Professional Documents
Culture Documents
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 2 of 128
Business Name:
License #:
Inspection Date
Inspector Name
7/27/2000
9/26/2000
Inspection Type
Status / Result
OMC - BLIGHT
ABATEMENT OMCInjurious OMC-1
1st Inspection
Substantial
compliance/no fees
Unable to Verify
Result Comments
Inspector Name
Inspection Type
1st
1st
1st
1st
1st
1st
1st
1st
RICHARD FIELDING 1st
1st
1st
1st
1st
1st
1st
1st
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Inspection
Status / Result
Violation Verified
Violation Verified
Violation Verified
No Entry
No Violations
Violation Verified
No Violations
No Entry
No Entry
No Entry
Unable to Verify
Violation Verified
No Violations
No Entry
Unable to Verify
Violation Verified
Result Comments
Reinsp generated from insp result 87 on 04/11/05
Auto scheduled from 62 result on 04/19/05
Reinsp generated from insp result 93 on 05/10/05
Reinsp generated from insp result 82 on 06/06/05
Auto scheduled from 64 result on 06/14/05
Reinsp generated from insp result 93 on 07/07/05
NOTICE SENT TO WRONG ADDRESS
INSP OUT RE-SCHEDULE
Reinsp generated from insp result 82 on 08/23/05
Reinsp generated from insp result 82 on 08/31/05
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 3 of 128
:
Business Name:
License #:
Inspection Date
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
ED LABAYOG
Inspection Type
OHC - BUILDING
Status / Result
Complaint ABated
Result Comments
COMPLETED 9/29
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 4 of 128
Requestor:
:
Business Name:
License #:
Inspection Date
9/28/2016
Inspector Name
Chris Candell
Inspection Type
1st Inspection
Status / Result
Unable to Verify
Result Comments
Date: 9/28/2016 Site visit, photos taken. I walked the
site with Jean-Francois Lincourt director of operations
and Jeff Muscat director of engineering. We observed
the HVAC & kitchen air handling equipment on the
roof above the newly reworked restaurant, the
cooling tower, and all the other existing equipment.
The new kitchen equipment (the subject of the
complaint), replaces similar equipment that was in the
same location. I took noise measurements on the roof
where the new equipment is, the parking lot, and on
the other roof area where the old equipment is. The
new equipment is not louder than the AC equipment.
The cooling tower is the closest piece of equipment to
adjacent residences and has been in operation for
many years. Day time noise readings appear to meet
current noise standards. We observed one pump
making louder noise, a whine and that is scheduled
for repair this week. The pump is in a sound
enclosure that effectively reduces the noise level at
least line of site. This may be the source of the
complaint. I do not have the complainants contact
info. Even that noise is unlikely to violate the
performance standards in the day. The violation
cannot be confirmed. CMC x 6986
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 5 of 128
Inspector Name
Inspection Type
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
FTG/SLAB/EMBED
01P
SHEARWALL/ROOF
03N
FTG/SLAB/EMBED
01P
ROUGH 03P
ROUGH 03P
SHEARWALL/ROOF
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
SHEARWALL/ROOF
03N
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
ROUGH 03P
ROUGH 03P
SHEARWALL/ROOF
03N
FTG/SLAB/EMBED
01P
FINAL BUILDING 04P
FTG/SLAB/EMBED
01P
ROUGH 03P
ROUGH 03P
SHEARWALL/ROOF
03N
ROUGH 03P
SHEARWALL/ROOF
03N
Status / Result
Result Comments
NO ACCESS/NO
PLANS
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 6 of 128
8/16/2000
8/17/2000
8/18/2000
8/21/2000
SHEARWALL/ROOF
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
8/22/2000
8/23/2000
8/24/2000
ROUGH 03P
ROUGH 03P
ROUGH 03P
8/25/2000
8/29/2000
ROUGH 03P
FTG/SLAB/EMBED
01P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
8/30/2000
8/31/2000
9/1/2000
9/5/2000
9/6/2000
9/7/2000
9/8/2000
9/11/2000
9/12/2000
9/13/2000
9/14/2000
9/15/2000
9/18/2000
9/19/2000
9/19/2000
9/26/2000
9/27/2000
9/28/2000
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
Frame
ROUGH 03P
WALLBRD/SHINGLE
03N
WALLBRD/SHINGLE
03N
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
9/29/2000
10/2/2000
10/3/2000
10/4/2000
10/5/2000
10/6/2000
10/9/2000
Frame
ROUGH
ROUGH
ROUGH
ROUGH
Frame
ROUGH
10/10/2000
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
FINAL BUILDING 04P
ROUGH 03P
WALLBRD/SHINGLE
03N
9/20/2000
9/21/2000
9/21/2000
9/22/2000
9/25/2000
9/26/2000
10/11/2000
10/12/2000
10/13/2000
10/16/2000
10/17/2000
03P
03P
03P
03P
03P
INSP CANCELLED
INSP CANCELLED
INSP CANCELLED
NO ACCESS/NO
PLANS
PARTIAL APPROVAL
INSP CANCELLED
CORRECTION
NOTICE
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
NO ACCESS/NO
PLANS
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
No Status
PARTIAL APPROVAL
PARTIAL APPROVAL
CANCEL
CANCEL
CANCEL
INFO ONLY-ROUGH
P/R INFO @ STEEL FRAME WALLS
CANCEL
INFO-CORRECTIONS/REQUIRED LATERAL @ STEEL
FRAME
INFO ONLY-STEEL FRAME SUB TO LATERAL BRACING
REBAR FOR MEN'S HOT TUB
WALL THRU STUDIO LEVEL CORRECTIONS
WALK THRU STUDIO LEVEL CORRECTION
SEE NOTES
INFO AND CORRECTIONS @ STUDIO LEVEL
SEE NOTES
INFO ONLY @ STUDIO LEVEL
P/ROUGH @ STUDIO LEVEL PER CARD
P/ROUGH/WALL/BD @ STUDIO LEVEL
P/ROUGH OK @ CARRIAGE LEVEL PER CARD
P/ROUGH OK @ STUDIO LEVEL PER CARD
P/ROUGH OK @ RECEPTION AREA @ STUDIO
NELSON 848-0217
NELSON 848-0217
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 7 of 128
10/18/2000
10/30/2000
WALLBRD/SHINGLE
03N
WALLBRD/SHINGLE
03N
ROUGH 03P
WALLBRD/SHINGLE
03N
WALLBRD/SHINGLE
03N
WALLBRD/SHINGLE
03N
WALLBRD/SHINGLE
03N
WALLBRD/SHINGLE
03N
ROUGH 03P
10/31/2000
ROUGH 03P
11/1/2000
11/2/2000
SHEARWALL/ROOF
03N
ROUGH 03P
11/3/2000
ROUGH 03P
11/6/2000
11/7/2000
ROUGH 03P
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
10/19/2000
10/20/2000
10/23/2000
10/24/2000
10/25/2000
10/26/2000
10/27/2000
11/8/2000
11/9/2000
11/10/2000
11/13/2000
11/15/2000
11/16/2000
11/17/2000
11/20/2000
11/21/2000
11/22/2000
SHEARWALL/ROOF
03N
SHEARWALL/ROOF
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
11/27/2000
11/28/2000
ROUGH 03P
FINAL BUILDING 04P
11/29/2000
ROUGH 03P
11/30/2000
12/5/2000
12/6/2000
12/7/2000
12/8/2000
12/11/2000
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
11/14/2000
12/12/2000
12/13/2000
NO ACCESS/NO
PLANS
NO ACCESS/NO
PLANS
PARTIAL APPROVAL
PARTIAL APPROVAL
DISC ONLY
T-BAR SEE NOTES
2 SHEARWALL SEE NOTES
SEE NOTES
CANCEL
P/ROUGH & INFO @ CARRIAGE LVL + CORR RBCD
INFO + P/ROUGH @ CARRIAGE LEVEL
INFO ONLY - NO INSP PERFORMED
INFO - RB & C.O.
INFO ONLY - RB T.C.D.
INFO: RE TCO @ STUDIO LEVEL
WALK THRU FOR T.C.O. REQUIRED
INFO AND T.C.O. SIGNED @ STUDIO LEVEL ONLY
INFO ONLY NO INSP PERFORMED
P/WALL/BD @ CARRIAGE LEVEL AND INFO
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 8 of 128
12/14/2000
12/15/2000
LATH/CEILING 03N
ROUGH 03P
12/18/2000
12/19/2000
12/20/2000
LATH/CEILING 03N
ROUGH 03P
ROUGH 03P
12/21/2000
ROUGH 03P
12/22/2000
12/26/2000
ROUGH 03P
ROUGH 03P
12/27/2000
ROUGH 03P
12/28/2000
ROUGH 03P
12/29/2000
1/2/2001
1/3/2001
1/4/2001
1/5/2001
Frame
ROUGH
ROUGH
ROUGH
ROUGH
1/8/2001
WALLBRD/SHINGLE
03N
Frame
ROUGH 03P
FINAL BUILDING 04P
ROUGH 03P
1/9/2001
1/10/2001
1/11/2001
1/12/2001
1/16/2001
1/17/2001
1/18/2001
1/19/2001
1/22/2001
1/23/2001
1/24/2001
1/25/2001
1/26/2001
1/29/2001
1/30/2001
1/31/2001
2/1/2001
2/2/2001
2/5/2001
2/6/2001
2/7/2001
2/8/2001
2/9/2001
2/13/2001
2/14/2001
2/15/2001
2/16/2001
2/16/2001
2/20/2001
2/21/2001
2/22/2001
2/23/2001
03P
03P
03P
03P
PARTIAL APPROVAL
NO ACCESS/NO
PLANS
PARTIAL APPROVAL
PARTIAL APPROVAL
NO ACCESS/NO
PLANS
NO ACCESS/NO
PLANS
INSP CANCELLED
NO ACCESS/NO
PLANS
NO ACCESS/NO
PLANS
NO ACCESS/NO
PLANS
No Status
PARTIAL APPROVAL
INSP CANCELLED
INSP CANCELLED
NO ACCESS/NO
PLANS
PARTIAL APPROVAL
No Status
INSP CANCELLED
INSP CANCELLED
NO ACCESS/NO
PLANS
ROUGH 03P
INSP CANCELLED
ROUGH 03P
INSP CANCELLED
FINAL BUILDING 04P INSP CANCELLED
ROUGH 03P
INSP CANCELLED
ROUGH 03P
INSP CANCELLED
FTG/SLAB/EMBED
INSP CANCELLED
01P
ROUGH 03P
INSP CANCELLED
ROUGH 03P
INSP CANCELLED
ROUGH 03P
INSP CANCELLED
ROUGH 03P
INSP CANCELLED
ROUGH 03P
INSP CANCELLED
ROUGH 03P
PARTIAL APPROVAL
FINAL BUILDING 04P INSP CANCELLED
ROUGH 03P
CORRECTION
NOTICE
ROUGH 03P
INSP CANCELLED
FINAL BUILDING 04P INSP CANCELLED
FINAL BUILDING 04P INSP CANCELLED
FINAL BUILDING 04P INSP CANCELLED
Frame
No Status
FINAL BUILDING 04P INSP CANCELLED
FINAL BUILDING 04P INSP CANCELLED
FINAL BUILDING 04P INSP CANCELLED
FINAL BUILDING 04P INSP CANCELLED
FINAL BUILDING 04P INSP CANCELLED
FINAL BUILDING 04P INSP CANCELLED
FINAL BUILDING 04P INSP CANCELLED
FINAL BUILDING 04P INSP CANCELLED
Frame
No Status
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 9 of 128
2/26/2001
2/27/2001
2/28/2001
3/21/2001
ROUGH 03P
INSP CANCELLED
FINAL BUILDING 04P INSP CANCELLED
FINAL BUILDING 04P INSP CANCELLED
ROUGH 03P
PARTIAL APPROVAL
CANCEL
CANCEL
CANCEL
INFO
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 10 of 128
:
Business Name:
License #:
Inspection Date
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
6/22/2001
ROUGH 03P
7/6/2001
7/11/2001
ROUGH 03P
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
7/11/2001
7/13/2001
7/17/2001
7/26/2001
7/27/2001
7/27/2001
7/31/2001
8/10/2001
8/14/2001
8/17/2001
8/17/2001
8/17/2001
8/23/2001
9/14/2001
10/10/2001
10/23/2001
10/23/2001
10/24/2001
10/24/2001
10/24/2001
Status / Result
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
INSP NOT
PERFORMED
FRAME 03M
INSP NOT
PERFORMED
ROUGH 03P
INSP NOT
PERFORMED
ROUGH 03P
PARTIAL APPROVAL
ROUGH 03P
PARTIAL APPROVAL
ROUGH 03P
PARTIAL APPROVAL
FIRE PREVENTION
INSP NOT
04N
PERFORMED
ROUGH 03P
INSP NOT
PERFORMED
ROUGH 03P
INSP NOT
PERFORMED
FINAL BUILDING 04P INSP NOT
PERFORMED
ROUGH 03P
PARTIAL APPROVAL
ROUGH 03P
PARTIAL APPROVAL
FTG/SLAB/EMBED
PARTIAL APPROVAL
01P
ROUGH 03P
PARTIAL APPROVAL
ROUGH 03P
APPROVED
LATH/CEILING 03N
REPORT/CERT/FEE
03N
Result Comments
INSP NOT
INFO
PERFORMED
PARTIAL APPROVAL P/FRAME, S/R @ DEMISING WALL B-D
PARTIAL APPROVAL P/SR @ LOCKERS: SEE CARD
P/ROUGH SEE CARD
INFO.
FRAMING @ CORR. 160
NO ACCESS
INFO; RATED CEILING
OK TO COVER M/W SHOWER CEILING/WALLS
T-BAR & CORRIDOR CEILING
REMAINDER T-BAR - 1ST FL
F.M. APPROVAL REQUIRED TO OCCUPY 1ST A
OK TO REMOVE CLOSURE PER K.L. @ EXIT
FIRECAULK REQUIRED 2 LOC @ T-BAR
INFO: SLAB CAULK SPEC. T/C
CEILING PENETRATIONS OK FROM 1ST FL.
FRAME @ 2ND FLOOR
S/R LESS ENTRY
T-BAR S/T P, E
2ND: S/R WALLS, T-BAR/EXIST NON-CONF.
PENETRATIONS REMAIN PER KL
APPROVED
STUCCO LATH @ NEW WINDOWS
PARTIAL APPROVAL EXIST. NON-CONF. PENETRATIONS REMAIN PER KL
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 11 of 128
2/14/2002
4/3/2002
4/3/2002
Inspector Name
5/10/2001
Inspection Type
5/18/2001
WALLBRD/SHINGLE
03N
REPORT/CERT/FEE
03N
ROUGH 03P
5/22/2001
5/23/2001
ROUGH 03P
ROUGH 03P
5/24/2001
6/5/2001
6/6/2001
ROUGH 03P
ROUGH 03P
FTG/SLAB/EMBED
01P
LATH/CEILING 03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
FINAL BUILDING 04P
5/11/2001
6/27/2001
8/9/2001
8/10/2001
8/14/2001
8/17/2001
8/24/2001
9/7/2001
3/15/2002
Status / Result
Result Comments
PARTIAL APPROVAL
INSP CANCELLED
INSP CANCELLED
PARTIAL APPROVAL
INSP NOT
PERFORMED
FINAL BUILDING 04P INSP NOT
PERFORMED
FINAL BUILDING 04P INSP NOT
PERFORMED
FINAL BUILDING 04P CORRECTION
NOTICE
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 12 of 128
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
3/27/2001
3/27/2001
ROUGH 03P
ROUGH 03P
4/2/2001
WALLBRD/SHINGLE
03N
ROUGH 03P
Frame
ROUGH 03P
4/4/2001
4/5/2001
4/6/2001
4/10/2001
4/13/2001
5/1/2001
5/10/2001
5/11/2001
6/6/2001
6/19/2001
9/14/2001
9/19/2001
9/21/2001
10/4/2001
12/3/2001
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
WALLBRD/SHINGLE
03N
ROUGH 03P
FRAME 03M
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
FINAL BUILDING 04P
Status / Result
Result Comments
PARTIAL APPROVAL
CORRECTION
SEE C/N; SEE NOTES
NOTICE
PARTIAL APPROVAL S/R 1ST LAYER PAN
PARTIAL APPROVAL
No Status
INSP NOT
PERFORMED
PARTIAL APPROVAL
SEE NOTES
R/BRUCE 650-33-0640
APP DETAILS ON RATED ASSY REQUIRED
PARTIAL APPROVAL
INSP NOT
PERFORMED
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
INSP NOT
INFO
PERFORMED
PARTIAL APPROVAL WEST GB AND FOOTING S/T S.I.
INSP NOT
DECK PEDESTAL: NEED ENG. CLARIF.
PERFORMED
PARTIAL APPROVAL DEGENKOLB REV RECD ON PEDESTAL
PARTIAL APPROVAL EAST G.B. AND PED. FTG
INSP NOT
PERFORMED
INFO
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 13 of 128
12/3/2001
1/15/2002
1/16/2002
2/14/2002
3/15/2002
4/3/2002
4/3/2002
Inspector Name
11/21/2003
Inspection Type
Frame
Status / Result
No Status
Result Comments
CALL ART @415 699-3699
Inspector Name
WILLIAM M
BERGSTROM
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 14 of 128
Address: 41 TUNNEL RD
APN: 048H767002200
Unit #:
Description: installation of an unmanned telecommunications facility at grade with 4 panel antennas inside of Raydome
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
4/19/2006
7/24/2006
8/21/2006
8/29/2006
9/22/2006
9/26/2006
10/10/2006
WILLIAM M
BERGSTROM
ALAN D ALBEE
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
Inspection Type
FIELD CHECK 00N
FTG/SLAB/EMBED
01P
ROUGH 03P
Status / Result
APPROVED
APPROVED
Result Comments
OK TO PLAN CK PER F-24 NOTES
OK TO POUR
Frame
No Status
FRAME 03M
INSP CANCELLED
FINAL BUILDING 04P INSP NOT
PERFORMED
FINAL BUILDING 04P APPROVED
PRE-PLASTER/DAISY, 925-462-1441
F/DASIY 925-462-1441 /CANCEL PER SUP
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 15 of 128
Inspector Name
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
8/23/2006
1/22/2007
1/25/2007
2/1/2007
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
Inspection Type
Status / Result
Result Comments
ROUGH 03P
ROUGH 03P
INSP CANCELLED
PARTIAL APPROVAL SEE CARD NEED E & M CEILING
ROUGH 03P
APPROVED
ROUGH 03P
APPROVED
FRAME 03M
INSP CANCELLED
FRAME 03M
INSP CANCELLED
FINAL 04M
INSP CANCELLED
FINAL OK
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 16 of 128
Inspector Name
WILLIAM M
BERGSTROM
JANICE J KATO
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
Inspection Type
ROUGH 03P
Status / Result
Result Comments
ROUGH 03P
CORRECTION
C/N INFO
NOTICE
CORRECTION
CN
NOTICE
PARTIAL APPROVAL SEE CARD
FRAME 03M
INSP CANCELLED
WALLBRD/SHINGLE
03N
ROUGH 03P
CANCEL IN OFFICE
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 17 of 128
11/14/2011
11/16/2011
11/17/2011
11/22/2011
12/5/2011
12/9/2011
12/14/2011
12/23/2011
1/5/2012
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
KEN PALMER
KEN PALMER
ROUGH 03P
ROUGH 03P
CORRECTION
NOTICE
NO PROGRESS
C/N
WORK ON CN NOT DONE
ROUGH 03P
APPROVED
R OK
WALLBRD/SHINGLE
03N
TUB/SHOWER WALL
03N
TUB/SHOWER WALL
03N
TUB/SHOWER WALL
03N
FINAL BUILDING 04P
FINAL BUILDING 04P
APPROVED
SR & FS
Inspector Name
KEN PALMER
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
Inspection Type
Status / Result
Result Comments
ROUGH 03P
PARTIAL APPROVAL SPA RESTRM
FINAL BUILDING 04P CORRECTION
CN
NOTICE
FINAL BUILDING 04P APPROVED
FINAL IN OFFICE
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 18 of 128
Inspection Date
6/21/2012
6/25/2012
7/17/2012
7/25/2012
7/26/2012
10/25/2012
10/31/2012
12/20/2012
Inspector Name
Inspection Type
Status / Result
Result Comments
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
KEN PALMER
FRAME 03M
INSP CANCELLED
ROUGH 03P
ROUGH 03P
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
ROUGH 03P
ROUGH 03P
CANCEL
FINAL IN OFFICE
Inspector Name
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
KEN PALMER
WILLIAM M
BERGSTROM
8/29/2012
8/30/2012
10/25/2012
12/21/2012
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
Inspection Type
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
MASONRY 03N
FINAL BUILDING 04P
Status / Result
Result Comments
NO ACCESS/NO
NO PLANS OR CARD AT SITE
PLANS
PARTIAL APPROVAL CARRIAGE LEVEL RETAINING WALLS
CORRECTION
CN
NOTICE
FINAL BUILDING 04P APPROVED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 19 of 128
Inspector Name
8/17/2012
KEN PALMER
11/19/2012
WILLIAM M
BERGSTROM
WILLIAM M
BERGSTROM
12/20/2012
Inspection Type
FTG/SLAB/EMBED
01P
Frame
Status / Result
Result Comments
F/ALLEN/415-816-2963 REQ PM
FINAL IN OFFICE
Inspector Name
Inspection Type
Status / Result
6/26/2014
Jorge Reyes
Field Check
Ok to Plan Check
4/30/2015
Bill Bergstrom
Frame
Partial
5/8/2015
5/19/2015
Bill Bergstrom
Bill Bergstrom
Frame
Frame
Partial
Partial
6/2/2015
Steve Brandeberry
Frame
Partial
Result Comments
Date: 6/26/2014 Ok to plan check ADA compliance
addressed for bathrooms on second phase of project
Date: 4/30/2015 Floor support and wall blocking for
ships ladder okay.
Date: 5/8/2015 Ship ladder ok
Date: 5/19/2015 Rough framing for elevator
penthouse okay. Info on scope of project
Date: 6/2/2015 -Units 602, 603, 604, 605 and 606
fire blocking and draft stopping complete. Framing
okay to cover. -unit 601 and 502 blocking, draft
stopping and ceiling frame all OK. Framing okay to
cover. -Note: all inspections were performed on
elevator permit and not rescheduled or entered on
unit T I / remodel permit. ( they promise they'll get it
right NEXT time - blah blah blah...)
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 20 of 128
Description: REMODEL 3 GUEST ROOMS; REMOVE CLOSET WALLS IN 1 TO CREATE LARGER MASTER BATHROOM. REWMOVE
AND REPLACE PLUMBING FIXTURES.(#715, #159, #140).
Inspector Name
Ken Palmer
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Ken Palmer
Jorge Reyes
Inspection Type
Field Check
Frame
Frame
Frame
Frame
Final Building
Frame
Status / Result
Need More Info
Partial
Partial
Partial
Partial
Partial
Cancelled
Result Comments
ok to plan check
Walk & Talk
Date: 11/4/2014 Rough on 2 units see card.
Date: 11/5/2014 SR & wet wall in #159 ok
Date: 11/10/2014 Progress see card
final ok units 140,159,715 pending Electrical Final
Inspector Name
Inspection Type
Status / Result
4/6/2015
Joe DeLagrange
Field Check
Ok to Plan Check
4/6/2015
Joe DeLagrange
Field Check
Ok to Plan Check
6/9/2015
Bill Bergstrom
Frame
Partial
6/9/2015
Bill Bergstrom
Frame
Partial
6/11/2015
Bill Bergstrom
Frame
Partial
6/11/2015
Bill Bergstrom
Frame
Partial
Result Comments
Date: 4/6/2015 Existing parking entry and path of
travel are compliant. Scope of work includes ADA
upgrades. Okay to plan check
Date: 4/6/2015 Existing parking entry and path of
travel are compliant. Scope of work includes ADA
upgrades. Okay to plan check
Date: 6/9/2015 S/R Bathrooms 602, 603, 604, 605 ok
Rough Bathrooms 501, 502, 504 & 506
Date: 6/9/2015 S/R Bathrooms 602, 603, 604, 605 ok
Rough Bathrooms 501, 502, 504 & 506
Date: 6/11/2015 Dave Miles, Mark Moriarty and Bill
Bergstrom met with contractor and owner's agent on
site to discuss scope of work. Bathrooms in units 503,
505, 506 okay to rock. Sheetrock ok in bathrooms of
unit 502, 504 and 507
Date: 6/11/2015 Dave Miles, Mark Moriarty and Bill
Bergstrom met with contractor and owner's agent on
site to discuss scope of work. Bathrooms in units 503,
505, 506 okay to rock. Sheetrock ok in bathrooms of
unit 502, 504 and 507
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 21 of 128
6/17/2015
Bill Bergstrom
Frame
Pass
6/17/2015
Bill Bergstrom
Frame
Pass
7/3/2015
Bill Bergstrom
Frame
Not Pass
7/3/2015
Bill Bergstrom
Frame
Not Pass
7/7/2015
Bill Bergstrom
Frame
Partial
7/7/2015
Bill Bergstrom
Frame
Partial
7/9/2015
Bill Bergstrom
Frame
Partial
7/9/2015
Bill Bergstrom
Frame
Partial
7/10/2015
David Miles
Frame
Partial
7/10/2015
David Miles
Frame
Partial
7/16/2015
Bill Bergstrom
Frame
Pass
7/16/2015
Bill Bergstrom
Frame
Pass
7/18/2015
Bill Bergstrom
Frame
Partial
7/18/2015
Bill Bergstrom
Frame
Partial
7/21/2015
Steve Brandeberry
Frame
Partial
7/21/2015
Steve Brandeberry
Frame
Partial
7/29/2015
Bill Bergstrom
Frame
Partial
7/29/2015
Bill Bergstrom
Frame
Partial
8/3/2015
Bill Bergstrom
Frame
Partial
8/3/2015
Bill Bergstrom
Frame
Partial
8/5/2015
Bill Bergstrom
Frame
Pass
8/5/2015
Bill Bergstrom
Frame
Pass
8/10/2015
Dave Velez
Frame
Partial
8/10/2015
Dave Velez
Frame
Partial
8/10/2015
Dave Velez
Frame
Partial
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 22 of 128
8/10/2015
Dave Velez
Frame
Partial
8/13/2015
Dave Velez
Frame
Partial
8/13/2015
Dave Velez
Frame
Partial
8/18/2015
Bill Bergstrom
Frame
Not Pass
8/18/2015
Bill Bergstrom
Frame
Not Pass
8/24/2015
Bill Bergstrom
Frame
Pass
8/24/2015
Bill Bergstrom
Frame
Pass
8/24/2015
Bill Bergstrom
Frame
Partial
8/24/2015
Bill Bergstrom
Frame
Partial
8/26/2015
Ken Palmer
Frame
Partial
8/26/2015
Ken Palmer
Frame
Partial
9/1/2015
Bill Bergstrom
Frame
Partial
9/1/2015
Bill Bergstrom
Frame
Partial
9/3/2015
9/3/2015
9/11/2015
Bill Bergstrom
Bill Bergstrom
Dave Velez
Frame
Frame
Frame
Pass
Pass
Partial
9/11/2015
Dave Velez
Frame
Partial
9/16/2015
Bill Bergstrom
Frame
Pass
9/16/2015
Bill Bergstrom
Frame
Pass
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 23 of 128
9/17/2015
Joe DeLagrange
Frame
Partial
9/17/2015
Joe DeLagrange
Frame
Partial
9/22/2015
9/22/2015
9/25/2015
9/25/2015
9/28/2015
Bill
Bill
Bill
Bill
Bill
Bergstrom
Bergstrom
Bergstrom
Bergstrom
Bergstrom
Frame
Frame
Frame
Frame
Frame
Not Pass
Not Pass
Cancelled In Field
Cancelled In Field
Partial
9/28/2015
Bill Bergstrom
Frame
Partial
9/28/2015
Bill Bergstrom
Frame
Pass
9/28/2015
Bill Bergstrom
Frame
Pass
9/29/2015
Bill Bergstrom
Frame
Pass
9/29/2015
Bill Bergstrom
Frame
Pass
9/29/2015
9/29/2015
10/1/2015
Bill Bergstrom
Bill Bergstrom
Dave Velez
Frame
Frame
Frame
Pass
Pass
Partial
10/1/2015
Dave Velez
Frame
Partial
10/6/2015
Dave Velez
Frame
Partial
10/6/2015
Dave Velez
Frame
Partial
10/8/2015
10/8/2015
10/9/2015
Dave Velez
Dave Velez
Dave Velez
Frame
Frame
Frame
Not Pass
Not Pass
Partial
10/9/2015
Dave Velez
Frame
Partial
10/14/2015
Bill Bergstrom
Frame
Pass
10/14/2015
Bill Bergstrom
Frame
Pass
10/16/2015
Bill Bergstrom
Frame
Partial
10/16/2015
Bill Bergstrom
Frame
Partial
10/20/2015
Bill Bergstrom
Frame
Partial
10/20/2015
Bill Bergstrom
Frame
Partial
Date: 9/16/2015 S/R & Fire safe and pre fill. 321,
323, 324, 326 & 132 Less SR behind tubs in 321, 323
& 324
Date: 9/17/2015 Third floor fire doors at elevator
lobby OK to sheet rock. Sheet rock below tub walls at
unit 323 and 324 OK. First floor corridor fire doors OK
Date: 9/17/2015 Third floor fire doors at elevator
lobby OK to sheet rock. Sheet rock below tub walls at
unit 323 and 324 OK. First floor corridor fire doors OK
Date: 9/22/2015 303 302 303 304 305 nothing passes
Date: 9/22/2015 303 302 303 304 305 nothing passes
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 24 of 128
10/21/2015
Bill Bergstrom
Frame
Partial
10/21/2015
Bill Bergstrom
Frame
Partial
10/25/2015
10/25/2015
10/27/2015
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Frame
Frame
Frame
Cancelled In Field
Cancelled In Field
Pass
10/27/2015
Bill Bergstrom
Frame
Pass
10/30/2015
Bill Bergstrom
Frame
Partial
10/30/2015
Bill Bergstrom
Frame
Partial
10/30/2015
Bill Bergstrom
Frame
Not Pass
10/30/2015
Bill Bergstrom
Frame
Not Pass
11/3/2015
11/3/2015
11/5/2015
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Frame
Frame
Frame
Cancelled In Field
Cancelled In Field
Partial
11/5/2015
Bill Bergstrom
Frame
Partial
11/6/2015
11/6/2015
11/7/2015
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Frame
Frame
Frame
Not Pass
Not Pass
Pass
11/7/2015
Bill Bergstrom
Frame
Pass
11/9/2015
11/9/2015
11/10/2015
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Frame
Frame
Frame
Cancelled In Field
Cancelled In Field
Pass
11/10/2015
Bill Bergstrom
Frame
Pass
11/13/2015
Bill Bergstrom
Frame
Not Pass
11/13/2015
Bill Bergstrom
Frame
Not Pass
11/17/2015
Bill Bergstrom
First Floor
Pass
11/17/2015
Bill Bergstrom
First Floor
Pass
11/21/2015
Bill Bergstrom
Frame
Pass
11/21/2015
Bill Bergstrom
Frame
Pass
11/21/2015
Bill Bergstrom
Frame
Cancelled In Field
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 25 of 128
11/21/2015
11/24/2015
11/24/2015
11/24/2015
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Dave Velez
Frame
Frame
Frame
Frame
Cancelled In Field
Pass
Pass
Partial
11/24/2015
Dave Velez
Frame
Partial
12/1/2015
12/1/2015
12/1/2015
Dave Velez
Dave Velez
Bill Bergstrom
Frame
Frame
Frame
Not Pass
Not Pass
Not Pass
12/1/2015
Bill Bergstrom
Frame
Not Pass
12/3/2015
Steve Brandeberry
Frame
Partial
12/3/2015
Steve Brandeberry
Frame
Partial
12/8/2015
Jorge Reyes
Frame
Partial
12/8/2015
Jorge Reyes
Frame
Partial
12/10/2015
Bill Bergstrom
Frame
Not Pass
12/10/2015
Bill Bergstrom
Frame
Not Pass
12/15/2015
Dave Velez
Frame
Partial
12/15/2015
Dave Velez
Frame
Partial
12/17/2015
12/17/2015
12/22/2015
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Frame
Frame
Final Building
Not Pass
Not Pass
Partial
12/22/2015
Bill Bergstrom
Final Building
Partial
12/22/2015
12/22/2015
12/22/2015
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Frame
Frame
Frame
Pass
Pass
Pass
12/22/2015
Bill Bergstrom
Frame
Pass
12/24/2015
Bill Bergstrom
Frame
Partial
12/24/2015
Bill Bergstrom
Frame
Partial
12/28/2015
Bill Bergstrom
Frame
Cancelled In Field
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 26 of 128
12/28/2015
12/30/2015
Bill Bergstrom
Bill Bergstrom
Frame
Frame
Cancelled In Field
Partial
12/30/2015
Bill Bergstrom
Frame
Partial
1/4/2016
1/4/2016
1/4/2016
1/4/2016
1/6/2016
Bill
Bill
Bill
Bill
Bill
Bergstrom
Bergstrom
Bergstrom
Bergstrom
Bergstrom
Frame
Frame
Frame
Frame
Frame
Pass
Pass
Pass
Pass
Partial
1/6/2016
Bill Bergstrom
Frame
Partial
1/7/2016
Bill Bergstrom
Frame
Pass
1/7/2016
Bill Bergstrom
Frame
Pass
1/13/2016
1/13/2016
1/27/2016
1/27/2016
1/28/2016
1/28/2016
1/29/2016
Bill
Bill
Bill
Bill
Bill
Bill
Bill
Bergstrom
Bergstrom
Bergstrom
Bergstrom
Bergstrom
Bergstrom
Bergstrom
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Cancelled
Cancelled
Cancelled
Cancelled
Not Pass
Not Pass
Not Pass
1/29/2016
Bill Bergstrom
Frame
Not Pass
2/1/2016
2/1/2016
2/2/2016
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Frame
Frame
Frame
Pass
Pass
Not Pass
2/2/2016
Bill Bergstrom
Frame
Not Pass
2/3/2016
2/3/2016
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Steve Brandeberry
Steve Brandeberry
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Bill Bergstrom
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Foundation
Foundation
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Pass
Pass
Cancelled
Scheduled
Scheduled
Scheduled
Scheduled
Scheduled
Scheduled
Scheduled
Scheduled
Cancelled
Cancelled
Scheduled
Scheduled
Cancelled
Cancelled
Cancelled
In
In
In
In
Date: 12/30/2015 Pre fill 155, 160. Rough 157, 161 &
163 Info
Date: 12/30/2015 Pre fill 155, 160. Rough 157, 161 &
163 Info
Pre Fill 157, 161 &167
Pre Fill 157, 161 &167
UFER ok ok to pour
UFER ok ok to pour
Date: 1/5/2016 Final 5th floor rooms ok less
adjustment of spring hinges. Rough rooms 158 & 165
Date: 1/5/2016 Final 5th floor rooms ok less
adjustment of spring hinges. Rough rooms 158 & 165
Date: 1/7/2016 5th floor rooms final ok common
areas TC. Rough 143 & 164. SR & pre fill 158, 162 &
165.
