Professional Documents
Culture Documents
SPAN (ctc) L =
37.00 M
I. DATA
0.4
L=
Beam length
Beam spacing (s)
Concrete Slab thickness
Asphalt thickness
RC Flat thickness
37.00 M
=
=
=
=
=
37.80
205.00
25.00
10.00
7.00
m
( edge anchor to edge ancho
cm
cm (not include RC Flat)
cm
cm
20
12
25
25
cm
cm
cm
cm
Cross Section
H
A
B
tweb
=
=
=
=
210
80
70
20
cm
cm
cm
cm
tfl-1
tfl-2
tfl-3
tfl-4
=
=
=
=
tfl-1
tfl-2
tfl-3
tfl-4
II. MATERIAL
2.1 Concrete
Beam
Compressive strength
at service
* fc' = (0.76+0.2*log(bk/150))*bk =
600
528.2
at initial
(
80%
), fc'i =
422.6
Allowable stress at initial ..(AASHTO 1992, Chapt. 9.15.2.1-Design)
Compressive
0.55 * fc'I =
232.4
Tensile
0.80 * Sqrt(fc'I) =
16.4
Allowable stress at service . (AASHTO 1992, Chapt. 9.15.2.2-Design)
Compressive
Tensile
0.40 * fc' =
211.3
1.59 * Sqrt(fc') =
36.5
Modulus of elasticity
Ec = 347052.8
Eci = 310413.5
Modulus rupture
Note :
* Pedoman Beton 1988, Chapter 3
fr =
45.5
0.9871
fu
[cm2]
: 1.96E+06 [kg/cm2]
: 19000 [kg/cm2]
dia
13
Ast
- Modulus of elasticity
Es
[mm]
Ast
: 1.327323 [cm2]
- Modulus of elasticity
Es
: 2.10E+06 [kg/cm2]
- Yield stress
fy
3900
[kg/cm2]
347053
Ep 2 =
257922
kg/cm2
kg/cm2
[Girder]
5
4
[Slab]
Ya
n = Ep 1 / Ep 2
n=
1.35
3
Yb
base line
PRECAST BEAM
Zone
6
5
4
3
2
1
Total
Section
Height
Width
Bottom
Upper
7.0
13.0
12.0
128.0
25.0
25.0
210.0
64.0
80.0
20.0
20.0
70.0
70.0
64.0
80.0
80.0
20.0
20.0
70.0
Area
cm2
Level
cm
Yb
cm
Area*Yb
cm3
448.00
1040.00
600.00
2560.00
1125.00
1750.00
7523.00
203.0
190.0
178.0
50.0
25.0
0.0
206.5
196.5
185.2
114.0
35.2
12.5
101.2
92512
204360
111120
291840
39583
21875
761290
Area
cm2
Level
cm
Yb
cm
Area*Yb
cm3
3808.79
0.00
7523.00
11331.79
210.0
203.0
0.0
222.5
205.3
101.2
142.0
847456
0
761290
1608746
Area (cm2)
Ya (cm)
Yb (cm)
Ix (cm4)
108.8
93.0
61.0
101.2
142.0
41398803
78805199
Height
Section
Width
Bottom
Upper
25.0
7.0
210.0
235.0
152.4
0.0
70.0
1
Total
3.3
152.4
0.0
80.0
Resume
[in cm]
Description
Precast Beam
Composite Beam
7523.00
[composite] 11331.79
[precast]
IV. Loading
4.1 Dead Load
Design Carracteristics. Bridge Management System ( BMS ), Vol.1 Chapter 2.3.1
1. Specific Gravity of Precast Beam = 2.5 ton/m 3 ( PB )
q1 =
q1 =
q2 =
q2 =
q3 =
q3 =
p =
p =
no. diaph.
