROPOSED PLAN

Name of the Work:


ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medi
km 6/4 of Sivakodu- Manepalli Road in E.G.Dt.
1

Socio economic advantages

Villages and towns covered

Population

PCUS/Dat, CVPD

Existing crust , Width of the road

Year of Last Renewal

Advantages/ Benefits to the public

Road Map Road Strip Plan

Proforma Estimate

10

MLA/MP/ Hon'ble Minister

11

Specification Report

12

Proforma & Certificate as per finance U.O.


Note

Asst. Executive Engineer (R&B),


R&B Section, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

OF PARTICULARS SUBMITTED FOR THE PROPOSED PLAN WORKS

he Work:
ruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in
km 6/4 of Sivakodu- Manepalli Road in E.G.Dt.
As per specification report
Sivakodu, chintalapalli, Kunavaram,
Mulikipalli, Geddada, Vegivaripalem,
Tatipaka
60000
13355, 2040
BT, 5.50m
Prior to 1999
As per specification report
Enclosed
Enclosed
Enclosed
Enclosed
Enclosed

Deputy Executive Engineer (R&B),


R&B Subdivision, Razole

Superintending Engineer (R&B),


R&B Circle, Kakinada

CERTIFICATE
(As per para 2a (ii) of Annexure-I of
GO Ms No.94 Irrigation & CAD Department Dated 01-07-2003)
Name of the work:
ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in km 6/4 of
Sivakodu- Manepalli Road in E.G.Dt.
*****

Certified that the Stage I approval is not required as detailed investigation


completed and no land acquisition is required for taking up the subject work without
interruption.

Asst. Executive Engineer (R&B),


R&B Section, Razole

Deputy Executive Engineer (R&B),


R&B Subdivision, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Superintending Engineer (R&B),


R&B Circle, Kakinada

Check slip accompanying the Road Work Proposals under PLAN to


Government
Name of the Work:
ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in
km 6/4 of Sivakodu- Manepalli Road in E.G.Dt.
1

Budget Eligibility
a. Budget Provision during the year 2016-17
b. Commitments on hand under the head (spill over works
as on 1st April + sanctions accorded during the year)
c. Balance available

NIL

Whether detailed investigation conducted. Department


Yes
to certify that investigation is done properly.

Whether designs have been approved by the competent Yes


authority
Whether Hydrological clearance is obtained, wherever Not applicable
required.
If the work is for new formation or upgradation of a
road , the proposal should be substantiated with -reference to traffic census.
In case the proposal is against the provisions of SCP/TSP,
whether the guidelines prescribed have been satisfied. Not applicable

4
5

Whether any Land Acquisition involved. If so , the details


viz., Govt Land, Private Land, Forest Land etc., and the Land Acquisition not
realistic costs thereon and the stage of acquisition.
required.

Whether the land is free from litigation

Whether the work requires two stage Administrative


Sanction , as envisaged in GO Ms No.94 I & CAD
Department , Dated 01-07-2003 (Applicable to all Does not arise
Engineering Departements)

Free from Litigation

a. If the land acquisition or any other clearances are


involved , the department may propose invariably for Does not arise
Stage-I sanction only
b. In case the department satisfies that all the above
requirements are fulfilled and there are no hurdles to go
ahead with the work , the department should append a
certificate from the Engineer-in-Chief/Chief Engineer to
that effect as requied under para 2 a(ii) of Annexure-1 of
GO Ms No.94 I & CAD Dept Dated 01-07-2003.
10

Detailed estimae prepared has been checked with


reference to the Codal Rules and Government Orders Yes
issued periodically.

11

Any other requirement not covered above.

12

Remarks of the Administrative Department

NIL

Asst. Executive Engineer (R&B),


R&B Section, Razole

Deputy Executive Engineer (R&B),


R&B Subdivision, Razole

Executive Engineer (R&B),

Superintending Engineer (R&B),

R&B Division, Amalapuram

R&B Circle, Kakinada

Specification Report to accompany the Estimate


ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in km 6/4 of
Sivakodu- Manepalli Road in E.G.Dt.
Estimate Amount : Rs.

Lakhs

Sivakodu - Manepalli road from km 0.000 to 13.675 is an important SH in Razole constituency


having a total length of 13.675 Km. This road is a Intermediate lane and at Jaggannapeta Village limits
it is Multilane. This road connects villages Sivakodu, Chiintalapalli, Kunavaram, Mulikipalli, Kadali,
Geddada, Mogalikuduru, Tatipaka, Vadrevupalli. It connects a number of other imporatnt roads such as
CBM road, Kunavaram - Kesanapalli road, Mulikipalli - Gogannamatam road, Razole - Ponnamanda
road, NH 216, and Kadali Irrigation Channel Road. Daily number of heavy loaded vehicles carrying
Aqua and Agricultural products & Road materials travel on this road. This is the main trading route for
a number of villages. This road connects to NH216 at Tatipaka junction. This junction is a busy
commercial area for the surrounding villages. This is the main route to reach the acqa and coconut
industries, small scale industries like Sri Vatsa Power Projects, in Sivakodu, Razole (M). So many
schools and colleges are developed in Jaggannapeta, which is a near by town and to reach this place
this is the main route for surrounding villages. This road serves a direct population of 60,000 residing
in 11 villages on the road and an indirect population of the people in Razole and Mamidikuduru
Mandals as Jaggannapeta is a commercial center for these two mandals.
The bridge at km 6/4 of this road is narrow and severely damaged. Wide cracks were formed
in Abutments which are of brick masonry type and the return walls were tilted and flared up. The steel
girders which were placed under the slab to support the loads coming on to the bridge were rusted
and eroded. Right side Girder was failed at the abutment suddenly and it was unable to take the load
from the slab. Temporary arrangements were taken for the movement of light weight vehicles. The
parapet walls on both sides were damaged.
With this condition of the bridge, the bridge point became traffic harazard. Lot of agitation is
coming from the side of public representatives and the public.

Hence the estimate is prepared with the following provisions as per actual requirement based
on the present road condition to the extent of absolute necessity.
1)
1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
10)
11)
12)
13)
14)
18)
14)
15)
16)
19)
20)
21)
22)
23)

Earth work excavation in all soils upto SDR


sand filling in foundation.
Plain cement concrete (1:3:6) nominal mix for levelling course under Raft and wing walls.
Vibrated cement concrete M 20 Grade Concrete for footings.
Vibrated Reinforced cement concrete M 25 Grade Concrete for Raft foundation, fly wings
Vibrated cement concrete M 20 Grade for substructure
V.R.C.C. M25 grade concrete for bed blocks and backing walls
Furnishing and placing reinforced cement concrete VRCC M 25 grade for deck slab
Plain cement concrete M 15 Grade Concrete below approach slab
V.R.C.C. M30 grade concrete for approach slab
V.R.C.C. M30 grade concrete for wearing coat
precast VRCC railing of M25 grade
Providing HYSD bars ( Fe-415 ) for foundation as skin reinforcement
Providing HYSD bars ( Fe-415 ) for sub structure
Providing HYSD bars ( Fe-415 ) for super structure
Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size
Providing rough stone revelment other than granite 300 mm thick
Back filling behind Abutments
Providing and laying filter media
Providing and laying filter material for pitching of slopes
Providing and laying boulders apron on river bed for protecting against scour
Providing 100 mm dia AC pipes for weep holes at 1.00 M C/C
Supplying and fixing of CI drainage spouts
Plain cement concrete M 15 Grade Concrete below approach slab
Supplying and fixing mastic pads for expansion joints.

26)
27)
28)
29)
30)
31)
32)
33)

Providing
Providing
Providing
Providing
Providing
Providing
Providing
Providing

of GSB for road


WMM for road
prime coat with bitumen emulsion
and applying tack coat with bitumen emulsion
50mm thick BM
25mm thick SDBC
earthen shoulders
Guard Stones

1)
2)
3)
4)
5)
6)
7)
8)
9)
10)
11)

LS provisions:Provision towards VAT @ 5%


Provision towards Seigniorages
Provision for QC charges
Provision for Price Adjustment
Provision for Road Safety Intervensions
Provision for shifting of utility serveces
Provision for dismantling of existing bridge, cross bunds and diversion of drain
Provision for soil investigation and soil testing
Provision for Field investigation, site survey and preparation of Drawings
Provision for Avagahana sadassu
Provision for DTP, Xerox, Stationary, Car hire charges, Unforeseen items and rounding off

The rates adopted in the estimate are as per SSR 2016-17 and the work will be carried out as
per relevant specifications of MORT&H.

Asst. Executive Engineer (R&B),


R&B Section, Razole

Deputy Executive Engineer (R&B),


R&B Sub-division, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Superintending Engineer (R&B),


R&B Circle, Kakinada

GENERAL ABSTRACT
N.W.:-

ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in


km 6/4 of Sivakodu- Manepalli Road in E.G.Dt.

S. No.

Description

Amount in Rs

Bridge Proper (6V of 8.0M eff span) without foot paths as per SD
Drawing

9485249

Forming approaches to bridge

3070303

Total

12555552

LS provisions
1

Provision for VAT @ 5.0%

627778

Quality Control charges @ 1.0%

125556

Provision for NAC @ 0.1%

12556

Provision for Avagahana Sadasu & Web hoisting

10000

Provision for Shifting of Utility Services

200000

Provision for Price Adjustment @ 4.5%

565000

Provision for Seigniorage Charges

231916

Provision for Subsoil exploration

150000

Provision for Design Changes

625000

10

Provision for Diversion of Drain

750000

11

Provision for Road Safety Interventions

120000

12

Provision for Unforeseen items and rounding off


Total

Rs

26643
16000000

(Rupees One Hundred and Seventy Lakhs only)

Asst. Executive Engineer (R&B),


R&B Section, Razole

Deputy Executive Engineer (R&B),


R&B Subdivision, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Superintending Engineer (R&B),


R&B Circle, Kakinada

N.W:- ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in km 6/4 of
Sivakodu- Manepalli Road in E.G.Dt.
BRIDGE ABSTRACT ESTIMATE
S.No
1

Description

Quantity

unit

b Below
LWL
dewatering charges

27144

including
780.00 cum

34.80

1 cum

Sand filling under foundation including cost and conveyence of all materials to
site and watering, tamping etc., complete for finished item of work as per MoRTH
&H specification 304 (5th Revision) and as directed by the Engineer-In-Charge.
710.00

1 cum

51891

PCC(1:3:6) Nominal mix in foundation with crushed stone aggregate 40 mm


nominal size mechanically mixed placed in foundation and compacted by
vibration including curing complete asper Morth Spn no.2100.
5160.00

1 cum

175440

Vibrated Reinforced cement concrete M 20 Grade Concrete using 40mm , 20mm


and 10mm size HBG crushed stone aggregate (Coarse aggregate conforming to
table 1000-1 and fine aggregate conforming to table 1000-2) including cost, and
conveyance of all
materials to site and all labour charges for machine
mixing,laying in position, Compacting , Vibrating and curing including all other
incidental and all other operational charges of T&P required etc., complete as
per MoRT&H Specification 1500,1700, 2100 (5th Revision) for Raft
195.00 cum

Amount

11819

34.00 cum
4

Per

Earthwork excavation in soils upto SDR by mechanical means for foundations of


structures as per drawing and technical specification including setting out,
construction of shoring and bracing, removal of stumps and other deleterious
matter, dressing sides of bottom, back filling the excavation earth to the extent
required etc., complete for finished item of work as per MoRT&H specification
304(5th Revision)
a Above
LWL
excluding
dewatering charges
356.00 cum
33.20
1 cum

73.09 cum
3

Rate

6660.00

1 cum

1298700

Vibrated cement concrete M 20 Grade Concrete using 20mm and 10mm size
HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1
and fine aggregate conforming to table 1000-2) including cost and conveyance
of all materials to site and all labour charges for machine mixing,laying in
position, Compacting , Vibrating and curing including all other incidental and all
other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for footings of Abutments ,Piers
and Cut off walls.
206.00 cum
6660.00
1 cum

1371960

Vibrated cement concrete M 20 Grade Concrete using 20mm and 10mm size
HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1
and fine aggregate conforming to table 1000-2) including cost,and conveyance
of all materials to site and all labour charges for machine mixing, laying in
position,Compacting, Vibrating and curing including all other incidental and all
other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2200 (5th Revision) for Sub structure for Abutments
and Piers.
307.00 cum
7050.00
1 cum

2164350

S.No
7

10

Description

unit

Rate

Per

Amount

Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost,
conveyance of all
materials to site and labour charges, centering, machine mixing, laying,
vibrating, curing etc., including other incidental hire and operational charges of
all T&P as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per
MoRT&H specification 1500,1600,1700 & 2200 (5th revision ) and as directed
by the Engineer-in-Charge for Substructure Bed blocks and backing walls
13.00 cum
7050.00
1 cum

91650

Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HT


crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost, conveyance of all
materials to site and labour charges, centering, machine mixing, laying,
vibrating, curing etc., including other incidental hire and operational charges of
all T&P etc., complete as per approved drawings and as directed during
execution but excluding cost of steel and its fabrication charges for finished item
as per MoRT&H specification 1500,1600,1700
and as per M.O.S.T DRG No
No.SD/179 for Deck slab
145.00 cum
8200.00
1 cum

1189000

Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm
size HBG crushed stone aggregate (Coarse aggregate conforming to table 10001 and fine aggregate conforming to table 1000-2) including cost, and
conveyance of all
materials to site and all labour charges for machine
mixing,laying in position, Compacting , Vibrating and curing including all other
incidental and all other operational charges of T&P required etc., complete as
per MoRT&H Specification 1500,1700, 2100 (5th Revision) for Levelling course
below approach slab.
11.00 cum
5710.00
1 cum

62810

Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost,
conveyance of all
materials to site and labour charges, centering, machine mixing, laying,
vibrating, curing etc., including all other incidental and operational charges of all
T&P etc., complete for finished item of work as per approved drawing,excluding
cost of steel and its fabrication charges as per MoRT&H specification 1500,
1600,1700, & 2704 and as per MOST Drg.No.SD/104 for Approach slab.
Approach slab.

11

Quantity

24.00 cum

7020.00

1 cum

168480

Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost,
conveyance of all
materials to site and labour charges, centering, machine mixing, laying,
vibrating, curing etc., including all other incidental and operational charges of all
T&P etc., complete for finished item of work as per drawing BD/1-69 (A) but
excluding cost of steel and its fabrication charges as per MoRT&H specification
1500, 1600,1700, & 2702 for wearing coat over Deck slab.
wearing coat over Deck slab.

21.00 cum

6980.00

1 cum

146580

S.No
12

13

Description

Per

Amount

50556

16.00 MT

53280.00

1 MT

852480

Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of
all diameters including cost and conveyance of steel to site and all labour
charges for fabrication of reinforcement including cutting, bending, binding rods,
tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges
etc., and including over lapping welding if required etc., complete for all R.C.C
items for finished item of work as per standard drawings, as per the directions of
the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th
revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.
3.50 MT

51790.00

1 MT

181265

Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of
all diameters including cost and conveyance of steel to site and all labour
charges for fabrication of reinforcement including cutting, bending, binding rods,
tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges
etc., and including over lapping welding if required etc., complete for all R.C.C
items for finished item of work as per standard drawings, as per the directions of
the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th
revision) and as per I.S.1786 of 1985 for foundations of R.C.C items.
foundations

16

Rate

Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of
all diameters including cost and conveyance of steel to site and all labour
charges for fabrication of reinforcement including cutting, bending, binding rods,
tying grills, placing them in position etc., complete including cost and
conveyance of binding wire and all handling charges and operational charges
etc., and including over lapping welding if required etc., complete for all R.C.C
items for finished item of work as per standard drawings, as per the directions of
the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th
revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.

Sub structure
15

unit

Construction of precast VRCC railing of M25 grade using HBG crushed stone
aggregate of size not exceeding 12 mm and fine aggregate conforming to table
1000-2 true to line and grade, tolerance of vertical RCC post not to exceed 1 in
500, centre to centre spacing between vertical posts not to exceed 2000mm,
leaving adequate space between vertical posts for expansion including cost,
seigniorage conveyance of all materials to site and labour charges, centering,
machine mixing, laying, vibrating, curing etc., including other incidental hire and
operational charges of all T&P as per approved drawings and as directed during
execution, excluding cost of steel and its fabrication charges as per approved
drawings and technical specifications for finished item of work as per MoRT&H
Specification 2703, 1500, 1600, 1700(5th Revision)
HAND RAILS WITHOUT FOOT
66.00 Rm
766.00
1 Rm
PATHS

Super structure
14

Quantity

15.00 MT

51590.00

1 MT

Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm
size grouted with 0.20 cum of CC (1:4:8) including cost, and conveyance of
materials to site and including labour charges for packing the stones for
revetment etc., complete for finished item of work as per MoRT&H specification
2504 ( 5th revision ) and as directed by the Engineer-in-Charge for quadrential
revetment.
27.00 cum
2710.00
1 cum

773850

73170

S.No
17

Description

Quantity

unit

19

20

21

1 cum

22000

Back filling behind Abutments with gravel (selected earth) including cost
,conveyance of all materials to site etc., complete as per Clause 710.1.4 of
IRC : 78and as per MoRT&H Specification No. 2200 and as per Cl 710.1.4 of IRC :
78
129.00 cum
1604.00
1 cum

206916

Providing and laying of filter media using 50% of 150 mm IRC soling stone and
50 % of 40 mm HBG metal satisfying the requirements laid down in clause
2504.2.2 of MoRT&H specifications to athickness of not less than 600mm with
smaller size towards the soil and bigger size towards the wall and provided over
the entire surface behind the abutment, wing wall and return wall to the full
height compacted to a firm condition including cost and conveyance of all metal
seignorage charges ,and all labour charges as directed by the departmental
officers as per drawing and Technical specifications as per clause 710.1.1 of
IRC:78 and Clause 2200 of MoRT&H (5th Revision) for finished item of work.
53.00 cum
2260.00
1 cum
Providing weep holes in VCC Abutments, Return walls and wing walls with
100mm Diameter AC pipe extending through the full width of the structure at
1.00m C/C in both horizontal and vertical direction so that the weep holes in
each horizontal direction is staggered from the weep holes laying above and
below lines as shown in drawing including cost and conveyance of the A.C pipes
and labour charges for cutting to required length, placing the pipe with a slope of
about 1V : 20H towards stream side face etc., complete for finished item of work
for weep holes as per MoRT&H specification 2706 & 2200 (5th Revision)
420.00

1 Rm

119780

43260

Supplying and fixing of CI drainage spouts complete as per MoRT&H


Specification No.2705 and as per MOST drawing No.SD / 103
3110.00

1 No.

12440

Providing and laying Boulder approns on river bed for protection against scour
with stone boulders weighing not less than 40 Kg each as per drawing and
technical specifications and as per MORTH Specification No.2507.2
Boulders laid dry without wire
crates

24

2000.00

26180

4.00 No.
23

Amount

Providing and laying filter material with Gravel (selected earth)underneath


pitching in slopes including cost, and conveyance of materials to site including
labour charges etc., complete for finished item of work as per MoRT&H
Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge
under Revetment.
14.00 cum
1870.00
1 cum

103.00 Rm
22

Per

Pitching with ssrevetment with300 mm size rough stone including cost, and
conveyance of materials to site and including labour charges for packing the
stones for revetment etc., complete for finished item of work as per MoRT&H
specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for
Pitching of slopes for Toe wall.
11.00 cum

18

Rate

76.00 cum

2050

1 cum

155800

Supply and fixing of high performance expansion joint filler board of 1'' thick
conforming to M.O.S.T for expansion joints approved make including cost and
conveyance of labour charges for fixing etc., complete 25 mm thick (Silflex
Rubber Board)
100.00 sqm

1127

1 sqm

112700

S.No
25

Description

Quantity

unit

Rate

Amount

Dismantling of existing structures like culverts , bridges, retaining walls and


other structures comprising of masonry, cement, concrete, wood work , steel
work, including T&P and scaffolding wherever necessary sorting the dismantled
material, disposal of unserviceable materials and stacking the materials with all
lifts and lead of 1000 m ( By Mechanical means in Cement concrete grade M-15
& M-20) as per MoRTH specification 202 , 2.4 II (A) (5th revision)
100.00 cum

26

Per

637

1 cum

63700

Dismantling of existing structures like Stone Masonry in Cement Mortar by


mechanical means including T&P and scaffolding wherever necessary sorting the
dismantled material, disposal of unserviceable materials and stacking the
materials with all lifts and lead of 1000 m as per MoRTH specification 202 , 2.4
III (B) (5th revision)
88.00 cum
356
1 cum
Total

Rs.