Date: 1/7/2016 5th floor rooms final ok common
areas TC. Rough 143 & 164. SR & pre fill 158, 162 &
165.
Field
Field
Field
Field
Date: 1/28/2016 Third-floor room finals need work
Date: 1/28/2016 Third-floor room finals need work
Date: 1/29/2016 Room on 3rd floor ok less door
closers
Date: 1/29/2016 Room on 3rd floor ok less door
closers
Date: 2/1/2016 Six floor rooms final OK
Date: 2/1/2016 Six floor rooms final OK
Date: 2/2/2016 4th floor final on rooms more work to
do.
Date: 2/2/2016 4th floor final on rooms more work to
do.
Date: 2/3/2016 First floor rooms final OK
Date: 2/3/2016 First floor rooms final OK
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 27 of 128
Description: Interior soft demo of guest rooms on Floors 5, 6 & 7, wall finishes, plumbing and lighting fixtures.
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
8/17/2015
Bill Bergstrom
Frame
Not Pass
8/24/2015
Bill Bergstrom
Frame
Pass
8/26/2015
8/28/2015
Ken Palmer
Steve Brandeberry
Frame
Frame
Partial
Partial
9/3/2015
9/11/2015
Bill Bergstrom
Dave Velez
Frame
Frame
Partial
Partial
9/16/2015
Bill Bergstrom
Frame
Partial
9/22/2015
Bill Bergstrom
Frame
Pass
10/1/2015
Dave Velez
Frame
Partial
11/7/2015
12/15/2015
12/22/2015
Bill Bergstrom
Dave Velez
Bill Bergstrom
Frame
Frame
Frame
Pass
Partial
Partial
Result Comments
Date: 8/17/2015 Correction notice 1. Need to five side
recessed cans 2. Should have pre-rock before
installing new walls need to repair separation
between first and second floor. 3. Need to close off all
wall cavities to Joist cavities. 4. The draft stopping at
new walls. 5. Building will require low illuminated exit
signs in court doors halls restaurants in assembly
areas.
Date: 8/24/2015 Vistabule at rear deck light covers ok
ok to paster.
North gallery Room 112 lid ok to gyp
Date: 8/28/2015 Sheet rock at three coffered ceiling
in north gallery OK.
Date: 9/3/2015 See card
Sheet rock and pre-fill OK in rooms 101, 101A, 102,
103. Rough in lobby/restaurant rooms 105 and 106
Date: 9/16/2015 Info and ok to ST openings for
dampers.
Date: 9/22/2015 Frame for infills ceiling in room 104
reception area OK. Underfloor inspection of lobby bar
room 107 OK Left that infill window at main entry OK
Floor infill at rooms Reception 101, Lobby Lounge OK
Sheet rock and pre-fill at Bell Desk wall OK
Date: 11/7/2015 Ceiling 108 & 108A
T-bar at storage pantry OK
Date: 12/22/2015 Rough in ground floor men's and
women's restrooms OK
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 28 of 128
1/12/2016
1/22/2016
Bill Bergstrom
Jorge Reyes
Frame
Frame
Cancelled In Field
Partial
4/23/2016
Bill Bergstrom
Frame
Partial
Dave Velez
Bill Bergstrom
Frame
Frame
Cancelled
Scheduled
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
10/1/2015
10/25/2015
Dave Velez
Bill Bergstrom
Frame
Frame
Partial
Partial
10/27/2015
Bill Bergstrom
Frame
Not Pass
Result Comments
Framing at rest room foyer to storage pantry OK
Date: 10/25/2015 Kitchen floor ok to cover. CN Need
to patch penetrations in rated ceiling and dining area.
(Other work was inspected on three other permits
and will be resulted on Monday.)
Date: 10/27/2015 CN (photo in attachments) 1.
Plumber has destroyed beam that is supporting floor
joists floor in the dining area. This is a built-up being
inside the floor assembly. Engineer needs to address
repair or replacement of beam. Repair needs to be
submitted to city plan checker for approval. 2. Need
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 29 of 128
10/28/2015
Bill Bergstrom
Frame
Pass
11/5/2015
Bill Bergstrom
Frame
Partial
11/17/2015
Bill Bergstrom
Frame
Pass
11/24/2015
12/5/2015
Dave Velez
Bill Bergstrom
Frame
Frame
Partial
Not Pass
12/8/2015
12/14/2015
Jorge Reyes
Bill Bergstrom
Frame
Frame
Partial
Pass
1/27/2016
Bill Bergstrom
Final Building
Not Pass
4/7/2016
Bill Bergstrom
Final Building
Not Pass
Bill Bergstrom
Frame
Final Building
Final Building
Final Building
Final Building
Cancelled
Pending
Pending
Pending
Pending
Inspector Name
Inspection Type
WALLBRD/SHINGLE
03N
LATH/CEILING 03N
Status / Result
Result Comments
APPROVED
PARTIAL APPROVAL
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 30 of 128
Address: 41 TUNNEL RD
APN: 048H766303500
Unit #:
Description: ADDITION
Inspector Name
8/21/1987
Inspection Type
Status / Result
Result Comments
FTG/SLAB/EMBED
APPROVED
01P
FINAL BUILDING 04P APPROVED
3/11/1988
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 31 of 128
7/20/1988
7/27/1988
8/22/1988
8/25/1988
8/29/1988
9/2/1988
9/2/1988
9/8/1988
9/8/1988
9/14/1988
9/15/1988
9/15/1988
9/16/1988
9/20/1988
9/20/1988
9/22/1988
9/26/1988
9/29/1988
9/29/1988
10/3/1988
10/5/1988
10/21/1988
11/3/1988
11/8/1988
11/9/1988
11/14/1988
12/1/1988
12/30/1988
1/10/1989
1/13/1989
1/17/1989
1/20/1989
1/27/1989
8/9/1989
ROUGH 03P
ROUGH 03P
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 32 of 128
Inspector Name
9/17/1987
Inspection Type
Status / Result
Result Comments
Inspector Name
10/17/1988
10/20/1988
10/21/1988
10/24/1988
Inspection Type
ROUGH 03P
Frame
ROUGH 03P
WALLBRD/SHINGLE
03N
TUB/SHOWER WALL
03N
Frame
FINAL BUILDING 04P
10/28/1988
2/3/1989
2/6/1989
Status / Result
Result Comments
PARTIAL APPROVAL
No Status
APPROVED
PARTIAL APPROVAL FRONT ENTERANCE TO HOTEL
APPROVED
No Status
APPROVED
Inspector Name
Inspection Type
Status / Result
Result Comments
PARTIAL APPROVAL
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 33 of 128
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
Frame
10/24/1988
1/19/1989
PARTIAL APPROVAL
No Status
Inspector Name
Inspection Type
9/22/1988
ROUGH 03P
9/26/1988
WALLBRD/SHINGLE
03N
Status / Result
Result Comments
FEE DUE
REINSPECT
APPROVED
Inspector Name
1/16/1990
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 34 of 128
Inspector Name
1/16/1990
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
12/19/1988
12/20/1988
1/31/1989
2/6/1989
Frame
FIELD CHECK 00N
ROUGH 03P
ROUGH 03P
2/10/1989
ROUGH 03P
3/2/1989
WALLBRD/SHINGLE
03N
WALLBRD/SHINGLE PARTIAL APPROVAL
03N
WALLBRD/SHINGLE APPROVED
03N
FINAL BUILDING 04P APPROVED
3/6/1989
3/31/1989
4/11/1989
Result Comments
No Status
PM 848 0241 PETE OR JERRY DIST 4P
APPROVED
PM 8480241 PETE OR JERRY DIST 4P
PARTIAL APPROVAL
FEE DUE
REINSPECT
FEE DUE
REINSPECT
PARTIAL APPROVAL
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 35 of 128
Business Name:
License #: 270088
Inspection Date
Inspector Name
4/6/1989
Inspection Type
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
Frame
ROUGH 03P
ROUGH 03P
ROUGH 03P
4/17/1989
5/17/1989
5/18/1989
6/12/1989
6/20/1989
6/23/1989
6/27/1989
ROUGH 03P
REPORT/CERT/FEE
04N
WALLBRD/SHINGLE
03N
TUB/SHOWER WALL
03N
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
FINAL BUILDING 04P
7/17/1989
7/17/1989
7/20/1989
7/28/1989
8/25/1989
10/16/1989
Status / Result
Result Comments
PARTIAL APPROVAL
PARTIAL APPROVAL
No Status
PARTIAL APPROVAL
PARTIAL APPROVAL
FEE DUE
REINSPECT
APPROVED
APPROVED
PARTIAL APPROVAL
APPROVED
APPROVED
APPROVED
ROOF NAILING
PARTIAL APPROVAL
PARTIAL APPROVAL
Inspector Name
7/10/1989
8/29/1989
8/30/1989
11/20/1989
Inspection Type
FTG/SLAB/EMBED
01P
MISCELLANEOUS 00N
Frame
FINAL BUILDING 04P
Status / Result
Result Comments
PARTIAL APPROVAL
PARTIAL APPROVAL
No Status
APPROVED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 36 of 128
Inspector Name
1/23/1989
Inspection Type
FTG/SLAB/EMBED
01P
Status / Result
Result Comments
PARTIAL APPROVAL
Inspector Name
2/8/1989
6/14/1989
Inspection Type
Status / Result
Frame
No Status
FINAL BUILDING 04P NO ACCESS/NO
PLANS
FINAL BUILDING 04P APPROVED
6/19/1989
Result Comments
PM ERIC BERG 635-0111 (DIST. 4P)
Inspector Name
Inspection Type
ROUGH 03P
Status / Result
Result Comments
APPROVED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 37 of 128
APN: 048H766303500
Unit #:
Description: REPLACE CEILING IN HORIZON ROOM
Inspector Name
Inspection Type
7/11/1989
ROUGH 03P
7/17/1989
WALLBRD/SHINGLE
03N
Status / Result
Result Comments
FEE DUE
REINSPECT
APPROVED
Inspector Name
4/17/1990
5/15/1990
5/31/1990
Inspection Type
Frame
ROUGH 03P
WALLBRD/SHINGLE
03N
Status / Result
Result Comments
No Status
APPROVED
APPROVED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 38 of 128
Business Name:
License #: 270088
Inspection Date
Inspector Name
4/12/1990
5/1/1990
Inspection Type
Status / Result
Result Comments
ROUGH 03P
APPROVED
WALLBRD/SHINGLE APPROVED
03N
FINAL BUILDING 04P NO ACCESS/NO
PLANS
FINAL BUILDING 04P APPROVED
5/22/1990
5/24/1990
Inspector Name
5/21/1990
7/20/1990
7/30/1990
Inspection Type
Frame
ROUGH 03P
WALLBRD/SHINGLE
03N
FINAL BUILDING 04P
8/15/1990
Status / Result
Result Comments
No Status
APPROVED
APPROVED
APPROVED
Inspector Name
Inspection Type
FIELD CHECK 00N
FTG/SLAB/EMBED
01P
Frame
ROUGH 03P
Status / Result
Result Comments
APPROVED
PARTIAL APPROVAL
No Status
INSP CANCELLED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 39 of 128
10/4/1990
FTG/SLAB/EMBED
APPROVED
01P
TUB/SHOWER WALL APPROVED
03N
FINAL BUILDING 04P CORRECTION
NOTICE
10/22/1990
11/13/1990
Inspector Name
8/28/1992
10/22/1992
Inspection Type
Status / Result
Result Comments
ROUGH 03P
APPROVED
FINAL BUILDING 04P APPROVED
Inspector Name
Inspection Type
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
FOUNDATION 01M
Status / Result
Result Comments
APPROVED
INSP CANCELLED
CANCEL
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 40 of 128
12/2/1993
12/15/1993
12/22/1993
1/13/1994
2/3/1994
2/10/1994
ROUGH 03P
FOUNDATION 01M
ROUGH 03P
ROUGH 03P
ROUGH 03P
WALLBRD/SHINGLE
03N
ROUGH 03P
4/20/1994
4/25/1994
5/2/1994
PARTIAL APPROVAL
INSP CANCELLED
PARTIAL APPROVAL
APPROVED
PARTIAL APPROVAL
PARTIAL APPROVAL
0
P/ROUGH-EXTERIOR SHEAR ONLY
X12-12:30 FRAME @ NEW STORAGE BLDG.
SHEARWALL NAILING OK.
1ST & 2ND FLOOR AT ADDITION S/R OK.
CORRECTION
FIRE BLOCKING REQ.
NOTICE
PARTIAL APPROVAL FRAME STORAGE AREA OFF NEW ADDITION OK.
PARTIAL APPROVAL S/R NAILING STORAGE RM OK/C/N FOR TEMP.CO
ROUGH 03P
WALLBRD/SHINGLE
03N
FINAL BUILDING 04P CORRECTION
NOTICE
FINAL BUILDING 04P APPROVED
5/2/1994
5/31/1994
Inspector Name
5/21/1993
7/26/1993
2/14/1994
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
FIELD CHECK 00N
Status / Result
Result Comments
APPROVED
1:00-2:00 P.M.
PARTIAL APPROVAL OK TO POUR ELEV. PIT SUBJ. TO S.I. APPROVAL
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 41 of 128
FTG/SLAB/EMBED
01P
FRAME 03M
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
ROUGH 03P
ROUGH 03P
11/3/1994
11/4/1994
11/18/1994
11/30/1994
3/13/1995
3/15/1995
3/29/1995
4/21/1995
ROUGH 03P
ROUGH 03P
WALLBRD/SHINGLE
03N
ROUGH 03P
LATH/CEILING 03N
ROUGH 03P
ROUGH 03P
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
4/21/1995
5/12/1995
6/12/1995
8/25/1995
8/25/1995
9/22/1995
9/22/1995
INSP CANCELLED
PARTIAL APPROVAL ELEV. PIT WALLS - FORMS SUB. TO S.I. & APP'D
REVIS.
PARTIAL APPROVAL SLAB COL. FTG. (TOP OF ELEV. P.T.) T-FLG @ 1/5-3
SUBJ. TO S.I.
PARTIAL APPROVAL PROGRESS OF LAUND. SHAFT & ELEV. DR. OPN'GS
PARTIAL APPROVAL OUTER WALL MACHINE RM AND FLOOR JOISTS IN
FRONT OF ELEVATOR
PARTIAL APPROVAL STUDIO LOBBY MEZZ, ELEV. OPENING FRAME
PARTIAL APPROVAL SEE SHT. FOR LIST
PARTIAL APPROVAL
PARTIAL APPROVAL
APPROVED
PARTIAL APPROVAL 1ST,2ND,3RD FL. MEZZ FRAMING SEE SHT.
PARTIAL APPROVAL MEZZ 4TH FLOOR ETC. SEE NOTES
PARTIAL APPROVAL
10/16/1995
11/1/1995
5/16/1996
PARTIAL APPROVAL
CORRECTION
NOTICE
ROUGH 03P
PARTIAL APPROVAL
ROUGH 03P
PARTIAL APPROVAL
FINAL BUILDING 04P PARTIAL APPROVAL
5/23/1996
Inspector Name
Inspection Type
FIELD CHECK 00N
FTG/SLAB/EMBED
01P
ROUGH 03P
ROUGH 03P
WALLBRD/SHINGLE
03N
WALLBRD/SHINGLE
03N
Status / Result
APPROVED
APPROVED
Result Comments
848-0279 FOR TIME PLEASE
PIER OK TO POUR
S/R NAILING OK
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 42 of 128
APN: 048H766303500
Unit #:
Description: Passenger elevator attached to exterior of bldg. and ramps to access it to meet accessibility requirements.
Inspector Name
10/11/1996
Inspection Type
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
LATH/CEILING 03N
ROUGH 03P
WALLBRD/SHINGLE
03N
ROUGH 03P
WALLBRD/SHINGLE
03N
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
FINAL BUILDING 04P
FINAL BUILDING 04P
10/16/1996
10/23/1996
10/28/1996
1/7/1997
1/7/1997
1/9/1997
1/30/1997
1/30/1997
2/5/1997
2/6/1997
2/7/1997
3/27/1997
10/23/1997
Status / Result
Result Comments
PARTIAL APPROVAL FLOOR ELEV. PIT & GRADE BEAM PENDING SPL INSP
PARTIAL APPROVAL WALLS OK TO 1ST KEYWY SP. INSP.
PARTIAL APPROVAL FOOTING FOR ENTRY WALLS
PARTIAL APPROVAL WALLS OK TO POUR
APPROVED
EXTERIOR S/R AND EXT LATH OK
PARTIAL APPROVAL
PARTIAL APPROVAL S/R OK INTERIOR ELEVATOR SHAFT
PARTIAL APPROVAL ABOVE CEILING
PARTIAL APPROVAL
APPROVED
INSP CANCELLED
PARTIAL APPROVAL
PARTIAL APPROVAL
APPROVED
CANCEL
ABOVE CEILING OK EXCEPT CONN. TO DD
COMPLETE EXCPT FINAL SP. INSP. LETTERS
FINAL
Inspector Name
Inspection Type
FIELD CHECK 00N
FTG/SLAB/EMBED
01P
ROUGH 03P
Status / Result
Result Comments
APPROVED
PARTIAL APPROVAL DISC: RE TEMP EXITING
PREL. DISC. RE: FRAME
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 43 of 128
3/22/1996
4/24/1996
4/26/1996
5/1/1996
5/3/1996
7/16/1996
7/18/1996
7/19/1996
7/29/1996
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
Frame
FRAME 03M
8/6/1996
8/13/1996
8/13/1996
10/3/1996
10/4/1996
10/14/1996
10/15/1996
10/16/1996
ROUGH 03P
ROUGH 03P
WALLBRD/SHINGLE
03N
Frame
WALLBRD/SHINGLE
03N
WALLBRD/SHINGLE
03N
ROUGH 03P
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
10/17/1996
10/18/1996
ROUGH 03P
ROUGH 03P
10/21/1996
10/22/1996
10/23/1996
ROUGH 03P
ROUGH 03P
ROUGH 03P
10/24/1996
10/25/1996
ROUGH 03P
ROUGH 03P
10/28/1996
10/29/1996
ROUGH 03P
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
TUB/SHOWER WALL
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
8/19/1996
8/26/1996
9/13/1996
9/13/1996
9/19/1996
10/29/1996
10/30/1996
10/31/1996
11/1/1996
11/5/1996
11/6/1996
11/7/1996
11/13/1996
11/14/1996
11/15/1996
11/15/1996
11/18/1996
11/19/1996
11/20/1996
11/21/1996
INSP NOT
PERFORMED
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
No Status
INSP NOT
PERFORMED
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
No Status
FRAMING/848-0279
PARTIAL APPROVAL S/R < 1ST LAY > OK- MEZZ CEIL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
INSP CANCELLED
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
CORRECTION
NOTICE
PARTIAL APPROVAL
CORRECTION
NOTICE
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
CANCELLED
PARTIAL S/W STUDIO LEVEL - SEE NOTES
PARTIAL S/W SEE NOTES
MEZZ. LEVEL - PREL. WALK THOU CORR.
C/N RE: FRAME
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
CORRECTION
NOTICE
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
INSP CANCELLED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 44 of 128
11/22/1996
11/25/1996
11/26/1996
12/3/1996
12/4/1996
12/5/1996
12/6/1996
12/9/1996
12/10/1996
12/11/1996
12/12/1996
12/13/1996
12/16/1996
12/17/1996
12/18/1996
12/19/1996
12/20/1996
12/26/1996
12/27/1996
12/30/1996
1/2/1997
1/3/1997
1/8/1997
1/22/1997
1/28/1997
2/5/1997
2/10/1997
2/24/1997
2/27/1997
2/28/1997
3/11/1997
Frame
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
FINAL BUILDING
FINAL BUILDING
FINAL BUILDING
FINAL BUILDING
3/12/1997
4/3/1997
5/5/1997
7/2/1997
12/10/1997
04P
04P
04P
04P
No Status
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
CORRECTION
NOTICE
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
APPROVED
Inspector Name
Inspection Type
FIELD CHECK 00N
ROUGH 03P
Status / Result
Result Comments
APPROVED
PARTIAL APPROVAL HIGH CEILING OK TO S/R
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 45 of 128
3/7/1997
3/10/1997
3/13/1997
3/21/1997
ROUGH 03P
ROUGH 03P
ROUGH 03P
FINAL BUILDING 04P
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
APPROVED
Inspector Name
Inspection Type
1/6/2000
1/7/2000
1/10/2000
1/11/2000
1/12/2000
SHEARWALL/ROOF
03N
ROUGH 03P
WALLBRD/SHINGLE
03N
ROUGH 03P
SHEARWALL/ROOF
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
1/13/2000
ROUGH 03P
1/14/2000
1/18/2000
Frame
SHEARWALL/ROOF
03N
ROUGH 03P
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
12/20/1999
12/22/1999
12/30/1999
1/3/2000
1/19/2000
1/20/2000
1/21/2000
1/25/2000
1/26/2000
1/27/2000
1/28/2000
1/31/2000
2/1/2000
2/2/2000
2/3/2000
2/4/2000
ROUGH 03P
ROUGH 03P
ROUGH 03P
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
Status / Result
Result Comments
INSP CANCELLED
CANCEL
PARTIAL APPROVAL P/WALL/BD @ LINE 4-H-I
PARTIAL APPROVAL
PARTIAL APPROVAL
NO ACCESS/NO
PLANS
INSP CANCELLED
INSP CANCELLED
PARTIAL APPROVAL
PARTIAL APPROVAL
INSP CANCELLED
CANCEL
NO ACCESS/NO
INFO ONLY NO INSP PERFORMED
PLANS
PARTIAL APPROVAL P/S/R @ MEZZANINE OFFICE AREA AND INFOR
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 46 of 128
2/8/2000
2/9/2000
2/10/2000
2/11/2000
2/14/2000
2/15/2000
2/16/2000
2/17/2000
2/18/2000
2/22/2000
2/23/2000
2/24/2000
2/25/2000
2/28/2000
2/29/2000
3/1/2000
3/2/2000
3/2/2000
3/3/2000
3/6/2000
3/7/2000
3/8/2000
3/9/2000
3/10/2000
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
SHEARWALL/ROOF
03N
WALLBRD/SHINGLE
03N
Frame
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
WALLBRD/SHINGLE
03N
SHEARWALL/ROOF
03N
ROUGH 03P
3/14/2000
3/15/2000
3/16/2000
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
FTG/SLAB/EMBED
01P
ROUGH 03P
ROUGH 03P
ROUGH 03P
3/17/2000
3/20/2000
ROUGH 03P
ROUGH 03P
3/21/2000
3/22/2000
ROUGH 03P
WALLBRD/SHINGLE
03N
FTG/SLAB/EMBED
01P
ROUGH 03P
ROUGH 03P
3/23/2000
3/24/2000
3/28/2000
3/29/2000
4/3/2000
SHEARWALL/ROOF
03N
WALLBRD/SHINGLE
03N
SHEARWALL/ROOF
03N
ROUGH 03P
4/4/2000
4/5/2000
4/6/2000
4/7/2000
ROUGH
ROUGH
ROUGH
ROUGH
3/30/2000
3/31/2000
03P
03P
03P
03P
PARTIAL APPROVAL
INSP CANCELLED
INSP CANCELLED
INSP CANCELLED
NO ACCESS/NO
PLANS
PARTIAL APPROVAL
848-0217 NELSON
CANCELLED
P/GYP WALL/BD @ MEZZ. OFFICE AREA
P/FRAMING @ STORE FRONT AREAS LESS F/S
CANCEL
CANCEL
CANCEL
P/ROUGH OK @ STOREFRONT AREAS @ LOBBY
P/FRAME @ STOREFRONT AREA AND INFO
INSP CANCELLED
CANCELLED
NO ACCESS/NO
INFO ONLY-NO INSP PERFORMED
PLANS
PARTIAL APPROVAL P/SHEAR OK @ LINE 7 @ LOBBY
PARTIAL APPROVAL WALL/BD OK @ LINE 7, J-K @ LOBBY
PARTIAL APPROVAL P/SHEAR @ LOBBY PER JOB CARD
NO ACCESS/NO
PLANS
INSP CANCELLED
INSP CANCELLED
INSP CANCELLED
INSP CANCELLED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 47 of 128
4/10/2000
4/11/2000
4/12/2000
4/13/2000
4/14/2000
4/17/2000
4/18/2000
4/19/2000
4/20/2000
4/21/2000
4/24/2000
4/25/2000
4/26/2000
SHEARWALL/ROOF
03N
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
FTG/SLAB/EMBED
01P
ROUGH 03P
ROUGH 03P
WALLBRD/SHINGLE
03N
ROUGH 03P
ROUGH 03P
5/22/2000
FTG/SLAB/EMBED
01P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
Frame
ROUGH 03P
Frame
ROUGH 03P
ROUGH 03P
SHEARWALL/ROOF
03N
ROUGH 03P
5/23/2000
5/24/2000
5/25/2000
5/26/2000
5/30/2000
5/31/2000
6/1/2000
6/2/2000
6/6/2000
6/7/2000
6/8/2000
Frame
ROUGH
Frame
ROUGH
ROUGH
ROUGH
ROUGH
ROUGH
ROUGH
ROUGH
ROUGH
6/9/2000
ROUGH 03P
6/12/2000
FTG/SLAB/EMBED
01P
FTG/SLAB/EMBED
01P
ROUGH 03P
ROUGH 03P
4/27/2000
4/28/2000
5/1/2000
5/2/2000
5/3/2000
5/4/2000
5/5/2000
5/9/2000
5/10/2000
5/11/2000
5/12/2000
5/15/2000
5/16/2000
5/17/2000
5/18/2000
5/19/2000
6/13/2000
6/14/2000
6/15/2000
03P
03P
03P
03P
03P
03P
03P
03P
03P
INSP CANCELLED
CANCEL
NO ACCESS/NO
INFO ONLY-NO INSP PERFORMED
PLANS
PARTIAL APPROVAL P/WALL/BD @ HORIZON/LANAL III RMS
PARTIAL APPROVAL
NO ACCESS/NO
INFO ONLY-NO INSP PERFORMED
PLANS
PARTIAL APPROVAL WALL/BD @ PHONE CL AND STEEL @ SLAB
INSP CANCELLED
INSP CANCELLED
INSP CANCELLED
PARTIAL APPROVAL
INSP CANCELLED
INSP CANCELLED
INSP CANCELLED
INSP CANCELLED
INSP CANCELLED
INSP CANCELLED
No Status
INSP CANCELLED
No Status
INSP CANCELLED
INSP CANCELLED
PARTIAL APPROVAL
CANCEL
CANCEL
CANCEL
INFO AND P/R @ HORIZON RM.