(diaph )
Area x PB
0.7523
Hslab x s x s
2.5
0.3200 x
2.05
tasp x s x asp
2.4
0.10
2.05
x
x
Volume of diaph. x diaph
2.2
1.85
7
x 1.65 x
pcs
0.15
2.4
x
q4 (q ek = p*n/span)
which :
DLA = 1 + 0,4
DLA = 1 + 0,525
DLA = 1 + 0,3
=
=
=
=
=
q = 0,8 t/m'
q = 0,8 x (0,5 + 15/span) t/m'
e. Live load
- Distribution load q' = DF x q x s
=
1.00
0.72 x
x
- Line load p' = DF x DLA x KEL x s
1.00
1.400 x
x
2.05
4.400 x
2.05
V. MOMENT ANALYSIS
[in ton-meter]
Mid
Sec 1-1
Sec 2-2
Sec 3-3
span
0.00
6.50
14.50
DL
Precast beam
321.84
0.00
186.43
306.80
Subtotal
321.84
0.00
186.43
306.80
Slab
269.42
0.00
156.06
256.82
ADL
Asphalt
77.18
0.00
44.71
73.57
Diaphragm
35.58
0.00
20.61
33.91
Subtotal
382.17
0.00
221.38
364.31
LL
Distribution load
254.10
0.00
147.19
242.22
Line load
116.81
0.00
67.66
111.35
Subtotal
370.91
0.00
214.85
353.57
Total (DL + LL)
1074.92
0.00
622.65
1024.67
Ultimate total
1675.32
0.00
970.44
1597.00
Ultimate total = 1,2*Beam+1,3*Slab+2*Asphalt+1,2*Diaphragm+2*LL
( Bridge Management System, Vol.1-Page 2-6 )
Note :
DL = Dead Load
Type
Description
Description
Mid
Nos
strand
1
2
3
4
5
0
15
15
15
15
total
60
Parabolic curve :
Y=
Y=
A=
B=
C=
edge
profile
middle
0.00
170.00
140.00
60.00
30.00
100.00
0.00
20.00
10.00
10.00
10.00
12.50
Asp
cm2
fu
kg/cm2
Jacking Force
(kg)
0.987
0.987
0.987
0.987
0.987
19000
19000
19000
19000
19000
75%
75%
75%
75%
75%
75%
0.00
210992.63
210992.63
210992.63
210992.63
843970.50
AX2 +
BX + C
Average of Strand's position vertically from the bottom of beam ( Value for Y axis )
Constanta : ( (Ymiddle + Yedge)/(L/2)2)
Constanta : ( L x A )
Average of strand's position when the parabolic curve reach the Y axis
A = 0.002489
Y
=
0.002489 X2 + -0.093333
B = -0.093333
tg o =
0.00498 X
+
-0.093333
Eccentricity [e]
= Yb - Ys =
88.70
cm
Note :
Jacking Force = Nos x Asp x Fu x (Tension Persentation)
Nos = Number of Strand
Yb = Distance of Neutral Axis from the bottom of non composite beam ( Chapter 3.3 - Resume
Ys = Distance of tendon from the bottom of the beam at the middle span ( Chapter 7.1,Cable
7.2 Initial Jacking Force
Check for two condition
at initial for mid span
Top stress
Bottom Stress
Pi
<=
>=
<=
<=
<=
889.54
top =
Top stress
Bottom Stress bot =
<=
>=
>=
<=
564.44
Assumption :
Loss of Prestress assumption long term
From eq. [3] and eq. [6], gradually stressing is
not needed
12.7"
used prestressing cable
Pi =
843971 kg
=
Pe =
80.0%
843970.5
675244 kg
=
Note :
Pi = Initial Prestress Force
Wa = Modulus Section for Top section of Precast Beam
Mbs = Moment due to Self Weight
e = eccentricity
Wb = Modulus Section for Bottom section of Precast Beam
Pe = Effective Prestress force
Wac = Modulus Section for Top section of composite Beam
Mbp = Moment due to concrete Weight (Precast Beam + Slab + Diapraghm)(Chapt. V-Mome
Wbc = Modulus Section for Bottom section of composite Beam
Wap = Modulus Section for Top section of Precast Beam
Wbp = Modulus Section for Bottom section of Precast Beam
Mbp = Moment due to additional Load ( Asphalt + Live Load ) (Chapter 5-Moment Analysis
7.3 Losses of Prestress
1. Losses of Prestress (Short Term)
a. Friction
Friction cable and duck caused tensile at initial is not same tensile in ending section,
which the deferential of tensile can be calculated as follow :
-( * + k *x)
where :
Px = Po * e
. ( AASHTO 1992, Chap
Px = Prestress force at section distance x from tensile point.
