You are on page 1of 50

No.

Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA
LOCATION :
MAKALE, TANA TORAJA
TITLE

BILL OF QUANTITY
:
:

FACILITY
SUMMARY BILL OF QUANTITY

Drawing
SUMMARY
LABORATORY
NO

ITEM WORK

01
02
A
Preperation Work
1. Clearing area
B

Volume

03

04

Unit Price
05

m2

50.00

m3
m3
m3
m3
m2

12.19
6.38
0.19
1.39
11.40

Kg
Kg
nos

39.95
221.33
24.00

m3
m3
m3
m3
m2
Kg
Kg
Kg

2.52
1.08
0.24
1.44
14.40
29.80
150.04

m2
m3
m2
Kg

32.00
3.84
32.00
307.20

Foundation Work

1.
2.
3.
4.
5.
6.

7
C

Foundation Laboratory
Excavation for Foundation
Backfill
Lean Concrete K-100
Concrete K-225
Formwork
Rebar
-D10
-D16
Anchor M16

9
1,1
2

Sloof Work

1.
2.
3.
4.
5.
6.

Sloof Laboratory
Excavation
Backfill
Compacted Sand
Concrete K-225
Formwork
Rebar
-D10
-D13

2
1,1
2

Floor Work

1.
2.
3.
4.
E

Unit

Floor Laboratory
Cramics
Concrete K-225
Formwork
Rebar
Steel Work
Steel Laboratory

1
1,1
2

1. Steel Laboratory
F

Kg

264

m2
m2
m2
m2

72.00
144.00
144.00
144.00

Wall Work
Laboratory
1. Wall First Floor
- Brick Wall
- Plestering
- Acian
- Painting

DESIGNED BY :
WD
SIGNATURE
:
REVIEWED BY :
KMZ
SIGNATURE
:
APPROVED BY :
YSS
SIGNATURE
:
No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
FACILITY
SUMMARY BILL OF QUANTITY
LOCATION :
MAKALE, TANA TORAJA
TITTLE :

BILL OF QUANTITY

Drawing
SUMMARY
LABORATORY
NO

ITEM WORK

Unit

Volume

02

03

04

01
G
Roof Work
1. Cladding Roof
Cladding Nok
H

Door and window Work


1. Door
2. Windows

Unit Price
05

m
m

21.12
8

nos
nos

4.00
3.92

65,0
65,0

Mechanical Work
1. Mechanical Work

Ls

1.00

300,0

Electrical Work
1. Electrical Work

Ls

1.00

150,0

Total
Total Area (m2)
Price/m2

DESIGNED BY :
REVIEWED BY :
APPROVED BY :

WD
KMZ
YSS

SIGNATURE
SIGNATURE
SIGNATURE

:
:
:

PT.Bukaka Teknik Utama

DOC.NO : BOQ LH16-C15-D04-BQ-001


REV : 0
PAGE :
1
OF
2
Calculation
SUMMARY
LABORATORY
Unit Price (Rp)
05
8,483.87

Total Price (Rp)


06
424,193.50
424,193.50
10,209,149.93

122,700.00
12,500.00
900,400.00
1,141,600.00
221,270.00

10,209,149.93
1,495,406.25
79,687.50
172,876.80
1,583,970.00
2,522,478.00

13,675.00
13,675.00
32,569.20

546,338.59
3,026,731.99
781,660.80
7,661,319.69

122,700.00
12,500.00
204,755.10
1,141,600.00
221,270.00

7,661,319.69
309,204.00
13,500.00
49,141.22
1,643,904.00
3,186,288.00

13,675.00
13,675.00

407,477.53
2,051,804.93
20,831,424.00

161,440.00
1,141,600.00
221,270.00
13,675.00

20,831,424.00
5,166,080.00
4,383,744.00
7,080,640.00
4,200,960.00
4,884,000.00
4,884,000.00

18,500.00

4,884,000.00
30,486,744.00
30,486,744.00

220,855.00
46,300.00
34,575.00
20,411.00

15,901,560.00
6,667,200.00
4,978,800.00
2,939,184.00

DATE :
DATE :
DATE :

PT.Bukaka Teknik Utama

DOC.NO : BOQ LH16-C15-D04-BQ-001


REV : 0
PAGE :
2
OF
2
Calculation
SUMMARY
LABORATORY
Unit Price (Rp)
05

Total Price (Rp)

93,180.00
28,330.00

06
2,194,601.60
1,967,961.60
226,640.00

65,000,000.00
65,000,000.00

514,800,000.00
260,000,000.00
254,800,000.00

300,000,000.00

300,000,000.00
300,000,000.00

150,000,000.00

150,000,000.00
150,000,000.00
1,041,491,432.72
32.00
32,546,607.27

DATE :
DATE :
DATE :

No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :

ENGINEERING CALCULATION SHEET


FACILITY
SUMMARY

Drawing

No.