CANCEL
CANCEL
CANCEL
CANCEL
CANCEL
CANCEL
848-0217 NELSON
CANCEL
848-0217 NELSON
CANCEL
CANCEL
P/SHEAR @ WALLS AS INDICATED ON CARD
NO ACCESS/NO
PLANS
No Status
INSP CANCELLED
No Status
INSP CANCELLED
PARTIAL APPROVAL
INSP CANCELLED
PARTIAL APPROVAL
INSP CANCELLED
PARTIAL APPROVAL
PARTIAL APPROVAL
NO ACCESS/NO
PLANS
NO ACCESS/NO
PLANS
PARTIAL APPROVAL
NOT READY
848-0217 NELSON
CANCELLED
848-0217 NELSON
CANCEL
P/FLR FRAME @ 10-11 C-6 @ CARRIAGE LEVEL
CANCEL
FL FRMAE @ CARRIAGE LEVEL SEE NOTES
CANCEL
STEEL BEAMS VERIFIED AT STUDIO LEVEL
STEEL BEAMS @ STUDIO LEVEL OK SUB TO S.I.
INFO ONLY - NO INSP PERFORMED
INFO ONLY-NO INSP PERFORMED
P/FORMS OK @ EQUIP PADS LTR FROM HOTEL REQ.
CANCEL
INFO ONLY @ CARRIAGE LEVEL FRAMING
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 48 of 128
6/16/2000
ROUGH 03P
6/19/2000
ROUGH 03P
6/20/2000
6/21/2000
ROUGH 03P
FTG/SLAB/EMBED
01P
ROUGH 03P
ROUGH 03P
ROUGH 03P
6/22/2000
6/23/2000
2/2/2001
NO ACCESS/NO
PLANS
NO ACCESS/NO
PLANS
NO ACCESS/NO
PLANS
PARTIAL APPROVAL
PARTIAL APPROVAL
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
6/3/1993
6/9/1993
Inspection Type
Frame
Frame
Status / Result
APPROVED
APPROVED
Result Comments
PASS - (DT)
PASS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 49 of 128
Unit #:
Description: ELECTRICAL/KIOSK
Inspector Name
5/27/1993
6/3/1993
6/9/1993
Inspection Type
Frame
Frame
Frame
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 50 of 128
Inspector Name
Inspection Type
Status / Result
Result Comments
Status / Result
Result Comments
Inspector Name
Inspection Type
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 51 of 128
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
APN: 048H767002700
Unit #:
Description: Zoning determination letter to examine property information concerning use, permits, violations, noncomformity, conditi ons and site development plans.
Inspector Name
Inspection Type
Status / Result
Result Comments
10/6/2016
Page 52 of 128
Address: 41 TUNNEL RD
APN: 048H766303500
Unit #:
Description: Regular design review to add new swimming pool to Claremont Hotel property (S-4 zone triggers Design
Review)
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 53 of 128
License #:
Inspection Date
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 54 of 128
Business Name:
License #:
Inspection Date
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
8/25/2000
8/31/2000
9/11/2000
9/18/2000
9/25/2000
10/6/2000
10/13/2000
10/23/2000
11/2/2000
ROUGH
ROUGH
ROUGH
ROUGH
ROUGH
ROUGH
ROUGH
ROUGH
ROUGH
11/14/2000
11/21/2000
11/30/2000
ROUGH 03P
ROUGH 03P
FINAL ELECTRICAL
04P
ROUGH 03P
12/4/2000
03P
03P
03P
03P
03P
03P
03P
03P
03P
Status / Result
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
Result Comments
APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
CANCEL
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 55 of 128
12/7/2000
12/18/2000
ROUGH 03P
SUSPENDED CEILING
03N
SUSPENDED CEILING
03N
FINAL ELECTRICAL
04P
FINAL ELECTRICAL
04P
1/8/2001
1/26/2001
1/29/2001
T-BAR COMPLETE
INSP CANCELLED
APPROVED
FINAL OK
Inspector Name
3/22/2001
5/7/2001
5/17/2001
Inspection Type
Status / Result
Result Comments
ROUGH 03P
ROUGH 03P
ROUGH 03P
7/2/2001
8/21/2001
Inspector Name
Inspection Type
ROUGH 03P
ROUGH 03P
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 56 of 128
SUSPENDED CEILING
03N
ROUGH 03P
PARTIAL APPROVAL WALLS OK TO COVER
SUSPENDED CEILING APPROVED
UPPER LEVEL T-BAR OK
03N
FINAL ELECTRICAL
APPROVED
FINAL OK
04P
10/9/2001
10/25/2001
11/26/2001
Inspector Name
8/24/2001
Inspection Type
FINAL ELECTRICAL
04P
Status / Result
APPROVED
Result Comments
FINAL OK
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 57 of 128
Inspector Name
2/24/2006
3/2/2006
3/15/2006
Inspection Type
Status / Result
Result Comments
Inspector Name
JOEL C GARCIA
10/3/2006
Inspection Type
ROUGH 03P
FINAL ELECTRICAL
04P
FINAL ELECTRICAL
04P
Status / Result
Result Comments
APPROVED
APPROVED
INSP CANCELLED
Inspector Name
Inspection Type
Status / Result
Result Comments
UG OK BOND TO REBAR OK-RAILS
BONDING TO HANDRAILS-ETC OK
NOT READY
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 58 of 128
9/22/2006
9/26/2006
10/10/2006
FINAL ELECTRICAL
04P
LDF TERMINATED!!! FRAME 03M
JOEL C GARCIA
FINAL ELECTRICAL
04P
FINAL ELECTRICAL
04P
CORRECTION
NOTICE
INSP CANCELLED
CORRECTION
NOTICE
APPROVED
Inspector Name
Inspection Type
ROUGH 03P
JOEL C GARCIA
ROUGH 03P
ROUGH 03P
JOEL C GARCIA
FINAL ELECTRICAL
04P
LDF TERMINATED!!! FINAL ELECTRICAL
04P
Status / Result
PARTIAL APPROVAL
PARTIAL APPROVAL
APPROVED
PARTIAL APPROVAL
Result Comments
R OK CLAREMONT RM.
WALLS OK EMPIRE ROOM
R/OK
F/TOM 925-768-6852
APPROVED
Inspector Name
Inspection Type
JOEL C GARCIA
FINAL ELECTRICAL
04P
LDF TERMINATED!!! ROUGH 03P
LDF TERMINATED!!! FINAL ELECTRICAL
04P
Status / Result
CORRECTION
NOTICE
CORRECTION
NOTICE
APPROVED
Result Comments
C/N ON PERMIT
CONT. NOT ON SITE
FINAL
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 59 of 128
Inspector Name
Inspection Type
10/31/2011
JOEL C GARCIA
ROUGH 03P
11/9/2011
11/18/2011
12/22/2011
JOEL C GARCIA
JOEL C GARCIA
ROUGH 03P
ROUGH 03P
FINAL ELECTRICAL
04P
FINAL ELECTRICAL
04P
FRAME 03M
12/23/2011
1/4/2012
JOEL C GARCIA
Status / Result
Result Comments
AA
Inspector Name
JOEL C GARCIA
JOEL C GARCIA
Inspection Type
ROUGH 03P
FINAL ELECTRICAL
04P
Status / Result
APPROVED
APPROVED
Result Comments
ROUGH OK UNISSEX RESTROOM ONLY
FINAL OK
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 60 of 128
Inspector Name
12/18/2012
Inspection Type
FINAL ELECTRICAL
04P
Status / Result
APPROVED
Result Comments
FINAL SOLAR AT BUS SHELTER
Inspector Name
Joel Garcia
Joel Garcia
Joel Garcia
Joel Garcia
Jorge Reyes
Inspection Type
Frame
Final Electrical
Final Electrical
Frame
Frame
Status / Result
Partial
Partial
Pass
Cancelled
Cancelled
Result Comments
Rough OK units 140 and 159
Final OK units 140 and 159
Final OK
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 61 of 128
5/18/2015
5/27/2015
Joel Garcia
Alan Albee
Frame
Frame
Partial
Partial
Inspector Name
Inspection Type
Status / Result
4/28/2015
4/30/2015
Joel Garcia
Alan Albee
Frame
Frame
Partial
Partial
5/7/2015
6/12/2015
6/25/2015
Alan Albee
Joel Garcia
Joel Garcia
Frame
Final Electrical
Final Electrical
Partial
Partial
Not Pass
Joel Garcia
Alan Albee
Final Electrical
Frame
Cancelled
Scheduled
Result Comments
Partial U/G conduit approval
OK to pour 8 of 16 light standard bases, as marked
on drawing.
All UG / OK , OK to pour all pole bases.
Date: 6/12/2015 Light control panel
Date: 6/25/2015 Lighting control panel not
programmed yet
Inspector Name
Inspection Type
Status / Result
6/2/2015
Alan Albee
Frame
Partial
6/2/2015
Alan Albee
Frame
Partial
6/12/2015
Joel Garcia
Frame
Partial
6/12/2015
Joel Garcia
Frame
Partial
6/30/2015
Joel Garcia
Frame
Partial
Result Comments
R / OK Rooms 501, 504, 505, & 506. R / OK 502 and
503 less bathrooms.
R / OK Rooms 501, 504, 505, & 506. R / OK 502 and
503 less bathrooms.
Date: 6/12/2015 Landing between 4th and 5th fls
walls ok
Date: 6/12/2015 Landing between 4th and 5th fls
walls ok
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 62 of 128
6/30/2015
Joel Garcia
Frame
Partial
7/7/2015
Joel Garcia
Frame
Partial
7/7/2015
Joel Garcia
Frame
Partial
7/9/2015
7/9/2015
7/15/2015
Alan Albee
Alan Albee
Joel Garcia
Frame
Frame
Frame
Partial
Partial
Partial
7/15/2015
Joel Garcia
Frame
Partial
7/17/2015
Joel Garcia
Frame
Partial
7/17/2015
Joel Garcia
Frame
Partial
7/23/2015
Alan Albee
Frame
Partial
7/23/2015
Alan Albee
Frame
Partial
7/29/2015
Joel Garcia
Frame
Partial
7/29/2015
Joel Garcia
Frame
Partial
8/7/2015
8/7/2015
8/13/2015
8/13/2015
8/17/2015
Joel
Joel
Joel
Joel
Joel
Garcia
Garcia
Garcia
Garcia
Garcia
Frame
Frame
Frame
Frame
Frame
Partial
Partial
Not Pass
Not Pass
Partial
8/17/2015
Joel Garcia
Frame
Partial
8/20/2015
8/20/2015
8/24/2015
Joel Garcia
Joel Garcia
Joel Garcia
Frame
Frame
Frame
Partial
Partial
Partial
8/24/2015
Joel Garcia
Frame
Partial
9/1/2015
9/1/2015
9/3/2015
9/3/2015
9/11/2015
Alan Albee
Alan Albee
Joel Garcia
Joel Garcia
Joel Garcia
Frame
Frame
Frame
Frame
Frame
Partial
Partial
Partial
Partial
Partial
9/11/2015
Joel Garcia
Frame
Partial
9/15/2015
9/15/2015
9/17/2015
Alan Albee
Alan Albee
Joel Garcia
Frame
Frame
Frame
Partial
Partial
Partial
9/17/2015
Joel Garcia
Frame
Partial
9/22/2015
Joel Garcia
Frame
Partial
9/22/2015
Joel Garcia
Frame
Partial
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 63 of 128
9/24/2015
Joel Garcia
Frame
Partial
9/24/2015
Joel Garcia
Frame
Partial
9/29/2015
9/29/2015
10/1/2015
Joel Garcia
Joel Garcia
Joel Garcia
Frame
Frame
Frame
Partial
Partial
Partial
10/1/2015
Joel Garcia
Frame
Partial
10/6/2015
10/6/2015
10/8/2015
Joel Garcia
Joel Garcia
Joel Garcia
Frame
Frame
Frame
Not Pass
Not Pass
Partial
10/8/2015
Joel Garcia
Frame
Partial
10/15/2015
Joel Garcia
Frame
Partial
10/15/2015
Joel Garcia
Frame
Partial
10/20/2015
Joel Garcia
Frame
Partial
10/20/2015
Joel Garcia
Frame
Partial
10/22/2015
10/22/2015
10/26/2015
10/26/2015
10/27/2015
Joel
Joel
Joel
Joel
Joel
Garcia
Garcia
Garcia
Garcia
Garcia
Frame
Frame
Frame
Frame
Frame
Partial
Partial
Not Pass
Not Pass
Partial
10/27/2015
Joel Garcia
Frame
Partial
10/29/2015
10/29/2015
11/3/2015
Joel Garcia
Joel Garcia
Alan Albee
Frame
Frame
Foundation
Partial
Partial
Partial
11/3/2015
Alan Albee
Foundation
Partial
11/5/2015
Alan Albee
Frame
Partial
11/5/2015
Alan Albee
Frame
Partial
11/10/2015
11/10/2015
11/12/2015
Joel Garcia
Joel Garcia
Joel Garcia
Frame
Frame
Frame
Partial
Partial
Partial
11/12/2015
Joel Garcia
Frame
Partial
11/18/2015
Joel Garcia
First Floor
Partial
11/18/2015
Joel Garcia
First Floor
Partial
11/19/2015
Joel Garcia
Foundation
Partial
11/19/2015
Joel Garcia
Foundation
Partial
11/24/2015
11/24/2015
12/1/2015
Joel Garcia
Joel Garcia
Joel Garcia
Frame
Frame
Foundation
Partial
Partial
Partial
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 64 of 128
12/1/2015
Joel Garcia
Foundation
Partial
12/3/2015
12/3/2015
12/8/2015
Joel Garcia
Joel Garcia
Joel Garcia
Frame
Frame
Frame
Partial
Partial
Partial
12/8/2015
Joel Garcia
Frame
Partial
12/8/2015
Joel Garcia
Frame
Partial
12/8/2015
Joel Garcia
Frame
Partial
12/9/2015
12/9/2015
12/11/2015
12/11/2015
12/16/2015
12/16/2015
12/17/2015
Joel
Joel
Joel
Joel
Joel
Joel
Joel
Frame
Frame
First Floor
First Floor
Frame
Frame
Frame
Partial
Partial
Partial
Partial
Partial
Partial
Partial
12/17/2015
Joel Garcia
Frame
Partial
12/22/2015
Joel Garcia
Frame
Partial
12/22/2015
Joel Garcia
Frame
Partial
12/29/2015
12/29/2015
12/31/2015
12/31/2015
1/6/2016
1/6/2016
1/7/2016
Felix Melendez
Felix Melendez
Felix Melendez
Felix Melendez
Joel Garcia
Joel Garcia
Joel Garcia
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Partial
Partial
Partial
Partial
Partial
Partial
Partial
1/7/2016
Joel Garcia
Frame
Partial
1/26/2016
Joel Garcia
Frame
Partial
1/26/2016
Joel Garcia
Frame
Partial
1/27/2016
1/27/2016
1/29/2016
Joel Garcia
Joel Garcia
Joel Garcia
Frame
Frame
Frame
Partial
Partial
Partial
1/29/2016
Joel Garcia
Frame
Partial
2/1/2016
2/1/2016
2/2/2016
2/2/2016
Joel
Joel
Joel
Joel
Joel
Joel
Joel
Joel
Joel
Joel
Joel
Joel
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Partial
Partial
Partial
Partial
Cancelled
Cancelled
Cancelled
Cancelled
Cancelled
Cancelled
Cancelled
Cancelled
Garcia
Garcia
Garcia
Garcia
Garcia
Garcia
Garcia
Garcia
Garcia
Garcia
Garcia
Garcia
Garcia
Garcia
Garcia
Garcia
Garcia
Garcia
Garcia
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 65 of 128
Joel Garcia
Joel Garcia
Joel Garcia
Alan Albee
Alan Albee
Alan Albee
Alan Albee
Alan Albee
Alan Albee
Joel Garcia
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Cancelled
Cancelled
Cancelled
Cancelled
Cancelled
Scheduled
Scheduled
Cancelled
Cancelled
Cancelled
Inspector Name
Inspection Type
Status / Result
8/17/2015
8/26/2015
8/28/2015
Joel Garcia
Joel Garcia
Joel Garcia
Frame
Frame
Frame
Partial
Partial
Partial
9/11/2015
9/11/2015
9/30/2015
Joel Garcia
Joel Garcia
Alan Albee
Frame
Frame
Foundation
Partial
Cancelled In Field
Partial
10/21/2015
12/18/2015
12/24/2015
12/28/2015
Joel Garcia
Joel Garcia
Kevin D Dumford
Kevin D Dumford
Alan Albee
Joel Garcia
Joel Garcia
Frame
Frame
Frame
Frame
Frame
Frame
Final Electrical
Partial
Partial
Partial
Cancelled In Office
Scheduled
Cancelled
Cancelled
Result Comments
Date: 8/17/2015 Deck vestibule "111" rough ok
Date: 8/26/2015 Ceilings ok north gallery 112
Date: 8/28/2015 Ceilings ok in retail "101" south
gallery "102" and pre-function "103"
Date: 9/11/2015 Ceilings ok areas 105 and 106
Floor boxes in Tenzing Lounge 106, Lobby lounge 105
and drop ceiling in Rm E10 OK
Date: 10/21/2015 Pantry area walls ok
see job card
Rough electrical - rooms 115& 116 bathrooms O.K.
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 66 of 128
Requestor:
: Edgar Gallo
Business Name: HATHAWAY DINWIDDIE CONSTRUCTION COMPANY
License #: 729664
Inspection Date
7/27/2015
Inspector Name
Joel Garcia
Joel Garcia
Inspection Type
Final Electrical
Final Electrical
Status / Result
Pass
Cancelled
Result Comments
Final OK
Inspector Name
Inspection Type
Status / Result
10/6/2015
10/26/2015
10/28/2015
Joel Garcia
Joel Garcia
Joel Garcia
Frame
Frame
Frame
Partial
Not Pass
Partial
11/4/2015
Felix Melendez
Frame
Partial
11/16/2015
11/19/2015
11/30/2015
12/2/2015
12/14/2015
12/18/2015
1/6/2016
1/7/2016
Joel Garcia
Joel Garcia
Joel Garcia
Joel Garcia
Joel Garcia
Joel Garcia
Joel Garcia
Joel Garcia
Joel Garcia
Tim Low
Frame
Frame
Frame
Frame
Frame
Frame
Final Electrical
Final Electrical
Frame
Frame
Partial
Partial
Partial
Partial
Partial
Partial
Partial
Pass
Cancelled
Cancelled
Result Comments
Date: 10/6/2015 Restrooms vestibule ceiling on
Date: 10/26/2015 Not ready
Date: 10/28/2015 Dining room ceiling ok lines 05 to 6
and X to W
Hard lid ceiling rough OK for dinner, kitchen,
exhibition kitchen and reception area, except bar
area. Walls rough OK for pantry, kitchen, exhibition
kitchen and dinner area.
Date: 11/16/2015 Main restaurant bar ok
Date: 11/19/2015 Main restaurant kitchen ok
Date: 11/30/2015 Restaurant bar wall ok
Date: 12/2/2015 Main restaurant bar short wall ok
Date: 12/14/2015 Rough ok rooms 148, 150, 151
see job card
Date: 1/5/2016 Partial final ok
Date: 1/7/2016 Final ok
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 67 of 128
Requestor:
:
Business Name: HATHAWAY DINWIDDIE CON CO
License #: 729664
Inspection Date
10/27/2015
Inspector Name
Bill Bergstrom
Inspection Type
Final Electrical
Status / Result
Pass
Result Comments
Date: 10/27/2015 Bonding for rebar for monument
sign
Inspector Name
Inspection Type
Status / Result
Result Comments
Status / Result
Result Comments
Inspector Name
Inspection Type
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 68 of 128
Inspector Name
Inspection Type
Status / Result
Result Comments
Status / Result
Result Comments
Inspector Name
7/28/1988
9/6/1988
Inspection Type
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 69 of 128
11/9/1988
12/6/1988
12/19/1988
1/6/1989
1/23/1989
1/24/1989
4/5/1989
10/17/1989
1/11/1990
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 70 of 128
1/19/1989
FINAL ELECTRICAL
PARTIAL APPROVAL
04P
FINAL ELECTRICAL
PARTIAL APPROVAL
04P
MISCELLANEOUS 00N PARTIAL APPROVAL
MISCELLANEOUS 00N PARTIAL APPROVAL
ROUGH 03P
PARTIAL APPROVAL
ROUGH 03P
NO PROGRESS
MISCELLANEOUS 00N CORRECTION
NOTICE
MISCELLANEOUS 00N PARTIAL APPROVAL
MISCELLANEOUS 00N NO PROGRESS
MISCELLANEOUS 00N NO PROGRESS
FINAL ELECTRICAL
APPROVED
04P
1/23/1989
1/25/1989
3/31/1989
4/5/1989
4/17/1989
6/20/1989
7/10/1989
11/8/1989
11/9/1989
10/2/1990
Inspector Name
2/22/1988
2/22/1988
3/3/1988
5/24/1988
1/24/1989
2/21/1989
4/5/1989
Inspection Type
Status / Result
Result Comments
ROUGH 03P
PARTIAL APPROVAL
ROUGH 03P
PARTIAL APPROVAL
MISCELLANEOUS 00N CORRECTION
NOTICE
MISCELLANEOUS 00N PARTIAL APPROVAL
MISCELLANEOUS 00N PARTIAL APPROVAL
MISCELLANEOUS 00N NO PROGRESS
MISCELLANEOUS 00N NO PROGRESS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 71 of 128
License #: 232759
Inspection Date
Inspector Name
12/6/1988
4/3/1989
Inspection Type
Status / Result
Result Comments
Inspector Name
10/25/1988
12/5/1988
1/3/1989
1/27/1989
Inspection Type
ROUGH 03P
MISCELLANEOUS 00N
MISCELLANEOUS 00N
FINAL ELECTRICAL
04P
Status / Result
Result Comments
APPROVED
FRONT ENTERNCE
PARTIAL APPROVAL
PARTIAL APPROVAL
APPROVED
FRONT ENTRANCE
Inspector Name
Inspection Type
Status / Result
Result Comments
ROUGH 03P
PARTIAL APPROVAL
UNDERGROUND 01P APPROVED
MISCELLANEOUS 00N CORRECTION
NOTICE
MISCELLANEOUS 00N NO PROGRESS
MISCELLANEOUS 00N CORRECTION
NOTICE
MISCELLANEOUS 00N NO PROGRESS
MISCELLANEOUS 00N CORRECTION
NOTICE
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 72 of 128
12/6/1990
FINAL ELECTRICAL
04P
CORRECTION
NOTICE
Inspector Name
11/28/1988
11/29/1988
11/30/1988
12/29/1988
12/30/1988
1/13/1989
1/25/1989
2/8/1989
3/1/1989
6/19/1989
7/3/1989
Inspection Type
Status / Result
Result Comments
7/6/1989
7/21/1989
8/14/1989
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 73 of 128
10/16/1989
6/18/1990
Inspector Name
4/17/1989
4/24/1989
6/15/1989
7/10/1989
8/14/1989
8/28/1989
10/17/1989
11/9/1989
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
MISCELLANEOUS
MISCELLANEOUS
ROUGH 03P
ROUGH 03P
MISCELLANEOUS
ROUGH 03P
ROUGH 03P
MISCELLANEOUS
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 74 of 128
10/13/1989
FINAL ELECTRICAL
04P
FINAL ELECTRICAL
04P
Frame
10/16/1989
10/17/1989
PARTIAL APPROVAL
APPROVED
No Status
Inspector Name
4/9/1990
5/24/1990
Inspection Type
ROUGH 03P
FINAL ELECTRICAL
04P
Status / Result
Result Comments
APPROVED
APPROVED
Inspector Name
7/13/1990
8/14/1990
Inspection Type
ROUGH 03P
FINAL ELECTRICAL
04P
Status / Result
Result Comments
APPROVED
APPROVED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 75 of 128
Inspector Name
10/1/1990
Inspection Type
Status / Result
Result Comments
ROUGH 03P
NO ACCESS/NO
PLANS
UNDERGROUND 01P APPROVED
ROUGH 03P
PARTIAL APPROVAL
10/2/1990
10/2/1990
Inspector Name
8/21/1992
10/16/1992
Inspection Type
ROUGH 03P
FINAL ELECTRICAL
04P
Status / Result
Result Comments
PARTIAL APPROVAL
APPROVED
Inspector Name
Inspection Type
ROUGH 03P
ROUGH 03P
Status / Result
Result Comments
APPROVED
PARTIAL APPROVAL ROK ON STORAGE AREA OFF NEW ADDITION 2ND
LEVEL ABOVE PARKING LOT.
APPROVED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 76 of 128
FINAL ELECTRICAL
04P
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
4/25/1995
11/10/1995
11/30/1995
Inspection Type
ROUGH 03P
FINAL ELECTRICAL
04P
FINAL ELECTRICAL
04P
Status / Result
APPROVED
CORRECTION
NOTICE
APPROVED
Result Comments
ROK
PERMIT REQ BY ELEVATOR CONT.
FINAL OK
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 77 of 128
Inspector Name
11/30/1995
Inspection Type
FINAL ELECTRICAL
04P
Status / Result
APPROVED
Result Comments
FINAL OK
Inspector Name
12/5/1995
Inspection Type
FINAL ELECTRICAL
04P
Status / Result
Result Comments
APPROVED
Inspector Name
Inspection Type
9/11/1996
10/15/1996
ROUGH 03P
ROUGH 03P
10/24/1996
12/6/1996
12/16/1996
ROUGH 03P
ROUGH 03P
ROUGH 03P
12/20/1996
12/30/1996
2/4/1997
ROUGH 03P
ROUGH 03P
ROUGH 03P
Status / Result
Result Comments
PARTIAL APPROVAL
CORRECTION
NOTICE
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 78 of 128
2/27/1997
FINAL ELECTRICAL
04P
FINAL ELECTRICAL
04P
ROUGH 03P
FINAL ELECTRICAL
04P
ROUGH 03P
ROUGH 03P
FINAL ELECTRICAL
04P
FINAL ELECTRICAL
04P
FINAL ELECTRICAL
04P
3/11/1997
3/14/1997
3/21/1997
3/27/1997
7/9/1997
12/2/1997
6/24/1998
5/13/1999
Inspector Name
3/20/1997
Inspection Type
FINAL ELECTRICAL
04P
Status / Result
APPROVED
Result Comments
FINAL OK
Inspector Name
Inspection Type
ROUGH 03P
FINAL ELECTRICAL
04P
ROUGH 03P
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 79 of 128
1/30/2001
FINAL ELECTRICAL
04P
APPROVED
FINAL OK
Inspector Name
12/22/1999
1/7/2000
1/31/2000
2/10/2000
2/23/2000
3/7/2000
3/17/2000
3/31/2000
4/10/2000
4/24/2000
5/8/2000
6/7/2000
6/27/2000
7/14/2000
7/21/2000
8/7/2000
1/30/2001
Inspection Type
Status / Result
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
FINAL ELECTRICAL
04P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
CORRECTION
NOTICE
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
FINAL ELECTRICAL
04P
APPROVED
Result Comments
REAR RECEPTION WALL
SIDE SHEAR WALLS
MEZZ SHEAR WALL
MEZZ WALLS
ROUGH OK RETAIL SPACES
CEILING MEZZANIE, ETC.