Po = Jacking force ( tensile force at anchor, initial)
= friction coefficient
=0.20
(for grouting tendon in metal sheating, 7 w
= Change of cable angle from tensile point to x section
= 2 * arctg (
0.00498
x +
-0.093333 ) =
k = Wobble coefficient
0.003
(for grouting tendon in metal sheating, 7 w
x = Distance from tensile point to x section
37.80
If tensile of strand is taken
75%
from Ultimate Tensile Stress,
Po (Jacking Force)
=
75%
0.9871
19000
and value of tensile strand at end beam as follow :
Px
= 12092.14 kg
b. Anchor slip
Slip is occur after anchoring of pc strand is being held/restraint in the end of beam. Because
losses can not evenly distributed at the overall length of beam.
It can calculated by formula :
x = @sqrt(d*As*Es/m)
where: d = draw-in, assumption
=
As = eff. Section area
m = loss of prestress per length
So, x =
Tensile force at distance
P =Maximum tensile force =
m = (Po-P) / L
17.22 m
17.22 m as :
13167.12 kg
c. Elastic Shortening ( ES )
Losses due elastic shortening
ES =
(Kes*Es*fcir/Ec)*As
( ACI 318-95, Chapt. 18.6
where:
Kes =
0.50
(for postensioned)
As
fcir
= 0.9871 cm2
= concrete stress at centre gravity of prestressing force immediately after trans
fcir
ES
( CR )
CR
2.27
80.00
(ratio area/perimeter)
= Kcr*(Es/Ec)*(fcir-fcds)
206.85
Area = 7523.00
Where :
Kcr =
1.60
(for postensioned member)
fcir = stress at center point prestress force, initial condition
fcds = stress at center point prestress force, permanent dead load.
where :
Kre =
J =
C =
5000
0.04
0.66
RE =
188.79
kg
GRAPHICS OF LOSS OF PRESTRESS STAGE
1. Due Friction
14066
2. Due Slip (chek effect of prestress losses at mid span, wheather of not)
14066
13167
12268
13255
13079
17.22
18.90
12741
18.90
13079
12653
12565
13079
12653
12565
11754
11430
11254
10443
17.22
18.90
Stress force at X =
18.5
60
60
60
- Jacking Force =
- Initial
=
- Service
=
m
m
=
=
=
843970.5
784749.4
675247.3
[cm ]
[ton]
Cable
stress
[kg/cm2]
59.23
59.23
784.75
675.24
13250
11401
Asp
2
Tranfer
Service
% tensile
69.7%
60.0%
8.00
0.40
8.00
6.50
Moment DL
Pi
e (eccentricity)
x - [m]
[ton.m]
[ton]
[m]
Middle
Span
SEC 1-1
0.00
SEC 2-2
6.50
SEC 3-3
14.50
321.84
784.75
0.89
0.00
784.75
0.04
186.43
784.75
0.53
306.80
784.75
0.85
Pi.e
Moment Net.