Item Work

1.

Clearing Area

DESIGNED BY :
REVIEWED BY :
APPROVED BY :

WD
KMZ
YSS

SIGNATURE
SIGNATURE
SIGNATURE

:
:
:

ION SHEET
PT.Bukaka Teknik Utama

DOC.NO : CAL LH16-C15-D04-RX-003


REV : 0
PAGE :
1
OF
1
Calculation

Item Work
Clearing Area

Widht

Length

Volume

(m)

(m)

(m2)

10
Total

50
50

DATE :
DATE :
DATE :

No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :

ENGINEERING CALCULATION SHEET


FACILITY
SUMMARY

Drawing

1.

750 mm

Excavation

No.
1.

Item Work
Foundation

750 mm

2.

Backfill

No.
1.

250 mm

Backfill
Area: 0.850

3.

Item Work
Foundation

Lean Concrete

No.
1.

Item Work
750 mm
Foundation

750 m

1000 mm

Concrete K-225

No.
1.

Item Work
Foundation

750 mm

5.

Formwork

No.

Item Work

1.

Foundation

2.

Pedestal

6.

Rebar

No.

1.

7.
No.
1.

DESIGNED BY :
REVIEWED BY :
APPROVED BY :

WD
KMZ
YSS

SIGNATURE
SIGNATURE
SIGNATURE

:
:
:

Item Work

Foundation

Anchor Bolt
Item Work
Anchor M16

ION SHEET
PT.Bukaka Teknik Utama

DOC.NO : CAL LH16-C15-D04-RX-003


REV : 0
PAGE :
1
OF
1
Calculation

Item Work
Foundation

Area
(m2)
1.63

Qty =
Length
(m)

6
nos
Volume
(m3)

1.25

2.03
12.19

Item Work
Foundation

Area

Qty =
6
nos
Length
Volume

(m2)

(m)

0.85

1.25

(m3)
1.06
6.38

Lean Concrete
Item Work
Foundation

Area
(m2)
0.64

Qty =
Thick
(m)

6
nos
Volume
(m3)

0.05

0.03
0.19

Concrete K-225
Item Work
Foundation

Volume
(m3)
0.23

Qty =
Thick
(nos)

6
nos
Volume
(m3)

0.23
1.39

Item Work

Area
(m2)

Qty =
Thick
(m)

6
nos
Volume
(m2)

Foundation

3.00

0.3

0.90

Pedestal

1.00

1.00
11.40

Weght D16 Weght D10

Item Work

Foundation

Item Work
Anchor M16

Volume

(Kg)

(Kg)

(Kg)

221

39.95

261

Length

Widht

Thick

Qty

(mm)

(m)

(mm)

(nos)

500

50

12

24

DATE :
DATE :
DATE :

No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :

ENGINEERING CALCULATION SHEET


FACILITY
SUMMARY

Drawing

1.
1

Excavation

No.

Item Work

1.

Sloof

2.

Sloof

2.

8m
6

11

13

4m

Backfill

No.

Item Work

1.

Sloof

2.

Sloof

3.

Compacted Sand

No.

Item Work

1.

Sloof

2.

Sloof

0.35 m
4.

0.3 m

Concrete K-225

No.

Item Work

1.

Sloof

2.

Sloof

5.
No.

Formwork
Item Work

1.

Sloof

Sloof

6.

Rebar

No.

1.