SEE NOTES
SHOWCASE STORE, PHONE, PES
HORIZON RM
NEW H.R. OFFICES
INFO ON PANELS
TERRACE BAR RESTROOMS
SHEAR WALLS SPA LEVEL
CARRIAGE ENTRY LIGHTS OK
CANCEL
STEREO RM-MENS & WOMENS BATH, MEN'S CK INHALLWAY 224 TO H
FINAL OK
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 80 of 128
License #: 248877
Inspection Date
Inspector Name
1/13/2000
Inspection Type
FINAL ELECTRICAL
04P
Status / Result
APPROVED
Result Comments
FINAL OK
Inspector Name
Inspection Type
Status / Result
Result Comments
APN: 048H767002000
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
Inspector Name
Inspection Type
Status / Result
Result Comments
APN: 048H767002100
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 81 of 128
APN: 048H767002200
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
Inspector Name
Inspection Type
Status / Result
Result Comments
APN: 048H767002300
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
Inspector Name
Inspection Type
Status / Result
Result Comments
APN: 048H767002400
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
Inspector Name
Inspection Type
Status / Result
Result Comments
APN: 048H767002500
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 82 of 128
Inspector Name
Inspection Type
Status / Result
Result Comments
APN: 048H767002700
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
Inspector Name
Inspection Type
Status / Result
Result Comments
APN: 048H767002803
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 83 of 128
Inspector Name
Inspection Type
Status / Result
Result Comments
Status / Result
Result Comments
Inspector Name
Inspection Type
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 84 of 128
License #:
Inspection Date
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
10/16/2000
11/2/2000
11/20/2000
11/29/2000
12/18/2000
Inspection Type
ROUGH 03P
ROUGH 03P
ROUGH 03P
FINAL MECHANICAL
04P
FINAL MECHANICAL
04P
Status / Result
PARTIAL
PARTIAL
PARTIAL
PARTIAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
Result Comments
SEE CARD
SEE CARD
RMS 212,216,217,233,235,242 ROUGH OK
SEE CARD
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 85 of 128
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
5/22/2001
6/13/2001
Inspection Type
ROUGH 03P
DUCT (TYPE 1
HOOD) 03N
FINAL MECHANICAL
04P
FINAL MECHANICAL
04P
8/7/2001
1/16/2002
Status / Result
Result Comments
C/N GIVEN
HOOD NOT INSTALLED
Inspector Name
Inspection Type
7/19/2001
8/15/2001
ROUGH 03P
ROUGH 03P
8/17/2001
ROUGH 03P
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 86 of 128
8/24/2001
FINAL MECHANICAL
04P
Inspector Name
Inspection Type
10/25/2001
ROUGH 03P
10/31/2001
11/1/2001
1/16/2002
ROUGH 03P
ROUGH 03P
FINAL MECHANICAL
04P
Status / Result
CORRECTION
NOTICE
INSP CANCELLED
APPROVED
APPROVED
Result Comments
NEED INSTULATION CLIPS
CANCEL BY CONTRACTOR
ROUGH OK
FINAL
Inspector Name
DAVID C CARRILLO
8/1/2006
Inspection Type
Status / Result
Result Comments
L.P.D'S OK T-BAR T/C
F/TOM 925-768-6852 FINAL
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 87 of 128
Inspector Name
Inspection Type
DAVID C CARRILLO
FINAL MECHANICAL
04P
Status / Result
Result Comments
APPROVED
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
10/27/2014
Kevin Martin
Frame
Partial
11/4/2014
Kevin Martin
Frame
Partial
Result Comments
INFO MEETING. INFO ON EXHAUST FANS, 2" WASTE
TO SHOWERS, TESTING DWV AND H2O PIPES,
BACKING . 27OCT14 KM
RMS 140,159 UF AND INWALL CI NH , WATER
PIPING OK TO COVER. EXHAUST FANS OK TO
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 88 of 128
12/1/2014
Kevin Martin
Kevin Martin
Final Mechanical
Frame
Pass
Cancelled
Inspector Name
Inspection Type
Status / Result
6/4/2015
William Moriarty
Frame
Partial
6/4/2015
William Moriarty
Frame
Partial
6/8/2015
William Moriarty
Frame
Partial
6/8/2015
William Moriarty
Frame
Partial
6/11/2015
William Moriarty
6/11/2015
William Moriarty
7/15/2015
William Moriarty
Frame
Partial
7/15/2015
William Moriarty
Frame
Partial
Result Comments
Date: 6/4/2015 Inspection of 4th, 5th, and 6th floor
units as noted on inspection card. Found many
bathroom fan boxes need ceiling radiation dampers
installed in that ceiling sections had been removed
with new fans and/or ducting installed into open and
shared attic or joist bay space. See inspection card
notes.
Date: 6/4/2015 Inspection of 4th, 5th, and 6th floor
units as noted on inspection card. Found many
bathroom fan boxes need ceiling radiation dampers
installed in that ceiling sections had been removed
with new fans and/or ducting installed into open and
shared attic or joist bay space. See inspection card
notes.
Date: 6/8/2015 Rough mechanical for unit number
#502 fancoil above ceiling installed. Existing wet
mechanical piping, new sump pump used and piped
into existing condensate drain thru floor. OK to close
walls pending building and electrical approvals.
Date: 6/8/2015 Rough mechanical for unit number
#502 fancoil above ceiling installed. Existing wet
mechanical piping, new sump pump used and piped
into existing condensate drain thru floor. OK to close
walls pending building and electrical approvals.
Date: 6/11/2015 Primarily an informational inspection
only, walk-through of unit 505 as typical unit. No
progress at this time. Tub/shower valve to be blocked
in top and bottom due to bottom and top plate not
fire stopped.
Date: 6/11/2015 Primarily an informational inspection
only, walk-through of unit 505 as typical unit. No
progress at this time. Tub/shower valve to be blocked
in top and bottom due to bottom and top plate not
fire stopped.
Date: 7/15/2015 4th floor units rough mechanical Units #401, #402, #403, #414, 418, #419 OK for
bathroom fans with dampers, #417 to come.
Date: 7/15/2015 4th floor units rough mechanical Units #401, #402, #403, #414, 418, #419 OK for
bathroom fans with dampers, #417 to come.
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 89 of 128
Inspector Name
Inspection Type
Status / Result
8/18/2015
William Moriarty
Frame
Partial
10/6/2015
10/8/2015
David Carrillo
Kevin Martin
Frame
Frame
Partial
Pass
12/29/2015
William Moriarty
Frame
Cancelled In Field
Kevin Martin
Frame
Cancelled
Result Comments
Date: 8/18/2015 Inspection of overhead ducts for the
public space lobby area. Ducting from rooftop units at
this area to multiple linear diffusers and return
ducting (hard lid areas). Also underfloor ducting from
existing equipment up into "Pre-function Lounge" in
wall to lower wall mounted linear diffusers.
***Note*** Need to address fire rating issues at both
areas for duct penetrations thru floor and in
floor/ceiling assemblies.
Bath fans O.K. units 249,252,254 & 255 O.K. DCC
Date: 10/7/2015 3 fsd in rm 103 prefunction ok to
cover . KM.
Date: 12/29/2015 Dishwasher Type ll hood / duct not
ready.
Inspector Name
Inspection Type
Status / Result
9/29/2015
William Moriarty
Frame
Partial
12/3/2015
William Moriarty
Frame
Partial
Result Comments
Date: 9/29/2015 Partial inspection for dining room
duct to linear diffusers, inspected for approval to
complete insulation of duct, some last minute seals to
be done to diffuser connections but OK is given to
insulate.
Date: 12/3/2015 Grease duct inspection and light test
for duct runs from exhibition kitchen in front and thru
wall to back kitchen. OK given to fire wrap duct
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 90 of 128
12/7/2015
William Moriarty
Frame
Partial
12/11/2015
William Moriarty
Frame
Partial
12/21/2015
William Moriarty
Frame
Partial
1/5/2016
William Moriarty
Final Mechanical
Partial
1/28/2016
William Moriarty
Final Mechanical
Pass
William Moriarty
Frame
Cancelled
Inspector Name
12/8/1988
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 91 of 128
:
Business Name:
License #: 231348
Inspection Date
Inspector Name
11/14/1988
Inspection Type
Status / Result
Result Comments
Inspector Name
12/1/1984
11/29/1988
Inspection Type
ROUGH 03P
FINAL MECHANICAL
04P
Status / Result
Result Comments
APPROVED
APPROVED
Inspector Name
12/8/1988
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 92 of 128
Inspector Name
3/25/1986
Inspection Type
FINAL MECHANICAL
04P
FINAL MECHANICAL
04P
11/29/1988
Status / Result
Result Comments
APPROVED
APPROVED
Inspector Name
12/21/1988
12/21/1988
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
ROUGH 03P
Frame
ROUGH 03P
Status / Result
Result Comments
APPROVED
DOWNSTAIRS SEE BRYANT FROM COMSTOCK
PARTIAL APPROVAL
NO ACCESS/NO
TAKE SIGN OFF CARD--NEVER HAD ONE
PLANS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 93 of 128
9/14/1988
9/15/1988
9/21/1988
9/23/1988
10/3/1988
Frame
Frame
Frame
Frame
ROUGH 03P
10/10/1988
10/19/1988
10/21/1988
10/31/1988
Frame
Frame
Frame
ROUGH 03P
11/8/1988
11/14/1988
11/16/1988
11/18/1988
12/27/1988
12/29/1988
Frame
Frame
ROUGH
ROUGH
ROUGH
ROUGH
1/13/1989
ROUGH 03P
1/18/1989
FINAL MECHANICAL
04P
FINAL MECHANICAL
04P
FINAL MECHANICAL
04P
1/23/1989
6/29/1989
03P
03P
03P
03P
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
FEE DUE
REINSPECT
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
FEE DUE
REINSPECT
PARTIAL APPROVAL
PARTIAL APPROVAL
NO PROGRESS
APPROVED
APPROVED
NO ACCESS/NO
PLANS
FEE DUE
REINSPECT
FEE DUE
REINSPECT
FEE DUE
REINSPECT
APPROVED
Inspector Name
11/4/1988
11/4/1988
Inspection Type
ROUGH 03P
FINAL MECHANICAL
04P
Status / Result
Result Comments
APPROVED
APPROVED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 94 of 128
Inspector Name
6/21/1989
6/23/1989
6/26/1989
8/28/1989
Inspection Type
Status / Result
Result Comments
Frame
PARTIAL APPROVAL
Frame
No Status
Frame
PARTIAL APPROVAL INSPECTION FOR THE BOILER
MISCELLANEOUS 00N NO ACCESS/NO
PLANS
Frame
PARTIAL APPROVAL
FINAL MECHANICAL NO PROGRESS
04P
ROUGH 03P
APPROVED
FINAL MECHANICAL APPROVED
04P
8/29/1989
10/6/1989
10/13/1989
10/13/1989
Inspector Name
6/8/1989
Inspection Type
6/15/1989
FINAL MECHANICAL
04P
ROUGH 03P
6/20/1989
ROUGH 03P
6/29/1989
FINAL MECHANICAL
04P
ROUGH 03P
FINAL MECHANICAL
04P
10/6/1989
10/6/1989
Status / Result
Result Comments
NO ACCESS/NO
PLANS
FEE DUE
REINSPECT
NO ACCESS/NO
PLANS
CORRECTION
NOTICE
APPROVED
APPROVED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 95 of 128
Inspector Name
6/26/1989
6/26/1989
Inspection Type
ROUGH 03P
FINAL MECHANICAL
04P
Status / Result
Result Comments
APPROVED
APPROVED
Inspector Name
10/8/1990
10/9/1990
11/9/1990
Inspection Type
ROUGH 03P
ROUGH 03P
FINAL MECHANICAL
04P
Status / Result
NO PROGRESS
APPROVED
APPROVED
Result Comments
SEE JERRY
Inspector Name
Inspection Type
ROUGH 03P
ROUGH 03P
Status / Result
Result Comments
PARTIAL APPROVAL
CORRECTION
NOTICE
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 96 of 128
Inspector Name
1/25/1993
Inspection Type
FINAL MECHANICAL
04P
ROUGH 03P
1/25/1993
Status / Result
APPROVED
Result Comments
CHECK WITH LESLIE AT THE FRONT DESK
APPROVED
Inspector Name
10/29/1996
12/18/1996
Inspection Type
ROUGH 03P
GAS PIPING 03N
Status / Result
Result Comments
APPROVED
BET WATER AND CHILLED PIPING OK
PARTIAL APPROVAL GAS PIPING FORM TUNNEL TO ROOF
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 97 of 128
Business Name:
License #: 630505
Inspection Date
Inspector Name
10/21/1996
10/24/1996
12/6/1996
12/12/1996
12/17/1996
12/19/1996
2/26/1997
2/26/1997
Inspection Type
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
FINAL MECHANICAL
04P
Status / Result
NO PROGRESS
NO PROGRESS
NO PROGRESS
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
APPROVED
APPROVED
Result Comments
INFORMATION ONLY
INFO ONLY
NOT READY
MECH IN CEILING SI THRU S17 OK
LEVEL L OK
MEZZ OK
Inspector Name
Inspection Type
3/17/2000
ROUGH 03P
6/13/2000
6/13/2000
ROUGH 03P
FINAL MECHANICAL
04P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
6/20/2000
8/24/2000
8/29/2000
9/12/2000
9/14/2000
9/22/2000
Status / Result
Result Comments
CORRECTION
SEE CORRECTION NOTICE
NOTICE
PARTIAL APPROVAL
PARTIAL APPROVAL MEZZ CORRECTION
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
INSP CANCELLED
PARTIAL APPROVAL
APPROVED
TERRACE RESTROOMS
RM 252 ABOVE CEILLING
SEE SIGN OFF SHEET
CANCEL BY CONTRACTOR
LINES ROUGH OK
8-10 AND A-I, 209 OK
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 98 of 128
:
Business Name:
License #: 270088
Inspection Date
Inspector Name
6/22/2000
6/28/2000
7/13/2000
8/10/2000
8/25/2000
9/14/2000
9/22/2000
9/25/2000
10/4/2000
10/16/2000
10/16/2000
10/24/2000
10/31/2000
11/7/2000
11/13/2000
11/29/2000
Inspection Type
DWV PIPING 03N
ROUGH 03P
UNDERGROUND 01P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
GAS TEST 04N
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
FINAL PLUMBING
04P
FINAL PLUMBING
04P
FINAL PLUMBING
04P
FINAL PLUMBING
04P
12/1/2000
1/18/2001
2/2/2001
Status / Result
Result Comments
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
APPROVED
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
NO PROGRESS
MEED T.C.O.
SEE CARD
SEE SIGN OFF
SEE CARD
SEE CARD
CARRIAGE HOUSE RESTROOM ROUGH
SEE CARD
Inspector Name
5/16/2001
7/31/2001
7/31/2001
7/31/2001
Inspection Type
ROUGH 03P
ROUGH 03P
FINAL PLUMBING
04P
GAS TEST 04N
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 99 of 128
Description: Plumbing: Toilets, Basins, Showers, Floor Sinks and Drains, Urinals and Drinking Fountain.
Inspector Name
6/12/2001
6/29/2001
8/8/2001
Inspection Type
UNDERGROUND 01P
ROUGH 03P
TUB/SHOWER PAN
03N
TUB/SHOWER PAN
03N
TUB/SHOWER PAN
03N
FINAL PLUMBING
04P
GAS TEST 04N
FINAL PLUMBING
04P
8/10/2001
8/15/2001
8/24/2001
12/12/2001
1/15/2002
Status / Result
Result Comments
PARTIAL APPROVAL
PARTIAL APPROVAL
NO ACCESS/NO
PLANS
CORRECTION
NOTICE
CORRECTION
NOTICE
PARTIAL APPROVAL
APPROVED
APPROVED
CORR
SEE NOTICE
FIRST FLOOR
Inspector Name
3/15/2002
3/15/2002
3/15/2002
Inspection Type
GAS TEST 04N
FINAL PLUMBING
04P
ROUGH 03P
Status / Result
APPROVED
APPROVED
Result Comments
FINAL OK
APPROVED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Inspector Name
6/13/2006
7/24/2006
8/21/2006
8/28/2006
8/29/2006
9/22/2006
9/26/2006
DAVID
DAVID
DAVID
DAVID
C
C
C
C
CARRILLO
CARRILLO
CARRILLO
CARRILLO
10/10/2006
DAVID C CARRILLO
DAVID C CARRILLO
Inspection Type
UNDER FLOOR 02P
UNDERGROUND 01P
UNDERGROUND 01P
ROUGH 03P
Frame
FRAME 03M
FINAL PLUMBING
04P
FRAME 03M
Status / Result
PARTIAL APPROVAL
APPROVED
APPROVED
APPROVED
No Status
INSP CANCELLED
APPROVED
Result Comments
UG DWV EQUIP ROOM C-CARD
U.G. FROM POOL ROOM TO POOL OK
DAISY 925-462-1441
BALANCE OF POOL EQUIPMENT OK
DAISY, 925-462-1441
F/DASIY 925-462-1441 CANCELLED PER SUP
INSP CANCELLED
Inspector Name
WILLIAM M
MORIARTY
WILLIAM M
MORIARTY
WILLIAM M
MORIARTY
WILLIAM M
MORIARTY
WILLIAM M
BERGSTROM
WILLIAM M
MORIARTY
WILLIAM M
MORIARTY
WILLIAM M
MORIARTY
Inspection Type
Status / Result
Result Comments
ROUGH 03P
ROUGH 03P
PARTIAL APPROVAL UNIT 908 LAU ISLAND OK, RM 900 SHWR VALVE
ONLY
PARTIAL APPROVAL ALL WEADJUSTMENTS IN WALL DWV OK
ROUGH 03P
ROUGH 03P
TUB/SHOWER PAN
03N
TUB/SHOWER PAN
03N
FINAL PLUMBING
04P
FINAL PLUMBING
04P
PARTIAL APPROVAL ALL UNITS (1) TUB & TUB/SHWR VALVES SHWR
TEST TO COME
CORRECTION
PRES WONT DARIN
NOTICE
APPROVED
R/ FERNANDO 812-0717 LAST SHWER TEST &
ROUGH COMPLETE
PARTIAL APPROVAL FINAL PLBG #709, 710, 802, 901, 902,908
COMPLETED
APPROVED
FINAL INSPECTION FOR BATH ALTERATIONS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Inspector Name
WILLIAM M
MORIARTY
WILLIAM M
MORIARTY
DAVID C CARRILLO
WILLIAM M
MORIARTY
DAVID C CARRILLO
Inspection Type
ROUGH 03P
ROUGH 03P
ROUGH 03P
FINAL PLUMBING
04P
FINAL PLUMBING
04P
Status / Result
Result Comments
APPROVED
Inspector Name
Inspection Type
Status / Result
5/18/2015
William Moriarty
Frame
Partial
5/28/2015
William Moriarty
Frame
Partial
Result Comments
Date: 5/18/2015 Informational inspection only on
plumbing. No progress at this time.
Date: 5/27/2015 Rough DWV underfloor an in wall for
unit #501, #601, #605-#606. Underfloor and in-wall
OK to cover less H20 completed for #601. Above
units will require tub/shower and/or shower pan
testing. Check #601 for valves in common wall
protection.
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Inspector Name
Inspection Type
10/27/2014
Kevin Martin
Frame
10/31/2014
William Moriarty
Frame
11/4/2014
Kevin Martin
Frame
11/14/2014
Kevin Martin
Frame
11/17/2014
Kevin Martin
Frame
11/18/2014
12/1/2014
William Moriarty
Kevin Martin
Kevin Martin
Frame
Final Plumbing
Frame
Final Plumbing
Frame
Kevin Martin
Status / Result
Result Comments
Partial
Inspector Name
William Moriarty
Inspection Type
Frame
Status / Result
Partial
Result Comments
Date: 6/4/2015 Inspection for units on 4th, 5th, and
6th floor for under-floor plumbing alterations and in-
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
6/4/2015
William Moriarty
Frame
Partial
7/1/2015
William Moriarty
Frame
Partial
7/1/2015
William Moriarty
Frame
Partial
7/6/2015
David Carrillo
Frame
Partial
7/6/2015
David Carrillo
Frame
Partial
7/8/2015
William Moriarty
Frame
Partial
7/8/2015
William Moriarty
Frame
Partial
7/15/2015
William Moriarty
Frame
Partial
7/15/2015
William Moriarty
Frame
Partial
7/17/2015
William Moriarty
Frame
Partial
7/17/2015
William Moriarty
Frame
Partial
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
7/20/2015
William Moriarty
Frame
Partial
7/20/2015
William Moriarty
Frame
Partial
7/23/2015
William Moriarty
Frame
Partial
7/23/2015
William Moriarty
Frame
Partial
7/27/2015
William Moriarty
Frame
Partial
7/27/2015
William Moriarty
Frame
Partial
7/30/2015
William Moriarty
Frame
Partial
7/30/2015
William Moriarty
Frame
Partial
8/4/2015
William Moriarty
Frame
Partial
8/4/2015
William Moriarty
Frame
Partial
8/7/2015
William Moriarty
Frame
Partial
8/7/2015
William Moriarty
Frame
Partial
8/10/2015
William Moriarty
Frame
Partial
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
8/10/2015
William Moriarty
Frame
Partial
8/18/2015
William Moriarty
Frame
Partial
8/18/2015
William Moriarty
Frame
Partial
8/20/2015
William Moriarty
Frame
Partial
8/20/2015
William Moriarty
Frame
Partial
8/24/2015
William Moriarty
Frame
Partial
8/24/2015
William Moriarty
Frame
Partial
8/28/2015
William Moriarty
Frame
Partial
8/28/2015
William Moriarty
Frame
Partial
9/1/2015
William Moriarty
Frame
Partial
9/1/2015
William Moriarty
Frame
Partial
Date: 8/10/2015 Rough plumbing underfloor and inwall for units #333, #342, #344, #350, and #351
after 5-sided or rated box is installed at tub/shower
valve. All other than #351 have 5-sided or rated
boxes. Need to address side wall bath fans for units
#342, #350, and #351 with building inspector for any
required protection of openings. See attached photo
of #350.
Date: 8/10/2015 Rough plumbing underfloor and inwall for units #333, #342, #344, #350, and #351
after 5-sided or rated box is installed at tub/shower
valve. All other than #351 have 5-sided or rated
boxes. Need to address side wall bath fans for units
#342, #350, and #351 with building inspector for any
required protection of openings. See attached photo
of #350.
Date: 8/18/2015 Underfloor and in-wall plumbing
rough alterations for units #347, #348, #352, #353,
#354, and #355. All tub/shower valves verified as
being installed with fire rated valve boxes. Ok to
cover floors and walls pending building inspector
approvals.
Date: 8/18/2015 Underfloor and in-wall plumbing
rough alterations for units #347, #348, #352, #353,
#354, and #355. All tub/shower valves verified as
being installed with fire rated valve boxes. Ok to
cover floors and walls pending building inspector
approvals.
Date: 8/20/2015 Tub tests for units #341, #343,
#344, #351 and shower base membranes tested for
units #333, #342, #345, and unit #346. Units above
OK to complete.
Date: 8/20/2015 Tub tests for units #341, #343,
#344, #351 and shower base membranes tested for
units #333, #342, #345, and unit #346. Units above
OK to complete.
Date: 8/24/2015 Shower base membrane tests for
units #341 and #436 completed.
Date: 8/24/2015 Shower base membrane tests for
units #341 and #436 completed.
Date: 8/28/2015 Shower base membrane tests for
units #343 and #349. Presidential suite preliminary,
allow vent take-offs for WC, Tub, and Shower to be
just above flat so as to not require extreme increased
elevation to floor. Vents OK'd to be run flat from takeoff.
Date: 8/28/2015 Shower base membrane tests for
units #343 and #349. Presidential suite preliminary,
allow vent take-offs for WC, Tub, and Shower to be
just above flat so as to not require extreme increased
elevation to floor. Vents OK'd to be run flat from takeoff.
Date: 9/1/2015 Rough underfloor and in-wall
plumbing for units #327, #328, #329, #330, #331,
and #332. Units #330 and #332 need trap arms
changed to 2" with vent taken off vertically behind
the far wall, Floor cover OK for all but these units and
walls OK for all those listed above. Verified valve
boxes are fire rated and bath fans have radiation
dampers installed.
Date: 9/1/2015 Rough underfloor and in-wall
plumbing for units #327, #328, #329, #330, #331,
and #332. Units #330 and #332 need trap arms
changed to 2" with vent taken off vertically behind
the far wall, Floor cover OK for all but these units and
walls OK for all those listed above. Verified valve
boxes are fire rated and bath fans have radiation
dampers installed.
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
9/3/2015
William Moriarty
Frame
Partial
9/3/2015
William Moriarty
Frame
Partial
9/8/2015
William Moriarty
Frame
Partial
9/8/2015
William Moriarty
Frame
Partial
9/12/2015
William Moriarty
Frame
Partial
9/12/2015
William Moriarty
Frame
Partial
9/16/2015
William Moriarty
Frame
Partial
9/16/2015
William Moriarty
Frame
Partial
9/17/2015
William Moriarty
Frame
Partial
9/17/2015
William Moriarty
Frame
Partial
9/24/2015
William Moriarty
Frame
Partial
9/24/2015
William Moriarty
Frame
Partial
9/29/2015
William Moriarty
Frame
Partial
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
9/29/2015
William Moriarty
Frame
10/1/2015
William Moriarty
Frame
10/1/2015
William Moriarty
Frame
10/6/2015
David Carrillo
Frame
10/6/2015
David Carrillo
Frame
10/13/2015
William Moriarty
Frame
10/13/2015
William Moriarty
Frame
10/15/2015
William Moriarty
Frame
10/15/2015
William Moriarty
Frame
10/21/2015
William Moriarty
Frame
10/21/2015
William Moriarty
Frame
10/23/2015
William Moriarty
Frame
10/23/2015
William Moriarty
Frame
10/27/2015
William Moriarty
Frame
Partial
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
10/27/2015
William Moriarty
Frame
Partial
10/29/2015
William Moriarty
Frame
Partial
10/29/2015
William Moriarty
Frame
Partial
11/3/2015
William Moriarty
First Floor
Partial
11/3/2015
William Moriarty
First Floor
Partial
11/6/2015
William Moriarty
Foundation
Partial
11/6/2015
William Moriarty
Foundation
Partial
11/18/2015
William Moriarty
First Floor
Partial
11/18/2015
William Moriarty
First Floor
Partial
11/19/2015
William Moriarty
Foundation
Partial
11/19/2015
William Moriarty
Foundation
Partial
11/24/2015
David Carrillo
Frame
Partial
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
11/24/2015
David Carrillo
Frame
11/30/2015
William Moriarty
Frame
11/30/2015
William Moriarty
Frame
12/1/2015
William Moriarty
First Floor
12/1/2015
William Moriarty
First Floor
12/3/2015
William Moriarty
Frame
12/3/2015
William Moriarty
Frame
12/9/2015
William Moriarty
Frame
12/9/2015
William Moriarty
Frame
12/11/2015
William Moriarty
Frame
12/11/2015
William Moriarty
Frame
12/15/2015
12/15/2015
12/17/2015
William Moriarty
William Moriarty
Kevin Martin
Frame
Frame
Frame
12/17/2015
Kevin Martin
Frame
12/22/2015
William Moriarty
Frame
12/22/2015
William Moriarty
Frame
12/29/2015
William Moriarty
Frame
12/29/2015
William Moriarty
Frame
12/31/2015
William Moriarty
Frame
Partial
Rough for 223 less tub test & rough O.K. for 215.
DCC
Partial
Date: 11/30/2015 Final inspections for rooms #241
thru #267 completed.
Partial
Date: 11/30/2015 Final inspections for rooms #241
thru #267 completed.
Partial
Date: 12/1/2015 Tub test done for unit #232, shower
pan inspections and test for units #226, #227, #228
completed and approved. Cover OK for units noted.
Partial
Date: 12/1/2015 Tub test done for unit #232, shower
pan inspections and test for units #226, #227, #228
completed and approved. Cover OK for units noted.
Partial
Date: 12/3/2015 Rough underfloor plumbing DWV for
unit #166. In-wall plumbing to come. Rough
underfloor and in-wall DWV and H2o for units #100,
#144, #145, #146, and #152 inspected and OK to
cover floor and walls but less bath fans and dampers.
Partial
Date: 12/3/2015 Rough underfloor plumbing DWV for
unit #166. In-wall plumbing to come. Rough
underfloor and in-wall DWV and H2o for units #100,
#144, #145, #146, and #152 inspected and OK to
cover floor and walls but less bath fans and dampers.
Partial
Date: 12/9/2015 Rough underfloor and in wall
plumbing for units #141, #142, and #147. Verified
rated box for valves and radiation damper at exhaust
fans. Floor and walls OK to cover on units noted.
Partial
Date: 12/9/2015 Rough underfloor and in wall
plumbing for units #141, #142, and #147. Verified
rated box for valves and radiation damper at exhaust
fans. Floor and walls OK to cover on units noted.
Partial
Date: 12/11/2015 Rough underfloor and in-wall
plumbing for unit #148 and #150. Rated valve box
and radiation dampers OK. Units OK to cover as
noted.
Partial
Date: 12/11/2015 Rough underfloor and in-wall
plumbing for unit #148 and #150. Rated valve box
and radiation dampers OK. Units OK to cover as
noted.
Cancelled In Office Date: 12/15/2015 Inspection cancelled by Brandon.
Cancelled In Office Date: 12/15/2015 Inspection cancelled by Brandon.
Pass
Date: 12/17/2015 Rm 145 tub test ok. Rms
149,151,153 Dwv and water ok to cover. KM.
Pass
Date: 12/17/2015 Rm 145 tub test ok. Rms
149,151,153 Dwv and water ok to cover. KM.
Partial
Date: 12/22/2015 Rough DWV underfloor and in-wall
DWV and H2o for rooms #154, #155, #156, #160.
Tub test for room #146, and in-wall plumbing for
room #166 (underfloor inspected previously). All
noted rooms have radiation dampers on bath exhaust
fans and fire rated valve boxes. Walls OK on rooms
noted.
Partial
Date: 12/22/2015 Rough DWV underfloor and in-wall
DWV and H2o for rooms #154, #155, #156, #160.
Tub test for room #146, and in-wall plumbing for
room #166 (underfloor inspected previously). All
noted rooms have radiation dampers on bath exhaust
fans and fire rated valve boxes. Walls OK on rooms
noted.
Partial
Date: 12/29/2015 Rough underfloor and in-wall
plumbing DWV and H2o for rooms #157, #162, and
#163. Underfloor and in-wall cover OK.
Partial
Date: 12/29/2015 Rough underfloor and in-wall
plumbing DWV and H2o for rooms #157, #162, and
#163. Underfloor and in-wall cover OK.
Cancelled In Office Date: 12/31/2015 Inspection cancelled in office by
Brandon.
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
12/31/2015
William Moriarty
Frame
1/4/2016
William Moriarty
Frame
1/4/2016
William Moriarty
Frame
1/5/2016
William Moriarty
Frame
1/5/2016
William Moriarty
Frame
1/7/2016
William Moriarty
Frame
1/7/2016
William Moriarty
Frame
1/8/2016
William Moriarty
Frame
1/8/2016
William Moriarty
Frame
1/11/2016
William Moriarty
Frame
1/11/2016
William Moriarty
Frame
1/28/2016
William Moriarty
Frame
1/28/2016
William Moriarty
Frame
2/1/2016
William Moriarty
Frame
2/1/2016
William Moriarty
Frame
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Frame
Scheduled
Scheduled
Scheduled
Scheduled
Scheduled
Cancelled
Cancelled
Scheduled
Scheduled
Scheduled
Scheduled
Scheduled
Scheduled
Scheduled
Inspector Name
Inspection Type
9/12/2015
William Moriarty
Frame
9/16/2015
William Moriarty
Frame
9/18/2015
William Moriarty
Frame
9/21/2015
10/9/2015
David Carrillo
William Moriarty
Frame
Frame
11/18/2015
William Moriarty
Final Plumbing
Status / Result
Result Comments
Partial
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
1/15/2016
David Carrillo
Frame
Partial
Inspector Name
William Moriarty
Inspection Type
Final Plumbing
Status / Result
Pass
Result Comments
Date: 7/27/2015 Final inspection for the replacement
of one (1) floor receptor for kettle and dishwasher
piping replaced and/or re-piped. Final for permit
scope of work approved.