Pi / A
M / Wa
M / Wb
Initial Stresses
[kg/cm2]
-414.78
-228.35
104.31
-60.02
55.82
44.30
160.13
-664.78
-357.99
104.31
-94.09
87.51
10.23
191.82
)
[kg/cm ]
146.11
83.52
119.78
T
bottom ( B ) -2.75
95.56
38.61
SEC 3-3
14.50
671.10
675.25
-572.02
99.08
353.57
89.76
26.04
-24.22
27.38
-63.70
41.74
143.18
1.84
-27.57
-27.57
104.31
-7.25
6.74
97.07
111.05
Pi/A =
104.31
kg/cm2
M/Wa =
-98.35
top =
kg/cm2
5.97
kg/cm2
+
-
Note :
-696.03
-374.19
104.31
[kg/cm2]
-98.35
[kg/cm2]
91.47
top ( T )
5.97
bottom ( B ) 195.78
[ton.m]
[ton.m]
[kg/cm2]
=
-
Pi/A =
104.31
kg/cm2
M/Wb =
91.47 kg/cm2
bottom =
195.78 kg/cm2
Pi/A =
89.76
kg/cm2
M1/Wa =
27.62 kg/cm2
28.73kg/cm2
M2/Wa' =
=
+
Pi/A =
89.76
kg/cm2
M1/Wb =
-25.69kg/cm2
-66.82kg/cm2
M2/Wb' =
bottom =
8.3 Deflection
Note :
P=
e' =
l=
w=
e'
Ix =
Ex =
l/2
l/2
Reference :
w
Condition
(t/m)
(ton)
(t/m)
at initial
1.88
0.00
-3.91
at aDL (total)
2.23
0.00
at service (total)
5.60
12.63
-3.36
due to Live Load
1.48
12.63
deflection = (5q*L4/384EI) + (pL3/48EI)
No.
1
due load
prestress
wd
w ad
w LL
3 x (2)
17100
kg/cm2
=
=
=
=
=
Aps * fps
=
1012765
0.85*fc'beam*tweb*(a-tslab-tflens)
0.85*fc'beam*A*tflens
=
718416
0.85*fc'slab*bslab*tslab
=
1270972
((T-C2-C3)/(0.85*fc'*tweb))+tslab+tflens
=
-63.8
-- Check, if a < (tslab+tflens), so must analyse as T beam or square beam.
(tslab+tflens) =
45
cm
C1 = -976624 kg
d = (H+tslab-ed) =
222.50 cm
Mn = C1(d-(a-tslab-tflens)/2)+C2(d-tslab-tflens/2)+C3(d-tslab/2) =
Mn =
Analysed as T beam, for a < (tslab+tflens) or at flens of beam :
a = ((T-C3)/(0.85*fc'*A))+tslab
=
17.8
-- Check, if a < (tslab), so must analyse as square beam.
(tslab)
25
cm
C2 = 0.85*fc'beam*A*tflens
=
718416
Mn = C2(d-tslab-((a-tslab)/2))+C3(d-tslab/2)
=
4113.73
Mn = 3702.36
Analysed as square beam, for a < tslab :
a = Aps*fps/(0.85*fc'slab*bslab)
Mn = T*(d-a/2)
= 2152.52 ton.m
Mn = 1937.27 ton.m
19.9
1.16
X. SHEAR ANALYSIS
10.1
Shear calculation by rebar
WEB SHEAR
=
bw =
Description
Mid
Sec 1-1
Sec 2-2
Sec 3-3
Vu = 1.3[Vdl+5/3Vll]
Mu = 1.3[Mdl+5/3Mll]
dp
> 0.80 h
[Vu*dp]/Mu >1
Vc min
Vc
Vc max
Vc taken
Vu/
Vs = Vu/ - Vc --- > 0
x - [m]
[ton]
[t-m]
[cm]
span
0.00
6.50
14.50
12.63
181.12
121.92
49.06
1675.32
0.00
970.44 1597.00
197.49
110.00
160.15
193.00
0.01 1.99E+101
0.20
0.06
[kg] 48114.86 26798.9 39017.0 47021.0
[kg] 302645.12 2.1E+108 3.2E+06 1.14E+06
[kg]
### 67250.1 97910.7 117996.1
[kg]
### 67250.1 97910.7 117996.1
[kg] 14856.47 213076.9 143431.9 57714.9
[kg]
0.000 145826.8 45521.2
0.0
Shear Connector
Slab K- 350
Distance ctc beam (be) =
Thickness of slab =
Height of compression stress (a) =
Hu
= 1.0E+06 kg
f'c =
291.76 kg/cm2
2.05
m
25.00 cm
19.92 cm
(see moment capacity section)
305.51
156.76
121
cm
mm
pcs.