DESIGNED BY :
REVIEWED BY :
APPROVED BY :

WD
KMZ
YSS

SIGNATURE
SIGNATURE
SIGNATURE

:
:
:

Item Work

Sloof

ION SHEET
PT.Bukaka Teknik Utama

DOC.NO : CAL LH16-C15-D04-RX-003


REV : 0
PAGE :
1
OF
2
Calculation

Item Work

Area

Length

Qty

Volume

(m2)

(m)

(nos)

(m3)

Sloof

0.11

1.68

Sloof

0.11

0.84

2.52

Area

Length

Qty

Volume

(m2)

(m)

(nos)

(m3)

Sloof

0.05

0.72

Sloof

0.05

0.36

Item Work

1.08
Compacted Sand
Area

Length

Qty

Volume

(m2)

(m)

(nos)

(m3)

Sloof

0.01

0.16

Sloof

0.01

0.08

Item Work

0.24
Concrete K-225
Area

Length

Qty

Volume

(m2)

(m)

(nos)

(m3)

Sloof

0.06

0.96

Sloof

0.06

0.48

Item Work

1.44

Item Work

Widht

Length

Qty

Volume

(m2)

(m)

(nos)

(m2)

Sloof

0.6

9.6

Sloof

0.6

4.8

14.4

Item Work

Sloof

Weght D13 Weght D10

Volume

(Kg)

(Kg)

(Kg)

150

30

179.84
179.84

DATE :
DATE :
DATE :

No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :

ENGINEERING CALCULATION SHEET


FACILITY
SUMMARY

Drawing

First Floor
1.

Concrete K-225

No.

Item Work

1.

Concrete K-225

2.
No.
1.

3.
No.
1.

4.
No.

1.

Formwork
Item Work
Formwork

Rebar
Item Work
Rebar

Cramics
Item Work

Cramics

DESIGNED BY :
REVIEWED BY :
APPROVED BY :

WD
KMZ
YSS

SIGNATURE
SIGNATURE
SIGNATURE

:
:
:

ION SHEET
PT.Bukaka Teknik Utama

DOC.NO : CAL LH16-C15-D04-RX-003


REV : 0
PAGE :
1
OF
1
Calculation

Concrete K-225
Item Work

Qty =
Thick

Widht

Lenght

(m2)

(m)

(m)

8.00

0.12

Concrete K-225

4.00

1
Volume
(m3)
3.84
3.84

Item Work

Widht

Lenght

(m2)

(m)

Formwork

4.00

Qty =
Thick
(m)

8.00

1
Volume
(m2)

32.00
32.00

Item Work

Volume Concrete

Qty =
Weight/m3

1
Volume

(m3)

(kg)

(Kg)

Rebar

3.84

80

307.20
307.20

Item Work

Cramics

Widht

Lenght

Qty

Volume

(m2)

(m)

(nos)

(m2)

32.00

32.00

DATE :
DATE :
DATE :

No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :

ENGINEERING CALCULATION SHEET

Drawing

FACILITY
SUMMARY

DESIGNED BY :
REVIEWED BY :
APPROVED BY :

WD
KMZ
YSS

SIGNATURE
SIGNATURE
SIGNATURE

:
:
:

ION SHEET
PT.Bukaka Teknik Utama

DOC.NO : CAL LH16-C15-D04-RX-003


REV : 0
PAGE :
1
OF
1
Calculation

DATE :
DATE :
DATE :

No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :

ENGINEERING CALCULATION SHEET


FACILITY
SUMMARY

Drawing

Wall Warehouse outside


1
Outside

3m

4m

No.

Item Work

1.

Hebel wall

No.

Item Work

1.

Hebel wall

DESIGNED BY :
REVIEWED BY :
APPROVED BY :

WD
KMZ
YSS

SIGNATURE
SIGNATURE
SIGNATURE

:
:
:

ION SHEET
PT.Bukaka Teknik Utama

DOC.NO : CAL LH16-C15-D04-RX-003


REV : 0
PAGE :
1
OF
1
Calculation

Wall Warehouse outside

Item Work
Hebel wall

Item Work
Hebel wall

(Hebel)
Lenght

Height

Qty

Volume

(m)
4

(m)
3

(nos)
6

(m2)
72
72

Lenght

Height

Qty

Volume

(m)
4

(m)
3

(nos)
1

(m2)
64.08
64.08

DATE :
DATE :
DATE :

No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :

ENGINEERING CALCULATION SHEET


FACILITY
SUMMARY

Drawing

2.04 m

1.

Roof Warehouse

No.

Item Work

1.

