BOMBAY HIGH FIELD PLATFORMS & W.L LINES NETWORK 26 WELL PLATFORMS Group 3 sl + oe a SARKU PRE-ENGINEERING SURVEY PLAN item | ZONE | Prop. Grp | Platform | P.Platform | Completion Date | Plan Date_| Crane Condition 1 South 4 SJ BHS 25/03/2006 2 ‘South 4 Si BHS 24/03/2006 3 South 2 SN BHS 29/09/2006 4 ‘South’ 1 ‘SP BHS 22/05/2006 5 ‘South 7 ST BHS 21/05/2006 6 ‘South 1 SG ICP 20/03/2006 7 ‘South 2 Sa ICP [5Te31qeo6 | 19103/2006 | Not Working 8 ‘South 4 NM ICP 1 O3] 200e 18/03/2006 9 ‘South 4 ‘SM 1oP 17/03/2006 __|_17109/2006_|_Boom Damaged 10 ‘South a TA ICP 16/03/2006 | 1603/2007 1 ‘South 2 18 ICP 15/03/2006 |_15103/2007 12 North: 5 NB. BHN 43, ‘South 4 NL BHS x 14 ‘South 2 ‘SB BHS x 15 ‘South 1 SE, BHS x 16 ‘South’ i ‘SF, BHS x 17___| Next Field 6 HB. HRA, 18__| Next Field 6 HC. HRA 19 ‘South 2 ‘SD 10P x 20 North 5 ND. NOO 21 North 5. NE NOO. 7 ‘South 4 EC, ‘SHP x 23 ‘South’ 3 iE SAP x 24 ‘South 3 Sw SHP x 25 South 3 SY, SHP x 26 North 5 Ni ‘WIN Completed 12 Outstanding 14