2
100.00
cm
15
0.9871
3/8 P (1 - a/b) =
3/8 P (1 - a/h) =
ton
As
=
58.15 / ( 0.87 x
Number of bursting steel needed
3900 )
8
D13
19000
52.91
58.15
17.14
420
100
880
101.2
100
600
25.00 cm
0.00 cm
Keterangan
x [m]
Vn = Vdl + Vll
tg
Vp = P tg
Vs = Vn - Vp
Joint's shear stress
V =Vs/(Concrete Area)
Ya =
Yb =
Middle
Span
[ton]
[ton]
[ton]
SEC 1-1
0.00
66.80 cm
41.20 cm
SEC 2-2
6.50
SEC 3-3
14.50
6.31
0.000
0.34
5.98
116.21
-0.093
62.52
53.69
77.60
-0.060
40.67
36.93
30.07
-0.020
13.78
16.29
2.49
0.00
0.00
-23.72
85.93
92.12
1.71
407.81
214.85
-356.90
98.68
82.46
0.75
671.10
353.57
-572.02
106.91
76.22
P.e
[t-m]
Top stress
Bottom stress
Top point
max
min
Bottom Point
max
min
[kg/cm2]
[kg/cm2]
0.28
704.02
370.91
-598.91
107.94
75.44
[kg/cm2]
[kg/cm2]
107.94
0.00
86.00
-0.07
98.71
-0.03
106.92
-0.01
[kg/cm2]
[kg/cm2]
75.44
0.00
92.18
-0.07
82.49
-0.04
76.23
-0.01
[kg/cm2]
[t-m]
Calculation :
Top stress = P/A + Mdl/Wa + Mll/Wa'
Bottom Stress =
P max =
P min =
Note :
P=
A=
Mdl =
Mll =
Wa =
Wb =
teg. =
V=
Vn =
Vp =
s=
Ae
h'
h
AB
A'e
Av
Av'
H
(ton)
(mm)
(mm)
(mm)
(mm)
(kg/cm2)
Sec 2-2
6.50
77.60
100
50
1080
520
3900
Sec 3-3
14.50
30.07
100
50
1080
520
3900
(kg/cm2)
1950
1950
( mm2 )
265.46
265.46
( mm2 )
230.28
0.87
2
89.25
0.34
2
( mm2 )
57.57
0.22
2
1989.66
7.49
8
22.31
0.08
2
771.15
2.90
3
478.28
1.80
185.37
0.70
Male Section
Ae
Number of stell Needed
Number of steel Used
AB
Number of stell Needed
Number of steel Used
Av
Number of stell Needed
Number of steel Used
Female section
A'e
Number of stell Needed
( mm2 )
( mm2 )
( mm )
2
( mm2 )
119.57
0.45
2
1989.66
7.49
8
46.34
0.17
2
771.15
2.90
3
Sxa
0.8 x h x sa
Ae
4
S
2 x sa
Sxa
0.8 x h' x sa
A'e
4
A'e =
AB =
Av' =
Av
a= H/2
fc at lifting =
50%
= 264.1236 [kg/cm2]
fc'
Beam Segment
Length (m)
a
b
Precast beam weight
Segment beam weight
Dynamic load factor
Force at lifitng point
Safety Factor
No. legs for lifting point
MDL middle
Wx
botom
fr' conc.at stock yard
fr' conc.at instalation
Stress control
13.0015 [kg/cm2]
fc at install =
80% fc'
= 422.5978 [kg/cm2]
frupture = 0.8 sqrt(fc at instal) = 16.44575
1
2
3
4
5
6.90
8.00
8.00
8.00
6.90
1.43
1.66
1.66
1.66
1.43
4.04
4.69
4.69
4.69
4.04
1.8808
1.8808
1.8808
1.8808
1.8808
13.0
15.0
15.0
15.0
13.0
1.4
1.4
1.4
1.4
1.4
9.1
10.5
10.5
10.5
9.1
2
2
2
2
2
2
2
2
2
2
2.70E+05 3.62E+05 3.62E+05 3.62E+05 2.70E+05
4.09E+05 4.09E+05 4.09E+05 4.09E+05 4.09E+05
0.66
13.00
16.45
OK
a
0.89
13.00
16.45
OK
0.89
13.00
16.45
OK
b
0.89
13.00
16.45
OK
0.66
13.00
16.45
OK
a
12,7
0.987
19000
75%
14.06
mm
cm2
kg/cm2
UTS
ton for 1 leg of strand
Beam Weight =
Dynamic Load Factor =