Roof Warehouse

DESIGNED BY :
REVIEWED BY :
APPROVED BY :

WD
KMZ
YSS

SIGNATURE
SIGNATURE
SIGNATURE

:
:
:

ION SHEET
PT.Bukaka Teknik Utama

DOC.NO : CAL LH16-C15-D04-RX-003


REV : 0
PAGE :
1
OF
1
Calculation

Roof Warehouse
Item Work
Roof Warehouse

Lenght

Height

Qty

Volume

(m)

(m)

(nos)

(m2)

2.64

8.00

21.12
21.12

DATE :
DATE :
DATE :

No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :

ENGINEERING CALCULATION SHEET


FACILITY
SUMMARY

Drawing

1.
No.
1.

2.
No.
1.

Door
Item Work
Door 1

Windows
Item Work
Windows

DESIGNED BY :
REVIEWED BY :
APPROVED BY :

WD
KMZ
YSS

SIGNATURE
SIGNATURE
SIGNATURE

:
:
:

ION SHEET
PT.Bukaka Teknik Utama

DOC.NO : CAL LH16-C15-D04-RX-003


REV : 0
PAGE :
1
OF
1
Calculation

Item Work
Door 1

Height

Widht

Qty

Volume

(m)

(m)

(nos)

(m2)

4
4

Item Work
Windows

Height

Widht

Qty

Volume

(m)

(m)

(nos)

(m2)

1.4

1.4

3.92
3.92

DATE :
DATE :
DATE :

No.Ref : DDRG
LH16-C16-G03-DE-001
Date
:
PROJECT :
PLTA MALEA STAGE-1 (2X45MW) AREA :
LOCATION :
MAKALE, TANA TORAJA
TITTLE :

ENGINEERING CALCULATION SHEET


FACILITY
SUMMARY

Drawing

1.
No.
1.

Anchor Foundation
Item Work
Anchor M16

DESIGNED BY :
REVIEWED BY :
APPROVED BY :

WD
KMZ
YSS

SIGNATURE
SIGNATURE
SIGNATURE

:
:
:

ION SHEET
PT.Bukaka Teknik Utama

DOC.NO : CAL LH16-C15-D14-RX-003


REV : 0
PAGE :
1
OF
1
Calculation

Anchor Foundation
Item Work
Anchor M16

Length

Widht

Thick

Qty

(mm)

(m)

(mm)

(nos)

500

50

12

24

DATE :
DATE :
DATE :

No.Ref : DDRG
LH16-C16-G03-DE-001

PROJECT

:
:

LOCATION :

PLTA MALEA STAGE-1 (2X45MW) AREA


MAKALE, TANA TORAJA

FACILITY

TITTLE :

REBAR

Drawing

Mark

Qty

Length

Reinforcemen
10
13

Foundation

LABORATORY

Date

ENGINEERING CALCULATION SHEET

114

16

2
3

24
60
Length
Weight
Total Weight

16
10

1000
1093
1080
(mm)
(Kg)
(Kg)

64800
64800
39.951634
261.28

Sloof
4

6
44.75
Length
Weight
Total Weight

13
10

24000
1080
(mm)
(Kg)
(Kg)

144000
48330
48330
144000
29.79726 150.04058
179.84

DESIGNED BY :

WD

SIGNATURE

REVIEWED BY :

KMZ

SIGNATURE

APPROVED BY :

YSS

SIGNATURE

ION SHEET
PT.Bukaka Teknik Utama

DOC.NO :
REV :
Calculation

Reinforcement
13
16

undation

114000
26232
140232
221.33
261.28

Sloof
144000
144000
150.04058
179.84

CAL LH16-C15-D04-RX-003
PAGE :

OF

DATE :
DATE :
DATE :

No.Ref : DDRG
LH16-C16-G03-DE-001
Date
PROJECT

BILL OF QUANTITY

:
:

LOCATION :

PLTA MALEA STAGE-1 (2X45MW)

AREA

MAKALE, TANA TORAJA

TITTLE :

FACILITY

SUMMARY BILL OF QUANTITY LABORA

Drawing

ITEM WORK

NO

Unit

Laboratory
1 Concrete K-225

m3

2 Rebar ( 10)

kg

3 Rebar ( 13)

kg

3 Rebar (D 16)

kg

DESIGNED BY :

WD

SIGNATURE

REVIEWED BY :

KMZ

SIGNATURE

APPROVED BY :

YSS

SIGNATURE

PT.Bukaka Teknik Utama

DOC.NO :

ARY BILL OF QUANTITY LABORATORY

REV :
Calculation

Unit

Volume

m3

6.67

kg

69.75

kg

150.04

kg

221.33
441.12

BOQ LH16-C15-D04-BQ-003
PAGE :

OF

DATE :
DATE :
DATE :

You might also like