Inspector Name
Inspection Type
Status / Result
10/26/2015
William Moriarty
Frame
Partial
10/28/2015
William Moriarty
Frame
Partial
11/6/2015
William Moriarty
Frame
Cancelled In Field
11/18/2015
William Moriarty
Frame
Pass
Result Comments
Date: 10/26/2015 Underfloor DWV for restaurant
renovation in kitchen (West) DWV for floor sinks, floor
drains, etc. test OK and OK given to cover floor, Inwall plumbing to come at this area. Floor OK.
Date: 10/28/2015 In wall DWV, H2o, and gas rough
piping in main and exhibition kitchen at 1st floor.
Walls OK after added isolation to copper lines, add
strapping, install vent stub-out for 3-compartment
sink for future tie-in at final. Walls OK this area, area
at South side to come to bar.
Date: 11/6/2015 Not ready for inspection, no
progress.
Date: 11/18/2015 Rough plumbing for 1st floor
kitchen areas including kitchen, bar area, etc. Last
inspection for in-wall plumbing including DWV, H2o,
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
1/5/2016
William Moriarty
Final Plumbing
Partial
1/28/2016
William Moriarty
Final Plumbing
Pass
Inspector Name
Inspection Type
12/31/1987
1/7/1988
5/10/1988
5/12/1988
10/11/1988
10/12/1988
11/1/1988
11/9/1988
1/17/1989
Frame
Frame
ROUGH 03P
ROUGH 03P
Frame
Frame
Frame
UNDER FLOOR 02P
ROUGH 03P
2/27/1989
2/27/1989
ROUGH 03P
FINAL PLUMBING
04P
Status / Result
Result Comments
PARTIAL APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
APPROVED
PARTIAL APPROVAL
No Status
OUT SIDE PUMP ROOM
PARTIAL APPROVAL
APPROVED
FEE DUE
REINSPECT
APPROVED
APPROVED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
License #: 392967
Inspection Date
Inspector Name
1/25/1988
2/16/1988
2/22/1988
5/12/1988
5/16/1988
6/8/1988
6/10/1988
6/14/1988
6/17/1988
7/7/1988
7/19/1988
7/20/1988
8/12/1988
9/26/1988
9/26/1988
9/28/1988
9/29/1988
10/10/1988
10/18/1988
10/21/1988
10/25/1988
10/31/1988
11/1/1988
11/1/1988
11/3/1988
11/4/1988
11/8/1988
11/17/1988
11/21/1988
11/29/1988
12/22/1988
12/27/1988
1/13/1989
1/20/1989
1/24/1989
2/27/1989
2/28/1989
Inspection Type
Status / Result
Frame
PARTIAL APPROVAL
Frame
PARTIAL APPROVAL
Frame
PARTIAL APPROVAL
Frame
PARTIAL APPROVAL
Frame
PARTIAL APPROVAL
Frame
PARTIAL APPROVAL
Frame
PARTIAL APPROVAL
Frame
PARTIAL APPROVAL
Frame
PARTIAL APPROVAL
Frame
PARTIAL APPROVAL
Frame
PARTIAL APPROVAL
INFORMATION 00N APPROVED
ROUGH 03P
PARTIAL APPROVAL
Frame
PARTIAL APPROVAL
MISCELLANEOUS 00N APPROVED
Frame
PARTIAL APPROVAL
MISCELLANEOUS 00N CORRECTION
NOTICE
Frame
No Status
ROUGH 03P
FEE DUE
REINSPECT
ROUGH 03P
PARTIAL APPROVAL
ROUGH 03P
FEE DUE
REINSPECT
MISCELLANEOUS 00N PARTIAL APPROVAL
Frame
PARTIAL APPROVAL
MISCELLANEOUS 00N APPROVED
ROUGH 03P
FEE DUE
REINSPECT
Frame
No Status
Frame
PARTIAL APPROVAL
ROUGH 03P
PARTIAL APPROVAL
Frame
PARTIAL APPROVAL
Frame
PARTIAL APPROVAL
Frame
PARTIAL APPROVAL
ROUGH 03P
FEE DUE
REINSPECT
Frame
PARTIAL APPROVAL
ROUGH 03P
PARTIAL APPROVAL
MISCELLANEOUS 00N APPROVED
FINAL PLUMBING
APPROVED
04P
UTILITY RELEASE
APPROVED
04N
Result Comments
EARLY AFTERNOON
NOT AFTER 3:00 PM
NOT AFTER 3:00 PM
NOT AFTER 3 PM
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Inspector Name
2/22/1988
5/12/1988
Inspection Type
Status / Result
Result Comments
Frame
PARTIAL APPROVAL
MISCELLANEOUS 00N FEE DUE
REINSPECT
ROUGH 03P
APPROVED
FINAL PLUMBING
APPROVED
04P
5/18/1988
1/17/1989
Inspector Name
1/23/1989
1/23/1989
1/23/1989
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
UNDER FLOOR 02P
ROUGH 03P
FINAL PLUMBING
04P
Status / Result
Result Comments
APPROVED
APPROVED
APPROVED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Inspector Name
7/10/1989
7/26/1989
10/6/1989
Inspection Type
UNDER FLOOR 02P
ROUGH 03P
FINAL PLUMBING
04P
Status / Result
Result Comments
APPROVED
APPROVED
APPROVED
Inspector Name
3/6/1990
4/16/1990
5/9/1990
1/7/1992
Inspection Type
Status / Result
Result Comments
Frame
PARTIAL APPROVAL
ROUGH 03P
INSP CANCELLED
ROUGH 03P
APPROVED
MISCELLANEOUS 00N EXPIRED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Inspector Name
7/17/1990
11/8/1990
11/14/1990
Inspection Type
ROUGH 03P
ROUGH 03P
FINAL PLUMBING
04P
Status / Result
Result Comments
APPROVED
PARTIAL APPROVAL
APPROVED
Inspector Name
9/20/1990
9/26/1990
11/9/1990
Inspection Type
UNDER FLOOR 02P
ROUGH 03P
FINAL PLUMBING
04P
Status / Result
Result Comments
APPROVED
APPROVED
APPROVED
Inspector Name
Inspection Type
8/14/1992
ROUGH 03P
10/2/1992
10/2/1992
ROUGH 03P
Status / Result
Result Comments
CORRECTION
NOTICE
APPROVED
APPROVED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
FINAL PLUMBING
04P
Inspector Name
10/13/1993
1/5/1994
5/4/1994
Inspection Type
UNDER FLOOR 02P
ROUGH 03P
FINAL PLUMBING
04P
Status / Result
APPROVED
APPROVED
APPROVED
Result Comments
$31.00 FEES DUE
Inspector Name
9/20/1994
Inspection Type
ROUGH 03P
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Inspector Name
6/13/1995
6/13/1995
Inspection Type
ROUGH 03P
FINAL PLUMBING
04P
Status / Result
APPROVED
APPROVED
Result Comments
RGH AND FINAL
Inspector Name
7/19/1996
7/26/1996
7/30/1996
8/16/1996
8/22/1996
10/3/1996
10/9/1996
10/24/1996
11/5/1996
11/15/1996
11/22/1996
12/18/1996
1/10/1997
2/10/1997
2/25/1997
3/4/1997
3/4/1997
9/11/1997
1/26/1998
Inspection Type
UNDERGROUND 01P
UNDER FLOOR 02P
UNDER FLOOR 02P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
TUB/SHOWER PAN
03N
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
ROUGH 03P
FINAL PLUMBING
04P
GAS TEST 04N
FINAL PLUMBING
04P
FINAL PLUMBING
04P
FINAL PLUMBING
04P
Status / Result
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
PARTIAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
APPROVAL
PARTIAL APPROVAL
PARTIAL APPROVAL
APPROVED
INSP CANCELLED
APPROVED
PARTIAL APPROVAL
CORRECTION
NOTICE
APPROVED
PARTIAL APPROVAL
Result Comments
SEE PLANS ON JOB FOR SECTIONS APPROVED
SEE PLANS FOR SECTIONS APPROVED
PA ON UNDERFLOOR
SEE PLANS
PARTIAL RGH OK SEE PLANS
SEE PLANS
BUSY TUBS AND SHOWERS FINISH FLOOR
1ST FLOOR TUBS O.K.
DWV H2O OK LESS 1 BATH T/C
ROUGH LESS GAS PIPE & TEST
ROUGH/JIM/848-0279
ROOF DRAIN & LEADERS OK CLOSET RINGS OK
INDIRECT DRAIN & H20 FOR ICE MACHINES OK
VACCUUM BR ON HAND SHOWER DOOR/FOOL AT
LAVY'S
GAS TEST OK
FINAL OK LESS LAVATORIES
NO PROGRESS
APPROVED
FINAL
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Inspector Name
3/4/1997
3/4/1997
Inspection Type
ROUGH 03P
FINAL PLUMBING
04P
Status / Result
APPROVED
APPROVED
Result Comments
FINAL OK
FINAL OK
Inspector Name
6/25/1997
8/27/1997
Inspection Type
ROUGH 03P
FINAL PLUMBING
04P
Status / Result
APPROVED
APPROVED
Result Comments
ROUGH OK
FINAL/O.K.
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
2/9/2000
2/17/2000
3/17/2000
UNDERGROUND 01P
ROUGH 03P
FINAL PLUMBING
04P
UNDERGROUND 01P
ROUGH 03P
4/18/2000
6/1/2000
Inspector Name
Inspection Type
Status / Result
Result Comments
APN: 048H767002700
Unit #:
Description: Major Conditional Use Permit and Regular Design Review for improvements to the 22-acre Claremont Hotel
site to create expansions to the existing club, the Increase of resort facilities, and the creation of 44 residential dwellings
units.
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
:
Business Name:
License #:
Inspection Date
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
8/24/2001
9/19/2001
Status / Result
NO ACCESS/NO
PLANS
APPROVED
Result Comments
NEED PLANS
FINAL OK
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Inspector Name
Bill Bergstrom
Bill Bergstrom
Inspection Type
Final Project
Frame
Status / Result
Pass
Pass
Result Comments
Date: 10/27/2015 Rebar for monument sign.
Date: 11/5/2015 Piers for three flagpoles OK
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
compliance. Comply with all terms of City of Oakland Public Works Standards, Street Excavation Rules, Revised March 2015
and City Council Ordinance No. 13300 C.M.S. Five day prior notice required for work lasting five days or less in
business/commercial districts; 72 hour notice in residential districts. Ten day prior notice required for work lasting six days
or more in all districts. USA # and date must be provided in order to have a permit issued. Permit valid 90 days. Call PWA
INSPECTION prior to start: 510-238-3651 or email PWA_inspections@oaklandnet.com. USA #W623500978
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
Status / Result
Result Comments
Inspector Name
Inspection Type
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Address: 41 TUNNEL RD
APN: 064 422500500
Unit #:
Description: Repair/replace sewer lateral and EXCAVATE in PUBLIC RIGHT-OF-WAY. Overflow device may be needed. Call
PWA INSPECTION prior to start: 510-238-3651. 4th FLOOR.
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
:
Business Name:
License #: 604196
Inspection Date
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
6/4/1998
6/10/1998
Inspection Type
Frame
Frame
Status / Result
Result Comments
APPROVED
INSP CANCELLED
CABARET APPROVED
CANCEL
Inspector Name
Inspection Type
6/4/1998
Frame
6/10/1998
Frame
Status / Result
CORRECTION
NOTICE
INSP CANCELLED
Result Comments
INSP. BY S.L. - C/N
CANCEL
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Inspector Name
Inspection Type
Status / Result
Result Comments
Inspector Name
Inspection Type
Status / Result
Result Comments
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 1 of 141
COMMENTER
PTS
COMMENTS
ANNUAL INSPECTION - HOUSE KEEPING STANDARDS CLAREMONT HOTEL
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 2 of 141
Business Name:
License #:
COMMENT DATE
7/26/2000
7/26/2000
COMMENTER
PTS
PTS
COMMENTS
NOISE: FAN RUNNING 24HRS 7 DAYS A WEEK
NOISE: FAN RUNNING 24HRS 7 DAYS A WEEK
COMMENTER
4/8/2005
PTS
1/21/2014
PTS
1/21/2014
PTS
COMMENTS
EXCESSIVE NOISE FROM A/C UNIT THAT WAS INSTALLED WITHOUT PERMIT. CONSTRUCTED
ENCLOSURE WITHOUT ZONING APROVAL & WITHOUT PERMIT.
|Verified that an 80 ton air conditioning unit had been installed and|that an enclosure was
constructed around the new roof top unit.|Issued S.W.O. to head maintenance engineer (Chase)
and explained to|him that he needs a mechanical and electrical permit for the new|A.C. unit and
that he needs zoning aproval and a building permit.|>>> 04/11/2005 14:17:00 MCBRI#E
0104|OWNERSHIP VERIFIED/LA WANDA|>>> 04/21/2005 11:46:57 WYRIC#L
0015|05/09/05|Visited complainants property on 210 Stonewall. Hotel stated|that the air
conditioner unit was turned on. Noise measurment readings|were about 55 dBA at 2:30-3:00
p.m.|ws|>>> 05/12/2005 08:54:51 SINGM#WJ 0067|LEFT MESSAGE WITH ENGINEER TO
CONTACT ME ABOUT THE PERMITS.|>>> 06/06/2005 15:55:52 MCBRI#E 0292|VERIFIED
ADDRESS SAME AS WIN2DATA|>>> 06/30/2005 11:22:52 ACTEMP1 0108|On July 8, 2005 case
file no. LMD05-195 (apn048H-7663-035-00)|was aproved by design review to construct permanent
screening around|the new a/c unit installed.|I contacted engineer Chase Newton from the
claremont hotel at|510-549-8586 and informed him that the city would need a decibal test|report
submitted from a private testing agency for review before|permits can be issued.|>>> 04/18/2006
14:14:25 MCBRI#E 0192|9/16/05 recieved decibal test results from All Electric 143 Belle
ln.|Pleasant Hill Ca. 94523 (925-944-5706).|>>> 04/18/2006 14:32:50 MCBRI#E 0192|Discussed
case with supervisor Gary L. and we reviewed test results|and determined that readings were
satisfactory and will aprove permit|to be issued. Contacted Chase Newton and made 3:00 p.m.
apointment|for 4/20/06 to meet at permit counter to obtain permits.|>>> 04/18/2006 14:36:54
MCBRI#E 0192|Met with Mr. Newton at counter and he needs to have engineered plans|for roof
structure support of new a/c unit submitted for plan check|aproval before permits can be issued.
allowing 30 days for plans to|be submitted.|>>> 04/20/2006 15:48:43 MCBRI#E 0120|Jonathan
Schelding- I called,left message that ac unit appears OK. Tes|t was 55db. Code allows up to 60 db
for commercial ac. OMC 17.120.050J|.GL.|>>> 05/24/2006 17:55:42 LEPOR#G 0330|I spoke to
the General Manager, Mike Churckowski. He said that they tu|rned in the engineered plans and are
waiting for the City to issue the|permit. He said that they are willing to put up sound attenuation,
if|the complainants are willing to pay for it. They have multiple approv|als to acquire from Planning
(such as historical considerations ) befo|re they can put things up on the building.Mike also stated
that the co|mplainants removed large trees on the Claremont property that had prev|iously blocked
sound.|I spoke to Jonathon Schelding(complaiant 502-6735)and told him what t|he General
Manager said. He says that these things aren't true and tha|t there are previous injunctions against
the hotel for noise. He is go|ing to pursue the case from that angle. I am closing the case for
now,|as there does not appear to be anything else we can do at this point.|>>> 07/11/2006
14:05:50 LEPOR#G 0419|This is based on what Ray Derania told me that the City Attorny's offi|ce
said the noise ord. is really unenforcable.GL.|>>> 07/11/2006 14:07:26 LEPOR#G 0419
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 3 of 141
1/21/2014
PTS
|Verified that an 80 ton air conditioning unit had been installed and|that an enclosure was
constructed around the new roof top unit.|Issued S.W.O. to head maintenance engineer (Chase)
and explained to|him that he needs a mechanical and electrical permit for the new|A.C. unit and
that he needs zoning aproval and a building permit.|>>> 04/11/2005 14:17:00 MCBRI#E
0104|OWNERSHIP VERIFIED/LA WANDA|>>> 04/21/2005 11:46:57 WYRIC#L
0015|05/09/05|Visited complainants property on 210 Stonewall. Hotel stated|that the air
conditioner unit was turned on. Noise measurment readings|were about 55 dBA at 2:30-3:00
p.m.|ws|>>> 05/12/2005 08:54:51 SINGM#WJ 0067|LEFT MESSAGE WITH ENGINEER TO
CONTACT ME ABOUT THE PERMITS.|>>> 06/06/2005 15:55:52 MCBRI#E 0292|VERIFIED
ADDRESS SAME AS WIN2DATA|>>> 06/30/2005 11:22:52 ACTEMP1 0108|On July 8, 2005 case
file no. LMD05-195 (apn048H-7663-035-00)|was aproved by design review to construct permanent
screening around|the new a/c unit installed.|I contacted engineer Chase Newton from the
claremont hotel at|510-549-8586 and informed him that the city would need a decibal test|report
submitted from a private testing agency for review before|permits can be issued.|>>> 04/18/2006
14:14:25 MCBRI#E 0192|9/16/05 recieved decibal test results from All Electric 143 Belle
ln.|Pleasant Hill Ca. 94523 (925-944-5706).|>>> 04/18/2006 14:32:50 MCBRI#E 0192|Discussed
case with supervisor Gary L. and we reviewed test results|and determined that readings were
satisfactory and will aprove permit|to be issued. Contacted Chase Newton and made 3:00 p.m.
apointment|for 4/20/06 to meet at permit counter to obtain permits.|>>> 04/18/2006 14:36:54
MCBRI#E 0192|Met with Mr. Newton at counter and he needs to have engineered plans|for roof
structure support of new a/c unit submitted for plan check|aproval before permits can be issued.
allowing 30 days for plans to|be submitted.|>>> 04/20/2006 15:48:43 MCBRI#E 0120|Jonathan
Schelding- I called,left message that ac unit appears OK. Tes|t was 55db. Code allows up to 60 db
for commercial ac. OMC 17.120.050J|.GL.|>>> 05/24/2006 17:55:42 LEPOR#G 0330|I spoke to
the General Manager, Mike Churckowski. He said that they tu|rned in the engineered plans and are
waiting for the City to issue the|permit. He said that they are willing to put up sound attenuation,
if|the complainants are willing to pay for it. They have multiple approv|als to acquire from Planning
(such as historical considerations ) befo|re they can put things up on the building.Mike also stated
that the co|mplainants removed large trees on the Claremont property that had prev|iously blocked
sound.|I spoke to Jonathon Schelding(complaiant 502-6735)and told him what t|he General
Manager said. He says that these things aren't true and tha|t there are previous injunctions against
the hotel for noise. He is go|ing to pursue the case from that angle. I am closing the case for
now,|as there does not appear to be anything else we can do at this point.|>>> 07/11/2006
14:05:50 LEPOR#G 0419|This is based on what Ray Derania told me that the City Attorny's offi|ce
said the noise ord. is really unenforcable.GL.|>>> 07/11/2006 14:07:26 LEPOR#G 0419
|Verified that an 80 ton air conditioning unit had been installed and|that an enclosure was
constructed around the new roof top unit.|Issued S.W.O. to head maintenance engineer (Chase)
and explained to|him that he needs a mechanical and electrical permit for the new|A.C. unit and
that he needs zoning aproval and a building permit.|>>> 04/11/2005 14:17:00 MCBRI#E
0104|OWNERSHIP VERIFIED/LA WANDA|>>> 04/21/2005 11:46:57 WYRIC#L
0015|05/09/05|Visited complainants property on 210 Stonewall. Hotel stated|that the air
conditioner unit was turned on. Noise measurment readings|were about 55 dBA at 2:30-3:00
p.m.|ws|>>> 05/12/2005 08:54:51 SINGM#WJ 0067|LEFT MESSAGE WITH ENGINEER TO
CONTACT ME ABOUT THE PERMITS.|>>> 06/06/2005 15:55:52 MCBRI#E 0292|VERIFIED
ADDRESS SAME AS WIN2DATA|>>> 06/30/2005 11:22:52 ACTEMP1 0108|On July 8, 2005 case
file no. LMD05-195 (apn048H-7663-035-00)|was aproved by design review to construct permanent
screening around|the new a/c unit installed.|I contacted engineer Chase Newton from the
claremont hotel at|510-549-8586 and informed him that the city would need a decibal test|report
submitted from a private testing agency for review before|permits can be issued.|>>> 04/18/2006
14:14:25 MCBRI#E 0192|9/16/05 recieved decibal test results from All Electric 143 Belle
ln.|Pleasant Hill Ca. 94523 (925-944-5706).|>>> 04/18/2006 14:32:50 MCBRI#E 0192|Discussed
case with supervisor Gary L. and we reviewed test results|and determined that readings were
satisfactory and will aprove permit|to be issued. Contacted Chase Newton and made 3:00 p.m.
apointment|for 4/20/06 to meet at permit counter to obtain permits.|>>> 04/18/2006 14:36:54
MCBRI#E 0192|Met with Mr. Newton at counter and he needs to have engineered plans|for roof
structure support of new a/c unit submitted for plan check|aproval before permits can be issued.
allowing 30 days for plans to|be submitted.|>>> 04/20/2006 15:48:43 MCBRI#E 0120|Jonathan
Schelding- I called,left message that ac unit appears OK. Tes|t was 55db. Code allows up to 60 db
for commercial ac. OMC 17.120.050J|.GL.|>>> 05/24/2006 17:55:42 LEPOR#G 0330|I spoke to
the General Manager, Mike Churckowski. He said that they tu|rned in the engineered plans and are
waiting for the City to issue the|permit. He said that they are willing to put up sound attenuation,
if|the complainants are willing to pay for it. They have multiple approv|als to acquire from Planning
(such as historical considerations ) befo|re they can put things up on the building.Mike also stated
that the co|mplainants removed large trees on the Claremont property that had prev|iously blocked
sound.|I spoke to Jonathon Schelding(complaiant 502-6735)and told him what t|he General
Manager said. He says that these things aren't true and tha|t there are previous injunctions against
the hotel for noise. He is go|ing to pursue the case from that angle. I am closing the case for
now,|as there does not appear to be anything else we can do at this point.|>>> 07/11/2006
14:05:50 LEPOR#G 0419|This is based on what Ray Derania told me that the City Attorny's offi|ce
said the noise ord. is really unenforcable.GL.|>>> 07/11/2006 14:07:26 LEPOR#G 0419
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 4 of 141
1/21/2014
PTS
1/21/2014
PTS
|Verified that an 80 ton air conditioning unit had been installed and|that an enclosure was
constructed around the new roof top unit.|Issued S.W.O. to head maintenance engineer (Chase)
and explained to|him that he needs a mechanical and electrical permit for the new|A.C. unit and
that he needs zoning aproval and a building permit.|>>> 04/11/2005 14:17:00 MCBRI#E
0104|OWNERSHIP VERIFIED/LA WANDA|>>> 04/21/2005 11:46:57 WYRIC#L
0015|05/09/05|Visited complainants property on 210 Stonewall. Hotel stated|that the air
conditioner unit was turned on. Noise measurment readings|were about 55 dBA at 2:30-3:00
p.m.|ws|>>> 05/12/2005 08:54:51 SINGM#WJ 0067|LEFT MESSAGE WITH ENGINEER TO
CONTACT ME ABOUT THE PERMITS.|>>> 06/06/2005 15:55:52 MCBRI#E 0292|VERIFIED
ADDRESS SAME AS WIN2DATA|>>> 06/30/2005 11:22:52 ACTEMP1 0108|On July 8, 2005 case
file no. LMD05-195 (apn048H-7663-035-00)|was aproved by design review to construct permanent
screening around|the new a/c unit installed.|I contacted engineer Chase Newton from the
claremont hotel at|510-549-8586 and informed him that the city would need a decibal test|report
submitted from a private testing agency for review before|permits can be issued.|>>> 04/18/2006
14:14:25 MCBRI#E 0192|9/16/05 recieved decibal test results from All Electric 143 Belle
ln.|Pleasant Hill Ca. 94523 (925-944-5706).|>>> 04/18/2006 14:32:50 MCBRI#E 0192|Discussed
case with supervisor Gary L. and we reviewed test results|and determined that readings were
satisfactory and will aprove permit|to be issued. Contacted Chase Newton and made 3:00 p.m.
apointment|for 4/20/06 to meet at permit counter to obtain permits.|>>> 04/18/2006 14:36:54
MCBRI#E 0192|Met with Mr. Newton at counter and he needs to have engineered plans|for roof
structure support of new a/c unit submitted for plan check|aproval before permits can be issued.
allowing 30 days for plans to|be submitted.|>>> 04/20/2006 15:48:43 MCBRI#E 0120|Jonathan
Schelding- I called,left message that ac unit appears OK. Tes|t was 55db. Code allows up to 60 db
for commercial ac. OMC 17.120.050J|.GL.|>>> 05/24/2006 17:55:42 LEPOR#G 0330|I spoke to
the General Manager, Mike Churckowski. He said that they tu|rned in the engineered plans and are
waiting for the City to issue the|permit. He said that they are willing to put up sound attenuation,
if|the complainants are willing to pay for it. They have multiple approv|als to acquire from Planning
(such as historical considerations ) befo|re they can put things up on the building.Mike also stated
that the co|mplainants removed large trees on the Claremont property that had prev|iously blocked
sound.|I spoke to Jonathon Schelding(complaiant 502-6735)and told him what t|he General
Manager said. He says that these things aren't true and tha|t there are previous injunctions against
the hotel for noise. He is go|ing to pursue the case from that angle. I am closing the case for
now,|as there does not appear to be anything else we can do at this point.|>>> 07/11/2006
14:05:50 LEPOR#G 0419|This is based on what Ray Derania told me that the City Attorny's offi|ce
said the noise ord. is really unenforcable.GL.|>>> 07/11/2006 14:07:26 LEPOR#G 0419
|Verified that an 80 ton air conditioning unit had been installed and|that an enclosure was
constructed around the new roof top unit.|Issued S.W.O. to head maintenance engineer (Chase)
and explained to|him that he needs a mechanical and electrical permit for the new|A.C. unit and
that he needs zoning aproval and a building permit.|>>> 04/11/2005 14:17:00 MCBRI#E
0104|OWNERSHIP VERIFIED/LA WANDA|>>> 04/21/2005 11:46:57 WYRIC#L
0015|05/09/05|Visited complainants property on 210 Stonewall. Hotel stated|that the air
conditioner unit was turned on. Noise measurment readings|were about 55 dBA at 2:30-3:00
p.m.|ws|>>> 05/12/2005 08:54:51 SINGM#WJ 0067|LEFT MESSAGE WITH ENGINEER TO
CONTACT ME ABOUT THE PERMITS.|>>> 06/06/2005 15:55:52 MCBRI#E 0292|VERIFIED
ADDRESS SAME AS WIN2DATA|>>> 06/30/2005 11:22:52 ACTEMP1 0108|On July 8, 2005 case
file no. LMD05-195 (apn048H-7663-035-00)|was aproved by design review to construct permanent
screening around|the new a/c unit installed.|I contacted engineer Chase Newton from the
claremont hotel at|510-549-8586 and informed him that the city would need a decibal test|report
submitted from a private testing agency for review before|permits can be issued.|>>> 04/18/2006
14:14:25 MCBRI#E 0192|9/16/05 recieved decibal test results from All Electric 143 Belle
ln.|Pleasant Hill Ca. 94523 (925-944-5706).|>>> 04/18/2006 14:32:50 MCBRI#E 0192|Discussed
case with supervisor Gary L. and we reviewed test results|and determined that readings were
satisfactory and will aprove permit|to be issued. Contacted Chase Newton and made 3:00 p.m.
apointment|for 4/20/06 to meet at permit counter to obtain permits.|>>> 04/18/2006 14:36:54
MCBRI#E 0192|Met with Mr. Newton at counter and he needs to have engineered plans|for roof
structure support of new a/c unit submitted for plan check|aproval before permits can be issued.