Force at lifitng point =
No legs for lifting point =
0.4
( edge anchor to edge anchor :
37.5
nclude RC Flat)
A
tfl-1
tfl-2
tweb
H
A
Slab
350
291.8
233.4
[kg/cm2]
[kg/cm2]
[kg/cm2]
-Design)
128.4
12.2
[kg/cm2]
[kg/cm2]
.2-Design)
116.7
27.2
257922.1
33.8
[kg/cm2]
[kg/cm2]
[kg/cm2]
[kg/cm2]
[kg/cm2]
m)
Ya'
1
Yb'
COMPOSITE BEAM
Io
cm4
Area*d2
cm4
Ix
cm4
1829
4967932 4969761
14647
9446356 9461002
6336
4234099 4240435
3495253 419755 3915008
52566
4901964 4954530
91146 13766920 13858066
3661777 37737026 41398803
Io
cm4
Area*d2
cm4
Ix
cm4
Wa (cm3)
Wb (cm3)
380486
847072
1291201
409099
555093
1.8808
[t/m']
1.5744
[t/m']
0.4510
[t/m']
1.0989
0.2079
[ton]
[t/m']
1.40
1.53
1.30
4.40
1.00
for
Span <= 50 m
50 < Span < 90 m
Span >= 90 m
ton/m'
Span <= 30 m
Span > 30 m
1.48
ton/m'
12.63
ton
Sec 4-4
22.50
306.80
306.80
256.82
73.57
33.91
364.31
242.22
111.35
353.57
1024.67
1597.00
Sec 5-5
30.50
186.43
186.43
156.06
44.71
20.61
221.38
147.19
67.66
214.85
622.65
970.44
Sec 6-6
18.50 (m)
321.84
321.84
269.42
77.18
35.58
382.17
254.10
116.81
370.91
1074.92
1675.32
Sec 4-4
22.50
-7.52
-7.52
-6.30
-1.80
-0.83
-8.93
-5.94
-7.68
-13.62
-30.07
-49.06
Sec 5-5
30.50
-22.57
-22.57
-18.89
-5.41
-2.49
-26.80
-17.82
-10.41
-28.23
-77.60
-121.92
Sec 6-6
18.50 (m)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-6.31
-6.31
-6.31
-12.63
Jacking Force
(kg)
0.00
210992.63
210992.63
210992.63
210992.63
843970.50
X +
-16.45 kg/cm2
1008.48 ton
232.43
889.54
ton
kg/cm2
ton
[3]
-16.45
[1]
[2]
211.30
63.34
-36.54
564.44
ton
kg/cm2
ton
kg/cm2
ton
[6]
[4]
( -36.54
[5]
0.189 rad
ng tendon in metal sheating, 7 wire strand)
m
kg
mm
0.9871
cm2
0.52
kg/cm'
184.48
kg/cm2
cm2
perimeter= 3312.90 cm
5, Chapt.18.6 )
RESS STAGE
12092
12092
12092
11578
12092
11578
10267
kg
kg
kg
(
(
(
75.00% )
69.74% )
60.01% )
0.00
0.00
0.00
37.80
SEC 4-4
22.50
SEC 5-5
30.50
SEC 6-6
18.50
306.80
784.75
0.85
186.43
784.75
0.53
321.84
784.75
0.89
-664.78
-357.99
104.31
-94.09
87.51
10.23
191.82
-414.78
-228.35
104.31
-60.02
55.82
44.30
160.13
-696.03
-374.19
104.31
-98.35
91.47
5.97
195.78
( = M1 )
( = M2 )
SEC 4-4 SEC 5-5
22.50
30.50
671.10
407.81
675.25
675.25
-572.02
-356.90
99.08
50.90
353.57
214.85
89.76
89.76
26.04
13.38
-24.22
-12.44
27.38
16.64
-63.70
-38.71
41.74
25.36
143.18
119.78
1.84
38.61
SEC 6-6
18.50
704.02
675.25
-598.91
105.11
370.91
89.76
27.62
-25.69
28.73
-66.82
43.79
146.11
-2.75
ment Analysis )
dition ( Chapter 7.4 - Effective Stress Force )
Precast Beam)
ast condition
it Condition. ( Chapter 3.3 - Resume )
osite condition . ( Chapter 3.3 - Resume )
kg/cm2
kg/cm2
Allow.