31328
9485249

Asst. Executive Engineer (R&B),


R&B Section, Razole

Deputy Executive Engineer (R&B),


R&B Subdivision, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Superintending Engineer (R&B),


R&B Circle, Kakinada

N.W :-ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in km 6/4 of
Sivakodu- Manepalli Road in E.G.Dt.
BRIDGE DETAILED ESTIMATE
S.
No.
1

a)

b)

Description

No

Length

Bredth

Depth

In ordinary soils upto SDR soils using Machinery


Below low water level +1.290 (Raft top level)
including dewatering charges up to 3.0m depth
1
For Raft portion (1+0.6+0.1+0.3)
Cut off walls on U/S
1
Cut off walls on D/S
1
For jeddy stone approns on U/S(1.2+0.6) 1
On D/S
1

54.410
54.410
54.410
54.410
54.410

14.060
0.600
0.600
2.800
3.700

Avg depth
2.000
1.000
1.500
0.900
0.900

54.410

14.060

0.300
or say

229.50
230.00 cum

PCC(1:3:6) Nominal mix in foundation with crushed stone aggregate 40 mm nominal size
mechanically mixed placed in foundation and compacted by vibration including curing complete
asper Morth Spn no.2100.
1

Under Raft
(14.06-0.6-0.6)

54.410

12.860

0.100
or say

1530.01
32.65
48.97
137.11
181.19
1929.92
1930.00 cum

Sand filling under foundation including cost and conveyence of all materials to site and watering,
tamping etc., complete for finished item of work as per MoRTH &H specification 304 (5th
Revision) and as directed by the Engineer-In-Charge.
under Raft

Unit

Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as
per drawing and technical specification including setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter, dressing sides of bottom, back filling the
excavation earth to the extent required etc., complete for finished item of work as per MoRT&H
specification 304(5th Revision)
In ordinary soils upto SDR soils using Machinery
above low water level +1.290 (Raft top level)
Avg depth
excluding dewatering charges
1
54.410
14.060
1.050
803.25
For Raft portion avg depth
For jeddy stone approns on U/S
1
54.410
2.800
1.050
159.97
On D/S
1
54.410
3.700
1.050
211.38
Toe walls (3.14*6.580*2/4)
4
10.331
0.600
0.600
14.88
(rcl-sill+0.3)
1189.48
say
1190.00 cum

or say
2

Quantity

69.97
69.97
70.00 cum

Vibrated Reinforced cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size
HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour
charges for machine mixing,laying in position, Compacting , Vibrating and curing including all
other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for Raft
For Raft

54.41

14.06

0.600
or say

459.00
459.00
460.00 cum

S.
No.
5

Description

No

Length

Bredth

Depth

1
1
2
5
5

54.410
54.410
12.700
13.760
13.760

0.600
0.600
2.850
1.820
2.820

1.000
1.500
1.000
0.500
0.500
or say

32.65
48.97
72.39
62.61
97.01
313.62
314.00 cum

Vibrated cement concrete M 20 Grade Concrete using 20mm and 10mm size HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including costand conveyance of all materials to site and all labour charges for machine
mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all
other operational charges of T&P required etc., complete as per MoRT&H Specification
1500,1700, 2200 (5th Revision) for Sub structure for Abutments and Piers
Abutments (2.35+0.72)/2
Piers
cut waters (3.14*(0.82^2+0.82^2)/2/4)

Unit

Vibrated cement concrete M 20 Grade Concrete using 20mm and 10mm size HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost,and conveyance of all materials to site and all labour charges for machine
mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all
other operational charges of T&P required etc., complete as per MoRT&H Specification
1500,1700, 2100 (5th Revision) for footings of Abutments,Piers and Cut off walls .
Cut off walls on U/S
Cut off walls on D/S
Abutments (3.35+2.35)/2
Piers footing I
Piers footing II

Quantity

2
5
5

12.700
12.940
0.528

1.535
0.820

5.130
5.130
5.130

200.01
272.17
13.54
485.72
or say
486.00 cum
Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, conveyance of all materials to site and labour charges, centering,
machine mixing, laying, vibrating, curing etc., including other incidental hire and operational
charges of all T&P as per approved drawings and as directed during execution but excluding
cost of steel and its fabrication charges for finished item as per MoRT&H specification
1500,1600,1700 & 2200 (5th revision ) and as directed by the Engineer-in-Charge for
Substructure Bed blocks and backing walls
Abutments bed blocks
12.700 0.770
0.300
5.87
2
Abutments backing walls
2
12.700
0.300
0.775
5.91
-2
11.445
0.300
0.300
-2.06
Pier bed blocks
5
12.000
0.920
0.300
16.56
Cut waters (3.14*0.92*0.92/4)
5
0.664
0.300
1.00
27.27
or say
28.00 cum
Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, conveyance of all materials to site and labour charges, centering,
machine mixing, laying, vibrating, curing etc., including other incidental hire and operational
charges of all T&P etc., complete as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification
1500,1600,1700 and as per M.O.T DRG No No.SD/179 for Deck slab
Super structure (0-5m)
For Kerbs over wingwalls (4.0+0.3)

6
4

79.45
4.30

0.550

0.315
or say

476.70
2.98
479.68
480.00 cum

S.
No.
9

Description

No

Length

Bredth

Depth

Quantity

Unit

Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour
charges for machine mixing,laying in position, Compacting , Vibrating and curing including all
other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for Levelling course below approach slab.
Under approach slab

3.500

11.445

0.150
or say

12.02
13.00 cum

10

Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, conveyance of all materials to site and labour charges, centering,
machine mixing, laying, vibrating, curing etc., including all other incidental and operational
charges of all T&P etc., complete for finished item of work as per Approved drawing,excluding
cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2704
and as per MOST Drg.No.SD/104 for Approach slab
2
3.800
11.445
0.368
31.97
Approach slab (0.435+0.30)/2
or say
32.00 cum

11

Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, conveyance of all materials to site and labour charges, centering,
machine mixing, laying, vibrating, curing etc., including all other incidental and operational
charges of all T&P etc., complete for finished item of work as per drawing BD/1-69 (A) but
excluding cost of steel and its fabrication charges as per MoRT&H specification
1500,
1600,1700, & 2702 for wearing coat over Deck slab.
Deck
6
8.890
10.900
0.075
43.61
Approach slab
2
3.800
11.445
0.075
6.52
50.13
or say
51.00 cum

12

Construction of precast VRCC railing of M25 grade using HBG crushed stone aggregate of size not
exceeding 20 mm and fine aggregate conforming to table 1000-2 true to line and grade,
tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical
posts not to exceed 2000mm, leaving adequate space between vertical posts for expansion
including cost, conveyance of all materials to site and labour charges, centering, machine
mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all
T&P as per approved drawings and as directed during execution, excluding cost of steel and its
fabrication charges as per approved drawings and technical specifications for finished item of
work as per MoRT&H Specification 2703, 1500, 1600, 1700(5th Revision)
2 61.9232
123.85
HAND RAILS WITHOUT FOOT PATHS
(6*8.4)*1.058+2*(4+0.3)
or say
124.00 Rm

13

Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters
including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc.,
complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge
and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for
Super structure of R.C.C items.
Super structure
1
6.00
5867
Kgs/span
35.20
Approach slab
1
31.97
85
Kgs/cum
2.72
Wearing coat
1
50.13
35
Kgs/cum
1.75
Hand Rails
1
123.85
14
Kgs/Rm
1.73
kerbs
1
2.98
100
Kgs/cum
0.30
41.71
or say
42.00 MT

S.
No.

Description

No

Length

Bredth

Depth

Quantity

Unit

14

Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters
including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc.,
complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge
and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for
Sub structure of R.C.C items.
For Fly wings
1 #REF!
60.00
Kgs/cum
#REF!
Bed blocks & backing walls
1 27.27
100.00 Kgs/cum
2.73
Skin reinforcement for abutments
2 146.05
5.00
Kgs/sqm
1.46
(2*12.7*5.13+5.13*(2.35+0.72))
Skin reinforcement for Piers
5 141.18
5.00
Kgs/sqm
3.53
(2*12.94*5.13+(5.13*2*(0.82+0.82)/2))
#REF!
Say
#REF! MT

15

Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters
including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc.,
complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge
and as per MoRT&H specification 1600 &2200 (5th revision).
For Raft
1
Skin reinforcement for Abutments
2
12.7(1.0+1*1.414) +1.0*(3.35+2.35))
Skin reinforcement for Piers
5
(13.76*(2.0+2.0)+1.82*2*0.5+2.82*2*0.5)

459.00
36.36
59.68

50.00 Kgs/Cum
60.00 Kgs/sqm

22.95
4.36

5.00 Kgs/sqm

1.49

Say

28.81
29.00 MT

16

Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with
0.20 cum of CC (1:4:8) including cost, and conveyance of materials to site and including labour
charges for packing the stones for revetment etc., complete for finished item of work as per
MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for
quadrential revetment.
3.14*6.280*6.280*1.414/4
4
43.776
0.30
52.53
(RCL-Sill Level)
Say
53.00 cum

17

Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and
including labour charges for packing the stones for revetment etc., complete for finished item of
work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge
for Pitching of slopes for Toe wall.
Toe Walls (2*3.14*6.580)/4
(RCL-Sill Level)+0.3

18

0.60

0.60
Say

14.88
15.00 cum

Providing and laying filter material with Gravel (selected earth)underneath pitching in slopes
including cost, and conveyance of materials to site including labour charges etc., complete for
finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed by the
Engineer-in-Charge under Revetment.
4

19

10.331

43.776

0.15
Say

26.27
27.00 cum

Back filling behind Abutments with gravel (selected earth) including cost ,conveyance of all
materials to site etc., complete as per
Clause 710.1.4 of IRC : 78and as per MoRT&H
Specification No. 2200 and as per Cl 710.1.4 of IRC :78
behind abutments
2x1/2 11.600
RCL-W.C-Thickness of app slab-levelling coarse-sill level

3.308

5.730

219.90
219.90

S.
No.

Description

No

Length

Bredth

B=tan30*h

Depth
Say

Quantity

Unit

220.00 cum

20

Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm
HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to
athickness of not less than 600mm with smaller size towards the soil and bigger size towards the
wall and provided over the entire surface behind the abutment, wing wall and return wall to the
full height compacted to a firm condition including cost and conveyance of all metal seignorage
charges ,and all labour charges as directed by the departmental officers as per drawing and
Technical specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th
Revision) for finished item of work.
behind abutments
2
11.600
0.600
5.730
79.76
79.76
Say
80.00 cum

21

Providing weep holes in VCC Abutments, Return walls and wing walls with 100mm Diameter AC
pipe extending through the full width of the structure at 1.00m C/C in both horizontal and
vertical direction so that the weep holes in each horizontal direction is staggered from the weep
holes laying above and below lines as shown in drawing including cost and conveyance of the A.C
pipes and labour charges for cutting to required length, placing the pipe with a slope of about
1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per
MoRT&H specification 2706 & 2200 (5th Revision)
Abutments (2.35+0.72)/2
2
11.000
5.00
1.535
168.85
168.85
Say
169.00 Rm

22

Supplying and fixing of CI drainage spouts complete as per MoRT&H Specification No.2705 and as
per MOST drawing No.SD / 103

23

Drainage spouts
6
2.00
12.00 no
Providing and laying Boulder approns on river bed for protection against scour with stone
boulders weighing not less than 40 Kg each as per drawing and technical specifications
Boulders laid dry without wire crates
For Jeddy stone approns on U/S (1.20+0.
For Jeddy stone approns on D/S (1.20+0.

24

137.11
181.19
318.30
Say
319.00 cum
Dismantling of existing structures like culverts , bridges, retaining walls and other structures
comprising of masonry, cement, concrete, wood work , steel work, including T&P and scaffolding
wherever necessary sorting the dismantled material, disposal of unserviceable materials and
stacking the materials with all lifts and lead of 1000 m ( By Mechanical means in Cement
concrete grade M-15 & M-20) as per MoRTH specification 202 , 2.4 II (A) (5th revision)
Raft
Abutments Footings

Piers

Bedblocks - Abutment
Bedblocks - Piers
Deck Slab
Other unforeseen items

1
1

1
2
2
2
5
5
5
2
5
7

54.410
54.410

54.410
5.000
5.000
5.000
5.000
5.000
5.000
5.000
5.000
7.000

2.800
3.700

5.500
2.000
1.500
1.200
1.600
1.300
1.000
0.750
0.760
4.500

0.900
0.900

0.600
0.500
0.500
0.500
0.500
0.500
0.500
0.300
0.300
0.575

Say
25

179.55
10.00
7.50
6.00
20.00
16.25
12.50
2.25
5.70
126.79
50.00
436.54
437.00 cum

Dismantling of existing structures like Stone Masonry in Cement Mortar by mechanical means
including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of
unserviceable materials and stacking the materials with all lifts and lead of 1000 m as per
MoRTH specification 202 , 2.4 III (B) (5th revision)

S.
No.

Description

No

Length

Bredth

Depth

Abutment Substructure

5.000

3.900

37.05

Pier Substructure

5.000

(1.2+0.7)/
2
(0.9+0.8)/
2

3.900

82.88

Other unforeseen items


Say

Quantity

Unit

50.00
169.93
170.00 cum

26

Provision for VAT@5%

LS

27

Provision for NAC @ 0.1%

LS

28

Provision for QC Charges @ 1%

LS

29

Seignorage charges(As per statement enclosed)

LS

30

Provision for Sub soil investigation and soil testing

LS

31

Provision for variation in foundations

LS

32

Provision for Pylon construction

LS

32

Provision for Painting to railing etc.,

LS

33

Provision for Unforeseen items and rounding off

LS

Asst. Executive Engineer (R&B),


R&B Section, Razole

Deputy Executive Engineer (R&B),


R&B Subdivision, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Superintending Engineer (R&B),


R&B Circle, Kakinada

N.W :-ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in km 6/4 of
Sivakodu- Manepalli Road in E.G.Dt.
BRIDGE DETAILED ESTIMATE
S.
No.
1

a)

b)

Description

No

Length

Bredth

Depth

In ordinary soils upto SDR soils using Machinery


Below low water level (Raft top level)
including dewatering charges up to 3.0m depth
1
For Raft portion (1.5+0.8+0.15+0.3)
Cut off walls on U/S
1
Cut off walls on D/S
1
For jeddy stone approns on U/S(1.2+0.6) 1
On D/S
1

18.740
18.740
18.740
18.740
18.740

13.000
0.600
0.600
1.500
3.000

Avg depth
2.750
1.500
1.500
0.900
0.900

18.740

13.000

0.300
or say

73.09
74.00 cum

PCC(1:3:6) Nominal mix in foundation with crushed stone aggregate 40 mm nominal size
mechanically mixed placed in foundation and compacted by vibration including curing complete
asper Morth Spn no.2100.
1

Under Raft
(13-0.6(cutoff wall)-0.6(cutoff wall))

18.740

11.800

0.150
or say

669.96
16.87
16.87
25.30
50.60
779.58
780.00 cum

Sand filling under foundation including cost and conveyence of all materials to site and watering,
tamping etc., complete for finished item of work as per MoRTH &H specification 304 (5th
Revision) and as directed by the Engineer-In-Charge.
under Raft

Unit

Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as
per drawing and technical specification including setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter, dressing sides of bottom, back filling the
excavation earth to the extent required etc., complete for finished item of work as per MoRT&H
specification 304(5th Revision)
In ordinary soils upto SDR soils using Machinery
above low water level (Raft top level)
Avg depth
excluding dewatering charges
1
18.740
13.000
1.050
255.80
For Raft portion avg depth
For jeddy stone approns on U/S
1
18.740
1.500
1.050
29.52
On D/S
1
18.740
3.000
1.050
59.03
Toe walls (3.14*4.775*2/4)
4
7.497
0.600
0.600
10.80
(rcl-sill+0.3)
355.14
say
356.00 cum

or say
2

Quantity

33.17
33.17
34.00 cum

Vibrated Reinforced cement concrete M 20 Grade Concrete using 40mm , 20mm and 10mm size
HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour
charges for machine mixing,laying in position, Compacting , Vibrating and curing including all
other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for Raft
For Raft

18.74

13.00

0.800
or say

194.90
194.90
195.00 cum

S.
No.
5

Description

No

Length

Bredth

Depth

1
1
2
2
1
1
1

18.740
18.740
12.000
12.700
13.000
13.000
13.000

0.600
0.600
3.400
2.400
4.600
3.600
2.600

1.500
1.500
0.500
1.000
0.500
0.500
0.500
or say

16.87
16.87
40.80
60.96
29.90
23.40
16.90
205.69
206.00 cum

Vibrated cement concrete M 20 Grade Concrete using 20mm and 10mm size HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including costand conveyance of all materials to site and all labour charges for machine
mixing, laying in position,Compacting, Vibrating and curing including all other incidental and all
other operational charges of T&P required etc., complete as per MoRT&H Specification
1500,1700, 2200 (5th Revision) for Sub structure for Abutments and Piers
Abutments (1.9+0.7)/2
Pier (1.6+0.760)/2
cut waters (3.14*(0.76^2+1.60^2)/2/4)
Wing walls - Sivakodu side
I Footing
Trapizoidal Footing (3.4+2.4)/2
Wall (2.4+0.45)/2
Wing walls - Manepalli side
I Footing
Trapizoidal Footing (3.4+2.4)/2
Wall (2.4+0.45)/2

2
1
1

12.000
12.240
1.232

1.300
1.180

3.300
3.300
3.300

102.96
47.66
4.06

2
2
2

3.500
3.500
3.500

4.400
2.900
1.425

0.500
1.000
4.050

15.40
20.30
40.40

2
2
2

3.500
3.500
3.500

4.400
2.900
1.425

0.500
1.000
4.050

15.40
20.30
40.40

or say
7

Unit

Vibrated cement concrete M 20 Grade Concrete using 20mm and 10mm size HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost,and conveyance of all materials to site and all labour charges for machine
mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all
other operational charges of T&P required etc., complete as per MoRT&H Specification
1500,1700, 2100 (5th Revision) for footings of Abutments,Piers and Cut off walls .
Cut off walls on U/S
Cut off walls on D/S
Abutments I Footing
Abutments-Trapizoidal Footing(2.9+1.9)/
Pier I footing
Pier II footing
Pier III footing