allowing 30 days for plans to|be submitted.|>>> 04/20/2006 15:48:43 MCBRI#E 0120|Jonathan
Schelding- I called,left message that ac unit appears OK. Tes|t was 55db. Code allows up to 60 db
for commercial ac. OMC 17.120.050J|.GL.|>>> 05/24/2006 17:55:42 LEPOR#G 0330|I spoke to
the General Manager, Mike Churckowski. He said that they tu|rned in the engineered plans and are
waiting for the City to issue the|permit. He said that they are willing to put up sound attenuation,
if|the complainants are willing to pay for it. They have multiple approv|als to acquire from Planning
(such as historical considerations ) befo|re they can put things up on the building.Mike also stated
that the co|mplainants removed large trees on the Claremont property that had prev|iously blocked
sound.|I spoke to Jonathon Schelding(complaiant 502-6735)and told him what t|he General
Manager said. He says that these things aren't true and tha|t there are previous injunctions against
the hotel for noise. He is go|ing to pursue the case from that angle. I am closing the case for
now,|as there does not appear to be anything else we can do at this point.|>>> 07/11/2006
14:05:50 LEPOR#G 0419|This is based on what Ray Derania told me that the City Attorny's offi|ce
said the noise ord. is really unenforcable.GL.|>>> 07/11/2006 14:07:26 LEPOR#G 0419
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 5 of 141
1/21/2014
PTS
1/21/2014
PTS
|Verified that an 80 ton air conditioning unit had been installed and|that an enclosure was
constructed around the new roof top unit.|Issued S.W.O. to head maintenance engineer (Chase)
and explained to|him that he needs a mechanical and electrical permit for the new|A.C. unit and
that he needs zoning aproval and a building permit.|>>> 04/11/2005 14:17:00 MCBRI#E
0104|OWNERSHIP VERIFIED/LA WANDA|>>> 04/21/2005 11:46:57 WYRIC#L
0015|05/09/05|Visited complainants property on 210 Stonewall. Hotel stated|that the air
conditioner unit was turned on. Noise measurment readings|were about 55 dBA at 2:30-3:00
p.m.|ws|>>> 05/12/2005 08:54:51 SINGM#WJ 0067|LEFT MESSAGE WITH ENGINEER TO
CONTACT ME ABOUT THE PERMITS.|>>> 06/06/2005 15:55:52 MCBRI#E 0292|VERIFIED
ADDRESS SAME AS WIN2DATA|>>> 06/30/2005 11:22:52 ACTEMP1 0108|On July 8, 2005 case
file no. LMD05-195 (apn048H-7663-035-00)|was aproved by design review to construct permanent
screening around|the new a/c unit installed.|I contacted engineer Chase Newton from the
claremont hotel at|510-549-8586 and informed him that the city would need a decibal test|report
submitted from a private testing agency for review before|permits can be issued.|>>> 04/18/2006
14:14:25 MCBRI#E 0192|9/16/05 recieved decibal test results from All Electric 143 Belle
ln.|Pleasant Hill Ca. 94523 (925-944-5706).|>>> 04/18/2006 14:32:50 MCBRI#E 0192|Discussed
case with supervisor Gary L. and we reviewed test results|and determined that readings were
satisfactory and will aprove permit|to be issued. Contacted Chase Newton and made 3:00 p.m.
apointment|for 4/20/06 to meet at permit counter to obtain permits.|>>> 04/18/2006 14:36:54
MCBRI#E 0192|Met with Mr. Newton at counter and he needs to have engineered plans|for roof
structure support of new a/c unit submitted for plan check|aproval before permits can be issued.
allowing 30 days for plans to|be submitted.|>>> 04/20/2006 15:48:43 MCBRI#E 0120|Jonathan
Schelding- I called,left message that ac unit appears OK. Tes|t was 55db. Code allows up to 60 db
for commercial ac. OMC 17.120.050J|.GL.|>>> 05/24/2006 17:55:42 LEPOR#G 0330|I spoke to
the General Manager, Mike Churckowski. He said that they tu|rned in the engineered plans and are
waiting for the City to issue the|permit. He said that they are willing to put up sound attenuation,
if|the complainants are willing to pay for it. They have multiple approv|als to acquire from Planning
(such as historical considerations ) befo|re they can put things up on the building.Mike also stated
that the co|mplainants removed large trees on the Claremont property that had prev|iously blocked
sound.|I spoke to Jonathon Schelding(complaiant 502-6735)and told him what t|he General
Manager said. He says that these things aren't true and tha|t there are previous injunctions against
the hotel for noise. He is go|ing to pursue the case from that angle. I am closing the case for
now,|as there does not appear to be anything else we can do at this point.|>>> 07/11/2006
14:05:50 LEPOR#G 0419|This is based on what Ray Derania told me that the City Attorny's offi|ce
said the noise ord. is really unenforcable.GL.|>>> 07/11/2006 14:07:26 LEPOR#G 0419
|Verified that an 80 ton air conditioning unit had been installed and|that an enclosure was
constructed around the new roof top unit.|Issued S.W.O. to head maintenance engineer (Chase)
and explained to|him that he needs a mechanical and electrical permit for the new|A.C. unit and
that he needs zoning aproval and a building permit.|>>> 04/11/2005 14:17:00 MCBRI#E
0104|OWNERSHIP VERIFIED/LA WANDA|>>> 04/21/2005 11:46:57 WYRIC#L
0015|05/09/05|Visited complainants property on 210 Stonewall. Hotel stated|that the air
conditioner unit was turned on. Noise measurment readings|were about 55 dBA at 2:30-3:00
p.m.|ws|>>> 05/12/2005 08:54:51 SINGM#WJ 0067|LEFT MESSAGE WITH ENGINEER TO
CONTACT ME ABOUT THE PERMITS.|>>> 06/06/2005 15:55:52 MCBRI#E 0292|VERIFIED
ADDRESS SAME AS WIN2DATA|>>> 06/30/2005 11:22:52 ACTEMP1 0108|On July 8, 2005 case
file no. LMD05-195 (apn048H-7663-035-00)|was aproved by design review to construct permanent
screening around|the new a/c unit installed.|I contacted engineer Chase Newton from the
claremont hotel at|510-549-8586 and informed him that the city would need a decibal test|report
submitted from a private testing agency for review before|permits can be issued.|>>> 04/18/2006
14:14:25 MCBRI#E 0192|9/16/05 recieved decibal test results from All Electric 143 Belle
ln.|Pleasant Hill Ca. 94523 (925-944-5706).|>>> 04/18/2006 14:32:50 MCBRI#E 0192|Discussed
case with supervisor Gary L. and we reviewed test results|and determined that readings were
satisfactory and will aprove permit|to be issued. Contacted Chase Newton and made 3:00 p.m.
apointment|for 4/20/06 to meet at permit counter to obtain permits.|>>> 04/18/2006 14:36:54
MCBRI#E 0192|Met with Mr. Newton at counter and he needs to have engineered plans|for roof
structure support of new a/c unit submitted for plan check|aproval before permits can be issued.
allowing 30 days for plans to|be submitted.|>>> 04/20/2006 15:48:43 MCBRI#E 0120|Jonathan
Schelding- I called,left message that ac unit appears OK. Tes|t was 55db. Code allows up to 60 db
for commercial ac. OMC 17.120.050J|.GL.|>>> 05/24/2006 17:55:42 LEPOR#G 0330|I spoke to
the General Manager, Mike Churckowski. He said that they tu|rned in the engineered plans and are
waiting for the City to issue the|permit. He said that they are willing to put up sound attenuation,
if|the complainants are willing to pay for it. They have multiple approv|als to acquire from Planning
(such as historical considerations ) befo|re they can put things up on the building.Mike also stated
that the co|mplainants removed large trees on the Claremont property that had prev|iously blocked
sound.|I spoke to Jonathon Schelding(complaiant 502-6735)and told him what t|he General
Manager said. He says that these things aren't true and tha|t there are previous injunctions against
the hotel for noise. He is go|ing to pursue the case from that angle. I am closing the case for
now,|as there does not appear to be anything else we can do at this point.|>>> 07/11/2006
14:05:50 LEPOR#G 0419|This is based on what Ray Derania told me that the City Attorny's offi|ce
said the noise ord. is really unenforcable.GL.|>>> 07/11/2006 14:07:26 LEPOR#G 0419
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 6 of 141
1/21/2014
PTS
1/21/2014
PTS
|Verified that an 80 ton air conditioning unit had been installed and|that an enclosure was
constructed around the new roof top unit.|Issued S.W.O. to head maintenance engineer (Chase)
and explained to|him that he needs a mechanical and electrical permit for the new|A.C. unit and
that he needs zoning aproval and a building permit.|>>> 04/11/2005 14:17:00 MCBRI#E
0104|OWNERSHIP VERIFIED/LA WANDA|>>> 04/21/2005 11:46:57 WYRIC#L
0015|05/09/05|Visited complainants property on 210 Stonewall. Hotel stated|that the air
conditioner unit was turned on. Noise measurment readings|were about 55 dBA at 2:30-3:00
p.m.|ws|>>> 05/12/2005 08:54:51 SINGM#WJ 0067|LEFT MESSAGE WITH ENGINEER TO
CONTACT ME ABOUT THE PERMITS.|>>> 06/06/2005 15:55:52 MCBRI#E 0292|VERIFIED
ADDRESS SAME AS WIN2DATA|>>> 06/30/2005 11:22:52 ACTEMP1 0108|On July 8, 2005 case
file no. LMD05-195 (apn048H-7663-035-00)|was aproved by design review to construct permanent
screening around|the new a/c unit installed.|I contacted engineer Chase Newton from the
claremont hotel at|510-549-8586 and informed him that the city would need a decibal test|report
submitted from a private testing agency for review before|permits can be issued.|>>> 04/18/2006
14:14:25 MCBRI#E 0192|9/16/05 recieved decibal test results from All Electric 143 Belle
ln.|Pleasant Hill Ca. 94523 (925-944-5706).|>>> 04/18/2006 14:32:50 MCBRI#E 0192|Discussed
case with supervisor Gary L. and we reviewed test results|and determined that readings were
satisfactory and will aprove permit|to be issued. Contacted Chase Newton and made 3:00 p.m.
apointment|for 4/20/06 to meet at permit counter to obtain permits.|>>> 04/18/2006 14:36:54
MCBRI#E 0192|Met with Mr. Newton at counter and he needs to have engineered plans|for roof
structure support of new a/c unit submitted for plan check|aproval before permits can be issued.
allowing 30 days for plans to|be submitted.|>>> 04/20/2006 15:48:43 MCBRI#E 0120|Jonathan
Schelding- I called,left message that ac unit appears OK. Tes|t was 55db. Code allows up to 60 db
for commercial ac. OMC 17.120.050J|.GL.|>>> 05/24/2006 17:55:42 LEPOR#G 0330|I spoke to
the General Manager, Mike Churckowski. He said that they tu|rned in the engineered plans and are
waiting for the City to issue the|permit. He said that they are willing to put up sound attenuation,
if|the complainants are willing to pay for it. They have multiple approv|als to acquire from Planning
(such as historical considerations ) befo|re they can put things up on the building.Mike also stated
that the co|mplainants removed large trees on the Claremont property that had prev|iously blocked
sound.|I spoke to Jonathon Schelding(complaiant 502-6735)and told him what t|he General
Manager said. He says that these things aren't true and tha|t there are previous injunctions against
the hotel for noise. He is go|ing to pursue the case from that angle. I am closing the case for
now,|as there does not appear to be anything else we can do at this point.|>>> 07/11/2006
14:05:50 LEPOR#G 0419|This is based on what Ray Derania told me that the City Attorny's offi|ce
said the noise ord. is really unenforcable.GL.|>>> 07/11/2006 14:07:26 LEPOR#G 0419
|Verified that an 80 ton air conditioning unit had been installed and|that an enclosure was
constructed around the new roof top unit.|Issued S.W.O. to head maintenance engineer (Chase)
and explained to|him that he needs a mechanical and electrical permit for the new|A.C. unit and
that he needs zoning aproval and a building permit.|>>> 04/11/2005 14:17:00 MCBRI#E
0104|OWNERSHIP VERIFIED/LA WANDA|>>> 04/21/2005 11:46:57 WYRIC#L
0015|05/09/05|Visited complainants property on 210 Stonewall. Hotel stated|that the air
conditioner unit was turned on. Noise measurment readings|were about 55 dBA at 2:30-3:00
p.m.|ws|>>> 05/12/2005 08:54:51 SINGM#WJ 0067|LEFT MESSAGE WITH ENGINEER TO
CONTACT ME ABOUT THE PERMITS.|>>> 06/06/2005 15:55:52 MCBRI#E 0292|VERIFIED
ADDRESS SAME AS WIN2DATA|>>> 06/30/2005 11:22:52 ACTEMP1 0108|On July 8, 2005 case
file no. LMD05-195 (apn048H-7663-035-00)|was aproved by design review to construct permanent
screening around|the new a/c unit installed.|I contacted engineer Chase Newton from the
claremont hotel at|510-549-8586 and informed him that the city would need a decibal test|report
submitted from a private testing agency for review before|permits can be issued.|>>> 04/18/2006
14:14:25 MCBRI#E 0192|9/16/05 recieved decibal test results from All Electric 143 Belle
ln.|Pleasant Hill Ca. 94523 (925-944-5706).|>>> 04/18/2006 14:32:50 MCBRI#E 0192|Discussed
case with supervisor Gary L. and we reviewed test results|and determined that readings were
satisfactory and will aprove permit|to be issued. Contacted Chase Newton and made 3:00 p.m.
apointment|for 4/20/06 to meet at permit counter to obtain permits.|>>> 04/18/2006 14:36:54
MCBRI#E 0192|Met with Mr. Newton at counter and he needs to have engineered plans|for roof
structure support of new a/c unit submitted for plan check|aproval before permits can be issued.
allowing 30 days for plans to|be submitted.|>>> 04/20/2006 15:48:43 MCBRI#E 0120|Jonathan
Schelding- I called,left message that ac unit appears OK. Tes|t was 55db. Code allows up to 60 db
for commercial ac. OMC 17.120.050J|.GL.|>>> 05/24/2006 17:55:42 LEPOR#G 0330|I spoke to
the General Manager, Mike Churckowski. He said that they tu|rned in the engineered plans and are
waiting for the City to issue the|permit. He said that they are willing to put up sound attenuation,
if|the complainants are willing to pay for it. They have multiple approv|als to acquire from Planning
(such as historical considerations ) befo|re they can put things up on the building.Mike also stated
that the co|mplainants removed large trees on the Claremont property that had prev|iously blocked
sound.|I spoke to Jonathon Schelding(complaiant 502-6735)and told him what t|he General
Manager said. He says that these things aren't true and tha|t there are previous injunctions against
the hotel for noise. He is go|ing to pursue the case from that angle. I am closing the case for
now,|as there does not appear to be anything else we can do at this point.|>>> 07/11/2006
14:05:50 LEPOR#G 0419|This is based on what Ray Derania told me that the City Attorny's offi|ce
said the noise ord. is really unenforcable.GL.|>>> 07/11/2006 14:07:26 LEPOR#G 0419
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 7 of 141
1/21/2014
PTS
1/21/2014
PTS
|Verified that an 80 ton air conditioning unit had been installed and|that an enclosure was
constructed around the new roof top unit.|Issued S.W.O. to head maintenance engineer (Chase)
and explained to|him that he needs a mechanical and electrical permit for the new|A.C. unit and
that he needs zoning aproval and a building permit.|>>> 04/11/2005 14:17:00 MCBRI#E
0104|OWNERSHIP VERIFIED/LA WANDA|>>> 04/21/2005 11:46:57 WYRIC#L
0015|05/09/05|Visited complainants property on 210 Stonewall. Hotel stated|that the air
conditioner unit was turned on. Noise measurment readings|were about 55 dBA at 2:30-3:00
p.m.|ws|>>> 05/12/2005 08:54:51 SINGM#WJ 0067|LEFT MESSAGE WITH ENGINEER TO
CONTACT ME ABOUT THE PERMITS.|>>> 06/06/2005 15:55:52 MCBRI#E 0292|VERIFIED
ADDRESS SAME AS WIN2DATA|>>> 06/30/2005 11:22:52 ACTEMP1 0108|On July 8, 2005 case
file no. LMD05-195 (apn048H-7663-035-00)|was aproved by design review to construct permanent
screening around|the new a/c unit installed.|I contacted engineer Chase Newton from the
claremont hotel at|510-549-8586 and informed him that the city would need a decibal test|report
submitted from a private testing agency for review before|permits can be issued.|>>> 04/18/2006
14:14:25 MCBRI#E 0192|9/16/05 recieved decibal test results from All Electric 143 Belle
ln.|Pleasant Hill Ca. 94523 (925-944-5706).|>>> 04/18/2006 14:32:50 MCBRI#E 0192|Discussed
case with supervisor Gary L. and we reviewed test results|and determined that readings were
satisfactory and will aprove permit|to be issued. Contacted Chase Newton and made 3:00 p.m.
apointment|for 4/20/06 to meet at permit counter to obtain permits.|>>> 04/18/2006 14:36:54
MCBRI#E 0192|Met with Mr. Newton at counter and he needs to have engineered plans|for roof
structure support of new a/c unit submitted for plan check|aproval before permits can be issued.
allowing 30 days for plans to|be submitted.|>>> 04/20/2006 15:48:43 MCBRI#E 0120|Jonathan
Schelding- I called,left message that ac unit appears OK. Tes|t was 55db. Code allows up to 60 db
for commercial ac. OMC 17.120.050J|.GL.|>>> 05/24/2006 17:55:42 LEPOR#G 0330|I spoke to
the General Manager, Mike Churckowski. He said that they tu|rned in the engineered plans and are
waiting for the City to issue the|permit. He said that they are willing to put up sound attenuation,
if|the complainants are willing to pay for it. They have multiple approv|als to acquire from Planning
(such as historical considerations ) befo|re they can put things up on the building.Mike also stated
that the co|mplainants removed large trees on the Claremont property that had prev|iously blocked
sound.|I spoke to Jonathon Schelding(complaiant 502-6735)and told him what t|he General
Manager said. He says that these things aren't true and tha|t there are previous injunctions against
the hotel for noise. He is go|ing to pursue the case from that angle. I am closing the case for
now,|as there does not appear to be anything else we can do at this point.|>>> 07/11/2006
14:05:50 LEPOR#G 0419|This is based on what Ray Derania told me that the City Attorny's offi|ce
said the noise ord. is really unenforcable.GL.|>>> 07/11/2006 14:07:26 LEPOR#G 0419
|Verified that an 80 ton air conditioning unit had been installed and|that an enclosure was
constructed around the new roof top unit.|Issued S.W.O. to head maintenance engineer (Chase)
and explained to|him that he needs a mechanical and electrical permit for the new|A.C. unit and
that he needs zoning aproval and a building permit.|>>> 04/11/2005 14:17:00 MCBRI#E
0104|OWNERSHIP VERIFIED/LA WANDA|>>> 04/21/2005 11:46:57 WYRIC#L
0015|05/09/05|Visited complainants property on 210 Stonewall. Hotel stated|that the air
conditioner unit was turned on. Noise measurment readings|were about 55 dBA at 2:30-3:00
p.m.|ws|>>> 05/12/2005 08:54:51 SINGM#WJ 0067|LEFT MESSAGE WITH ENGINEER TO
CONTACT ME ABOUT THE PERMITS.|>>> 06/06/2005 15:55:52 MCBRI#E 0292|VERIFIED
ADDRESS SAME AS WIN2DATA|>>> 06/30/2005 11:22:52 ACTEMP1 0108|On July 8, 2005 case
file no. LMD05-195 (apn048H-7663-035-00)|was aproved by design review to construct permanent
screening around|the new a/c unit installed.|I contacted engineer Chase Newton from the
claremont hotel at|510-549-8586 and informed him that the city would need a decibal test|report
submitted from a private testing agency for review before|permits can be issued.|>>> 04/18/2006
14:14:25 MCBRI#E 0192|9/16/05 recieved decibal test results from All Electric 143 Belle
ln.|Pleasant Hill Ca. 94523 (925-944-5706).|>>> 04/18/2006 14:32:50 MCBRI#E 0192|Discussed
case with supervisor Gary L. and we reviewed test results|and determined that readings were
satisfactory and will aprove permit|to be issued. Contacted Chase Newton and made 3:00 p.m.
apointment|for 4/20/06 to meet at permit counter to obtain permits.|>>> 04/18/2006 14:36:54
MCBRI#E 0192|Met with Mr. Newton at counter and he needs to have engineered plans|for roof
structure support of new a/c unit submitted for plan check|aproval before permits can be issued.
allowing 30 days for plans to|be submitted.|>>> 04/20/2006 15:48:43 MCBRI#E 0120|Jonathan
Schelding- I called,left message that ac unit appears OK. Tes|t was 55db. Code allows up to 60 db
for commercial ac. OMC 17.120.050J|.GL.|>>> 05/24/2006 17:55:42 LEPOR#G 0330|I spoke to
the General Manager, Mike Churckowski. He said that they tu|rned in the engineered plans and are
waiting for the City to issue the|permit. He said that they are willing to put up sound attenuation,
if|the complainants are willing to pay for it. They have multiple approv|als to acquire from Planning
(such as historical considerations ) befo|re they can put things up on the building.Mike also stated
that the co|mplainants removed large trees on the Claremont property that had prev|iously blocked
sound.|I spoke to Jonathon Schelding(complaiant 502-6735)and told him what t|he General
Manager said. He says that these things aren't true and tha|t there are previous injunctions against
the hotel for noise. He is go|ing to pursue the case from that angle. I am closing the case for
now,|as there does not appear to be anything else we can do at this point.|>>> 07/11/2006
14:05:50 LEPOR#G 0419|This is based on what Ray Derania told me that the City Attorny's offi|ce
said the noise ord. is really unenforcable.GL.|>>> 07/11/2006 14:07:26 LEPOR#G 0419
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 8 of 141
1/21/2014
PTS
1/21/2014
PTS
|Verified that an 80 ton air conditioning unit had been installed and|that an enclosure was
constructed around the new roof top unit.|Issued S.W.O. to head maintenance engineer (Chase)
and explained to|him that he needs a mechanical and electrical permit for the new|A.C. unit and
that he needs zoning aproval and a building permit.|>>> 04/11/2005 14:17:00 MCBRI#E
0104|OWNERSHIP VERIFIED/LA WANDA|>>> 04/21/2005 11:46:57 WYRIC#L
0015|05/09/05|Visited complainants property on 210 Stonewall. Hotel stated|that the air
conditioner unit was turned on. Noise measurment readings|were about 55 dBA at 2:30-3:00
p.m.|ws|>>> 05/12/2005 08:54:51 SINGM#WJ 0067|LEFT MESSAGE WITH ENGINEER TO
CONTACT ME ABOUT THE PERMITS.|>>> 06/06/2005 15:55:52 MCBRI#E 0292|VERIFIED
ADDRESS SAME AS WIN2DATA|>>> 06/30/2005 11:22:52 ACTEMP1 0108|On July 8, 2005 case
file no. LMD05-195 (apn048H-7663-035-00)|was aproved by design review to construct permanent
screening around|the new a/c unit installed.|I contacted engineer Chase Newton from the
claremont hotel at|510-549-8586 and informed him that the city would need a decibal test|report
submitted from a private testing agency for review before|permits can be issued.|>>> 04/18/2006
14:14:25 MCBRI#E 0192|9/16/05 recieved decibal test results from All Electric 143 Belle
ln.|Pleasant Hill Ca. 94523 (925-944-5706).|>>> 04/18/2006 14:32:50 MCBRI#E 0192|Discussed
case with supervisor Gary L. and we reviewed test results|and determined that readings were
satisfactory and will aprove permit|to be issued. Contacted Chase Newton and made 3:00 p.m.
apointment|for 4/20/06 to meet at permit counter to obtain permits.|>>> 04/18/2006 14:36:54
MCBRI#E 0192|Met with Mr. Newton at counter and he needs to have engineered plans|for roof
structure support of new a/c unit submitted for plan check|aproval before permits can be issued.
allowing 30 days for plans to|be submitted.|>>> 04/20/2006 15:48:43 MCBRI#E 0120|Jonathan
Schelding- I called,left message that ac unit appears OK. Tes|t was 55db. Code allows up to 60 db
for commercial ac. OMC 17.120.050J|.GL.|>>> 05/24/2006 17:55:42 LEPOR#G 0330|I spoke to
the General Manager, Mike Churckowski. He said that they tu|rned in the engineered plans and are
waiting for the City to issue the|permit. He said that they are willing to put up sound attenuation,
if|the complainants are willing to pay for it. They have multiple approv|als to acquire from Planning
(such as historical considerations ) befo|re they can put things up on the building.Mike also stated
that the co|mplainants removed large trees on the Claremont property that had prev|iously blocked
sound.|I spoke to Jonathon Schelding(complaiant 502-6735)and told him what t|he General
Manager said. He says that these things aren't true and tha|t there are previous injunctions against
the hotel for noise. He is go|ing to pursue the case from that angle. I am closing the case for
now,|as there does not appear to be anything else we can do at this point.|>>> 07/11/2006
14:05:50 LEPOR#G 0419|This is based on what Ray Derania told me that the City Attorny's offi|ce
said the noise ord. is really unenforcable.GL.|>>> 07/11/2006 14:07:26 LEPOR#G 0419
|Verified that an 80 ton air conditioning unit had been installed and|that an enclosure was
constructed around the new roof top unit.|Issued S.W.O. to head maintenance engineer (Chase)
and explained to|him that he needs a mechanical and electrical permit for the new|A.C. unit and
that he needs zoning aproval and a building permit.|>>> 04/11/2005 14:17:00 MCBRI#E
0104|OWNERSHIP VERIFIED/LA WANDA|>>> 04/21/2005 11:46:57 WYRIC#L
0015|05/09/05|Visited complainants property on 210 Stonewall. Hotel stated|that the air
conditioner unit was turned on. Noise measurment readings|were about 55 dBA at 2:30-3:00
p.m.|ws|>>> 05/12/2005 08:54:51 SINGM#WJ 0067|LEFT MESSAGE WITH ENGINEER TO
CONTACT ME ABOUT THE PERMITS.|>>> 06/06/2005 15:55:52 MCBRI#E 0292|VERIFIED
ADDRESS SAME AS WIN2DATA|>>> 06/30/2005 11:22:52 ACTEMP1 0108|On July 8, 2005 case
file no. LMD05-195 (apn048H-7663-035-00)|was aproved by design review to construct permanent
screening around|the new a/c unit installed.|I contacted engineer Chase Newton from the
claremont hotel at|510-549-8586 and informed him that the city would need a decibal test|report
submitted from a private testing agency for review before|permits can be issued.|>>> 04/18/2006
14:14:25 MCBRI#E 0192|9/16/05 recieved decibal test results from All Electric 143 Belle
ln.|Pleasant Hill Ca. 94523 (925-944-5706).|>>> 04/18/2006 14:32:50 MCBRI#E 0192|Discussed
case with supervisor Gary L. and we reviewed test results|and determined that readings were
satisfactory and will aprove permit|to be issued. Contacted Chase Newton and made 3:00 p.m.
apointment|for 4/20/06 to meet at permit counter to obtain permits.|>>> 04/18/2006 14:36:54
MCBRI#E 0192|Met with Mr. Newton at counter and he needs to have engineered plans|for roof
structure support of new a/c unit submitted for plan check|aproval before permits can be issued.
allowing 30 days for plans to|be submitted.|>>> 04/20/2006 15:48:43 MCBRI#E 0120|Jonathan
Schelding- I called,left message that ac unit appears OK. Tes|t was 55db. Code allows up to 60 db
for commercial ac. OMC 17.120.050J|.GL.|>>> 05/24/2006 17:55:42 LEPOR#G 0330|I spoke to
the General Manager, Mike Churckowski. He said that they tu|rned in the engineered plans and are
waiting for the City to issue the|permit. He said that they are willing to put up sound attenuation,
if|the complainants are willing to pay for it. They have multiple approv|als to acquire from Planning
(such as historical considerations ) befo|re they can put things up on the building.Mike also stated
that the co|mplainants removed large trees on the Claremont property that had prev|iously blocked
sound.|I spoke to Jonathon Schelding(complaiant 502-6735)and told him what t|he General
Manager said. He says that these things aren't true and tha|t there are previous injunctions against
the hotel for noise. He is go|ing to pursue the case from that angle. I am closing the case for
now,|as there does not appear to be anything else we can do at this point.|>>> 07/11/2006
14:05:50 LEPOR#G 0419|This is based on what Ray Derania told me that the City Attorny's offi|ce
said the noise ord. is really unenforcable.GL.|>>> 07/11/2006 14:07:26 LEPOR#G 0419
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 9 of 141
1/21/2014
PTS
1/21/2014
PTS
|Verified that an 80 ton air conditioning unit had been installed and|that an enclosure was
constructed around the new roof top unit.|Issued S.W.O. to head maintenance engineer (Chase)
and explained to|him that he needs a mechanical and electrical permit for the new|A.C. unit and
that he needs zoning aproval and a building permit.|>>> 04/11/2005 14:17:00 MCBRI#E
0104|OWNERSHIP VERIFIED/LA WANDA|>>> 04/21/2005 11:46:57 WYRIC#L
0015|05/09/05|Visited complainants property on 210 Stonewall. Hotel stated|that the air
conditioner unit was turned on. Noise measurment readings|were about 55 dBA at 2:30-3:00
p.m.|ws|>>> 05/12/2005 08:54:51 SINGM#WJ 0067|LEFT MESSAGE WITH ENGINEER TO
CONTACT ME ABOUT THE PERMITS.|>>> 06/06/2005 15:55:52 MCBRI#E 0292|VERIFIED
ADDRESS SAME AS WIN2DATA|>>> 06/30/2005 11:22:52 ACTEMP1 0108|On July 8, 2005 case
file no. LMD05-195 (apn048H-7663-035-00)|was aproved by design review to construct permanent
screening around|the new a/c unit installed.|I contacted engineer Chase Newton from the
claremont hotel at|510-549-8586 and informed him that the city would need a decibal test|report
submitted from a private testing agency for review before|permits can be issued.|>>> 04/18/2006
14:14:25 MCBRI#E 0192|9/16/05 recieved decibal test results from All Electric 143 Belle
ln.|Pleasant Hill Ca. 94523 (925-944-5706).|>>> 04/18/2006 14:32:50 MCBRI#E 0192|Discussed
case with supervisor Gary L. and we reviewed test results|and determined that readings were
satisfactory and will aprove permit|to be issued. Contacted Chase Newton and made 3:00 p.m.
apointment|for 4/20/06 to meet at permit counter to obtain permits.|>>> 04/18/2006 14:36:54
MCBRI#E 0192|Met with Mr. Newton at counter and he needs to have engineered plans|for roof
structure support of new a/c unit submitted for plan check|aproval before permits can be issued.