stress
-16.4
232.4
Allow.
stress
116.7
211.3
-36.5
slab =
43.79
kg/cm2
146.11 kg/cm2
top =
+
bottom =
-2.75kg/cm2
Prestress force
Distance between c.g of strand at end and
c.g of strand at lowest point.
length of anchor to anchor
Equivalent loading for prestress force
Inertia of beam
Modulus of Elasticity
8 . P . e'
w=
l2
1.81
-0.46
must <=
= 0.9
200
cm
kg
kg
kg
cm
se as T beam or square beam.
1312.03 ton.m
1180.83 ton.m
cm
square beam.
kg
ton.m
ton.m
cm
1675.32 ton.m
0.85
20
Sec 4-4
Sec 5-5
Sec 6-6
22.50
49.06
1597.00
194.00
30.50
121.92
970.44
163.14
5.96E-02
2.05E-01
47263.5
39744.7
1.1E+06
3.29E+06
118604.7 99736.7
118604.7 99736.7
57714.9 143431.9
0.0 43695.2
18.50
12.63
1675.32
197.48
0.01
48112.4
302615.3
120735.0
120735.0
14856.5
0.0
2
2
2
13
13
13
3900
3900
3900
2.53
2.53
2.53
1.9E+17 368.9706 2.0E+017
26258.0 24079.02 26492.80
609.60
609.60
609.60
26258.04 988.26 26492.80
609.60
368.97
609.60
10*Av*fy*dp/Vs
10*Av*80*fy*dp/(Aps*fps*sqrt(dp/bw)
d/2 atau 24 in (=60.96 cm)
10*Av*fy/(50*bw) if only Vu/ > Vc/2
210992.6 kg
ton
ton
cm2
Ya'[c]
Ya
Y'b[c]
Yb
Ya' =
Yb' =
SEC 4-4
22.50
142.0
26.03 cm
81.97 cm
SEC 5-5
30.50
SEC 6-6
18.50
30.07
0.019
13.11
16.97
77.60
0.059
40.00
37.60
6.31
0.000
0.34
5.98
0.79
671.10
353.57
-572.02
106.91
76.22
1.74
407.81
214.85
-356.90
98.68
82.46
0.28
704.02
370.91
-598.91
107.94
75.44
Allow.
stress
106.92
-0.01
98.71
-0.03
107.94
0.00
211.3
-36.5
76.23
-0.01
82.49
-0.04
75.44
0.00
211.3
-36.5
Sec 4-4
22.50
-30.07
100
50
1080
520
3900
Sec 5-5
30.50
-77.60
100
50
1080
520
3900
1950
1950
265.46
265.46
-89.25
0.34
2
-230.28
0.87
2
-22.31
0.08
2
-771.15
2.90
3
-57.57
0.22
2
-1989.66
7.49
8
-185.37
0.70
-478.28
1.80
-46.34
0.17
2
-771.15
2.90
3
-119.57
0.45
2
-1989.66
7.49
8
Unit
m
m
t/m
ton
ton
leg
kg.cm
cm3
kg/cm2
kg/cm2
kg/cm2
Lifting Point
Beam Weight =
Dynamic Load Factor =
Force at lifitng point =
SF =
No legs for lifting point =
78.158 ton
1.4
54.7106 ton
2
16
legs