Quantity

306.88
307.00 cum

Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, conveyance of all materials to site and labour charges, centering,
machine mixing, laying, vibrating, curing etc., including other incidental hire and operational
charges of all T&P as per approved drawings and as directed during execution but excluding
cost of steel and its fabrication charges for finished item as per MoRT&H specification
1500,1600,1700 & 2200 (5th revision ) and as directed by the Engineer-in-Charge for
Substructure Bed blocks and backing walls
Abutments bed blocks
12.000
0.750
0.300
5.40
2
Abutments backing walls
2
12.000
0.300
0.450
3.24
Pier bed blocks
1
12.240
0.900
0.300
3.30
Cut waters (3.14*0.90*0.90/4)
1
0.636
0.300
0.19
12.14
or say
13.00 cum

S.
No.
8

Description

No

Length

Bredth

Depth

Unit

Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, conveyance of all materials to site and labour charges, centering,
machine mixing, laying, vibrating, curing etc., including other incidental hire and operational
charges of all T&P etc., complete as per approved drawings and as directed during execution but
excluding cost of steel and its fabrication charges for finished item as per MoRT&H specification
1500,1600,1700 and as per M.O.T DRG No No.SD/112 for Deck slab
Super structure (0-5m)
For Kerbs over wingwalls (3.50+0.3)

2
4

70.81
3.80

0.550

0.315
or say

Quantity

141.62
2.63
144.25
145.00 cum

Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG
crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate
conforming to table 1000-2) including cost, and conveyance of all materials to site and all labour
charges for machine mixing,laying in position, Compacting , Vibrating and curing including all
other incidental and all other operational charges of T&P required etc., complete as per MoRT&H
Specification 1500,1700, 2100 (5th Revision) for Levelling course below approach slab.
Under approach slab

3.500

10.150

0.150
or say

10.66
11.00 cum

10

Vibrated reinforced cement concrete M.30 grade using 20mm & 10mm HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, conveyance of all materials to site and labour charges, centering,
machine mixing, laying, vibrating, curing etc., including all other incidental and operational
charges of all T&P etc., complete for finished item of work as per Approved drawing,excluding
cost of steel and its fabrication charges as per MoRT&H specification 1500, 1600,1700, & 2704
and as per MOST Drg.No.SD/104 for Approach slab
2
3.800
10.150
0.300
23.14
Approach slab
or say
24.00 cum

11

Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table
1000-2) including cost, conveyance of all materials to site and labour charges, centering,
machine mixing, laying, vibrating, curing etc., including all other incidental and operational
charges of all T&P etc., complete for finished item of work as per drawing BD/1-69 (A) but
excluding cost of steel and its fabrication charges as per MoRT&H specification
1500,
1600,1700, & 2702 for wearing coat over Deck slab.
Deck
2
8.740
10.900
0.075
14.29
Approach slab
2
3.800
10.900
0.075
6.21
20.50
or say
21.00 cum

12

Construction of precast VRCC railing of M25 grade using HBG crushed stone aggregate of size not
exceeding 20 mm and fine aggregate conforming to table 1000-2 true to line and grade,
tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical
posts not to exceed 2000mm, leaving adequate space between vertical posts for expansion
including cost, conveyance of all materials to site and labour charges, centering, machine
mixing, laying, vibrating, curing etc., including other incidental hire and operational charges of all
T&P as per approved drawings and as directed during execution, excluding cost of steel and its
fabrication charges as per approved drawings and technical specifications for finished item of
work as per MoRT&H Specification 2703, 1500, 1600, 1700(5th Revision)
2
32.99
65.98
HAND RAILS WITHOUT FOOT PATHS
(3*8.0)*1.058+2*(3.5+0.3)
or say
66.00 Rm

S.
No.

Description

No

Length

Bredth

Depth

Quantity

Unit

13

Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters
including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc.,
complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge
and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for
Super structure of R.C.C items.
Super structure
1
2.00
5867
Kgs/span
11.73
Approach slab
1
23.14
85
Kgs/cum
1.97
Wearing coat
1
20.50
35
Kgs/cum
0.72
Hand Rails
1
65.98
14
Kgs/Rm
0.92
kerbs
1
2.63
100
Kgs/cum
0.26
15.61
or say
16.00 MT

14

Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters
including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc.,
complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge
and as per MoRT&H specification 1600 &2200 (5th revision) and as per I.S.1786 of 1985 for
Sub structure of R.C.C items.
Bed blocks & backing walls
Skin reinforcement for abutments
(2*12.0*5.13+5.13*(1.90+0.70))
Skin reinforcement for Piers
(2*12.24*5.13+(5.13*2*(1.60+0.76)/2))

1 12.14
2 136.46
1

137.69

100.00
5.00
5.00

Kgs/cum
Kgs/sqm
Kgs/sqm

Say
15

1.21
1.36
0.69
3.27
3.50 MT

Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters
including cost and conveyance of steel to site and all labour charges for fabrication of
reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc.,
complete including cost and conveyance of binding wire and all handling charges and operational
charges etc., and including over lapping welding if required etc., complete for all R.C.C items for
finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge
and as per MoRT&H specification 1600 &2200 (5th revision).
For Raft
1
Skin reinforcement for Abutments
2
12.0(1.0+1*1.414) +1.0*(2.90+3.40))
Skin reinforcement for Piers
1
(13.00*(2.0+2.0)+1.82*2*0.5+2.82*2*0.5)

194.90
36.36
59.68

50.00 Kgs/Cum
60.00 Kgs/sqm

9.74
4.36

5.00 Kgs/sqm

0.30

Say

14.41
15.00 MT

16

Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with
0.20 cum of CC (1:4:8) including cost, and conveyance of materials to site and including labour
charges for packing the stones for revetment etc., complete for finished item of work as per
MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge for
quadrential revetment.
3.14*4.475*4.475*1.414/4
4
22.228
0.30
26.67
(RCL-Sill Level)
Say
27.00 cum

17

Pitching with 300 mm size rough stone including cost, and conveyance of materials to site and
including labour charges for packing the stones for revetment etc., complete for finished item of
work as per MoRT&H specification 2504 ( 5th revision ) and as directed by the Engineer-in-Charge
for Pitching of slopes for Toe wall.
Toe Walls (2*3.14*4.775)/4

7.497

0.60

0.60

10.80

S.
No.

Description

No

Length

Bredth

(RCL-Sill Level)+0.3
18

Say

Quantity

Unit

11.00 cum

Providing and laying filter material with Gravel (selected earth)underneath pitching in slopes
including cost, and conveyance of materials to site including labour charges etc., complete for
finished item of work as per MoRT&H Specification 2504 (5th Revision) and as directed by the
Engineer-in-Charge under Revetment.
4

20

Depth

22.228

0.15
Say

13.34
14.00 cum

Back filling behind Abutments with gravel (selected earth) including cost ,conveyance of all
materials to site etc., complete as per
Clause 710.1.4 of IRC : 78and as per MoRT&H
Specification No. 2200 and as per Cl 710.1.4 of IRC :78
behind abutments
2x1/2 10.900
RCL-W.C-Thickness of app slab-levelling coarse-sill level

2.900

4.050
Say

128.02
128.02
129.00 cum

21

Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm
HBG metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to
athickness of not less than 600mm with smaller size towards the soil and bigger size towards the
wall and provided over the entire surface behind the abutment, wing wall and return wall to the
full height compacted to a firm condition including cost and conveyance of all metal seignorage
charges ,and all labour charges as directed by the departmental officers as per drawing and
Technical specifications as per clause 710.1.1 of IRC:78 and Clause 2200 of MoRT&H (5th
Revision) for finished item of work.
behind abutments
2
10.900
0.600
4.050
52.97
52.97
Say
53.00 cum

22

Providing weep holes in VCC Abutments, Return walls and wing walls with 100mm Diameter AC
pipe extending through the full width of the structure at 1.00m C/C in both horizontal and
vertical direction so that the weep holes in each horizontal direction is staggered from the weep
holes laying above and below lines as shown in drawing including cost and conveyance of the A.C
pipes and labour charges for cutting to required length, placing the pipe with a slope of about
1V : 20H towards stream side face etc., complete for finished item of work for weep holes as per
MoRT&H specification 2706 & 2200 (5th Revision)
Abutments (1.90+0.70)/2
2
12.000
3.30
1.300
102.96
102.96
Say
103.00 Rm

23

Supplying and fixing of CI drainage spouts complete as per MoRT&H Specification No.2705 and as
per MOST drawing No.SD / 103

24

Drainage spouts
2
2.00
4.00 no
Providing and laying Boulder approns on river bed for protection against scour with stone
boulders weighing not less than 40 Kg each as per drawing and technical specifications
Boulders laid dry without wire crates
For Jeddy stone approns on U/S (1.20+0.
For Jeddy stone approns on D/S (1.20+0.

25

25.30
50.60
75.90
Say
76.00 cum
Dismantling of existing structures like culverts , bridges, retaining walls and other structures
comprising of masonry, cement, concrete, wood work , steel work, including T&P and scaffolding
wherever necessary sorting the dismantled material, disposal of unserviceable materials and
stacking the materials with all lifts and lead of 1000 m ( By Mechanical means in Cement
concrete grade M-15 & M-20) as per MoRTH specification 202 , 2.4 II (A) (5th revision)
Abutments Footings

Bedblocks - Abutment

1
1

2
2
2
2

18.740
18.740

5.000
5.000
5.000
5.000

1.500
3.000

2.000
1.500
1.200
0.750

0.900
0.900

0.500
0.500
0.500
0.300

10.00
7.50
6.00
2.25

S.
No.

Description
Bedblocks - Piers
Deck Slab
Other unforeseen items

No

Length

Bredth

Depth

5
1

5.000
7.000

0.760
4.500

0.300
0.575

Say
26

Quantity

Unit

5.70
18.11
50.00
99.56
100.00 cum

Dismantling of existing structures like Stone Masonry in Cement Mortar by mechanical means
including T&P and scaffolding wherever necessary sorting the dismantled material, disposal of
unserviceable materials and stacking the materials with all lifts and lead of 1000 m as per
MoRTH specification 202 , 2.4 III (B) (5th revision)
Abutment Substructure

5.000

(1.2+0.7)/
2

3.900

Other unforeseen items


Say

37.05
50.00
87.05
88.00 cum

27

Provision for VAT@5%

LS

28

Provision for NAC @ 0.1%

LS

29

Provision for QC Charges @ 1%

LS

30

Seignorage charges(As per statement enclosed)

LS

31

Provision for Sub soil investigation and soil testing

LS

32

Provision for variation in foundations

LS

33

Provision for Pylon construction

LS

34

Provision for Painting to railing etc.,

LS

35

Provision for Unforeseen items and rounding off

LS

Asst. Executive Engineer (R&B),


R&B Section, Razole

Deputy Executive Engineer (R&B),


R&B Subdivision, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Superintending Engineer (R&B),


R&B Circle, Kakinada

N.W:- ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in km 6/4 of
Sivakodu- Manepalli Road in E.G.Dt.
APPROACHES ABSTRACT ESTIMATE
S.
No.

Description

Quantity

unit

Rate

Per

Amount

1 Forming embankment with borrowed useful earth from outside road boundary by
mechanical means upto SDR with all leads and lifts including pre-watering of soil at
borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of
soil, depositing the soil on the embankment, spreading soil, breaking clods, sectioning,
grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to meet
requirement of table 300-2 of MoRT&H, including all hire and operational charges of
T&P , complete for finished item of work as per MoRT&H specification 305 (5th
Revision) (Payment will be made based on level for finished item of work).
496.00 cum
2

2480.00

1 cum

543120

2670.00

1 cum

731580

Providing and applying primer coat with bitumen emulsion on prepared surface of
granular Base including clearing of road surface and spraying primer at the rate of
0.70 kg/sqm using mechanical means as per MoRT&H specification clause No.502 and
as directed by the Engineer-in-Charge.
1050.00 sqm

599664

Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to
Wet Mix macadem specification including cost,seignorage of all materials and
including premixing the material with water at OMC in Mechanical mix plant carriage
of mixed material by tipper to site , laying in uniform layers with paver in
base
courses on well prepared surface and compacting with Vibratory roller to acheive the
desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H
specification.406 (5th revision) for finished item of work.
274.00 cum

1 cum

Construction of Granular sub-base by providing HBG material confirming to Grading IV of MoRT&H Table 400-2 including cost, seigniorage charges and conveyance of all
materials to work site and spreading in uniform layers with motor grader or by
approved means, on prepared surface mixing by mix in place method with Rotavator /
approved means at OMC and compacting with vibratory roller to achieve the desired
density etc., complete for finished item of work as per MoRT&H Specification 401
(5th revision) and as directed by the Engineer-in-charge.
219.00 cum

1209.00

28.10

1 sqm

Providing and applying tack coat with bitumen Emulsion (Medium settting) (Bulk) using
Emulsion pressure distributor at the rate of 0.25 kgs per sqm on the prepared
bituminous/granular surface cleaned with mechanical broom for finished item of work
as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-inCharge.
2100.00 sqm
11.00
1 sqm

29505

23100

Providing and laying of 50 mm thick Dense Graded Bituminous Macadam with 100120 TPH batch type hot mix plant/40-60TPH hot mix plant using HBG crushed
aggregates of grade-2 as per table 500-10 of MoRTH specification 505 (5th revision)
premixed with bituminious binder VG-30 grade @ 4.50% of weight of total volume of
mixture, transported to site, laid over a previously prepared surface with mechanical
paver finisher to the required grade, level and alignment and rolled as per Clauses
501.6 & 501.7 to achieve the desired compaction for finished item of work as directed
by Engineer-In-Charge including hire and operational charges all T & Pand all other
contingent charges necessary including cost of (excluding seigniorage charges) od all
materials etc., complete and as per MoRTH specification No.505 (5th revision)
53.00 cum

7014.00

1 cum

371742

S.
No.
7

Description

Quantity

unit

Rate

Per

Amount

Providing and laying 40mm compacted Bituminous Concrete with 100-120 TPH batch
type hot mix plant/40-60TPH hot mix plant using HBG crushed aggregates of Grading2 as per table 500-7 of specification 507 of MoRTH (5th revision), premixed with
bitumen VG-30 grade @ 5.4% of mix and filler including cost and conveyance of all
materials to work site and transporting the hot mix to work site, laying with
mechanical paver finisher to the required grade, level and alignment, rolling with
smooth wheeled, vibratory and tandom rollers to achieve the desired compaction as
per MoRTH specification 507 (5th revision) complete and as directed by the EngineerIn-Charge.
42.00 cum
8360.00
1 cum

351120

Construction of Gravel shoulders (Selected Earth) including cost, and conveyance of


all materials to work site and spreading in uniform layers by approved means, on
prepared surface and compacting with vibratory roller to achieve the desired density
at OMC etc., complete for finished item of work as per MoRT&H Specification 401&
407 (5th revision) and as directed by the Engineer-in-charge. ( Payment will be made
based on levels for finished item of work ).
338.00 cum

1244.00
Total

1 cum
Rs.

420472
3070303

Asst. Executive Engineer (R&B),


R&B Section, Razole

Deputy Executive Engineer (R&B),


R&B Subdivision, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Superintending Engineer (R&B),


R&B Circle, Kakinada

N.W :- ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in km 6/4 of
Sivakodu- Manepalli Road in E.G.Dt.
APPROACHES DETAILED ESTIMATE
S. No.
1

Description

No

Length

Bredth Depth

1
1

10.00
65.00

12.00
12.00

Avg
0.700
0.500

84.00
390.00

1
1

10.00
65.00

12.00
12.00

0.750
0.500

90.00
390.00

Deduct Crust
(-) Deduct GSB
(-) Deduct WMM
Add for variation in levels

-219.00
-273.75
34.59
495.84
496.00 cum

Say

Construction of Granular sub-base by providing HBG material confirming to Grading - IV of


MoRT&H Table 400-2 including cost, seigniorage charges and conveyance of all materials to work
site and spreading in uniform layers with motor grader or by approved means, on prepared
surface mixing by mix in place method with Rotavator / approved means at OMC and compacting
with vibratory roller to achieve the desired density etc., complete for finished item of work as per
MoRT&H Specification 401 (5th revision) and as directed by the Engineer-in-charge.
For Approaches
Sivakodu side
Manepalli Side

1
1

75.000
75.000

7.30
7.30

0.20
0.20
Say

109.50
109.50
219.00
219.00 cum

Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix
macadem specification including cost,seignorage of all materials and including premixing the
material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site ,
laying in uniform layers with paver in base courses on well prepared surface and compacting
with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and
as per MoRT&H specification.406 (5th revision) for finished item of work.
Sivakodu side
Manepalli Side

1
1

75.000
75.000

7.30
7.30

0.250
0.250
Say

unit

Forming embankment with borrowed useful earth from outside road boundary by mechanical
means upto SDR with all leads and lifts including pre-watering of soil at borrow area, removal of
top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soil on the
embankment, spreading soil, breaking clods, sectioning, grading and consolidation with 8 to 10
Tonnes Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H, including all
hire and operational charges of T&P , complete for finished item of work as per MoRT&H
specification 305 (5th Revision) (Payment will be made based on level for finished item of work).
Sivakodu side
Level portion
Approach portion
Manepalli side
Level portion
Approach portion

Quantity

136.88
136.88
273.75
274.00 cum

Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base
including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using
mechanical means as per MoRT&H specification clause No.502 and as directed by the Engineer-inCharge.
1
75.000
7.00
525.00
Sivakodu side
Manepalli Side

75.000

7.00
Say

525.00
1050.00
1050.00 sqm

Providing and applying tack coat with bitumen Emulsion (Medium settting) (Bulk) using Emulsion
pressure distributor at the rate of 0.25 kgs per sqm on the prepared bituminous/granular surface
cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5 th
revision) and as directed by the Engineer-in-Charge.
Sivakodu side
Manepalli Side

2
2

75.000
75.000

7.00
7.00
Say

1050.00
1050.00
2100.00
2100.00 sqm

Providing and laying of 50 mm thick Dense Graded Bituminous Macadam with 100-120
TPH batch type hot mix plant/40-60TPH hot mix plant using HBG crushed aggregates of
grade-2 as per table 500-10 of MoRTH specification 505 (5th revision) premixed with
bituminious binder VG-30 grade @ 4.50% of weight of total volume of mixture, transported
to site, laid over a previously prepared surface with mechanical paver finisher to the
required grade, level and alignment and rolled as per Clauses 501.6 & 501.7 to achieve the
desired compaction for finished item of work as directed by Engineer-In-Charge including
hire and operational charges all T & Pand all other contingent charges necessary including
cost of (excluding seigniorage charges) od all materials etc., complete and as per MoRTH
specification No.505 (5th revision)
1
75.000
7.00
0.050
26.25
Sivakodu side
1
75.000
7.00
0.050
26.25
Manepalli Side
52.50
Say
53.00 cum

Providing and laying 40mm compacted Bituminous Concrete with 100-120 TPH batch
type hot mix plant/40-60TPH hot mix plant using HBG crushed aggregates of Grading-2 as
per table 500-7 of specification 507 of MoRTH (5th revision), premixed with bitumen VG-30
grade @ 5.4% of mix and filler including cost and conveyance of all materials to work site
and transporting the hot mix to work site, laying with mechanical paver finisher to the
required grade, level and alignment, rolling with smooth wheeled, vibratory and tandom
rollers to achieve the desired compaction as per MoRTH specification 507 (5th revision)
complete and as directed by the Engineer-In-Charge.
1
75.000
7.00
0.040
21.00
Sivakodu side
1
75.000
7.00
0.040
21.00
Manepalli Side
42.00
Say
42.00 cum