allowing 30 days for plans to|be submitted.|>>> 04/20/2006 15:48:43 MCBRI#E 0120|Jonathan
Schelding- I called,left message that ac unit appears OK. Tes|t was 55db. Code allows up to 60 db
for commercial ac. OMC 17.120.050J|.GL.|>>> 05/24/2006 17:55:42 LEPOR#G 0330|I spoke to
the General Manager, Mike Churckowski. He said that they tu|rned in the engineered plans and are
waiting for the City to issue the|permit. He said that they are willing to put up sound attenuation,
if|the complainants are willing to pay for it. They have multiple approv|als to acquire from Planning
(such as historical considerations ) befo|re they can put things up on the building.Mike also stated
that the co|mplainants removed large trees on the Claremont property that had prev|iously blocked
sound.|I spoke to Jonathon Schelding(complaiant 502-6735)and told him what t|he General
Manager said. He says that these things aren't true and tha|t there are previous injunctions against
the hotel for noise. He is go|ing to pursue the case from that angle. I am closing the case for
now,|as there does not appear to be anything else we can do at this point.|>>> 07/11/2006
14:05:50 LEPOR#G 0419|This is based on what Ray Derania told me that the City Attorny's offi|ce
said the noise ord. is really unenforcable.GL.|>>> 07/11/2006 14:07:26 LEPOR#G 0419
|Verified that an 80 ton air conditioning unit had been installed and|that an enclosure was
constructed around the new roof top unit.|Issued S.W.O. to head maintenance engineer (Chase)
and explained to|him that he needs a mechanical and electrical permit for the new|A.C. unit and
that he needs zoning aproval and a building permit.|>>> 04/11/2005 14:17:00 MCBRI#E
0104|OWNERSHIP VERIFIED/LA WANDA|>>> 04/21/2005 11:46:57 WYRIC#L
0015|05/09/05|Visited complainants property on 210 Stonewall. Hotel stated|that the air
conditioner unit was turned on. Noise measurment readings|were about 55 dBA at 2:30-3:00
p.m.|ws|>>> 05/12/2005 08:54:51 SINGM#WJ 0067|LEFT MESSAGE WITH ENGINEER TO
CONTACT ME ABOUT THE PERMITS.|>>> 06/06/2005 15:55:52 MCBRI#E 0292|VERIFIED
ADDRESS SAME AS WIN2DATA|>>> 06/30/2005 11:22:52 ACTEMP1 0108|On July 8, 2005 case
file no. LMD05-195 (apn048H-7663-035-00)|was aproved by design review to construct permanent
screening around|the new a/c unit installed.|I contacted engineer Chase Newton from the
claremont hotel at|510-549-8586 and informed him that the city would need a decibal test|report
submitted from a private testing agency for review before|permits can be issued.|>>> 04/18/2006
14:14:25 MCBRI#E 0192|9/16/05 recieved decibal test results from All Electric 143 Belle
ln.|Pleasant Hill Ca. 94523 (925-944-5706).|>>> 04/18/2006 14:32:50 MCBRI#E 0192|Discussed
case with supervisor Gary L. and we reviewed test results|and determined that readings were
satisfactory and will aprove permit|to be issued. Contacted Chase Newton and made 3:00 p.m.
apointment|for 4/20/06 to meet at permit counter to obtain permits.|>>> 04/18/2006 14:36:54
MCBRI#E 0192|Met with Mr. Newton at counter and he needs to have engineered plans|for roof
structure support of new a/c unit submitted for plan check|aproval before permits can be issued.
allowing 30 days for plans to|be submitted.|>>> 04/20/2006 15:48:43 MCBRI#E 0120|Jonathan
Schelding- I called,left message that ac unit appears OK. Tes|t was 55db. Code allows up to 60 db
for commercial ac. OMC 17.120.050J|.GL.|>>> 05/24/2006 17:55:42 LEPOR#G 0330|I spoke to
the General Manager, Mike Churckowski. He said that they tu|rned in the engineered plans and are
waiting for the City to issue the|permit. He said that they are willing to put up sound attenuation,
if|the complainants are willing to pay for it. They have multiple approv|als to acquire from Planning
(such as historical considerations ) befo|re they can put things up on the building.Mike also stated
that the co|mplainants removed large trees on the Claremont property that had prev|iously blocked
sound.|I spoke to Jonathon Schelding(complaiant 502-6735)and told him what t|he General
Manager said. He says that these things aren't true and tha|t there are previous injunctions against
the hotel for noise. He is go|ing to pursue the case from that angle. I am closing the case for
now,|as there does not appear to be anything else we can do at this point.|>>> 07/11/2006
14:05:50 LEPOR#G 0419|This is based on what Ray Derania told me that the City Attorny's offi|ce
said the noise ord. is really unenforcable.GL.|>>> 07/11/2006 14:07:26 LEPOR#G 0419
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 10 of 141
1/21/2014
PTS
4/8/2005
PTS
4/8/2005
PTS
4/8/2005
PTS
4/8/2005
PTS
4/8/2005
PTS
4/8/2005
PTS
4/8/2005
PTS
4/8/2005
PTS
4/8/2005
PTS
4/8/2005
PTS
4/8/2005
PTS
4/8/2005
PTS
4/8/2005
PTS
4/8/2005
PTS
4/8/2005
PTS
|Verified that an 80 ton air conditioning unit had been installed and|that an enclosure was
constructed around the new roof top unit.|Issued S.W.O. to head maintenance engineer (Chase)
and explained to|him that he needs a mechanical and electrical permit for the new|A.C. unit and
that he needs zoning aproval and a building permit.|>>> 04/11/2005 14:17:00 MCBRI#E
0104|OWNERSHIP VERIFIED/LA WANDA|>>> 04/21/2005 11:46:57 WYRIC#L
0015|05/09/05|Visited complainants property on 210 Stonewall. Hotel stated|that the air
conditioner unit was turned on. Noise measurment readings|were about 55 dBA at 2:30-3:00
p.m.|ws|>>> 05/12/2005 08:54:51 SINGM#WJ 0067|LEFT MESSAGE WITH ENGINEER TO
CONTACT ME ABOUT THE PERMITS.|>>> 06/06/2005 15:55:52 MCBRI#E 0292|VERIFIED
ADDRESS SAME AS WIN2DATA|>>> 06/30/2005 11:22:52 ACTEMP1 0108|On July 8, 2005 case
file no. LMD05-195 (apn048H-7663-035-00)|was aproved by design review to construct permanent
screening around|the new a/c unit installed.|I contacted engineer Chase Newton from the
claremont hotel at|510-549-8586 and informed him that the city would need a decibal test|report
submitted from a private testing agency for review before|permits can be issued.|>>> 04/18/2006
14:14:25 MCBRI#E 0192|9/16/05 recieved decibal test results from All Electric 143 Belle
ln.|Pleasant Hill Ca. 94523 (925-944-5706).|>>> 04/18/2006 14:32:50 MCBRI#E 0192|Discussed
case with supervisor Gary L. and we reviewed test results|and determined that readings were
satisfactory and will aprove permit|to be issued. Contacted Chase Newton and made 3:00 p.m.
apointment|for 4/20/06 to meet at permit counter to obtain permits.|>>> 04/18/2006 14:36:54
MCBRI#E 0192|Met with Mr. Newton at counter and he needs to have engineered plans|for roof
structure support of new a/c unit submitted for plan check|aproval before permits can be issued.
allowing 30 days for plans to|be submitted.|>>> 04/20/2006 15:48:43 MCBRI#E 0120|Jonathan
Schelding- I called,left message that ac unit appears OK. Tes|t was 55db. Code allows up to 60 db
for commercial ac. OMC 17.120.050J|.GL.|>>> 05/24/2006 17:55:42 LEPOR#G 0330|I spoke to
the General Manager, Mike Churckowski. He said that they tu|rned in the engineered plans and are
waiting for the City to issue the|permit. He said that they are willing to put up sound attenuation,
if|the complainants are willing to pay for it. They have multiple approv|als to acquire from Planning
(such as historical considerations ) befo|re they can put things up on the building.Mike also stated
that the co|mplainants removed large trees on the Claremont property that had prev|iously blocked
sound.|I spoke to Jonathon Schelding(complaiant 502-6735)and told him what t|he General
Manager said. He says that these things aren't true and tha|t there are previous injunctions against
the hotel for noise. He is go|ing to pursue the case from that angle. I am closing the case for
now,|as there does not appear to be anything else we can do at this point.|>>> 07/11/2006
14:05:50 LEPOR#G 0419|This is based on what Ray Derania told me that the City Attorny's offi|ce
said the noise ord. is really unenforcable.GL.|>>> 07/11/2006 14:07:26 LEPOR#G 0419
EXCESSIVE NOISE FROM A/C UNIT THAT WAS INSTALLED WITHOUT PERMIT. CONSTRUCTED
ENCLOSURE WITHOUT ZONING APROVAL & WITHOUT PERMIT.
EXCESSIVE NOISE FROM A/C UNIT THAT WAS INSTALLED WITHOUT PERMIT. CONSTRUCTED
ENCLOSURE WITHOUT ZONING APROVAL & WITHOUT PERMIT.
EXCESSIVE NOISE FROM A/C UNIT THAT WAS INSTALLED WITHOUT PERMIT. CONSTRUCTED
ENCLOSURE WITHOUT ZONING APROVAL & WITHOUT PERMIT.
EXCESSIVE NOISE FROM A/C UNIT THAT WAS INSTALLED WITHOUT PERMIT. CONSTRUCTED
ENCLOSURE WITHOUT ZONING APROVAL & WITHOUT PERMIT.
EXCESSIVE NOISE FROM A/C UNIT THAT WAS INSTALLED WITHOUT PERMIT. CONSTRUCTED
ENCLOSURE WITHOUT ZONING APROVAL & WITHOUT PERMIT.
EXCESSIVE NOISE FROM A/C UNIT THAT WAS INSTALLED WITHOUT PERMIT. CONSTRUCTED
ENCLOSURE WITHOUT ZONING APROVAL & WITHOUT PERMIT.
EXCESSIVE NOISE FROM A/C UNIT THAT WAS INSTALLED WITHOUT PERMIT. CONSTRUCTED
ENCLOSURE WITHOUT ZONING APROVAL & WITHOUT PERMIT.
EXCESSIVE NOISE FROM A/C UNIT THAT WAS INSTALLED WITHOUT PERMIT. CONSTRUCTED
ENCLOSURE WITHOUT ZONING APROVAL & WITHOUT PERMIT.
EXCESSIVE NOISE FROM A/C UNIT THAT WAS INSTALLED WITHOUT PERMIT. CONSTRUCTED
ENCLOSURE WITHOUT ZONING APROVAL & WITHOUT PERMIT.
EXCESSIVE NOISE FROM A/C UNIT THAT WAS INSTALLED WITHOUT PERMIT. CONSTRUCTED
ENCLOSURE WITHOUT ZONING APROVAL & WITHOUT PERMIT.
EXCESSIVE NOISE FROM A/C UNIT THAT WAS INSTALLED WITHOUT PERMIT. CONSTRUCTED
ENCLOSURE WITHOUT ZONING APROVAL & WITHOUT PERMIT.
EXCESSIVE NOISE FROM A/C UNIT THAT WAS INSTALLED WITHOUT PERMIT. CONSTRUCTED
ENCLOSURE WITHOUT ZONING APROVAL & WITHOUT PERMIT.
EXCESSIVE NOISE FROM A/C UNIT THAT WAS INSTALLED WITHOUT PERMIT. CONSTRUCTED
ENCLOSURE WITHOUT ZONING APROVAL & WITHOUT PERMIT.
EXCESSIVE NOISE FROM A/C UNIT THAT WAS INSTALLED WITHOUT PERMIT. CONSTRUCTED
ENCLOSURE WITHOUT ZONING APROVAL & WITHOUT PERMIT.
EXCESSIVE NOISE FROM A/C UNIT THAT WAS INSTALLED WITHOUT PERMIT. CONSTRUCTED
ENCLOSURE WITHOUT ZONING APROVAL & WITHOUT PERMIT.
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 11 of 141
COMMENTER
PTS
PTS
COMMENTS
DEEMED APPROVED ANNUAL INSPECTION - CLAREMONT HOTEL CONTACT: MGR. 510-843-3000.
DEEMED APPROVED ANNUAL INSPECTION - CLAREMONT HOTEL CONTACT: MGR. 510-843-3000.
COMMENTER
PTS
PTS
PTS
COMMENTS
DEEMED APPROVED ANNUAL INSPECTION - CLAIRMONT HOTEL CONTACT: MGR. 510-843-3000.
|9/29/06 - Completed, in compliance. EXL|>>> 09/29/2006 14:55:33 LABAY#E 0362
DEEMED APPROVED ANNUAL INSPECTION - CLAIRMONT HOTEL CONTACT: MGR. 510-843-3000.
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 12 of 141
:
Business Name:
License #:
COMMENT DATE
8/1/2013
COMMENTER
PTS
COMMENTS
TRASH & DEBRIS ON EASEMENT
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 13 of 141
COMMENTER
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
COMMENTS
|1/24/00 TITLE 24 REPORT PREPARED BY MECHANICAL CONTRACTOR IN PLM/MECH|PLAN CHECK
FOLDER.|3/30/00 Three plansets submitted in response to 2/13/00 comments. JO|8/23/00 PLANS
BACK IN ARCHIVE. JO|12/4/00 PER INSPECTOR INSTRUCTION, VALUE RAISED $7,000,000 TO
REFLECT|TRUE VALUE OF WORK. JO|>>> 12/04/2000 16:35:45 OAKLE#JM OAK0821CA|2/9/01
REVISION PLAN ON READY TO ISSUE SHELF. JO|>>> 02/09/2001 17:31:36 OAKLE#JM
OAK0821CA
|1/24/00 TITLE 24 REPORT PREPARED BY MECHANICAL CONTRACTOR IN PLM/MECH|PLAN CHECK
FOLDER.|3/30/00 Three plansets submitted in response to 2/13/00 comments. JO|8/23/00 PLANS
BACK IN ARCHIVE. JO|12/4/00 PER INSPECTOR INSTRUCTION, VALUE RAISED $7,000,000 TO
REFLECT|TRUE VALUE OF WORK. JO|>>> 12/04/2000 16:35:45 OAKLE#JM OAK0821CA|2/9/01
REVISION PLAN ON READY TO ISSUE SHELF. JO|>>> 02/09/2001 17:31:36 OAKLE#JM
OAK0821CA
|1/24/00 TITLE 24 REPORT PREPARED BY MECHANICAL CONTRACTOR IN PLM/MECH|PLAN CHECK
FOLDER.|3/30/00 Three plansets submitted in response to 2/13/00 comments. JO|8/23/00 PLANS
BACK IN ARCHIVE. JO|12/4/00 PER INSPECTOR INSTRUCTION, VALUE RAISED $7,000,000 TO
REFLECT|TRUE VALUE OF WORK. JO|>>> 12/04/2000 16:35:45 OAKLE#JM OAK0821CA|2/9/01
REVISION PLAN ON READY TO ISSUE SHELF. JO|>>> 02/09/2001 17:31:36 OAKLE#JM
OAK0821CA
|1/24/00 TITLE 24 REPORT PREPARED BY MECHANICAL CONTRACTOR IN PLM/MECH|PLAN CHECK
FOLDER.|3/30/00 Three plansets submitted in response to 2/13/00 comments. JO|8/23/00 PLANS
BACK IN ARCHIVE. JO|12/4/00 PER INSPECTOR INSTRUCTION, VALUE RAISED $7,000,000 TO
REFLECT|TRUE VALUE OF WORK. JO|>>> 12/04/2000 16:35:45 OAKLE#JM OAK0821CA|2/9/01
REVISION PLAN ON READY TO ISSUE SHELF. JO|>>> 02/09/2001 17:31:36 OAKLE#JM
OAK0821CA
|1/24/00 TITLE 24 REPORT PREPARED BY MECHANICAL CONTRACTOR IN PLM/MECH|PLAN CHECK
FOLDER.|3/30/00 Three plansets submitted in response to 2/13/00 comments. JO|8/23/00 PLANS
BACK IN ARCHIVE. JO|12/4/00 PER INSPECTOR INSTRUCTION, VALUE RAISED $7,000,000 TO
REFLECT|TRUE VALUE OF WORK. JO|>>> 12/04/2000 16:35:45 OAKLE#JM OAK0821CA|2/9/01
REVISION PLAN ON READY TO ISSUE SHELF. JO|>>> 02/09/2001 17:31:36 OAKLE#JM
OAK0821CA
|1/24/00 TITLE 24 REPORT PREPARED BY MECHANICAL CONTRACTOR IN PLM/MECH|PLAN CHECK
FOLDER.|3/30/00 Three plansets submitted in response to 2/13/00 comments. JO|8/23/00 PLANS
BACK IN ARCHIVE. JO|12/4/00 PER INSPECTOR INSTRUCTION, VALUE RAISED $7,000,000 TO
REFLECT|TRUE VALUE OF WORK. JO|>>> 12/04/2000 16:35:45 OAKLE#JM OAK0821CA|2/9/01
REVISION PLAN ON READY TO ISSUE SHELF. JO|>>> 02/09/2001 17:31:36 OAKLE#JM
OAK0821CA
|1/24/00 TITLE 24 REPORT PREPARED BY MECHANICAL CONTRACTOR IN PLM/MECH|PLAN CHECK
FOLDER.|3/30/00 Three plansets submitted in response to 2/13/00 comments. JO|8/23/00 PLANS
BACK IN ARCHIVE. JO|12/4/00 PER INSPECTOR INSTRUCTION, VALUE RAISED $7,000,000 TO
REFLECT|TRUE VALUE OF WORK. JO|>>> 12/04/2000 16:35:45 OAKLE#JM OAK0821CA|2/9/01
REVISION PLAN ON READY TO ISSUE SHELF. JO|>>> 02/09/2001 17:31:36 OAKLE#JM
OAK0821CA
|1/24/00 TITLE 24 REPORT PREPARED BY MECHANICAL CONTRACTOR IN PLM/MECH|PLAN CHECK
FOLDER.|3/30/00 Three plansets submitted in response to 2/13/00 comments. JO|8/23/00 PLANS
BACK IN ARCHIVE. JO|12/4/00 PER INSPECTOR INSTRUCTION, VALUE RAISED $7,000,000 TO
REFLECT|TRUE VALUE OF WORK. JO|>>> 12/04/2000 16:35:45 OAKLE#JM OAK0821CA|2/9/01
REVISION PLAN ON READY TO ISSUE SHELF. JO|>>> 02/09/2001 17:31:36 OAKLE#JM
OAK0821CA
|1/24/00 TITLE 24 REPORT PREPARED BY MECHANICAL CONTRACTOR IN PLM/MECH|PLAN CHECK
FOLDER.|3/30/00 Three plansets submitted in response to 2/13/00 comments. JO|8/23/00 PLANS
BACK IN ARCHIVE. JO|12/4/00 PER INSPECTOR INSTRUCTION, VALUE RAISED $7,000,000 TO
REFLECT|TRUE VALUE OF WORK. JO|>>> 12/04/2000 16:35:45 OAKLE#JM OAK0821CA|2/9/01
REVISION PLAN ON READY TO ISSUE SHELF. JO|>>> 02/09/2001 17:31:36 OAKLE#JM
OAK0821CA
|1/24/00 TITLE 24 REPORT PREPARED BY MECHANICAL CONTRACTOR IN PLM/MECH|PLAN CHECK
FOLDER.|3/30/00 Three plansets submitted in response to 2/13/00 comments. JO|8/23/00 PLANS
BACK IN ARCHIVE. JO|12/4/00 PER INSPECTOR INSTRUCTION, VALUE RAISED $7,000,000 TO
REFLECT|TRUE VALUE OF WORK. JO|>>> 12/04/2000 16:35:45 OAKLE#JM OAK0821CA|2/9/01
REVISION PLAN ON READY TO ISSUE SHELF. JO|>>> 02/09/2001 17:31:36 OAKLE#JM
OAK0821CA
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 14 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 15 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 16 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 17 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 18 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 19 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 20 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 21 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 22 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 23 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 24 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 25 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 26 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 27 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 28 of 141
1/19/2014
PTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 29 of 141
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
PTS
COMMENTS
|interior work is allowed - construction on exterior portion of deck is|paused until design review is
complete. Permit can be issued. Claud|ia Cappio - x2229|>>> 05/01/2001 08:21:27 SMITH#DB
0008|6/4/01 OFFICE COPY TO P. MCGOWAN. JO|>>> 06/04/2001 15:55:44 OAKLE#JM
OAK0821CA|6/5/01 OFFICE COPY RETURNED TO ARCHIVE. JO|>>> 06/05/2001 11:17:52
OAKLE#JM OAK0821CA|6/26/01 REVISION #1: STRUCTURAL EXTERIOR WORK RELEASED,
EXCLUDES|HORIZONTAL RAILING COMPONENTS, LATTICE WORK AND LANDSCAPING.
REVISION|#2 WILL RELEASE RAILING LATIC WORK AND LANDSCAPING. JO|>>> 06/26/2001
11:09:04 PARKE#JM OAK0847CA|6/26/01 (CORRECTION) REVISION #1: STRUCTURAL EXTERIOR
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 30 of 141
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 31 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
|interior work is allowed - construction on exterior portion of deck is|paused until design review is
complete. Permit can be issued. Claud|ia Cappio - x2229|>>> 05/01/2001 08:21:27 SMITH#DB
0008|6/4/01 OFFICE COPY TO P. MCGOWAN. JO|>>> 06/04/2001 15:55:44 OAKLE#JM
OAK0821CA|6/5/01 OFFICE COPY RETURNED TO ARCHIVE. JO|>>> 06/05/2001 11:17:52
OAKLE#JM OAK0821CA|6/26/01 REVISION #1: STRUCTURAL EXTERIOR WORK RELEASED,
EXCLUDES|HORIZONTAL RAILING COMPONENTS, LATTICE WORK AND LANDSCAPING.
REVISION|#2 WILL RELEASE RAILING LATIC WORK AND LANDSCAPING. JO|>>> 06/26/2001
11:09:04 PARKE#JM OAK0847CA|6/26/01 (CORRECTION) REVISION #1: STRUCTURAL EXTERIOR
WORK RELEASED,|EXCLUDES VERTICAL AND HORIZONTAL RAILING COMPONENTS, LATTICE
WORK AND|LANDSCAPING. REVISION #2 WILL RELEASE RAILING LATIC WORK
AND|LANDSCAPING. JO|>>> 06/26/2001 12:00:42 OAKLE#JM OAK0821CA|7/5/01 REVISION #2
SUBMITTED, INCLUDES VERTICAL AND HORIZONTAL RAIL-|ING COMPONENTS, LATTICE WORK
AND LANDSCAPING. JO|>>> 07/05/2001 13:14:29 OAKLE#JM OAK0821CA|7/09/01: Exterior
appearance of deck approved by Planning per plans|>>> 07/09/2001 10:31:56 OAKLE#JM
0044|7/09/01: Exterior appearance of deck approved by Planning per plans|dated 7/03/01,
including the railing, lattice and planting at base of|deck and on slope below deck. Planting shall be
installed within|60 days of final inspection of the deck; painted parts of the|railing and columns
shall be white or off-white similar to the hotel|building; lattice shall be white/off-white or
brown/gray to match the|stone base of the hotel. This signoff approves Revision #2. PJM|>>>
07/09/2001 10:39:13 OAKLE#JM 0044|7/9/01 REV #2 ON REVISION SHELF READY TO ISSUE.
JO|>>> 07/09/2001 13:23:45 OAKLE#JM OAK0821CA|10/1/01 REV #3 Handrail for deck. Revision
approved by zoning. PJM|>>> 10/01/2001 11:54:42 MCGOW#P 0060|11/5/01 Change from metal
tubular handrail to San Francisco Victoriana|approved by PJM. ON REVISION SHELF READY TO
ISSUE SHELF. JO|>>> 11/13/2001 16:36:55 OAKLE#JM OAK0821CA|2/1/02 - Exterior work
completed per approved plans and zoning|conditions. Job card final signed for zoning.
CD01238.|BQ x6345|>>> 02/01/2002 16:00:58 QUESA#BG OAK0839CA
|interior work is allowed - construction on exterior portion of deck is|paused until design review is
complete. Permit can be issued. Claud|ia Cappio - x2229|>>> 05/01/2001 08:21:27 SMITH#DB
0008|6/4/01 OFFICE COPY TO P. MCGOWAN. JO|>>> 06/04/2001 15:55:44 OAKLE#JM
OAK0821CA|6/5/01 OFFICE COPY RETURNED TO ARCHIVE. JO|>>> 06/05/2001 11:17:52
OAKLE#JM OAK0821CA|6/26/01 REVISION #1: STRUCTURAL EXTERIOR WORK RELEASED,
EXCLUDES|HORIZONTAL RAILING COMPONENTS, LATTICE WORK AND LANDSCAPING.
REVISION|#2 WILL RELEASE RAILING LATIC WORK AND LANDSCAPING. JO|>>> 06/26/2001
11:09:04 PARKE#JM OAK0847CA|6/26/01 (CORRECTION) REVISION #1: STRUCTURAL EXTERIOR
WORK RELEASED,|EXCLUDES VERTICAL AND HORIZONTAL RAILING COMPONENTS, LATTICE
WORK AND|LANDSCAPING. REVISION #2 WILL RELEASE RAILING LATIC WORK
AND|LANDSCAPING. JO|>>> 06/26/2001 12:00:42 OAKLE#JM OAK0821CA|7/5/01 REVISION #2
SUBMITTED, INCLUDES VERTICAL AND HORIZONTAL RAIL-|ING COMPONENTS, LATTICE WORK
AND LANDSCAPING. JO|>>> 07/05/2001 13:14:29 OAKLE#JM OAK0821CA|7/09/01: Exterior
appearance of deck approved by Planning per plans|>>> 07/09/2001 10:31:56 OAKLE#JM
0044|7/09/01: Exterior appearance of deck approved by Planning per plans|dated 7/03/01,
including the railing, lattice and planting at base of|deck and on slope below deck. Planting shall be
installed within|60 days of final inspection of the deck; painted parts of the|railing and columns
shall be white or off-white similar to the hotel|building; lattice shall be white/off-white or
brown/gray to match the|stone base of the hotel. This signoff approves Revision #2. PJM|>>>
07/09/2001 10:39:13 OAKLE#JM 0044|7/9/01 REV #2 ON REVISION SHELF READY TO ISSUE.
JO|>>> 07/09/2001 13:23:45 OAKLE#JM OAK0821CA|10/1/01 REV #3 Handrail for deck. Revision
approved by zoning. PJM|>>> 10/01/2001 11:54:42 MCGOW#P 0060|11/5/01 Change from metal
tubular handrail to San Francisco Victoriana|approved by PJM. ON REVISION SHELF READY TO
ISSUE SHELF. JO|>>> 11/13/2001 16:36:55 OAKLE#JM OAK0821CA|2/1/02 - Exterior work
completed per approved plans and zoning|conditions. Job card final signed for zoning.
CD01238.|BQ x6345|>>> 02/01/2002 16:00:58 QUESA#BG OAK0839CA
|interior work is allowed - construction on exterior portion of deck is|paused until design review is
complete. Permit can be issued. Claud|ia Cappio - x2229|>>> 05/01/2001 08:21:27 SMITH#DB
0008|6/4/01 OFFICE COPY TO P. MCGOWAN. JO|>>> 06/04/2001 15:55:44 OAKLE#JM
OAK0821CA|6/5/01 OFFICE COPY RETURNED TO ARCHIVE. JO|>>> 06/05/2001 11:17:52
OAKLE#JM OAK0821CA|6/26/01 REVISION #1: STRUCTURAL EXTERIOR WORK RELEASED,
EXCLUDES|HORIZONTAL RAILING COMPONENTS, LATTICE WORK AND LANDSCAPING.
REVISION|#2 WILL RELEASE RAILING LATIC WORK AND LANDSCAPING. JO|>>> 06/26/2001
11:09:04 PARKE#JM OAK0847CA|6/26/01 (CORRECTION) REVISION #1: STRUCTURAL EXTERIOR
WORK RELEASED,|EXCLUDES VERTICAL AND HORIZONTAL RAILING COMPONENTS, LATTICE
WORK AND|LANDSCAPING. REVISION #2 WILL RELEASE RAILING LATIC WORK
AND|LANDSCAPING. JO|>>> 06/26/2001 12:00:42 OAKLE#JM OAK0821CA|7/5/01 REVISION #2
SUBMITTED, INCLUDES VERTICAL AND HORIZONTAL RAIL-|ING COMPONENTS, LATTICE WORK
AND LANDSCAPING. JO|>>> 07/05/2001 13:14:29 OAKLE#JM OAK0821CA|7/09/01: Exterior
appearance of deck approved by Planning per plans|>>> 07/09/2001 10:31:56 OAKLE#JM
0044|7/09/01: Exterior appearance of deck approved by Planning per plans|dated 7/03/01,
including the railing, lattice and planting at base of|deck and on slope below deck. Planting shall be
installed within|60 days of final inspection of the deck; painted parts of the|railing and columns
shall be white or off-white similar to the hotel|building; lattice shall be white/off-white or
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 32 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
brown/gray to match the|stone base of the hotel. This signoff approves Revision #2. PJM|>>>
07/09/2001 10:39:13 OAKLE#JM 0044|7/9/01 REV #2 ON REVISION SHELF READY TO ISSUE.
JO|>>> 07/09/2001 13:23:45 OAKLE#JM OAK0821CA|10/1/01 REV #3 Handrail for deck. Revision
approved by zoning. PJM|>>> 10/01/2001 11:54:42 MCGOW#P 0060|11/5/01 Change from metal
tubular handrail to San Francisco Victoriana|approved by PJM. ON REVISION SHELF READY TO
ISSUE SHELF. JO|>>> 11/13/2001 16:36:55 OAKLE#JM OAK0821CA|2/1/02 - Exterior work
completed per approved plans and zoning|conditions. Job card final signed for zoning.
CD01238.|BQ x6345|>>> 02/01/2002 16:00:58 QUESA#BG OAK0839CA
|interior work is allowed - construction on exterior portion of deck is|paused until design review is
complete. Permit can be issued. Claud|ia Cappio - x2229|>>> 05/01/2001 08:21:27 SMITH#DB
0008|6/4/01 OFFICE COPY TO P. MCGOWAN. JO|>>> 06/04/2001 15:55:44 OAKLE#JM
OAK0821CA|6/5/01 OFFICE COPY RETURNED TO ARCHIVE. JO|>>> 06/05/2001 11:17:52
OAKLE#JM OAK0821CA|6/26/01 REVISION #1: STRUCTURAL EXTERIOR WORK RELEASED,
EXCLUDES|HORIZONTAL RAILING COMPONENTS, LATTICE WORK AND LANDSCAPING.