Construction of Gravel shoulders (Selected Earth) including cost, and conveyance of all
materials to work site and spreading in uniform layers by approved means, on prepared
surface and compacting with vibratory roller to achieve the desired density at OMC etc.,
complete for finished item of work as per MoRT&H Specification 401& 407 (5 th revision) and
as directed by the Engineer-in-charge. ( Payment will be made based on levels for finished
item of work ).
Sivakodu side
2
75.000
2.50
0.45
168.75
Manepalli Side
2
75.000
2.50
0.45
168.75
337.50
Say
338.00 cum

Provision for VAT @ 5%

LS

10

Provision for NAC @ 0.1%

LS

11

Provision for QC Charges @ 1%

LS

12

Add for Seignorage charges(As per statement enclosed)

LS

13

Provision for Caution boards ,Village name boards & guide stones etc

LS

Asst. Executive Engineer (R&B),


R&B Section, Razole

Deputy Executive Engineer (R&B),


R&B Subdivision, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Superintending Engineer (R&B),


R&B Circle, Kakinada

LEAD CALCULATION FOR VARIOUS MATERIALS UPTO CENTER OF THE WORKING STRETCH
Name of the work: ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in
km 6/4 of Sivakodu- Manepalli Road in E.G.Dt.
-:oOo:Reach proposed in the present estimate: km 6
/ 400 to
Centre KM of the Working Reach=
= 0.000 K.M.
A) For HBG metal:
HBG metal from Katheru quarry
a) Cart track length =
b) Metalled road length:
From km 906 / 400
to
944
From km
31 / 735
to
58
From km
0 / 000
to
0
From km
6 / 400
to
13
0.000
Working K.M.
K.M.
c) Total lead
B) For Gravel:
Gravel from Kadium Quarry
a) Cart track length =
b) Metalled road length:
Quarry at Kadium Quarry
From km
55 / 600
to
60
From km 918 / 200
to
944
From km
31 / 735
to
58
From km
0 / 000
to
0
From km
6 / 400
to
13
0.000
Working K.M.
K.M.
c) Total lead

/
/
/
/

/
/
/
/
/

805
250
941
675

200
805
250
941
675

of NH 5
of NH 5 to RP road
of Kadali Irrigation channel road
of SM road

of Kakinada - Rajahmundry Road


of NH5
of NH 5 to RP road
of Kadali Irrigation channel road
of SM road

400

0.000 kms
0.000 kms

2.200 kms

=
=
=
=
=
=
Or say:

38.405 kms
26.515 kms
0.941 kms
7.275 kms
0.000 kms
75.336 kms
75.000 kms

0.000 kms

=
=
=
=
=
=
=
Or say:

4.600 kms
26.605 kms
26.515 kms
0.941 kms
7.275 kms
0.000 kms
65.936 kms
66.000 kms

=
=
=
=
=
=

1.600 kms
120.600 kms
113.550 kms
5.682 kms
0.000 kms
241.432 kms
241.000 kms

=
=
=
=
=
=
=
=
Or say:

0.110 kms
0.200 kms
9.178 kms
4.800 kms
0.941 kms
7.275 kms
0.000 kms
22.504 kms
22.000 kms

C) For Bitumen & Emulsion :


a) Lead from ex-factory
Visakhapatnam Refinery
b) Metalled road length:
From km
/
to
/
of Refinery to V-V road (NH.5)
From km 719 / 000
to
839 / 600 of Visakhapatnam - Kathipudi
From km
0 / 000
to
113 / 550 of NH 216
From km
6 / 400
to
12 / 082 of SM road
Working K.M.
0.000
K.M.
c) Total lead
Or say:
D) For Sand :
Sand Quarry at River Godavari at P. Gannavaram
River Bed to Panchayat Road
Panchayat Road
From km
49 / 072
to
58 / 250 of Rajavaram - Podalada Road
From km 115 / 550
to
120 / 350 of NH 216
From km
0 / 000
to
0 / 941 of Kadali Irrigation channel road
From km
6 / 400
to
13 / 675 of SM road
0.000
Working K.M.
K.M.
Total lead

Asst. Executive Engineer (R&B), Deputy Executive Engineer (R&B),


R&B Section, Razole
R&B Subdivision, Razole

Superintending Engineer (R&B),


R&B Circle, Kakinada

Executive Engineer (R&B),


R&B Division, Amalapuram

kms
kms

kms
kms
kms
kms
kms
kms
kms
kms

kms

kms
kms
kms
kms
kms
kms
kms
kms

kms
kms
kms
kms
kms
kms
kms

###
###
kms
kms
kms
kms
kms
kms
###

NAME OF WORK ::- ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in km 6/4 of
Sivakodu- Manepalli Road in E.G.Dt.
SOR 2016-17

Sl.
No

Description of Metal

1
2

150 mm IRC Soling stone


40 mm IRC HBG metal
Quarry spall (Field picked metal) Av. of
3
rate 25mm & 40mm
4 Rough stone 300mm Thick
5 Jeddy stone 450 to 600 mm thick
6 40 mm SS-5 HBG M/C metal
7 25 mm SS-5 HBG M/C metal
8 20 mm SS-5 HBG M/C metal
9 12 mm SS-5 HBG M/C metal
10 10 mm SS-5 HBG M/C metal
11 6 mm SS-5 HBG M/C metal
12 Sand for Mortor
13 Sand for Concrete
14 Sand for filling
15 Selected Earth
16 HYSD Steel
17 6mm MS Rods
18 Mild Steel
19 Structural Steel
20 Cement
Note :-

Conveyance
charges excluding
Lead in
Source of Supply
13.615%
Kms
contractors profit
& OH charges

Initial
cost

Machine
Blasting
crushing
charges
charges

Toal Cost
per Cum

Katheru Quarry
-- do --- do --

75.00
75.00

767.06
767.06

95.00
588.00

70.00
70.00

932.06
1425.06

75.00

767.06

49.50

0.00

816.56

-- do --- do -Katheru Quarry


-- do --- do --- do --- do --- do -Godavari river at
Ganavaram
-- do --- do -Kadium Quarry
G.O.Rt No.263
dated 02-05-2016

75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00

767.06
767.06
767.06
767.06
767.06
767.06
767.06
767.06

164.00
206.00
620.00
994.00
1036.00
822.00
692.00
532.00

0.00
0.00
70.00
70.00
70.00
70.00
70.00
70.00

22.00

262.47

165.00

22.00
22.00
66.00

262.47
262.47
683.89

95.00
95.00
103.00

155.00
248.50
259.00
205.50
173.00
133.00

931.06
973.06
1612.06
2079.56
2132.06
1864.56
1702.06
1502.06

###

427.47

###
###
###

357.47
357.47
786.89

###

###

34000.00

###

###

###

35000.00

###
###
### 37000.00
###
###
### 37000.00
###
###
###
5560.00
Seigniorage charges adopted as per GO Ms.No.100 Industries & Commerce Dept Dt.3110-2015.

Sl.
No

1
2
3
4
5
6
7
8
9

Conveyance
charges excluding
Lead in
Source of Supply
13.615%
Kms
contractors profit
& OH charges

Description of Metal

60 to 63
metal
50 to 55
metal
40 to 45
metal
40 to 45
metal

mm IRC and MoRTH HBG


mm IRC and MoRTH HBG
mm IRC and MoRTH HBG

19 to 22 mm IRC and MoRTH HBG M/C


metal
12 to 14 mm IRC and MoRTH HBG M/C
metal
9.5 to 11.20 mm IRC and MoRTH HBG
M/C metal
5 to 7 mm IRC and MoRTH HBG M/C
metal

2.36 to 5 mm IRC and MoRTH HBG


M/C metal
11 HBG Stone chips 2.36mm and below
12 Selected Earth
10

Machine
Blasting
crushing
charges
charges

Toal Cost
per Cum

75.00
75.00
75.00

767.06
767.06
767.06

419.00
456.00
588.00

70.00
70.00
70.00

0.00
0.00
0.00

1256.06
1293.06
1425.06

75.00

767.06

588.00

70.00

147.00

1572.06

-- do --

75.00

767.06

944.00

70.00

236.00

2017.06

-- do --

75.00

767.06

984.00

70.00

246.00

2067.06

-- do --

75.00

767.06

780.00

70.00

195.00

1812.06

-- do --

75.00

767.06

656.00

70.00

164.00

1657.06

-- do --

75.00

767.06

504.00

70.00

126.00

1467.06

-- do --

75.00

767.06

308.00

70.00

77.00

1222.06

-- do -Kadium Quarry

75.00
66.00

767.06
683.89

350.00
103.00

0.00
0.00

0.00
0.00

1117.06
786.89

Katheru Quarry
-- do --- do -mm IRC and MoRTH HBG M/C Katheru Quarry

25 to 27 mm IRC and MoRTH HBG M/C


metal

Initial
cost

Note :-

Seigniorage charges adopted as per GO Ms.No.100 Industries &


Commerce Dept Dt.31-10-2015.

Asst. Executive Engineer (R&B),

Deputy Executive Engineer (R&B),

Executive Engineer (R&B),

Superintending Engineer (R&B),

R&B Section, Razole

R&B Subdivision, Razole

R&B Division, Amalapuram

R&B Circle, Kakinada

COST OF BITUMEN / MT
ReConstruction of Bridge (2V X 8.37m) across Kunavaram
Medium drain in km 6/4 of Sivakodu- Manepalli Road in E.G.Dt.

Name of Work
Ref ::-

For Emulsion (Bulk) :- HINCOL Price List With Effect From Dt.01-06-16
For Bulk Bitumen 80/100, 60/70:- HPCL Price List With Effect From Dt.01-06-16

Basic Price
Lead from
Vizag

Bulk 80/100 Gr.

Bulk 60/70 Gr.

Emulsion (Bulk)

VIZAG

VIZAG

VIZAG

28,136.68

241.00

Kms

723.00

28,076.83

31,878.00

723.00

723.00

28,799.83

32,601.00

Lead charges for Bulk @


1.50

per KM
.
28,859.68

Asst. Executive Engineer (R&B),


R&B Section, Razole

Deputy Executive Engineer (R&B),


R&B Subdivision, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Superintending Engineer (R&B),


R&B Circle, Kakinada

DATA

Name of Work :ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in
km 6/4 of Sivakodu- Manepalli Road in E.G.Dt.
1

Quantity
Description of Item
Rate
per
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as
drawing and technical specification including setting out, construction of shoring and bracing, remo
of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth
the extent required etc., complete for finished item of work as per MoRT&H specification 304
Revision) and as directed by the Engineer-in-Charge

(a) Above LWL Excluding dewatering Charges


In ordinary soils upto SDR soils using Machinery upto 3M Depth.
Unit : Cum
Taking out put = 240 Cum
(A) Labour
0.32 day

Page 323 of MoRT&H SDB

8.00 day

Mate
Mazdoor unskilled

0.00 %

Add for M.A Allowance@20% on Labour

(B) Machinery
240.00 cum
Rate as per G.O. Ms No 10, Dt 26/7/2005

400.00
350.00

day
day

13.00

cum

Cost per 240 cum (A)+(B)


Add for Over head charges @ 19.615% on (A)+(B)
19.615 %
Add for Contractors profit
10.00 %
Cost per 240 cum
Rate for 1 cum
Rate to be adopted

(b) Below LWL including dewatering Charges


In ordinary soils upto SDR soils using Machinery upto 3M Depth.
Unit : Cum

Page 323 of MoRT&H SDB

Taking out put = 240 Cum


(A) Labour
0.32 day
8.00 day
0.00 %

Mate
Mazdoor unskilled
Add for M.A Allowance@20% on Labour

(B) Machinery
240.00 cum
Rate as per G.O. Ms No 10, Dt 26/7/2005
5.00 %

Add for Dewatering charges (labour+Machinery)

Cost per 240 cum (A)+(B)


Add for Over head charges @ 19.615% on (A)+(B)
19.615 %
Add for Contractors profit
10.00 %
Cost per 240 cum
Rate for 1 cum
Rate to be adopted

400.00
350.00

day
day

13.00

cum

Quantity

Description of Item

Rate

Sand filling under foundation including cost and conveyence of all materials to site and wateri
tamping etc., complete for finished item of work as per MoRTH &H specification 304 (5th Revision) a
as directed by the Engineer-In-Charge.
Unit = cum
Taking output = 1 cum
(A) Labour
0.01 nos
0.30 nos
0.00 %

Page 422 of MoRT&H SDB

Mate
Mazdoor
Add for M.A Allowance@20% on Labour
Total

(B) Material
1.20 cum
Sand for filling (assuming 20% voids)
Total
(C) Over head charges @ 19.615 % (25%-VAT)
Add for Over head charges @ 19.615% on (A)+(B)
19.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 1 cum (D)+ ( E)
Rate to be adopted

per

400.00
350.00

day
day

357.47

cum

PCC(1:3:6) Nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanic
mixed placed in foundation and compacted by vibration including curing complete asper Morth S
no.2100.
Unit = cum
Taking output = 15 cum
(A) Labour
0.64 nos
Mate
day
400.00
1.00 nos
Mason(30% I Class& 70% 11class)
day
413.50
15.00 nos
Mazdoor
day
350.00
0.00 %
Add for M.A Allowance@20% on Labour
Total
(B) Material
13.50 cum
1612.06
cum
Cost of 40mm SS-5 HBG M/C metal
6.75 cum
Sand at site
357.47
cum
3.45 MT
Cement at site
5560.00
MT
Total
(c) Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
456.20
hr
6.00 hr
Generator set 35 KVA
832.30
hr
2.00 hr
Water Tanker 6 KL Capacity
879.90
hr
(D) Over head charges @ 19.615 %
Add for Over head charges @ 19.615% on (A)+(B)+( C)
19.615 %
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 15 cum
Rate for 1 cum
Rate to be adopted

Quantity
Description of Item
Rate
per
Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggreg
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) includ
cost, seigniorage conveyance of all materials to site and labour charges, centering, machine mixi
laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P as
approved drawings and as directed during execution but excluding cost of steel and its fabricat
charges for finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th Revision ) and
directed by the Engineer-in-Charge for footings of Raft
Unit = cum
Taking output = 15 cum
(A) Labour
0.86 nos
1.50 nos
20.00 nos
0.00 %
(B) Material
8.10 cum
5.40 cum
6.75 cum
5.12 MT

Page 472,457 of MoRT&H SDB

Mate
Mason
Mazdoor
Add for M.A Allowance@20% on Labour
Total
Cost of 20mm SS-5 HBG M/C metal
Cost of 10mm SS-5 HBG M/C metal
Sand at site
Cement at site
Total

(c) Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
Total

400.00
413.50
350.00

day
day
day

2132.06
1702.06
357.47
5560.00

cum
cum
cum
MT

456.20
832.30

hr
hr

Basic rate for 15 cum concrete (A)+(B)+(C)


(D) Form work
4.00 %
Form work @ 10% on (A)+(B)+( C)
73036.21
(E) Over head charges @ 19.615 % (25%-VAT)
Add for Over head charges @ 19.615% on (A)+(B)+( C)+(D)
19.615 %
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

Cum

Vibrated cement concrete M 20 Grade Concrete using 20mm and 10mm size HBG crushed sto
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 10
2) including cost,and conveyance of all
materials to site and all labour charges for mach
mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all ot
operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (
Revision) for footings of Abutments,Piers and Cutoff walls
Unit = cum
Taking output = 15 cum
(A) Labour
0.86 nos
1.50 nos
20.00 nos
0.00 %

Page 335 of MoRT&H SDB

Mate
Mason
Mazdoor
Add for M.A Allowance@20% on Labour
Total

(B) Material
8.10 cum
Cost of 20mm SS-5 HBG M/C metal
5.40 cum
Cost of 10mm SS-5 HBG M/C metal
6.75 cum
Sand at site

400.00
413.50
350.00

day
day
day

2132.06
1702.06
357.47

cum
cum
cum

Quantity
5.12 MT

Description of Item
Cement at site
Total
(c) Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA

Rate
5560.00

per
MT

456.20
832.30

hr
hr

(D) Form work


4.00 %
Form work @ 4% on (A)+(B)+( C)
73036.21
(E) Over head charges @ 19.615%
Add for Over head charges @ 19.615% on (A)+(B)+( C)+(D)
19.615 %
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

Cum

Vibrated cement concrete M20 Grade Concrete using 20mm and 10mm size HBG crushed sto
aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 10
2) including cost,and conveyance of all materials to site and all labour charges for machine mixi
laying in position,Compacting, Vibrating and curing including all other incidental and all ot
operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2200 (
Revision) for Sub structure for Abutments & Piers
Unit = cum
Taking output = 15 cum
(A) Labour
0.86 nos
1.50 nos
20.00 nos
0.00 %
(B) Material
8.10 cum
5.40 cum
6.75 cum
5.12 MT

Mate
Mason
Mazdoor
Add for M.A Allowance@20% on Labour
Total

Cost of 20mm SS-5 HBG M/C metal


Cost of 10mm SS-5 HBG M/C metal
Sand at site
Cement at site
Total
(c) Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA

400.00
413.50
350.00

day
day
day

2132.06
1702.06
357.47
5560.00

cum
cum
cum
MT

456.20
832.30

hr
hr

(D) Form work


10.00 %
Form work @ 10% on (A)+(B)+( C)
73036.21
(E) Over head charges @ 19.615 % (25%-VAT)
Add for Over head charges @ 19.615% on (A)+(B)+( C)+(D)
19.615 %
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

Cum

Quantity
Description of Item
Rate
per
Vibrated reinforced cement concrete M 20 grade using 20mm & 10mm HBG crushed stone aggreg
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) includ
cost, conveyance of all materials to site and labour charges, centering, machine mixing, layi
vibrating, curing etc., including other incidental hire and operational charges of all T&P as per approv
drawings and as directed during execution but excluding cost of steel and its fabrication charges
finished item as per MoRT&H specification 1500,1600,1700 & 2200 (5th Revision ) and as directed
the Engineer-in-Charge for Abutments, Fly wings, Bed blocks & Backing walls (or Substructure)
Unit = cum
Taking output = 15 cum

Page 472,457 of MoRT&H SDB

(A) Labour
0.86 nos
1.50 nos
20.00 nos
0.00 %
(B) Material
8.10 cum
5.40 cum
6.75 cum
5.12 MT

Mate
Mason
Mazdoor
Add for M.A Allowance@20% on Labour
Total
Cost of 20mm SS-5 HBG M/C metal
Cost of 10mm SS-5 HBG M/C metal
Sand at site
Cement at site
Total

400.00
413.50
350.00

day
day
day

2132.06
1702.06
357.47
5560.00

cum
cum
cum
MT

(c) Machinery
6.00 hr

Concrete mixer 0.4/0.28 cum

456.20

hr

6.00 hr

Generator set 35 KVA

832.30

hr

73036.21

Cum

Total
a) ForBed blocks & Backing walls Htup to 5 M
Basic rate for 15 cum concrete (A)+(B)+(C)
(D) Form work
10.00 %
Form work @ 10% on (A)+(B)+( C)
(E) Over head charges @ 19.615 % (25%-VAT)

Add for Over head charges @ 19.615 % on (A)+(B)+( C)+(D)


19.615 %
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

Vibrated reinforced cement concrete M 25 grade using 20mm & 10mm HBG crushed stone aggreg
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) includ
cost, seigniorage conveyance of all materials to site and labour charges, centering, machine mixi
laying, vibrating, curing etc., including other incidental hire and operational charges of all T&P e
complete as per approved drawings and as directed during execution but excluding cost of steel and
fabrication charges for finished item as per MoRT&H specification 1500,1600,1700 (5th Revision)
Deck slab
A. RCC Grade M20
Deck slab
Unit = cum
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
day
400.00
1.50 nos
Mason
day
413.50
20.00 nos
Mazdoor
day
350.00
0.00 %
Add for M.A Allowance@20% on Labour
Total
(B) Material
8.10 cum
2132.06
cum
Cost of 20mm SS-5 HBG M/C metal
5.40 cum
1702.06
cum
Cost of 10mm SS-5 HBG M/C metal

Quantity
6.75 cum
5.99 MT

Description of Item
Sand at site
Cement at site
Total
(c) Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA

Rate
357.47
5560.00

per
cum
MT

456.20
832.30

hr
hr

Total rate per 15 Cum. (A)+(B)+(C)


a) Deck Slabs form work upto 5M Ht. 20% to 30 % of basic Rate of concrete
Cost of Concrete for 15 Cum.
20.00 %
Cost of concrete for height0 to 5 M
77873.41
Over head charges @ 19.615 % (25%-VAT)
Add for Over head charges @ 19.615% on (A)+(B)+( C)
19.615 %
Total
Add Contractors Profit at 10%
Cost per 15 cum
Rate for 1 cum
Rate to be adopted

Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size HBG crush
stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to ta
1000-2) including cost,and conveyance of all materials to site and all labour charges for mach
mixing,laying in position, Compacting , Vibrating and curing including all other incidental and all ot
operational charges of T&P required etc., complete as per MoRT&H Specification 1500,1700, 2100 (
Revision) for Levelling course below approach slab.
Unit = cum
(A) Labour
0.86 nos
1.50 nos
20.00 nos
0.00 %
(B) Material
8.10 cum
4.05 cum
1.35 cum
6.75 cum
4.13 MT

Page 335 of MoRT&H SDB


Mate
Mason
Mazdoor
Add for M.A Allowance@20% on Labour
Total
Cost of 40mm SS-5 HBG M/C metal
Cost of 20mm SS-5 HBG M/C metal
Cost of 10mm SS-5 HBG M/C metal
Sand at site
Cement at site
Total

(c) Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA

Taking output = 15 cum


400.00
413.50
350.00

day
day
day

1612.06
2132.06
1702.06
357.47
5560.00

cum
cum
cum
cum
MT

456.20
832.30

hr
hr

(E) Over head charges @ 19.615 % (25%-VAT)


Add for Over head charges @ 19.615% on (A)+(B)+( C)
19.615 %
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

Quantity
Description of Item
Rate
per
10 Vibrated reinforced cement concrete M30 grade using 20mm & 10mm HBG crushed stone aggreg
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) includ
cost, conveyance of all materials to site and labour charges, centering, machine mixing, layi
vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete
finished item of work as per Approved drawing,excluding cost of steel and its fabrication charges as
MoRT&H specification 1500, 1600,1700, & 2704 (5th Revision) and as directed by the Engineer
Charge for Approach slab.
Unit = cum
Taking output = 15 cum
(A) Labour
0.86 nos
Mate
day
400.00
1.50 nos
Mason
day
413.50
20.00 nos
Mazdoor
day
350.00
0.00 %
Add for M.A Allowance@20% on Labour
Total
(B) Material
8.10 cum
2132.06
cum
Cost of 20mm SS-5 HBG M/C metal
5.40 cum
1702.06
cum
Cost of 10mm SS-5 HBG M/C metal
6.75 cum
Sand at site
357.47
cum
6.10 MT
Cement at site
5560.00
MT
Total
(c) Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
Total
(D) Form work
2.00 %
Form work @ 2% on (A)+(B)+( C)
(E) Over head charges @ 19.615 % (25%-VAT)
Add for Over head charges @ 19.615% on (A)+(B)+(
19.615 %
(F) Total of (A) + (B)+( C)+(D)+(E)
(G) Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted

456.20
832.30

hr
hr

78485.01

Cum

C)+((D)

11 Vibrated reinforced cement concrete M 30 grade using 20mm & 10mm HBG crushed stone aggreg
(Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) includ
cost, conveyance of all materials to site and labour charges, centering, machine mixing, layi
vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete
finished item of work as per drawing BD/1-69 (A) but excluding cost of steel and its fabrication char
as per MoRT&H specification
1500, 1600,1700, & 2702 (5th Revision) and as directed by
Engineer-in-Charge for wearing coat over Deck slab.
Unit = cum
Page 477,492 of MoRT&H SDB
Taking output = 15 cum
(A) Labour
0.90 nos
Mate
day
400.00
1.50 nos
Mason
day
413.50
21.00 nos
Mazdoor
day
350.00
0.00 %
Add for M.A Allowance@20% on Labour
Total
(B) Material
8.10 cum
2132.06
cum
Cost of 20mm SS-5 HBG M/C metal
5.40 cum
1702.06
cum
Cost of 10mm SS-5 HBG M/C metal
6.75 cum
Sand at site
357.47
cum
6.10 MT
Cement at site
5560.00
MT
Total
(c) Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA

456.20
832.30

hr
hr

Quantity

Description of Item
Rate for 1 Cum M30 Concrete

0.15 nos
0.00 %

Labour for cleaning deck slab concrete


Add for M.A Allowance@20% on Labour

Rate

per

320.00

day

(D) Over head charges @ 19.615 % (25%-VAT)


Add for Over head charges @ 19.615%
19.615 %
(E) Total
(F) Add Contractors Profit at 10% on (E)
Rate for 1 cum M30 Concrete
Rate to be adopted

12 Construction of precast VRCC railing of M25 grade using HBG crushed stone aggregate of size
exceeding 12 mm and fine aggregate conforming to table 1000-2 true to line and grade, tolerance
vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical posts not to exce
2000mm, leaving adequate space between vertical posts for expansion including cost, conveyance of
materials to site and labour charges, centering, machine mixing, laying, vibrating, curing etc., includ
other incidental hire and operational charges of all T&P as per approved drawings and as direct
during execution, excluding cost of steel and its fabrication charges as per approved drawings a
technical specifications for finished item of work as per MoRT&H Specification 2703, 1500, 16
1700(5th Revision)
Unit = 1 RM
Hand rails without foot paths
Takingoutput = 8.0M span
Material
M30 grade VRCC
No. of vertical end posts = 2 x 0.275x 0.25 x0.86 =
0.1183
Internal vertical posts =5x0.275x0.25x0.86=
0.2956
hand rail in 2 tier =8.4-(2x0.25+5x0.25)=6.65 RM
quantity of RCC = 2x6.65x0.20x0.175 =
0.4655
Total Concrete =
0.8794
VRCC M 25 Grade
(A) Labour
0.86 nos
Mate
day
400.00
1.50 nos
Mason
day
413.50
20.00 nos
Mazdoor
day
350.00
0.00 %
Add for M.A Allowance@20% on Labour
Total
(B) Material
8.10 cum
1864.56
cum
Cost of 12mm SS-5 HBG M/C metal
5.40 cum
Cost of 10mm SS-5 HBG M/C metal
1702.06
cum
6.75 cum
Sand at site
357.47
cum
5.99 MT
Cement at site
5560.00
MT
Total
(c) Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
456.20
hr
6.00 hr
Generator set 35 KVA
832.30
hr
Total
Cost per 15 cum (A)+(B)+(C)
Rate for 1 cum
Cost of Railing for one side
0.8794 Cum
Cost per
8 RM =
5047.11
cum
5%
Add for form work for casting in casting yard
5%

Add for handling and fixing of precast pannels


4660.35
Cost per 8.4RM
Over head charges @ 19.615 % (25%-VAT)
Add for Over head charges @ 19.615% on (A)+(B)+( C)
19.615 %
10.00 %

Add Contractors Profit at 10% on

5853.20

Quantity

Description of Item
Cost per 8.4RM
Cost per 1 RM =
Rate to be adopted

Rate

per

6438.52 / 8.40

13 Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters includ
cost and conveyance of steel to site and all labour charges for fabrication of reinforcement includ
cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost a
conveyance of binding wire and all handling charges and operational charges etc., and including o
lapping welding if required etc., complete for all R.C.C items for finished item of work as per stand
drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &22
(5th Revision) and as per I.S.1786 of 1985 for foundations of R.C.C items.
Unit = MT
Taking output = 1 MT
(A) Labour
0.40 nos
2.00 nos
6.00 nos
0.00 %

Page 448 of MoRT&H SDB

Mate
Black smith
Mazdoor
Add for M.A Allowance@20% on Labour
Total

(B) Material
1.05 MT
HYSD bars including overlaps
6.00 Kg
Binding wire
Total
(C) Over head charges @ 19.615 % (25%-VAT)
Add for Over head charges @ 19.615% on (A)+(B)
19.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Rate for 1 MT (D)+(E)
Rate for 1 MT
Rate to be adopted

400.00
445.00
350.00

day
day
day

34000.00
60.00

MT
Kg

14 Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters includ
cost and conveyance of steel to site and all labour charges for fabrication of reinforcement includ
cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost a
conveyance of binding wire and all handling charges and operational charges etc., and including o
lapping welding if required etc., complete for all R.C.C items for finished item of work as per stand
drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &22
(5th Revision) and as per I.S.1786 of 1985 for Sub structure of R.C.C items.
Unit = MT
Taking output = 1 MT
(A) Labour
0.34 nos
2.00 nos
6.50 nos
0.00 %

Page 459,460 of MoRT&H SDB

Mate
Black smith
Mazdoor
Add for M.A Allowance@20% on Labour
Total

(B) Material
1.05 MT
HYSD bars including overlaps
6.00 Kg
Binding wire
Total
(C) Over head charges @ 19.615 % (25%-VAT)
Add for Over head charges @ 19.615% on (A)+(B)
19.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Rate for 1 MT (D)+(E)
Rate for 1 MT
Rate to be adopted

400.00
445.00
350.00

day
day
day

34000.00
60.00

MT
Kg

Quantity

Description of Item

Rate

per

15 Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters includ
cost and conveyance of steel to site and all labour charges for fabrication of reinforcement includ
cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost a
conveyance of binding wire and all handling charges and operational charges etc., and including o
lapping welding if required etc., complete for all R.C.C items for finished item of work as per stand
drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &22
(5th Revision) and as per I.S.1786 of 1985 for Super structure of R.C.C items.
Unit = MT
Taking output = 1 MT
(A) Labour
0.44 nos
3.00 nos
8.00 nos
0.00 %

Page 489,490 of MoRT&H SDB

Mate
Black smith
Mazdoor
Add for M.A Allowance@20% on Labour
Total

400.00
445.00
350.00

(B) Material
1.05 MT
HYSD bars including overlaps
34000.00
8.00 Kg
Binding wire
60.00
Total
Rate per 1 MT (A)+(B)
(C) Over head charges @ 19.615 % (25%-VAT)
Add for Over head charges @ 19.615% on (A)+(B)+( C)
19.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Rate for 1 MT (D)+(E)
Rate for 1 MT
Rate to be adopted

day
day
day

MT
Kg

16 Providing Grouted Revetment with rough stone (HBG) of not less than 300 mm size grouted with 0
cum of CC (1:4:8) including cost, and conveyance of materials to site and including labour charges
packing the stones for revetment etc., complete for finished item of work as per MoRT&H specificat
2504 ( 5th Revision ) and as directed by the Engineer-in-Charge for quadrential revetment.
Cost of CC(1:4:8)
Taking output = 15 cum
(A) Labour
0.64 nos
1.00 nos
15.00 nos
0.00 %

Page 331,522 of MoRT&H SDB

Mate
Mason
Mazdoor
Add for M.A Allowance@20% on Labour
Total

(B) Material
13.50 cum
Cost of 40mm SS-5 HBG M/C metal
6.75 cum
Sand at site
2.43 MT
Cement at site

400.00
413.50
350.00

day
day
day

1612.06
357.47
5560.00

cum
cum
MT

456.20
832.30
879.90

hr
hr
hr

Total
(C) Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
2.00 hr
water tanker 6kl capacity
Rate for 15 cum
Rate for 1 cum
Cost of Grouted Revetment
Unit = Cum
Taking output = 1 cum
(A) Labour

Quantity
0.04 nos
0.35 nos
0.75 nos
0.00 %

Description of Item
Mate
Mason
Mazdoor for laying stones, filling quarry spalls
Add for M.A Allowance@20% on Labour
Total

(B) Material
0.20 cum
Cost of CC(1:4:8)
1.00 cum
Cost of Rough stone 300 mm thick
Total
(C) Over head charges @ 19.615 % (25%-VAT)
Add for Over head charges @ 19.615% on (A)+(B)
19.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 1 cum (D)+(E)
Rate to be adopted

Rate
400.00
413.50
350.00

per
day
day
day

3539.79
931.06

cum
cum

2062.25

Quantity
Description of Item
Rate
per
including cost, seigniorage charges a
17 Pitching with ss revetment 300 mm size rough stone
conveyance of materials to site and including labour charges for packing the stones for revetment e
complete for finished item of work as per MoRT&H specification 2504 ( 5th Revision ) and as directed
the Engineer-in-Charge for Pitching of slopes for Toe wall.
(A) Labour
0.04 nos
0.35 nos
0.75 nos
0.00 %

Page 522 of MoRT&H SDB


Mate
400.00
Mason
413.50
Mazdoor for laying stones, filling quarry
350.00
spalls
Add for M.A Allowance@20% on Labour

(B) Material
1.00 cum
Cost of Rough stone 300 mm thick
0.20 cum
Cost of stone spalls
Total
(C) Over head charges @ 19.615 % (25%-VAT)
Add for Over head charges @ 19.615% on (A)+(B)
19.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 1 cum (D)+(E)
Rate to be adopted

931.06
816.56

day
day
day

cum
cum

18 Providing and laying filter material with Gravel underneath pitching in slopes including cost, a
conveyance of materials to site including labour charges etc., complete for finished item of work as
MoRT&H Specification 2504 (5th Revision) and as directed by the Engineer-in-Charge under Revetmen
Unit = cum
Page 523 of MoRT&H SDB
Taking output = 1 Cum
(A) Labour
0.05 nos
Mate
day
400.00
0.25 nos
Mazdoor skilled
day
413.50
1.00 nos
Mazdoor for laying stones, filling quarry spalls
day
350.00
0.00 %
Add for M.A Allowance@20% on Labour
Total
(B) Material
1.20 cum
Cost of gravel
786.89
cum
(C) Over head charges @ 19.615 % (25%-VAT)
Add for Over head charges @ 19.615% on (A)+(B)
19.615 %
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 1 cum (D)+(E)
Rate to be adopted

19 Back filling behind Abutments with gravel including cost ,conveyance of all materials to site e
complete as per Clause 710.1.4 of IRC : 78and as per MoRT&H Specification No. 2200 (5th Revisi
and as per Drawing and technical specifications for finished item of work
Unit = cum
Taking output = 10 cum
(A) Labour
0.28 nos
7.00 nos
0.00 %

Page 462 of MoRT&H SDB

Mate
Mazdoor
Add for M.A Allowance@20% on Labour
Total

(B) Material
12.00 cum
Cost of Granular material
Total
(c) Machinery

400.00
350.00

day
day

786.89

cum

Quantity

Description of Item

Rate

2.50 hr
0.05 hr

Plate compactor/Power rammer/road roller


58.00
Water tanker 6 KL capacity
879.90
Total
(D) Over head charges @ 19.615 % (25%-VAT)
Add for Over head charges @ 19.615% on (A)+(B)+( C)
19.615 %
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Cost per 1 cum (F)+(G)
Rate to be adopted

per
hr
hr

20 Providing and laying of filter media using 50% of 150 mm IRC soling stone and 50 % of 40 mm H
metal satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to athickn
of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provid
over the entire surface behind the abutment, wing wall and return wall to the full height compacted t
firm condition including cost and conveyance of all meterials ,and all labour charges as directed by
departmental officers as per drawing and Technical specifications as per clause 710.1.1 of IRC:78 a
Clause 2200 of MoRT&H (5th Revision) for finished item of work.
Unit = cum
Taking output = 10 cum
(A) Labour
0.32 nos
7.00 nos
1.00 nos
0.00 %

Page 463 of MoRT&H SDB

Mate
Mazdoor for filling watering, ramming etc
Mazdoor skilled
Add for M.A Allowance@20% on Labour
Total

400.00
350.00
413.50

day
day
day

932.06
1425.06

cum
cum

879.90

hr

(B) Material
Filter media of stone aggregate conforming
to clause 2504.2.2 of MoRT&H
6.00 cum
Cost of 150mm size IRC soling stone
6.00 cum
Cost of 40mm size IRC HBG metal
Total
(c) Machinery
0.06 hr
Water tanker 6 KL capacity
Total
(D) Over head charges @ 19.615 % (25%-VAT)
Add for Over head charges @ 19.615% on (A)+(B)+(
19.615 %
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 10 cum (E)+(F)
Rate for 1 cum
Rate to be adopted

C)

21 Providing weep holes in VCC Abutments, Return walls and wing walls with 100mm Diameter AC pi
extending through the full width of the structure at 1.00m C/C in both horizontal and vertical direction
that the weep holes in each horizontal direction is staggered from the weep holes laying above a
below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges
cutting to required length, placing the pipe with a slope of about 1V : 20H towards stream side face e
complete for finished item of work for weep holes as per MoRT&H specification 2706 & 2200 (
Revision)
Data adopted with observations as in remarks column,communicated vide CE(R&B)(D&P)
Circular Memo No: D&P/Bridge work estimates/Non SSR items/rates/2009-1, Dt.13-08-2009
Unit = RM
Taking output = 30 RM
Page 461,333 of MoRT&H SDB
Cement Mortor (1:3) (Out put = 1Cum)
Material

Quantity
0.51 MT
1.05 cum

Description of Item
Cost of Cement
Cost of Sand

0.04 nos
0.90 nos
0.00 %

Labour
Mate
Mazdoor
Add for M.A Allowance@20% on Labour

Rate
5560.00
427.47

per
MT
cum

400.00
350.00

day
day

268.00

RM

26.80
13.00
3615.44

each
each
cum

400.00
413.50
350.00

day
day
day

Cost per 1 Cum


(A) Material
31.50 RM

Cost of 100mm Dia., AC pipe including 5% Watage

10.00 nos
30.00 nos
0.05 cum

collors for AC pipe(10% of AC Pipe)


MS clamps
Cement mortor (1:3)

0.03 nos
0.50 nos
0.25 nos
0.00 %

(C)
(D)

(B) Labour
Mate
Mason
Mazdoor
Add for M.A Allowance@20% on Labour
Total

Add for Over head charges @ 19.615% on (A)+(B) i.e., on


Contractor's profit @ 10% on (A)+(B)+(C) i.e., on

9587.02
11467.51

Cost per 30 RM
Rate for 1 RM
Say Rs

22 Supplying and fixing of CI drainage spouts complete as per MoRT&H Specification No.2705 and as
drawing BD / 1-69.

Data adopted with observations as in remarks column,communicated vide CE(R&B)(D&P)


Circular Memo No: D&P/Bridge work estimates/Non SSR items/rates/2009-1, Dt.13-08-2009
Unit = 1 No.
Taking output = 1 No.
(A) Material
Corrosion resistant structural steel including 5
4.00 Kg
Percent wastage
G.I. Pipe 100mm dia
2.00 Rm
G.I.bolt 10 mm dia
6.00 No.
Galvanised M.S.flat clamp
2.00 No.
Total
(B) Labour
For fabrication
0.02 nos
Mate
0.02 nos
Skilled blacksmirh
0.02 nos
Mazdoor
Add for M.A Allowance@20% on Labour
0.00 %
Total
(C) For fixing in position
0.01 nos
Mate
0.01 nos
Mason

37.00
735.00
23.00
195.00

Kg
each
each
each

400.00
445.00
350.00

day
day
day

400.00
413.50

day
day

Quantity
0.20 nos
0.00 %

Description of Item
Mazdoor
Add for M.A Allowance@20% on Labour

5.00 %

Total
Add at 5% of cost of material and labour for
electrodes, cutting gas , sealant , anticorrosive
bituminous paint, mild steel grating etc

Rate
350.00

per
day

2248.04

Total
(D) Over head charges @ 19.615 %
19.615 %
Add for Over head charges @ 19.615% on
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)

2360.44

Cost per 1 No. (E)+(F)


Rate to be adopted

23 Providing and laying boulders apron on river bed for protection against scour with stone bould
weighing not less than 40 kg each complete as per drawing and MORTH Technical specification No.25
(A) Labour
0.04 nos
0.35 nos
0.75 nos
0.00 %

Page 522 of MoRT&H SDB


400.00
Mate
413.50
Mason
Mazdoor for laying stones, filling quarry
350.00
spalls
Add for M.A Allowance@20% on Labour

(B) Material
1.00 cum
Cost of Jeddy stone 450mm to 600mm thick
0.20 cum
Cost of stone spalls
Total
(C) Over head charges @ 19.615 % (25%-VAT)
19.615 %
Add for Over head charges @ 19.615% on (A)+(B)
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)

973.06
816.56

day
day
day

cum
cum

Cost per 1 cum (D)+(E)


Rate to be adopted

24 Supply and fixing of high performance expansion joint filler board of 1'' thick conforming to M.O.S.T fo
expansion joints approved make including cost and conveyance of labour charges for fixing etc.,
complete 25 mm thick
As per Building SSR item BMT-U.03 Page No:58 of 2015-16

25 Dismantling of existing structures like culverts , bridges, retaining walls and other structu
comprising of masonry, cement, concrete, wood work , steel work, including T&P and scaffold
wherever necessary sorting the dismantled material, disposal of unserviceable materials and stack
the materials with all lifts and lead of 1000 m ( By Mechanical means in Cement concrete grade M-15
M-20) as per MoRTH specification 202 , 2.4 II (A) (5th revision)
Page 23,24,25 of MoRT&H SDB
Unit = cum
Taking output = 1.25 cum
(A) Labour
0.02 nos
Mate
0.25 nos
Mazdoor for pneumatic breaker

400.00
350.00

day
day

Quantity
0.25 nos

Description of Item
Mazdoor for loading and unloding
Total
(B) Machinery
0.67 hour
Air Compressor
250
cfmTrally
with 2
Tractor
0.27 hour
leads of
Total
Pneumatic breaker
(C) Over head
charges
@ 19.615% (25%-VAT-Insurance)
@ 1.5
cum per
19.615 %
Add
for
Over
head charges @ 19.615% on (A)+(B)
hour
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)

Rate
350.00

per
day

462.20

hr

415.00

hr

Cost per 1.25 cum


Rate for 1 cum
Rate to be adopted

26 Dismantling of existing structures like Stone Masonry in Cement Mortar by mechanical me


including T&P and scaffolding wherever necessary sorting the dismantled material, disposal
unserviceable materials and stacking the materials with all lifts and lead of 1000 m as per MoR
specification 202 , 2.4 III (B) (5th revision)
Page 23,24,25 of MoRT&H SDB
Unit = cum
Taking output = 1.25 cum
(A) Labour
0.03 nos
Mate
0.75 nos
Mazdoor for loading and unloding
Total
(B) Machinery
Tractor Trally
0.27 hour
Total
(C) Over head charges @ 4.615% (10%-VAT-Insurance)
4.615 %
Add for Over head charges @ 4.615% on (A)+(B)
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 1.25 cum
Rate for 1 cum
Rate to be adopted

400.00
350.00

day
day

415.00

hr

DATA

f Bridge (2V X 8.37m) across Kunavaram Medium drain in


du- Manepalli Road in E.G.Dt.

Amount
SDR by mechanical means for foundations of structures as per
ncluding setting out, construction of shoring and bracing, removal
ter, dressing sides of bottom, back filling the excavation earth to
for finished item of work as per MoRT&H specification 304(5 th
ineer-in-Charge

128.00
2800.00
0.00
2928.00
3120.00

6048.00
1186.32
7234.32
723.43
7957.75
33.16
33.20
1 Cum

128.00
2800.00
0.00
2928.00
3120.00
302.40
6350.40
1245.63
7596.03
759.60
8355.63
34.82
34.80

Amount
1 Cum

ding cost and conveyence of all materials to site and watering,


tem of work as per MoRTH &H specification 304 (5th Revision) and
e.

4.00
105.00
0.00
109.00
428.96
428.96
105.52
643.48
64.35
707.83
710.00
Cum

on with crushed stone aggregate 40 mm nominal size mechanically


mpacted by vibration including curing complete asper Morth Spn

256.00
413.50
5250.00
0.00
5919.50
21762.87
2412.89
19182.00
43357.76
2737.20
4993.80
1759.80
9490.80
11527.35
70295.41
7029.54
77324.95
5155.00
5160.00
Cum

Amount
M 20 grade using 20mm & 10mm HBG crushed stone aggregate
le 1000-1 and fine aggregate conforming to table 1000-2) including
materials to site and labour charges, centering, machine mixing,
ng other incidental hire and operational charges of all T&P as per
during execution but excluding cost of steel and its fabrication
T&H specification 1500,1600,1700 & 2200 (5th Revision ) and as
r footings of Raft

344.00
620.25
7000.00
0.00
7964.25
17269.72
9191.15
2412.89
28467.20
57340.96

2737.20
4993.80
7731.00
73036.21
2921.45
14899.10
90856.76
9085.68
99942.44
6662.83
6660.00
1 Cum

rade Concrete using 20mm and 10mm size HBG crushed stone
ming to table 1000-1 and fine aggregate conforming to table 1000of all
materials to site and all labour charges for machine
g , Vibrating and curing including all other incidental and all other
etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th
Piers and Cutoff walls

344.00
620.25
7000.00
0.00
7964.25
17269.72
9191.15
2412.89

Amount
28467.20
57340.96
2737.20
4993.80
7731.00
2921.45
14899.10
90856.76
9085.68
99942.44
6662.83
6660.00
Cum

ade Concrete using 20mm and 10mm size HBG crushed stone
ming to table 1000-1 and fine aggregate conforming to table 1000all materials to site and all labour charges for machine mixing,
rating and curing including all other incidental and all other
etc., complete as per MoRT&H Specification 1500,1700, 2200 (5th
ments & Piers

344.00
620.25
7000.00
0.00
7964.25
17269.72
9191.15
2412.89
28467.20
57340.96
2737.20
4993.80
7731.00
7303.62
15758.66
96098.49
9609.85
105708.34
7047.22
7050.00
Cum

Amount
M 20 grade using 20mm & 10mm HBG crushed stone aggregate
le 1000-1 and fine aggregate conforming to table 1000-2) including
to site and labour charges, centering, machine mixing, laying,
incidental hire and operational charges of all T&P as per approved
ecution but excluding cost of steel and its fabrication charges for
ation 1500,1600,1700 & 2200 (5th Revision ) and as directed by
s, Fly wings, Bed blocks & Backing walls (or Substructure)

344.00
620.25
7000.00
0.00
7964.25
17269.72
9191.15
2412.89
28467.20
57340.96

2737.20
4993.80
7731.00
73036.21
7303.62

15758.66
96098.49
9609.85
105708.34
7047.22
7050.00
1 Cum

M 25 grade using 20mm & 10mm HBG crushed stone aggregate


le 1000-1 and fine aggregate conforming to table 1000-2) including
materials to site and labour charges, centering, machine mixing,
ng other incidental hire and operational charges of all T&P etc.,
and as directed during execution but excluding cost of steel and its
as per MoRT&H specification 1500,1600,1700 (5th Revision) for

344.00
620.25
7000.00
0.00
7964.25
17269.72
9191.15

Amount
2412.89
33304.40
62178.16
2737.20
4993.80
7731.00
77873.41
77873.41
15574.68
18329.84
111777.93
11177.79
122955.72
8197.05
8200.00
1 Cum

ade Concrete using 40mm , 20mm and 10mm size HBG crushed
conforming to table 1000-1 and fine aggregate conforming to table
nce of all materials to site and all labour charges for machine
g , Vibrating and curing including all other incidental and all other
etc., complete as per MoRT&H Specification 1500,1700, 2100 (5th
approach slab.
Taking output = 15 cum
344.00
620.25
7000.00
0.00
7964.25
13057.72
8634.86
2297.79
2412.89
22962.80
49366.06
2737.20
4993.80
7731.00
12761.78
77823.09
7782.31
85605.40
5707.03
5710.00
Cum

Amount
M30 grade using 20mm & 10mm HBG crushed stone aggregate
le 1000-1 and fine aggregate conforming to table 1000-2) including
to site and labour charges, centering, machine mixing, laying,
her incidental and operational charges of all T&P etc., complete for
d drawing,excluding cost of steel and its fabrication charges as per
1700, & 2704 (5th Revision) and as directed by the Engineer-in-

344.00
620.25
7000.00
0.00
7964.25
17269.72
9191.15
2412.89
33916.00
62789.76
2737.20
4993.80
7731.00
1569.70
15702.73
95757.44
9575.74
105333.18
7022.21
7020.00
Cum

M 30 grade using 20mm & 10mm HBG crushed stone aggregate


le 1000-1 and fine aggregate conforming to table 1000-2) including
to site and labour charges, centering, machine mixing, laying,
her incidental and operational charges of all T&P etc., complete for
BD/1-69 (A) but excluding cost of steel and its fabrication charges
0, 1600,1700, & 2702 (5th Revision) and as directed by the
over Deck slab.

360.00
620.25
7350.00
0.00
8330.25
17269.72
9191.15
2412.89
33916.00
62789.76
2737.20
4993.80
7731.00

Amount
5256.73
48.00
0.00
48.00
1040.52
6345.26
634.53
6979.78
6980.00
Cum

g of M25 grade using HBG crushed stone aggregate of size not


e conforming to table 1000-2 true to line and grade, tolerance of
500, centre to centre spacing between vertical posts not to exceed
tween vertical posts for expansion including cost, conveyance of all
centering, machine mixing, laying, vibrating, curing etc., including
l charges of all T&P as per approved drawings and as directed
steel and its fabrication charges as per approved drawings and
item of work as per MoRT&H Specification 2703, 1500, 1600,

cum
cum
cum
cum

344.00
620.25
7000.00
0.00
7964.25
15102.97
9191.15
2412.89
33304.40
60011.41
2737.20
4993.80
7731.00
75706.66
5047.11
4438.43
221.92
4660.35
233.02
4893.37
959.83
5853.20
585.32

Amount
6438.52
766.49
766.00
1 RM

rent diameters, wrought and put up bars of all diameters including


e and all labour charges for fabrication of reinforcement including
grills, placing them in position etc., complete including cost and
handling charges and operational charges etc., and including over
plete for all R.C.C items for finished item of work as per standard
Engineer-in-Charge and as per MoRT&H specification 1600 &2200
of 1985 for foundations of R.C.C items.

160.00
890.00
2100.00
0.00
3150.00
35700.00
360.00
36060.00
7691.04
46901.04
4690.10
51591.14
51591.14
51590.00
1 MT

rent diameters, wrought and put up bars of all diameters including


e and all labour charges for fabrication of reinforcement including
grills, placing them in position etc., complete including cost and
handling charges and operational charges etc., and including over
plete for all R.C.C items for finished item of work as per standard
Engineer-in-Charge and as per MoRT&H specification 1600 &2200
of 1985 for Sub structure of R.C.C items.

136.00
890.00
2275.00
0.00
3301.00
35700.00
360.00
36060.00
7720.66
47081.66
4708.17
51789.83
51789.83
51790.00

Amount
1 MT
rent diameters, wrought and put up bars of all diameters including
e and all labour charges for fabrication of reinforcement including
grills, placing them in position etc., complete including cost and
handling charges and operational charges etc., and including over
plete for all R.C.C items for finished item of work as per standard
Engineer-in-Charge and as per MoRT&H specification 1600 &2200
of 1985 for Super structure of R.C.C items.

176.00
1335.00
2800.00
0.00
4311.00
35700.00
480.00
36180.00
40491.00
7942.31
48433.31
4843.33
53276.64
53276.64
53280.00
1 MT

ough stone (HBG) of not less than 300 mm size grouted with 0.20
d conveyance of materials to site and including labour charges for
c., complete for finished item of work as per MoRT&H specification
by the Engineer-in-Charge for quadrential revetment.

256.00
413.50
5250.00
0.00
5919.50
21762.87
2412.89
13510.80
37686.56

2737.20
4993.80
1759.80
53096.86
3539.79

Amount
16.00
144.73
262.50
0.00
423.23
707.96
931.06
1639.02
404.51
2466.76
246.68
2713.44
2710.00
1 Cum

Amount
mm size rough stone
including cost, seigniorage charges and
including labour charges for packing the stones for revetment etc.,
per MoRT&H specification 2504 ( 5th Revision ) and as directed by
of slopes for Toe wall.
16.00
144.73
262.50
0.00
423.23
931.06
163.31
1094.37
297.68
1815.28
181.53
1996.81
2000.00
1 Cum

with Gravel underneath pitching in slopes including cost, and


ding labour charges etc., complete for finished item of work as per
sion) and as directed by the Engineer-in-Charge under Revetment.

20.00
103.38
350.00
0.00
473.38
944.27
278.07
1695.72
169.57
1865.29
1870.00
1 Cum

gravel including cost ,conveyance of all materials to site etc.,


IRC : 78and as per MoRT&H Specification No. 2200 (5th Revision)
ecifications for finished item of work

112.00
2450.00
0.00
2562.00
9442.66
9442.66

Amount
145.00
44.00
189.00
2391.79
14585.45
1458.55
16044.00
1604.40
1604.00
1 Cum

using 50% of 150 mm IRC soling stone and 50 % of 40 mm HBG


d down in clause 2504.2.2 of MoRT&H specifications to athickness
size towards the soil and bigger size towards the wall and provided
utment, wing wall and return wall to the full height compacted to a
veyance of all meterials ,and all labour charges as directed by the
g and Technical specifications as per clause 710.1.1 of IRC:78 and
n) for finished item of work.

128.00
2450.00
413.50
0.00
2991.50

5592.39
8550.39
14142.78
52.79
52.79
3371.24
20558.31
2055.83
22614.14
2261.41
2260.00
1 Cum

ents, Return walls and wing walls with 100mm Diameter AC pipe
e structure at 1.00m C/C in both horizontal and vertical direction so
ntal direction is staggered from the weep holes laying above and
uding cost and conveyance of the A.C pipes and labour charges for
e pipe with a slope of about 1V : 20H towards stream side face etc.,
for weep holes as per MoRT&H specification 2706 & 2200 (5th

as in remarks column,communicated vide CE(R&B)(D&P)


ork estimates/Non SSR items/rates/2009-1, Dt.13-08-2009.

Amount
2835.60
448.84
3284.44
16.00
315.00
0.00
331.00
3615.44

8442.00
268.00
390.00
180.77
9280.77
12.00
206.75
87.50
0.00
306.25
306.25
1880.49
1146.75
12614.26
420.48
420.00
1 RM

spouts complete as per MoRT&H Specification No.2705 and as per

as in remarks column,communicated vide CE(R&B)(D&P)


ork estimates/Non SSR items/rates/2009-1, Dt.13-08-2009.

148.00
1470.00
138.00
390.00
2146.00

8.00
8.90
7.00
0.00
23.90
4.00
4.14

Amount
70.00
0.00
78.14
112.40

2360.44
463.00
2823.44
282.34
3105.78
3110.00
each

n on river bed for protection against scour with stone boulders


mplete as per drawing and MORTH Technical specification No.2503.
16.00
144.73
262.50
0.00
423.23
973.06
163.31
1136.37
305.92
1865.52
186.55
2052.07
2050.00
1 Cum

e expansion joint filler board of 1'' thick conforming to M.O.S.T for


uding cost and conveyance of labour charges for fixing etc.,
1127.00
1 sqm

res like culverts , bridges, retaining walls and other structures


oncrete, wood work , steel work, including T&P and scaffolding
mantled material, disposal of unserviceable materials and stacking
1000 m ( By Mechanical means in Cement concrete grade M-15 &
02 , 2.4 II (A) (5th revision)

8.00
87.50

Amount
87.50
183.00
309.67
112.05
421.72
118.62
723.34
72.33
795.67
636.54
637.00
1 Cum

like Stone Masonry in Cement Mortar by mechanical means


erever necessary sorting the dismantled material, disposal of
g the materials with all lifts and lead of 1000 m as per MoRTH
vision)

12.00
262.50
274.50
112.05
112.05
17.84
404.39
40.44
444.83
355.86
356.00
1 Cum

ROAD DATA
Name of Work ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in k
::of Sivakodu- Manepalli Road in E.G.Dt.
Quantity

Description of Item

Rate

per

1 Forming embankment with borrowed useful earth from outside road boundary by mechanical mean
SDR with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excava
soils at borrowed area, conveyance of soil, depositing the soil on the embankment, spreadin
breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ O
meet requirement of table 300-2 of MoRT&H, including all hire and operational charges of
complete for finished item of work as per MoRT&H specification 305 (5th Revision) (Payment
made based on level for finished item of work).
Unit = cum
Taking output =100 cum
Page 68,69 of MoRT&H SDB
(A) Labour
0.04 day
Mate
400.00
day
1.00 day
Mazdoor
350.00
day
0.00 %
Add for M.A Allowance@20% on Labour
Total
(B) Machinery
100.00 cum
Rate as per GO Ms No 10 dt 26-7-2005
13.00
Cum
Tipper 10T capacity(L=74 Km )(160x74)
7.12
tkm
11840.00 1Km
Add 10% of cost of carriage for loading&
84300.80
hr
unloading
10.00 %
Dozer 80 HP for spreading @ 200 cum per
2562.60
hr
hour
0.50 hr
Motor Grader for grading @ 100 cum per
3220.00
hr
hour
1.00 hr
4.00 hr
Water tanker 6KL capacity per hour
879.90
hr
Vibratery Roller 8-10 tonnes @ 100 cum per
2637.20
hr
hour
1.00 hr
Total
Rate per 100 cum
(C) Over head charges @ 4.615%
4.615 %

Total

Add for Over head charges @ 4.615% on (A)+(B)

(D) Total
(E) Add Contractors Profit at 10% on (D)
Cost per 100 cum
Rate per 1 cum
Rate to be adopted

2 Construction of Granular sub-base by providing HBG material confirming to Grading - IV of MoRT&H


400-2 including cost, and conveyance of all materials to work site and spreading in uniform laye
motor grader or by approved means, on prepared surface mixing by mix in place method with Rota
approved means at OMC and compacting with vibratory roller to achieve the desired densit
complete for finished item of work as per MoRT&H Specification 401 (5th Revision) and as direc
the Engineer-in-charge. ( Payment will be made based on levels for finished item of work ).
Unit = cum
Taking output =300 cum
(A) Labour
0.40 day
2.00 day
8.00 day
0.00 %

Mate
Mazdoor skilled
Mazdoor unskilled
Add for M.A Allowance@20% on Labour
Total

(B) Machinery

400.00
400.00
350.00

day
day
day

Quantity

Description of Item

6.00 hr
12.00 hr
6.00 hr
3.00 hr

Motor grader 3.35M Blade @50 cum/Hr


Tractor with Rotavator
Vibratory roller 8T
Water tanker 6 KL
Total

Rate

per

3220.00
425.00
2637.20
879.90

hr
hr
hr
hr

(C) Material
Coarse graded Granular sub-base material as
per Table 400-2 of MORT&H
1707.06
26.5 mm to 4.75 mm @75%(Av. rate of 25288.00 cum
27,19-22,12-14,9.5-11.2mm , 5-7mm & 2.36
- 5mm HBG M/C metal)
2.36mm and below @25%
96.00 cum
1117.06
(Rate of 2.36mm & below HBG metal)
Total
(D) Over head charges @ 4.615%
4.615 %
Add for Over head charges @ 4.615% on (A)+(B)+(C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 300 cum (E) + (F)
Rate per 1 cum
Rate to be adopted

Cum

Cum

3 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix ma
specification including cost, of all materials and including premixing the material with water at O
Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with pa
base courses on well prepared surface and compacting with Vibratory roller to acheive the d
density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th Re
for finished item of work. (Payment based on levels for finished item of work)
Unit = cum
Taking output = 225 cum

Page 110,111 of MoRT&H SDB

(A) Labour
0.48 nos.
2.00 nos.
10.00 nos.
0.00 %

Mate
400.00
Mazdoor skilled
400.00
Mazdoor
350.00
Add for M.A Allowance@20% on Labour
Total
(B) Machinery
6.60 hr
Wet mix plant of 60 tonne hr. capacity
1650.00
6.00 hr
Electric generating set 125 KVA
1320.00
6.00 hr
front end loader 1 cum capacity
1650.00
6.00 hr
Mechanical Paver finisher 100 TPH
2250.00
3.90 hr
Vibratory roller 8-10 T
2637.20
3.00 hr
Water tanker
879.90
Total
(C) Material
89.10 cum
45 to 22.40mm IRC&MoRT&H HBG M/C
1885.40
metal@ 30% (Av. Of 40-45, 25-27, 19-22mm )
118.80 cum
22.4 to 2.36mm IRC&MoRT&H HBG M/C
1645.06
metal@40% (Av. Of 19-22mm, 12-14mm,
9.5-11.2mm, 5-7mm, 2.36 - 5mm )
89.10 cum

1117.06
Total
(D) Over head charges @ 4.615% (10%-VAT)
Add for Over head charges @ 4.615% on (A)+(B)+( C)
4.615 %
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 225 cum (E) + (F)
2.36mm to 75 micron @ 30% (2.36mm & belo

day
day
day

hr
hr
hr
hr
hr
hr

cum
cum

cum

Quantity

Description of Item

Rate

per

Rate per 1 cum


Rate to be adopted per 1 cum

4 Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base in
clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means
MoRT&H specification clause No.502 and as directed by the Engineer-in-Charge.
Unit = sqm
Taking output = 3500 sqm
(A) Labour
Mate
0.08 nos.
Mazdoor
2.00 nos.
0.00 %
Add for M.A Allowance@20% on Labour
Total
(B) Machinery
Mechanical broom @ 1250 sqm/hr.
2.80 hr
Air compressor 250 cfm
2.80 hr
2.00 hr
Bitumen/emulsion pressure distributor
@1750 sqm/hr
1.00 hr

400.00
350.00

day
day

375.00
462.20
860.00

hr
hr
hr

879.90

Water tanker 6 KL capacity @ 1 trip per hour


Total
(C) Material
Bitumen Emulsion@0.7 kg per sqm
2.45 MT
32601.00
Total
(D) Over head charges @4.615% (10-VAT)
Add for Over head charges @ 4.615% on (A)+(B)+(C)
4.615 %
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 3500 sqm (E) + (F)
Rate per 1 sqm
Rate to be adopted.

MT

5 Providing and applying tack coat with bitumen Emulsion (Medium settting) (Bulk) using Emulsion p
distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface cleane
mechanical broom for finished item of work as per MoRT&H Specification 503 (5th Revision)
directed by the Engineer-in-Charge.
unit = sqm
Page 124 of MoRT&H SDB
Taking output = 3500 sqm
(A) Labour
0.08 nos
Mate
400.00
2.00 nos
Mazdoor
350.00
0.00 %
Add for M.A Allowance@20% on Labour
Total
(B) Machinery
2.80 hr
Mechanical broom Hydraulic @ 1250 sqm/hr.
375.00
2.80 hr
Air compressor 250 cfm
462.20
2.00 hr
Emulsion pressure distributor @1750 sqm/hr
860.00
Total
(C) Material
Bitumen Emulsion @ 0.25 Kgs/sqm
32601.00
0.875 MT
Total
(D) Over head charges @ 4.615%
Add for Over head charges @ 4.615% on (A)+(B)+(C)
4.615 %
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 3500 sqm (E) + (F)

day
day

hr
hr
hr

MT

Quantity

Description of Item

Rate

per

Rate per 1 sqm


Rate to be adopted

6 Construction of Gravel shoulders (Selected Earth) including cost, and conveyance of all materials t
site and spreading in uniform layers by approved means, on prepared surface and compactin
vibratory roller to achieve the desired density at OMC etc., complete for finished item of work
MoRT&H Specification 401& 407 (5th Revision) and as directed by the Engineer-in-charge. for
Shoulders and Grading of canal bunds. ( Payment will be made based on levels for finished item of
Unit = cum
Taking output = 300 cum
(A) Labour
0.40 day
Mate
400.00
2.00 day
Mazdoor skilled
413.50
8.00 day
Mazdoor unskilled
350.00
0.00 %
Add for M.A Allowance@20% on Labour
Total
(B) Machinery
6.00 hr
Vibratory roller 8T
2637.20
3.00 hr
Water tanker 6 KL
879.90
Total
(C) Material
384.00 cum
Gravel
786.89
(D) Over head charges @4.615% on (A) + (B)+( C)
4.615 %
Add for Over head charges @ 4.615% on (A)+(B)+( C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 300 cum (E) + (F)
Rate per 1 cum
Rate to be adopted

day
day
day

hr
hr

Providing and laying of 50mm thick Bituminous Macadam with 100 -120 TPH hot mix plant produc
average output of 75 tonnes per hour using hard blasted granite crushed aggregates of Grading
per table 500-7 of MoRT&H specificaion 504 (5th Revision) premixed with bituminous binder of
grade @ 3.4 % by weight of total mixture, transported to site, laid over a previously prepared surfa
Hydrostatic paver finisher with sensor control to the required grade, level and alignment and ro
per Clauses 501.6 and 501.7 to achieve the desired compaction for finished item of work as direc
the Engineer-in-Charge including hire and opeational charges all T&P and all other contingent c
necessary , complete and as per MoRTH specification No. 504 (5th Revision).
Page 125,126,127 of MoRT&H SDB
Unit = cum
Taking out put = 205 cum (450 tonne)
(A) Labour
400.00
0.84
nos.
Mate
14.00
nos.
Mazdoor working with HMP, Mechanical
350.00
broom, paver, roller, asphalt cutter and
assistance for setting outlines, levels and
layout of construction.
5.00

nos.

0.00

6.00
2.20
6.00
6.00
6.00

Skilled Mazdoor for checking line and levels.


% Add for M.A Allowance@20% on Labour

Total
(B) Machinary
hr
Batch mix Hot mix plant @ 100 - 120 TPH
hr
Air Compressor 250 cfm
hr
Mechanical Paver finisher 100 TPH
hr
Generator 250 KVA
hr
Front end loader 1 cum capacity

day
day

413.50
7303.50

day

24200.00
538.20
2250.00
1850.00
1650.00

hr
hr
hr
hr
hr

Quantity
3.90
3.90
3.90

Description of Item
hr
hr
hr

smooth wheeled roller 8 Ton


Vibratory roler 8 tonne for intermediate
rolling
Finish rolling with 6-8 tonne smooth wheeled
tandem
roller.
Total

(C) Material
15.30
M.T
Bitumen 60/70 @ 3.4 % of weight of mix =
205x2.2=450 tonne

115.920

cum

(ii) Aggregate
For Grading II(10 mm nominal size)
IRC & MORT&H HBG M/C chips 25 to 10mm
@ 40%

Rate

per

1122.10
2637.20
1650.00

hr
hr
hr

28799.83

MT

1888.31

cum

2173.10

cum

1169.56

cum

Average rate of IRC&MoRT&H HBG M/C


metal of sizes 25-27mm, 19-22mm, 1214mm, 9.5-11.2mm
115.920

cum

IRC &MORT&H HBG M/C chips 10 to 5mm @


40%
Average rate of IRC&MoRT&H HBG M/C
metal of sizes 9.5-11.2mm, 5 to 7mm

57.96

cum

IRC &MORT&H HBG M/C chips 5mm and


below @ 20%
Average rate of IRC&MoRT&H HBG M/C
metal of sizes 2.36 to 5mm and 2.36mm&
below

cum

Total
(D) Over head charges @ 4.615% (10-VAT)
4.615 %
Add for Over head charges @ 4.615% on (A)+(B)+(C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 195 cum (E) + (F)
Rate per 1 cum
Rate to be adopted

Providing 25mm thick compacted Bituminous Concrete by hot mix plant using HBG crushed aggr
of Grading 2 as per table 500-18 of specification 509 of MoRT&H (5th revision), premixed with m
Bitumen 60/70 Grade @ 5.4% of mix and filler, transporting the hot mix to work site, layin
hydrostatic sensor paver finisher to the required grade, level and alignment, rolling with smooth wh
vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 50
revision) complete for finished item of work in all respects as directed by Engineer-in-Charge

a)

Unit = cum
Taking out put = 191 cum
Labour
0.84 day
Mate
14.00 day
Mazdoor working with HMP, mechanical
broom, paver, roller, asphalt cutter and
assistance for setting out lines, levels and
layout of construction.
5.00 day
0.00

Skilled Mazdoor for checking line and levels


% Add for M.A Allowance@20% on Labour

b)

Machinery

400.00
350.00

350.00
6986.00

day
day

Quantity

Description of Item

12.00 hour
6.00 hour
6.00 hour
6.00 hour
450xL t.km
3.90 hour
3.90 hour
3.90 hour

Hot Mix Plant 40 to 60 TPH


Mechanical Paver finisher 100 TPH

c)
24.30 T

Material

Generator 250 KVA


Front end loader 1 cum bucket capacity
Tipper 10 tonne capacity
Smooth wheeled roller 8-10 tonnes for initial
break
down
rolling
Vibratory
roller
8 tonnes for intermediate
rolling
Finish rolling with 6-8 tonnes smooth
wheeled tandem roller.
(I) Bitumen 60/70 grade @ 5.4 % by weight of

Rate
19200.00

per

2250.00
1850.00
1650.00

hour
hour
hour
hour

1850.00
1101.00
2637.20
1650.00

t.km
hour
hour
hour

28799.83

MT

85.50 cum

II)Aggregate
Grading - II (13mm nominal size)
Average of 12 to 14mm, 9.5 to 11.2 mm IRC H1734.56

cum

71.25 cum

Average of 9.5 to 11.20 mm, 5 to 7 mm,2.36- 1448.73

cum

122.55 cum
5.75 cum

Average of 2.36 to 5mm & 2.36 and below IR 1169.56


2.36mm and below @ 2%
0.00

cum
cum

4.615 %

Cost for191cum =
Over head charges

1387593.26

10.00 %

Contractor's profit

1451630.70

Rate per 191 cum


Rate per 1 cum
or say

Asst. Executive Engineer (R&B),


R&B Section, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Deputy Executive Engineer (R


R&B Subdivision, Razole

Superintending Engineer (R&


R&B Circle, Kakinada

ROAD DATA
idge (2V X 8.37m) across Kunavaram Medium drain in km 6/4
of Sivakodu- Manepalli Road in E.G.Dt.
Amount

d useful earth from outside road boundary by mechanical means upto


pre-watering of soil at borrow area, removal of top soil, excavation of
e of soil, depositing the soil on the embankment, spreading soil,
and consolidation with 8 to 10 Tonnes Vibratory Road Roller @ OMC to
of MoRT&H, including all hire and operational charges of T&P ,
as per MoRT&H specification 305 (5th Revision) (Payment will be
m of work).

16.00
350.00
0.00
366.00
1300.00
84300.80

8430.08
1281.30
3220.00
3519.60
2637.20
104688.98
105054.98

4848.29
109903.27
10990.33
120893.60
1208.94
1209.00
1 Cum

y providing HBG material confirming to Grading - IV of MoRT&H Table


nce of all materials to work site and spreading in uniform layers with
on prepared surface mixing by mix in place method with Rotavator /
mpacting with vibratory roller to achieve the desired density etc.,
as per MoRT&H Specification 401 (5th Revision) and as directed by
ll be made based on levels for finished item of work ).

160.00
800.00
2800.00
0.00
3760.00

Amount
19320.00
5100.00
15823.20
2639.70
42882.90

491634.49

107238.16
598872.65
29790.54
675306.09
67530.61
742836.70
2476.12
2480.00
1 Cum

mpacting graded HBG crushed stone aggregate to Wet Mix macadem


materials and including premixing the material with water at OMC in
xed material by tipper to site , laying in uniform layers with paver in
rface and compacting with Vibratory roller to acheive the desired
ineer-in-Charge and as per MoRT&H specification.406 (5th Revision)
based on levels for finished item of work)

192.00
800.00
3500.00
0.00
4492.00
10890.00
7920.00
9900.00
13500.00
10285.08
2639.70
55134.78
167988.92
195433.63

99530.42
462952.97
24117.06
546696.81
54669.68
601366.49

Amount
2672.74
2670.00
Cum

with bitumen emulsion on prepared surface of granular Base including


g primer at the rate of 0.70 kg/sqm using mechanical means as per
and as directed by the Engineer-in-Charge.

32.00
700.00
0.00
732.00
1050.00
1294.16
1720.00
879.90
4944.06
79872.45
79872.45
3948.06
89496.57
8949.66
98446.23
28.13
28.10
1 Sqm

h bitumen Emulsion (Medium settting) (Bulk) using Emulsion pressure


per sqm on the prepared bituminous/granular surface cleaned with
m of work as per MoRT&H Specification 503 (5th Revision) and as

32.00
700.00
0.00
732.00
1050.00
1294.16
1720.00
4064.16
28525.88
28525.88
1537.81
34859.85
3485.99
38345.84

Amount
10.96
11.00
1 Sqm

lected Earth) including cost, and conveyance of all materials to work


s by approved means, on prepared surface and compacting with
red density at OMC etc., complete for finished item of work as per
5th Revision) and as directed by the Engineer-in-charge. for Gravel
ds. ( Payment will be made based on levels for finished item of work ).

160.00
827.00
2800.00
0.00
3787.00
15823.20
2639.70
18462.90
302165.21
14971.76
339386.87
33938.69
373325.56
1244.42
1244.00
1 Cum

Bituminous Macadam with 100 -120 TPH hot mix plant producing an
ur using hard blasted granite crushed aggregates of Grading - II as
aion 504 (5th Revision) premixed with bituminous binder of VG-30
xture, transported to site, laid over a previously prepared surface with
sor control to the required grade, level and alignment and rolled as
ieve the desired compaction for finished item of work as directed by
re and opeational charges all T&P and all other contingent charges
RTH specification No. 504 (5th Revision).

336.00
4900.00

2067.50
0.00
7303.50
145200.00
1184.04
13500.00
11100.00
9900.00

Amount
4376.19
10285.08
6435.00
201980.31
440637.40

218893.38

251905.32

67787.94
0.00

979224.04
54849.64
1243357.49
124335.75
1367693.24
1367693.24
7013.81
7014.00
1 Cum

tuminous Concrete by hot mix plant using HBG crushed aggregates


f specification 509 of MoRT&H (5th revision), premixed with modified
mix and filler, transporting the hot mix to work site, laying with
the required grade, level and alignment, rolling with smooth wheeled,
ieve the desired compaction as per MoRT&H Specification 509 (5th
of work in all respects as directed by Engineer-in-Charge

336.00
4900.00

1750.00
0.00
6986.00

Amount
230400.00
13500.00
11100.00
9900.00
0.00
4293.90
10285.08
6435.00
285913.98
699835.87

148305.24
103222.07
143330.09
0.00
1094693.28
1387593.26
64037.43
1451630.70
145163.07
1596793.76
1596793.76
8360.18
8360.00
1 Cum

Deputy Executive Engineer (R&B),


R&B Subdivision, Razole

Superintending Engineer (R&B),


R&B Circle, Kakinada

LEAD CHARGES
Earth/Grav
Metal
el/Sand
loading
15.23
33.27
unloading
7.61
16.58
stacking
0.00
0.00
0.25
0.00
0.00
0.5
0.00
0.00
1
27.73
26.76
2
38.82
37.41
3
51.75
51.75
4
62.84
62.84
5
73.93
73.93
6
85.02
85.02
7
96.11
96.11
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

107.20
118.29
129.38
140.47
151.56
162.65
173.74
184.83
195.92
207.01
218.11
229.20
240.29
251.38
262.47
273.56
284.65
295.74
306.83
317.92
329.01
340.10
351.19
360.43
369.67
378.91
388.15
397.39
406.64
415.88
425.12
434.36
443.60
452.85

107.20
118.29
129.38
140.47
151.56
162.65
173.74
184.83
195.92
207.01
218.11
229.20
240.29
251.38
262.47
273.56
284.65
295.74
306.83
317.92
329.01
340.10
351.19
360.43
369.67
378.91
388.15
397.39
406.64
415.88
425.12
434.36
443.60
452.85

42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91

462.09
471.33
480.57
489.81
499.05
508.30
517.54
526.78
536.02
545.26
554.50
563.75
572.99
582.23
591.47
600.71
609.95
619.20
628.44
637.68
646.92
656.16
665.41
674.65
683.89
693.13
702.37
711.61
720.86
730.10
739.34
748.58
757.82
767.06
776.31
785.55
794.79
804.03
813.27
822.51
831.76
841.00
850.24
859.48
868.72
877.97
887.21
896.45
905.69
914.93

462.09
471.33
480.57
489.81
499.05
508.30
517.54
526.78
536.02
545.26
554.50
563.75
572.99
582.23
591.47
600.71
609.95
619.20
628.44
637.68
646.92
656.16
665.41
674.65
683.89
693.13
702.37
711.61
720.86
730.10
739.34
748.58
757.82
767.06
776.31
785.55
794.79
804.03
813.27
822.51
831.76
841.00
850.24
859.48
868.72
877.97
887.21
896.45
905.69
914.93

92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141

924.17
933.42
942.66
951.90
961.14
970.38
979.62
988.87
998.11
1007.35
1016.59
1025.83
1035.07
1044.32
1053.56
1062.80
1072.04
1081.28
1090.53
1099.77
1109.01
1118.25
1127.49
1136.73
1145.98
1155.22
1164.46
1173.70
1182.94
1192.18
1201.43
1210.67
1219.91
1229.15
1238.39
1247.63
1256.88
1266.12
1275.36
1284.60
1293.84
1303.08
1312.33
1321.57
1330.81
1340.05
1349.29
1358.54
1367.78
1377.02

924.17
933.42
942.66
951.90
961.14
970.38
979.62
988.87
998.11
1007.35
1016.59
1025.83
1035.07
1044.32
1053.56
1062.80
1072.04
1081.28
1090.53
1099.77
1109.01
1118.25
1127.49
1136.73
1145.98
1155.22
1164.46
1173.70
1182.94
1192.18
1201.43
1210.67
1219.91
1229.15
1238.39
1247.63
1256.88
1266.12
1275.36
1284.60
1293.84
1303.08
1312.33
1321.57
1330.81
1340.05
1349.29
1358.54
1367.78
1377.02

142
143
144
145
146
147
148
149
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150
150

1386.26
1395.50
1404.74
1413.99
1423.23
1432.47
1441.71
1450.95
1460.19
1469.44
1478.68
1487.92
1497.16
1506.40
1515.64
1524.89
1534.13
1543.37
1552.61
1561.85
1571.10
1580.34
1589.58
1598.82
1608.06
1617.30
1626.55
1635.79
1645.03
1654.27
1663.51
1672.75
1682.00
1691.24
1700.48
1709.72
1718.96
1728.20
1737.45
1746.69
1755.93
1765.17
1774.41
1783.66
1792.90
1802.14
1811.38
1820.62
1829.86
1839.11

1386.26
1395.50
1404.74
1413.99
1423.23
1432.47
1441.71
1450.95
1460.19
1469.44
1478.68
1487.92
1497.16
1506.40
1515.64
1524.89
1534.13
1543.37
1552.61
1561.85
1571.10
1580.34
1589.58
1598.82
1608.06
1617.30
1626.55
1635.79
1645.03
1654.27
1663.51
1672.75
1682.00
1691.24
1700.48
1709.72
1718.96
1728.20
1737.45
1746.69
1755.93
1765.17
1774.41
1783.66
1792.90
1802.14
1811.38
1820.62
1829.86
1839.11

150
150
150
150
150
150
150
150
150

1848.35
1857.59
1866.83
1876.07
1885.31
1894.56
1903.80
1913.04
1922.28

1848.35
1857.59
1866.83
1876.07
1885.31
1894.56
1903.80
1913.04
1922.28

Cost of Materials, Labour

Material Rates
60 to 63 mm IRC & MoRTH HBG metal
50 to 55 mm IRC & MoRTH HBG metal
40 to 45 mm IRC & MoRTH HBG metal
Roughstone 300mm (HBG)for revetment
Roughstone 225mm (HBG)for revetment
SS Revetment work 225mm
SS Revetment work 300mm
SS Revetment work 450mm
Laterite for Revetment 225mm
Laterite for Revetment 300mm
Jeddy stone above 450mm to 600mm
Quarry spall(Field picked metal)
Av. Of rate 25mm & 40mm
150 mm soling stone HBG metal
40 to 45 mm IRC & MoRTH HBG M/C metal
25 to 27 mm IRC & MoRTH HBG M/C metal
19 to 22 mm IRC & MoRTH HBG M/C metal
12 to 14 mm IRC & MoRTH HBG M/C metal
9.5 to 11.20 mm IRC & MoRTH HBG M/C metal
5 to 7 mm IRC & MoRTH HBG M/C metal
2.36 to 5 mm IRC & MoRTH HBG M/C metal
HBG Stone chips 2.36mm and below
Gravel
40 mm SS-5 m/c HBG metal
25 mm SS-5 m/c HBG metal
20 mm SS-5 m/c HBG metal
12 mm SS-5 m/c HBG metal
10 mm SS-5 m/c HBG metal
6 mm SS-5 m/c HBG metal
Sand for Mortar
Sand for Filling
HYSD Steel
Mild Steel , Structral steel
Cement
Mild Steel 6mm
Blasting charges
Blasting charges
Blasting charges for rough stone
Seigniorage charges
Metal
Gravel/earth
Sand
Labour Rates
Mate
Mason
Mazdoor unskilled

Pg no

232
232
232

419.00
456.00
588.00
164.00
145.00
145.00
164.00
156.00
136.00
159.00
206.00

213
230
230
230
230
230
230

49.50
95.00
588.00
944.00 do
984.00 do
780.00 do
656.00 do
504.00 do
308.00 do
350.00
103.00
620.00
994.00
1036.00
822.00
692.00
532.00
0.00
0.00

233
233
232

233
233
231
231
231
231
231
231
233
233 Sand for concrete

70.00
70.00
75.00
30.00
50.00
400.00
413.50
350.00

228
226 &227
228

413.5

Machinery Rates
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader 3.35M Blade @50 cum/Hr
Hydralic excavator
Front end loader 1 cum capacity
Tipper 5.5 cum
Vibratory roller 8T
smooth wheeled roller 8 Ton
Water tanker 6 KL
Tractor
Tractor with Rotavator
Tractor with ripper attachment @ 60 cum per hour
Air compressor 250 cfm
Wet mix plant of 60 tonne hr. capacity
Mechanical broom @ 1250 sqm/hr.
Bitumen pressure distributor @1750 sqm/hr
Emulsion pressure distributor @1750 sqm/hr
Hot mix plant 40 to 60 TPH
Mechanical Paver finisher 100 TPH
Hydraulic self propelled chip spreader @ 1500 sqm/hr.
Finish rolling with 6-8 tonne smooth wheeled tandem roller
Pneumatic road Roller
GSB Plant 50 Cum
Generator 250 KVA
Generator set 125 KVA
Generator set 30 KVA
Concrete mixer 0.4/0.28 cum
Truck 5.50 cum capacity per 10 Tonnes per tkm
Tipper 5 cum capacity for Soil, GSB, WMM, Hot mix
Plate compactor/Power rammer
Binding wire
Galvanized MS flat clamps
GI bolt 10 mm dia
Ms Clamps
fitter
blacksmith
welder
Mazdoor
sinker skilled
sinking helper (semi skilled)
mazdoor skilled
GI Pipe 100 mm dia B Class
40 to 45 mm IRC & MoRTH HBG M/C metal
25 to 27 mm IRC & MoRTH HBG M/C metal

2562.60
3220.00
2815.90
1650.00
924.10
2637.20
1122.10
879.90
415.00
425.00
425.00
462.20
1650.00
375.00
1500.00
860.00
19200.00
2250.00
2695.00
1650.00
1347.00
1257.00
1850.00
1320.00
832.30
456.20
7.23
72.30
48.00
60
195
23.00
13.00
388.5
445
388.5
350
420
375
388.5
735

238
do
do
do
do
do
do
do
do
do
do
239
239
239
239
239

239
240

240

210
210
211
211
226 and 227
227
226 &227
228
226

200

Tipper 10Tonne capacity for carriage of stone


chips from stock pile on road side to chip
spreader
cleaning deck slab concrete

320

228

Plate compactor/Power rammer/road roller


Cost of 100mm dia. AC Pipe including 5% was
Collar for AC pipe (average)

58
268
26.8

240

7.89

610

233

N.W:-ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in km 6/4 of Sivakodu- Manepalli Road in E.G.Dt.
Statement of Seignorage Charges
S.
Discription of Item
No.
1
2
1 Earth work excavation
a) Above LWL
b) Below LWL
2 Sand filling under foundations
3 PCC (1:3:6) under footings
4 VRCC M20 for footings of Raft
5 VCC M15 for footings of Abutments,piers
and cutoff walls
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

VCC M15 for Substructure for Abutmnts


and piers
VRCC M20 for Substructure for Flywings
VRCC M20 for Bed blocks
VRCC M20 for Deck Slab
VCC M15 for Levelling Course
VRCC M30 for Approach Slab
VRCC M30 for Wearing coat
VRCC M20 for Railing
Grouted Revetment
Rough stone Revetment
Filter materil with Gravel
Back filling with Gravel
Filter Media
Weep holes
Aprons
Total

Seignorage Charges
a) Earth/ Gravel
b) Sand
b) Metal
d) Stone

=
=
=
=

Qty

Unit

356.00 cum
780.00 cum
73.09 cum
34.00 cum
195.00 cum
206.00 cum

Earth/Gravel
Coefficient
Qty
5
6
1.00
1.00

Metal
Coefficient
Qty
9
10

1.200
0.450
0.450
0.450

87.70
15.30
87.75
92.70

0.900
0.900
0.900

30.60
175.50
185.40

307.00 cum

0.450

138.15

0.900

276.30

0.00 cum
13.00 cum
145.00 cum
11.00 cum
24.00 cum
21.00 cum
66.00 RM
27.00 cum
11.00 cum
14.00 cum
129.00 cum
53.00 cum
103.00 RM
76.00 cum

0.450
0.450
0.450
0.450
0.450
0.450
0.025
0.090

0.00
5.85
65.25
4.95
10.80
9.45
1.65
2.43

0.900
0.900
0.900
0.900
0.900
0.900
0.050
0.180

0.00
11.70
130.50
9.90
21.60
18.90
3.30
4.86

1.200

63.60

1.20
1.20

x
x
x
x

1.00
1.20

16.80
154.80
0.050

5.15
1.20

1307.60
cum

1307.60
527.13
932.16
131.40

Rough stone
Coefficient
11

356.00
780.00

30.00
50.00
75.00
75.00

cum
cum
cum
cum
Say

Asst. Executive Engineer (R&B),

Sand
Coefficient
Qty
7
8

Deputy Executive Engineer (R&B),

527.13
cum

=
=
=
=
Rs
Rs

932.16
cum

39228.00
26356.55
69911.67
9855.00
145351.21
145351.00

Executive Engineer (R&B),

Superintending Engineer (R&B

R&B Section, Razole

R&B Subdivision, Razole

R&B Division, Amalapuram

R&B Circle, Kakinada

um drain in km 6/4 of Sivakodu- Manepalli Road in E.G.Dt.

Rough stone
Qty
12

27.00
13.20

91.20
131.40
cum

Superintending Engineer (R&B),

R&B Circle, Kakinada

N.W:-ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in km 6/4 of Sivakodu- Manepalli Road in E.G.Dt.

Statement of Seignorage Charges for Approaches


S.
No.
1
1
2
3
4
5
6

Discription of Item

Qty

2
Forming Embankment with earth
Granular Sub Base
Wet Mix Macadam
DBM 50mm thick
BM 40mm thick
Gravel Shoulders
Total

Seignorage Charges
a) Earth/ Gravel
b) Metal
c)Sand

3
496.00
219.00
274.00
53.00
42.00
338.00

=
=
=

928.64
782.75
0.00

Unit
4
Cum
Cum
Cum
Cum
Cum
Cum

x
x
x

Earth/Gravel
Sand
Coefficient
Qty
Coefficient
Qty
5
6
7
8
1.00
496.00

Metal
Coefficient
Qty
9
10
1.280
1.320
1.473
1.492

1.28

30.00
75.00
50.00

280.32
361.68
78.07
62.68

432.64
928.64
Cum

Cum
Cum
Cum
Say

782.75
Cum

=
=
=
Rs
Rs

27859.20
58706.24
0.00
86565.44
86565.00

Improvements to Lakkavaram - Sankaraguptam road from km 0/0 to 3/0 in


E.G.Dt.

Photographs

km 0/8

Condition of Bridge

C E R T I F I C A T E
Name of Work:
ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in
km 6/4 of Sivakodu- Manepalli Road in E.G.Dt.
1)

Certified that I have personally inspected the above Bridge on . and the
provisions made in the estimate for the above work are adequate and essential.

2)

Certified that the leads provided in the R.M.R of the estimate are shortest and there is
sufficient yield of good quality material from the quarries proposed in the estimate.

3)

Certified that all the distances in the quarry map are correct.

4)

Certified that the quarries provided are the nearest.

5)

Certified that the routes shown in the quarry map are the
transportation of the materials.

6)

Certified that all the materials can be easily quarried.

7)

Certified that the description of all materials mentioned are correct to the best of my
knowledge.

8)

It is certified that no soil having MDD not less than 17.50 kN/cum and suitable for
shoulders is available within a lead of 74.00km. Hence a lead of 74.00km is proposed
for selected soil to be used for shoulders.

9)

It is certified that the side earth is B.C. soil and no earth for forming embankment is
locally available, borrowed useful earth with a Lead of 74.0 Km is necessary for
forming the approaches.

10)

shortest for the

Certified that the above work is not taken up in any other scheme. Hence there is no
overlap in the execution of work.

Asst. Executive Engineer (R&B),


R&B Section, Razole

Deputy Executive Engineer (R&B),


R&B Subdivision, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Superintending Engineer (R&B),


R&B Circle, Kakinada

Name of work :-

ReConstruction of Bridge (2V X 8.37m) across


Kunavaram Medium drain in km 6/4 of SivakoduManepalli Road in E.G.Dt.

Certified that
1) The quarry distances noted in the quarry map are correct
2) The quarries noted are the nearest
3) The routes shown are correct
4) The description of the material available in the quarries noted are correct
5) The side earth is B.C. soil and no earth for forming embankment is locally
available, borrowed useful earth with a Lead of 74.0 Km is necessary for
forming the approaches.

Asst. Executive Engineer (R&B),


R&B Section, Razole

Deputy Executive Engineer (R&B),


R&B Subdivision, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Superintending Engineer (R&B),


R&B Circle, Kakinada

BORROWED EARTH CERTIFICATE

Name of work :-

ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium


drain in km 6/4 of Sivakodu- Manepalli Road in E.G.Dt.

Certified that the side earth is B.C. soil and no earth for forming embankment is locally
available, borrowed useful earth with a Lead of 74.0 Km is necessary for forming the approaches.

Asst. Executive Engineer (R&B),


R&B Section, Razole

Deputy Executive Engineer (R&B),


R&B Subdivision, Razole

Executive Engineer (R&B),


R&B Division, Amalapuram

Superintending Engineer (R&B),


R&B Circle, Kakinada

Name of work :-

ReConstruction of Bridge (2V X 8.37m) across


Kunavaram Medium drain in km 6/4 of SivakoduManepalli Road in E.G.Dt.

Certified that I have inspected the above road personally on


and the provisions made in the estimate are essential and
adequate.

Superintending Engineer (R&B)


(R&B) Circle,Kakinada

ReConstruction of Bridge (2V X 8.37m) across Kunavaram


Medium drain in km 6/4 of Sivakodu- Manepalli Road in
E.G.Dt.

N.O.W ReConstruction of Bridge (2V X 8.37m) across Kunavaram Medium drain in km 6/4 of
Sivakodu- Manepalli Road in E.G.Dt.
APPROACHES ABSTRACT ESTIMATE
S.No
1

Description

Quantity Unit

1209.00 cum

cum

2480.00 cum

Providing, Laying, Spreading and compacting graded HBG crushed stone


aggregate to Wet Mix macadem specification including cost,seignorage of all
materials and including premixing the material with water at OMC in Mechanical
mix plant carriage of mixed material by tipper to site , laying in uniform layers
with paver in
base courses on well prepared surface and compacting with
Vibratory roller to acheive the desired density etc., as directed by the Engineerin-Charge and as per MoRT&H specification.406 (5th revision) for finished item
of work. (Payment based on levels for finished item of work)

274
4

cum

Construction of Granular sub-base by providing HBG material confirming to


Grading - IV of MoRT&H Table 400-2 including cost, seigniorage charges and
conveyance of all materials to work site and spreading in uniform layers with
motor grader or by approved means, on prepared surface mixing by mix in place
method with Rotavator / approved means at OMC and compacting with vibratory
roller to achieve the desired density etc., complete for finished item of work as
per MoRT&H Specification 401 (5th revision) and as directed by the Engineerin-charge. ( Payment will be made based on levels for finished item of work ).

219
3

Per

Forming embankment with borrowed useful earth from outside road boundary by
mechanical means upto SDR with all leads and lifts including pre-watering of soil
at borrow area, removal of top soil, excavation of soils at borrowed area,
conveyance of soil, depositing the soil on the embankment, spreading soil,
breaking clods, sectioning, grading and consolidation with 8 to 10 Tonnes
Vibratory Road Roller @ OMC to meet requirement of table 300-2 of MoRT&H,
including all hire and operational charges of T&P and seigniorage charges,
complete for finished item of work as per MoRT&H specification 305 (5th
revision) (Payment will be made based on level for finished item of work).

496

Rate

cum

2670.00 cum

Providing and applying primer coat with bitumen emulsion on prepared surface of
granular Base including clearing of road surface and spraying primer at the rate
of 0.70 kg/sqm using mechanical means as per MoRT&H specification clause
No.502 and as directed by the Engineer-in-Charge.
1050

sqm

28.10 sqm

S.No
5

Description

Quantity Unit

cum

7014.00 cum

cum

8360.00 cum

Construction of Gravel shoulders (Selected Earth) including cost, and


conveyance of all materials to work site and spreading in uniform layers by
approved means, on prepared surface and compacting with vibratory roller to
achieve the desired density at OMC etc., complete for finished item of work as
per MoRT&H Specification 401& 407 (5th revision) and as directed by the
Engineer-in-charge.
( Payment will be made based on levels for finished item of work ).
338

9
10
11

11.00 sqm

Providing and laying 40mm compacted Bituminous Concrete with 100-120


TPH batch type hot mix plant/40-60TPH hot mix plant using HBG crushed
aggregates of Grading-2 as per table 500-7 of specification 507 of MoRTH (5th
revision), premixed with bitumen VG-30 grade @ 5.4% of mix and filler including
cost and conveyance of all materials to work site and transporting the hot mix to
work site, laying with mechanical paver finisher to the required grade, level and
alignment, rolling with smooth wheeled, vibratory and tandom rollers to achieve
the desired compaction as per MoRTH specification 507 (5th revision) complete
and as directed by the Engineer-In-Charge.

42
8

sqm

Providing and laying of 50 mm thick Dense Graded Bituminous Macadam with


100-120 TPH batch type hot mix plant/40-60TPH hot mix plant using HBG
crushed aggregates of grade-2 as per table 500-10 of MoRTH specification 505
(5th revision) premixed with bituminious binder VG-30 grade @ 4.50% of weight
of total volume of mixture, transported to site, laid over a previously prepared
surface with mechanical paver finisher to the required grade, level and alignment
and rolled as per Clauses 501.6 & 501.7 to achieve the desired compaction for
finished item of work as directed by Engineer-In-Charge including hire and
operational charges all T & Pand all other contingent charges necessary
including cost of (excluding seigniorage charges) od all materials etc., complete
and as per MoRTH specification No.505 (5th revision)

53
7

Per

Providing and applying tack coat with bitumen Emulsion (Medium settting) (Bulk)
using Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the
prepared bituminous/granular surface cleaned with mechanical broom for
finished item of work as per MoRT&H Specification 503 (5th revision) and as
directed by the Engineer-in-Charge.
2100

Rate

cum

1244.00 cum

Add for VAT @ 5%


Add for Seignorage charges(as per statement enclosed)
Provision for Caution boards , guide posts & caution boards etc
Total

Rs

S.No

Description

Quantity Unit

Asst..Exe.Engineer (R&B)
R&B Section Malikipuram

Exe.Engineer (R&B)
(R&B) .Division Amalapura

Rate

Per

Deputy Exe.Engineer (R&B)


R&B Sub Division Razole

Superintending Engineer (R&B)


(R&B) Circle,Kakinada

ium drain in km 6/4 of

E
Amount

599664

543120

731580

29505

Amount

23100

371742

351120

420472

3070303
153515
86565
173371
3483754

Amount

ng Engineer (R&B)

GOVERNMENT OF ANDHRA PRADESH


ROADS AND BUILDINGS DEPARTMENT

APRDC

ReConstruction of Bridge (2V X 8.37m)


N.W:_across Kunavaram Medium drain in km 6/4
of Sivakodu- Manepalli Road in E.G.Dt.

ESTIMATE.
ESTIMATE AMOUNT
DISTRICT
CIRCLE
DIVISION
S U B-D I V I S I O N
S ECTION

::

Rs. 160.00 Lakhs

:: EAST GODAVARI
:: KAKINADA
:: AMALAPURAM
:: RAZOLE
:: MALIKIPURAM

Lakhs