REVISION|#2 WILL RELEASE RAILING LATIC WORK AND LANDSCAPING. JO|>>> 06/26/2001
11:09:04 PARKE#JM OAK0847CA|6/26/01 (CORRECTION) REVISION #1: STRUCTURAL EXTERIOR
WORK RELEASED,|EXCLUDES VERTICAL AND HORIZONTAL RAILING COMPONENTS, LATTICE
WORK AND|LANDSCAPING. REVISION #2 WILL RELEASE RAILING LATIC WORK
AND|LANDSCAPING. JO|>>> 06/26/2001 12:00:42 OAKLE#JM OAK0821CA|7/5/01 REVISION #2
SUBMITTED, INCLUDES VERTICAL AND HORIZONTAL RAIL-|ING COMPONENTS, LATTICE WORK
AND LANDSCAPING. JO|>>> 07/05/2001 13:14:29 OAKLE#JM OAK0821CA|7/09/01: Exterior
appearance of deck approved by Planning per plans|>>> 07/09/2001 10:31:56 OAKLE#JM
0044|7/09/01: Exterior appearance of deck approved by Planning per plans|dated 7/03/01,
including the railing, lattice and planting at base of|deck and on slope below deck. Planting shall be
installed within|60 days of final inspection of the deck; painted parts of the|railing and columns
shall be white or off-white similar to the hotel|building; lattice shall be white/off-white or
brown/gray to match the|stone base of the hotel. This signoff approves Revision #2. PJM|>>>
07/09/2001 10:39:13 OAKLE#JM 0044|7/9/01 REV #2 ON REVISION SHELF READY TO ISSUE.
JO|>>> 07/09/2001 13:23:45 OAKLE#JM OAK0821CA|10/1/01 REV #3 Handrail for deck. Revision
approved by zoning. PJM|>>> 10/01/2001 11:54:42 MCGOW#P 0060|11/5/01 Change from metal
tubular handrail to San Francisco Victoriana|approved by PJM. ON REVISION SHELF READY TO
ISSUE SHELF. JO|>>> 11/13/2001 16:36:55 OAKLE#JM OAK0821CA|2/1/02 - Exterior work
completed per approved plans and zoning|conditions. Job card final signed for zoning.
CD01238.|BQ x6345|>>> 02/01/2002 16:00:58 QUESA#BG OAK0839CA
|interior work is allowed - construction on exterior portion of deck is|paused until design review is
complete. Permit can be issued. Claud|ia Cappio - x2229|>>> 05/01/2001 08:21:27 SMITH#DB
0008|6/4/01 OFFICE COPY TO P. MCGOWAN. JO|>>> 06/04/2001 15:55:44 OAKLE#JM
OAK0821CA|6/5/01 OFFICE COPY RETURNED TO ARCHIVE. JO|>>> 06/05/2001 11:17:52
OAKLE#JM OAK0821CA|6/26/01 REVISION #1: STRUCTURAL EXTERIOR WORK RELEASED,
EXCLUDES|HORIZONTAL RAILING COMPONENTS, LATTICE WORK AND LANDSCAPING.
REVISION|#2 WILL RELEASE RAILING LATIC WORK AND LANDSCAPING. JO|>>> 06/26/2001
11:09:04 PARKE#JM OAK0847CA|6/26/01 (CORRECTION) REVISION #1: STRUCTURAL EXTERIOR
WORK RELEASED,|EXCLUDES VERTICAL AND HORIZONTAL RAILING COMPONENTS, LATTICE
WORK AND|LANDSCAPING. REVISION #2 WILL RELEASE RAILING LATIC WORK
AND|LANDSCAPING. JO|>>> 06/26/2001 12:00:42 OAKLE#JM OAK0821CA|7/5/01 REVISION #2
SUBMITTED, INCLUDES VERTICAL AND HORIZONTAL RAIL-|ING COMPONENTS, LATTICE WORK
AND LANDSCAPING. JO|>>> 07/05/2001 13:14:29 OAKLE#JM OAK0821CA|7/09/01: Exterior
appearance of deck approved by Planning per plans|>>> 07/09/2001 10:31:56 OAKLE#JM
0044|7/09/01: Exterior appearance of deck approved by Planning per plans|dated 7/03/01,
including the railing, lattice and planting at base of|deck and on slope below deck. Planting shall be
installed within|60 days of final inspection of the deck; painted parts of the|railing and columns
shall be white or off-white similar to the hotel|building; lattice shall be white/off-white or
brown/gray to match the|stone base of the hotel. This signoff approves Revision #2. PJM|>>>
07/09/2001 10:39:13 OAKLE#JM 0044|7/9/01 REV #2 ON REVISION SHELF READY TO ISSUE.
JO|>>> 07/09/2001 13:23:45 OAKLE#JM OAK0821CA|10/1/01 REV #3 Handrail for deck. Revision
approved by zoning. PJM|>>> 10/01/2001 11:54:42 MCGOW#P 0060|11/5/01 Change from metal
tubular handrail to San Francisco Victoriana|approved by PJM. ON REVISION SHELF READY TO
ISSUE SHELF. JO|>>> 11/13/2001 16:36:55 OAKLE#JM OAK0821CA|2/1/02 - Exterior work
completed per approved plans and zoning|conditions. Job card final signed for zoning.
CD01238.|BQ x6345|>>> 02/01/2002 16:00:58 QUESA#BG OAK0839CA
|interior work is allowed - construction on exterior portion of deck is|paused until design review is
complete. Permit can be issued. Claud|ia Cappio - x2229|>>> 05/01/2001 08:21:27 SMITH#DB
0008|6/4/01 OFFICE COPY TO P. MCGOWAN. JO|>>> 06/04/2001 15:55:44 OAKLE#JM
OAK0821CA|6/5/01 OFFICE COPY RETURNED TO ARCHIVE. JO|>>> 06/05/2001 11:17:52
OAKLE#JM OAK0821CA|6/26/01 REVISION #1: STRUCTURAL EXTERIOR WORK RELEASED,
EXCLUDES|HORIZONTAL RAILING COMPONENTS, LATTICE WORK AND LANDSCAPING.
REVISION|#2 WILL RELEASE RAILING LATIC WORK AND LANDSCAPING. JO|>>> 06/26/2001
11:09:04 PARKE#JM OAK0847CA|6/26/01 (CORRECTION) REVISION #1: STRUCTURAL EXTERIOR
WORK RELEASED,|EXCLUDES VERTICAL AND HORIZONTAL RAILING COMPONENTS, LATTICE
WORK AND|LANDSCAPING. REVISION #2 WILL RELEASE RAILING LATIC WORK
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 33 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 34 of 141
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 35 of 141
1/19/2014
PTS
1/19/2014
PTS
JO|>>> 07/09/2001 13:23:45 OAKLE#JM OAK0821CA|10/1/01 REV #3 Handrail for deck. Revision
approved by zoning. PJM|>>> 10/01/2001 11:54:42 MCGOW#P 0060|11/5/01 Change from metal
tubular handrail to San Francisco Victoriana|approved by PJM. ON REVISION SHELF READY TO
ISSUE SHELF. JO|>>> 11/13/2001 16:36:55 OAKLE#JM OAK0821CA|2/1/02 - Exterior work
completed per approved plans and zoning|conditions. Job card final signed for zoning.
CD01238.|BQ x6345|>>> 02/01/2002 16:00:58 QUESA#BG OAK0839CA
|interior work is allowed - construction on exterior portion of deck is|paused until design review is
complete. Permit can be issued. Claud|ia Cappio - x2229|>>> 05/01/2001 08:21:27 SMITH#DB
0008|6/4/01 OFFICE COPY TO P. MCGOWAN. JO|>>> 06/04/2001 15:55:44 OAKLE#JM
OAK0821CA|6/5/01 OFFICE COPY RETURNED TO ARCHIVE. JO|>>> 06/05/2001 11:17:52
OAKLE#JM OAK0821CA|6/26/01 REVISION #1: STRUCTURAL EXTERIOR WORK RELEASED,
EXCLUDES|HORIZONTAL RAILING COMPONENTS, LATTICE WORK AND LANDSCAPING.
REVISION|#2 WILL RELEASE RAILING LATIC WORK AND LANDSCAPING. JO|>>> 06/26/2001
11:09:04 PARKE#JM OAK0847CA|6/26/01 (CORRECTION) REVISION #1: STRUCTURAL EXTERIOR
WORK RELEASED,|EXCLUDES VERTICAL AND HORIZONTAL RAILING COMPONENTS, LATTICE
WORK AND|LANDSCAPING. REVISION #2 WILL RELEASE RAILING LATIC WORK
AND|LANDSCAPING. JO|>>> 06/26/2001 12:00:42 OAKLE#JM OAK0821CA|7/5/01 REVISION #2
SUBMITTED, INCLUDES VERTICAL AND HORIZONTAL RAIL-|ING COMPONENTS, LATTICE WORK
AND LANDSCAPING. JO|>>> 07/05/2001 13:14:29 OAKLE#JM OAK0821CA|7/09/01: Exterior
appearance of deck approved by Planning per plans|>>> 07/09/2001 10:31:56 OAKLE#JM
0044|7/09/01: Exterior appearance of deck approved by Planning per plans|dated 7/03/01,
including the railing, lattice and planting at base of|deck and on slope below deck. Planting shall be
installed within|60 days of final inspection of the deck; painted parts of the|railing and columns
shall be white or off-white similar to the hotel|building; lattice shall be white/off-white or
brown/gray to match the|stone base of the hotel. This signoff approves Revision #2. PJM|>>>
07/09/2001 10:39:13 OAKLE#JM 0044|7/9/01 REV #2 ON REVISION SHELF READY TO ISSUE.
JO|>>> 07/09/2001 13:23:45 OAKLE#JM OAK0821CA|10/1/01 REV #3 Handrail for deck. Revision
approved by zoning. PJM|>>> 10/01/2001 11:54:42 MCGOW#P 0060|11/5/01 Change from metal
tubular handrail to San Francisco Victoriana|approved by PJM. ON REVISION SHELF READY TO
ISSUE SHELF. JO|>>> 11/13/2001 16:36:55 OAKLE#JM OAK0821CA|2/1/02 - Exterior work
completed per approved plans and zoning|conditions. Job card final signed for zoning.
CD01238.|BQ x6345|>>> 02/01/2002 16:00:58 QUESA#BG OAK0839CA
|interior work is allowed - construction on exterior portion of deck is|paused until design review is
complete. Permit can be issued. Claud|ia Cappio - x2229|>>> 05/01/2001 08:21:27 SMITH#DB
0008|6/4/01 OFFICE COPY TO P. MCGOWAN. JO|>>> 06/04/2001 15:55:44 OAKLE#JM
OAK0821CA|6/5/01 OFFICE COPY RETURNED TO ARCHIVE. JO|>>> 06/05/2001 11:17:52
OAKLE#JM OAK0821CA|6/26/01 REVISION #1: STRUCTURAL EXTERIOR WORK RELEASED,
EXCLUDES|HORIZONTAL RAILING COMPONENTS, LATTICE WORK AND LANDSCAPING.
REVISION|#2 WILL RELEASE RAILING LATIC WORK AND LANDSCAPING. JO|>>> 06/26/2001
11:09:04 PARKE#JM OAK0847CA|6/26/01 (CORRECTION) REVISION #1: STRUCTURAL EXTERIOR
WORK RELEASED,|EXCLUDES VERTICAL AND HORIZONTAL RAILING COMPONENTS, LATTICE
WORK AND|LANDSCAPING. REVISION #2 WILL RELEASE RAILING LATIC WORK
AND|LANDSCAPING. JO|>>> 06/26/2001 12:00:42 OAKLE#JM OAK0821CA|7/5/01 REVISION #2
SUBMITTED, INCLUDES VERTICAL AND HORIZONTAL RAIL-|ING COMPONENTS, LATTICE WORK
AND LANDSCAPING. JO|>>> 07/05/2001 13:14:29 OAKLE#JM OAK0821CA|7/09/01: Exterior
appearance of deck approved by Planning per plans|>>> 07/09/2001 10:31:56 OAKLE#JM
0044|7/09/01: Exterior appearance of deck approved by Planning per plans|dated 7/03/01,
including the railing, lattice and planting at base of|deck and on slope below deck. Planting shall be
installed within|60 days of final inspection of the deck; painted parts of the|railing and columns
shall be white or off-white similar to the hotel|building; lattice shall be white/off-white or
brown/gray to match the|stone base of the hotel. This signoff approves Revision #2. PJM|>>>
07/09/2001 10:39:13 OAKLE#JM 0044|7/9/01 REV #2 ON REVISION SHELF READY TO ISSUE.
JO|>>> 07/09/2001 13:23:45 OAKLE#JM OAK0821CA|10/1/01 REV #3 Handrail for deck. Revision
approved by zoning. PJM|>>> 10/01/2001 11:54:42 MCGOW#P 0060|11/5/01 Change from metal
tubular handrail to San Francisco Victoriana|approved by PJM. ON REVISION SHELF READY TO
ISSUE SHELF. JO|>>> 11/13/2001 16:36:55 OAKLE#JM OAK0821CA|2/1/02 - Exterior work
completed per approved plans and zoning|conditions. Job card final signed for zoning.
CD01238.|BQ x6345|>>> 02/01/2002 16:00:58 QUESA#BG OAK0839CA
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 36 of 141
COMMENTER
COMMENTS
COMMENTER
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
COMMENTS
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
final signed
final signed
final signed
final signed
final signed
final signed
final signed
final signed
final signed
final signed
final signed
final signed
final signed
final signed
final signed
10/6/2016
Page 37 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
|2/1/02 - Exterior work completed per approved plans and zoning|conditions. Job card
for zoning. CD01238.|BQ x6345|>>> 02/01/2002 16:02:09 QUESA#BG OAK0839CA
final signed
final signed
final signed
final signed
final signed
final signed
final signed
final signed
final signed
final signed
COMMENTER
PTS
COMMENTS
|phone order by Robert Futch, contractor office, receipt given to|his staff at counter. Annie|>>>
12/11/2003 15:18:27 LEUNG#AY CASHTERM1
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 38 of 141
COMMENT DATE
COMMENTER
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
COMMENTS
|Field check is complete; but needs Health Approval. Called applicant|to pick up plans and get
Health Dept stamp and return the plans to us.|Plans will be in needs; keep the file in needs file
after applicant|picks up plans.|>>> 02/28/2006 14:47:56 LEE#C 0177|Applicant picked up plans
to get Health approval; send to plan check|after he resubmits with Health Dept. approval.|>>>
03/08/2006 10:42:23 LEE#C 0127
|Field check is complete; but needs Health Approval. Called applicant|to pick up plans and get
Health Dept stamp and return the plans to us.|Plans will be in needs; keep the file in needs file
after applicant|picks up plans.|>>> 02/28/2006 14:47:56 LEE#C 0177|Applicant picked up plans
to get Health approval; send to plan check|after he resubmits with Health Dept. approval.|>>>
03/08/2006 10:42:23 LEE#C 0127
|Field check is complete; but needs Health Approval. Called applicant|to pick up plans and get
Health Dept stamp and return the plans to us.|Plans will be in needs; keep the file in needs file
after applicant|picks up plans.|>>> 02/28/2006 14:47:56 LEE#C 0177|Applicant picked up plans
to get Health approval; send to plan check|after he resubmits with Health Dept. approval.|>>>
03/08/2006 10:42:23 LEE#C 0127
COMMENTER
COMMENTS
COMMENTER
PTS
COMMENTS
|4/19/06-FIELD CHECK: HANDICAP ACCESS ENTRY, PATH, AND BATHROOMS ALL|COMPLY.
SEPARATE ISSUE REGARDING THE PROPOSED RETAINING WALL/FENCE TO|BE CONSTRUCTED
BEHIND THE NEW SWIMMING POOL WAS DISCUSSED WITH HOTEL|MANAGEMENT. THEY WILL
SECURE A SEPARATED PERMIT FOR THIS ITEM WHICH|DOES NOT APPEAR TO BE PART OF THE
SCOPE UNDER THE CURRENT PERMIT|APPLICATION. FURTHER DISCUSSION REGARDING
OUTSTANDING COMPLAINT AND|PERMITS FOR THE HVAC UNIT INSTALLED IN 2005-MANAGEMENT INDICATES A|PERMIT APPLICATION IS "IN THE MAIL" (IE THEY ARE WORKING
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 39 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 40 of 141
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 41 of 141
License #: 570031
COMMENT DATE
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
1/20/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/20/2014
PTS
COMMENTS
|Refund request submitted for Claremont Resort & Spa 41 Tunnel Rd Berke|ley, CA 94705. Extra
money $69.13. Do not sent to fiscal until 10/6/06|. Sent to Tim Low. SKJ x4774|>>> 09/06/2006
14:06:08 JOHNS#SK CASHTERM1|Tim approved, sent to Joanne.|>>> 09/13/2006 08:58:40
JOHNS#SK CASHTERM1|Joanne approved. sent to fiscal. cashier will mail check when issued|.
Diana x 4774|>>> 09/14/2006 14:51:09 REX#D CASHTERM2|Cashier mailed check#565695,
$69.13, vendor#25320|>>> 10/12/2006 15:56:40 JOHNS#SK CASHTERM1
|SPECIAL INSPECTION FORWARDED TO SCANNING UNIT|>>> 01/30/2008 08:38:36 TEMP#PTS
0032
|SPECIAL INSPECTION FORWARDED TO SCANNING UNIT|>>> 01/30/2008 08:38:36 TEMP#PTS
0032
|Refund request submitted for Claremont Resort & Spa 41 Tunnel Rd Berke|ley, CA 94705. Extra
money $69.13. Do not sent to fiscal until 10/6/06|. Sent to Tim Low. SKJ x4774|>>> 09/06/2006
14:06:08 JOHNS#SK CASHTERM1|Tim approved, sent to Joanne.|>>> 09/13/2006 08:58:40
JOHNS#SK CASHTERM1|Joanne approved. sent to fiscal. cashier will mail check when issued|.
Diana x 4774|>>> 09/14/2006 14:51:09 REX#D CASHTERM2|Cashier mailed check#565695,
$69.13, vendor#25320|>>> 10/12/2006 15:56:40 JOHNS#SK CASHTERM1
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 42 of 141
COMMENTER
PTS
COMMENTS
|Applicant Ron Zeiger (electrical engineer) says someone else will come|back w/check to pay for
application. In needs file. I also let him|know that structural eng. calc.s need to be provided for the
14 new|steel lights poles. He said he will let the owners know about this &|the overall site plan req,
etc.|>>> 12/18/2008 11:15:54 WONG#JJ 0533
COMMENTER
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
COMMENTS
|call from management about allowing rooms under construction to be occ|upied
inspection due to shut down week.|>>> 12/23/2011 14:38:59 STEWA#JU 0043
|call from management about allowing rooms under construction to be occ|upied
inspection due to shut down week.|>>> 12/23/2011 14:38:59 STEWA#JU 0043
|call from management about allowing rooms under construction to be occ|upied
inspection due to shut down week.|>>> 12/23/2011 14:38:59 STEWA#JU 0043
|call from management about allowing rooms under construction to be occ|upied
inspection due to shut down week.|>>> 12/23/2011 14:38:59 STEWA#JU 0043
|call from management about allowing rooms under construction to be occ|upied
inspection due to shut down week.|>>> 12/23/2011 14:38:59 STEWA#JU 0043
|call from management about allowing rooms under construction to be occ|upied
inspection due to shut down week.|>>> 12/23/2011 14:38:59 STEWA#JU 0043
|call from management about allowing rooms under construction to be occ|upied
inspection due to shut down week.|>>> 12/23/2011 14:38:59 STEWA#JU 0043
|call from management about allowing rooms under construction to be occ|upied
inspection due to shut down week.|>>> 12/23/2011 14:38:59 STEWA#JU 0043
without final
without final
without final
without final
without final
without final
without final
without final
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 43 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
without final
without final
without final
without final
without final
without final
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 44 of 141
Unit #:
Description: Voluntary disabled access barrier removal project-constructi of a new accessible path of travel walkway
between the main hotel and the health club. Renovation of existing path.
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
GLIM
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 45 of 141
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
12/30/2014
GLIM
GLIM
GLIM
GLIM
GLIM
GLIM
12/30/2014
GLIM
12/30/2014
GLIM
12/30/2014
GLIM
12.30.14 After discussion with design engineer, the special inspections for Bolts in Concrete,
Welding, and Structural Observations have been removed. Plans may still have the Special
Inspection stamp on them, but no special inspections are required. GML Ext.6433
12.30.14 High Strength Bolting is no longer required also. GML Ext.6433
12.30.14 High Strength Bolting is no longer required also. GML Ext.6433
12.30.14 High Strength Bolting is no longer required also. GML Ext.6433
12.30.14 High Strength Bolting is no longer required also. GML Ext.6433
12.30.14 High Strength Bolting is no longer required also. GML Ext.6433
12.30.14 After discussion with design engineer, the special inspections for Bolts in Concrete,
Welding, and Structural Observations have been removed. Plans may still have the Special
Inspection stamp on them, but no special inspections are required. GML Ext.6433
12.30.14 After discussion with design engineer, the special inspections for Bolts in Concrete,
Welding, and Structural Observations have been removed. Plans may still have the Special
Inspection stamp on them, but no special inspections are required. GML Ext.6433
12.30.14 After discussion with design engineer, the special inspections for Bolts in Concrete,
Welding, and Structural Observations have been removed. Plans may still have the Special
Inspection stamp on them, but no special inspections are required. GML Ext.6433
12.30.14 After discussion with design engineer, the special inspections for Bolts in Concrete,
Welding, and Structural Observations have been removed. Plans may still have the Special
Inspection stamp on them, but no special inspections are required. GML Ext.6433
Field
Field
Field
Field
Field
COMMENTER
RPILI
RPILI
RPILI
RPILI
RPILI
RPILI
RPILI
COMMENTS
Applicant
Applicant
Applicant
Applicant
Applicant
Applicant
Applicant
filled
filled
filled
filled
filled
filled
filled
WRRP.
WRRP.
WRRP.
WRRP.
WRRP.
WRRP.
WRRP.
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 46 of 141
Requestor:
:
Business Name: HATHAWAY DINWIDDIE CONSTRUCTION COMPANY
License #: 729664
COMMENT DATE
4/9/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
COMMENTER
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
COMMENTS
OT.REQUESTED
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
Notified Edgar, Fees
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 47 of 141
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 48 of 141
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Edgar,
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 49 of 141
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
due
due
due
due
due
due
due
due
due
due
due
due
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 50 of 141
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 51 of 141
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 52 of 141
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
COMMENTER
COMMENTS
COMMENTER
CBURNS
CBURNS
COMMENTS
OT requested 6-5-15.
8-7-15: Revision approved by Kenny 8-4-15: Notified Edgar $1,290.94 due. CB
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 53 of 141
8/7/2015
8/7/2015
8/7/2015
8/7/2015
8/7/2015
8/7/2015
8/7/2015
8/7/2015
8/7/2015
8/7/2015
8/7/2015
8/7/2015
8/7/2015
8/7/2015
8/7/2015
8/7/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
6/9/2015
6/9/2015
6/9/2015
6/9/2015
6/9/2015
6/9/2015
6/9/2015
6/9/2015
6/9/2015
6/9/2015
6/9/2015
6/9/2015
6/9/2015
6/9/2015
6/9/2015
6/9/2015
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
due.
due.
due.
due.
due.
due.
due.
due.
due.
due.
due.
due.
due.
due.
due.
due.
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 54 of 141
COMMENTER
COMMENTS
COMMENTER
7/8/2015
11/6/2015
11/6/2015
11/6/2015
11/6/2015
11/6/2015
11/6/2015
11/6/2015
11/6/2015
11/6/2015
11/6/2015
11/6/2015
11/6/2015
11/6/2015
11/6/2015
11/6/2015
11/6/2015
11/6/2015
8/18/2015
KPACHECO
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
8/18/2015
CBURNS
8/18/2015
CBURNS
8/18/2015
CBURNS
8/18/2015
CBURNS
COMMENTS
applicant to bring in county health stamped plans within 1 week - KEP
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
REVISION FOR RAMP APPROVED. NOTIFIED EDGAR. $430.32 DUE.
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 55 of 141
8/18/2015
CBURNS
8/18/2015
CBURNS
8/18/2015
CBURNS
8/18/2015
CBURNS
8/18/2015
CBURNS
8/18/2015
CBURNS
8/18/2015
CBURNS
8/18/2015
CBURNS
8/18/2015
CBURNS
8/18/2015
CBURNS
8/18/2015
CBURNS
8/18/2015
CBURNS
7/13/2015
7/13/2015
7/13/2015
7/13/2015
7/13/2015
7/13/2015
7/13/2015
7/13/2015
7/13/2015
7/13/2015
7/13/2015
7/13/2015
7/13/2015
7/13/2015
7/13/2015
7/13/2015
7/13/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
7/8/2015
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
KPACHECO
KPACHECO
KPACHECO
KPACHECO
KPACHECO
KPACHECO
KPACHECO
KPACHECO
KPACHECO
KPACHECO
KPACHECO
KPACHECO
KPACHECO
KPACHECO
KPACHECO
KPACHECO
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
8-18-15: Notify Garret & Edgar; $3,227.34 due; Recycling Hold; Special
CB
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
applicant to bring in county health stamped plans within 1 week - KEP
applicant to bring in county health stamped plans within 1 week - KEP
applicant to bring in county health stamped plans within 1 week - KEP
applicant to bring in county health stamped plans within 1 week - KEP
applicant to bring in county health stamped plans within 1 week - KEP
applicant to bring in county health stamped plans within 1 week - KEP
applicant to bring in county health stamped plans within 1 week - KEP
applicant to bring in county health stamped plans within 1 week - KEP
applicant to bring in county health stamped plans within 1 week - KEP
applicant to bring in county health stamped plans within 1 week - KEP
applicant to bring in county health stamped plans within 1 week - KEP
applicant to bring in county health stamped plans within 1 week - KEP
applicant to bring in county health stamped plans within 1 week - KEP
applicant to bring in county health stamped plans within 1 week - KEP
applicant to bring in county health stamped plans within 1 week - KEP
applicant to bring in county health stamped plans within 1 week - KEP
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 56 of 141
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 57 of 141
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 58 of 141
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 59 of 141
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 60 of 141
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 61 of 141
Unit #:
Description: CONV. ONE OFFICE INTO 2 OFFICES ADD ONE WALL & DOOR
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 62 of 141
Unit #:
Description: ADD NEW NON-BEARING SHEETROCK WALLS AT SPA
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 63 of 141
Address: 41 TUNNEL RD
APN: 048H766303500
Unit #:
Description: FIR WIY MEDAL STUD APPROX 20' WALL AND SHEET ROCK
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 64 of 141
COMMENT DATE
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 65 of 141
COMMENTER
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
COMMENTS
|6/17/96 - Plan revision of elevator bldg. footprint, elevations and|ramp location approved by
zoning. BQ x6345|9/23/96 - Plan revision to revise finished graded of handicap ramp|leading to
elevator bldg., involving elimination of req.|retaining walls, approved by zoning. BQ x6345
|6/17/96 - Plan revision of elevator bldg. footprint, elevations and|ramp location approved by
zoning. BQ x6345|9/23/96 - Plan revision to revise finished graded of handicap ramp|leading to
elevator bldg., involving elimination of req.|retaining walls, approved by zoning. BQ x6345
|6/17/96 - Plan revision of elevator bldg. footprint, elevations and|ramp location approved by
zoning. BQ x6345|9/23/96 - Plan revision to revise finished graded of handicap ramp|leading to
elevator bldg., involving elimination of req.|retaining walls, approved by zoning. BQ x6345
|6/17/96 - Plan revision of elevator bldg. footprint, elevations and|ramp location approved by
zoning. BQ x6345|9/23/96 - Plan revision to revise finished graded of handicap ramp|leading to
elevator bldg., involving elimination of req.|retaining walls, approved by zoning. BQ x6345
|6/17/96 - Plan revision of elevator bldg. footprint, elevations and|ramp location approved by
zoning. BQ x6345|9/23/96 - Plan revision to revise finished graded of handicap ramp|leading to
elevator bldg., involving elimination of req.|retaining walls, approved by zoning. BQ x6345
|6/17/96 - Plan revision of elevator bldg. footprint, elevations and|ramp location approved by
zoning. BQ x6345|9/23/96 - Plan revision to revise finished graded of handicap ramp|leading to
elevator bldg., involving elimination of req.|retaining walls, approved by zoning. BQ x6345
|6/17/96 - Plan revision of elevator bldg. footprint, elevations and|ramp location approved by
zoning. BQ x6345|9/23/96 - Plan revision to revise finished graded of handicap ramp|leading to
elevator bldg., involving elimination of req.|retaining walls, approved by zoning. BQ x6345
|6/17/96 - Plan revision of elevator bldg. footprint, elevations and|ramp location approved by
zoning. BQ x6345|9/23/96 - Plan revision to revise finished graded of handicap ramp|leading to
elevator bldg., involving elimination of req.|retaining walls, approved by zoning. BQ x6345
|6/17/96 - Plan revision of elevator bldg. footprint, elevations and|ramp location approved by
zoning. BQ x6345|9/23/96 - Plan revision to revise finished graded of handicap ramp|leading to
elevator bldg., involving elimination of req.|retaining walls, approved by zoning. BQ x6345
|6/17/96 - Plan revision of elevator bldg. footprint, elevations and|ramp location approved by
zoning. BQ x6345|9/23/96 - Plan revision to revise finished graded of handicap ramp|leading to
elevator bldg., involving elimination of req.|retaining walls, approved by zoning. BQ x6345
|6/17/96 - Plan revision of elevator bldg. footprint, elevations and|ramp location approved by
zoning. BQ x6345|9/23/96 - Plan revision to revise finished graded of handicap ramp|leading to
elevator bldg., involving elimination of req.|retaining walls, approved by zoning. BQ x6345
|6/17/96 - Plan revision of elevator bldg. footprint, elevations and|ramp location approved by
zoning. BQ x6345|9/23/96 - Plan revision to revise finished graded of handicap ramp|leading to
elevator bldg., involving elimination of req.|retaining walls, approved by zoning. BQ x6345
|6/17/96 - Plan revision of elevator bldg. footprint, elevations and|ramp location approved by
zoning. BQ x6345|9/23/96 - Plan revision to revise finished graded of handicap ramp|leading to
elevator bldg., involving elimination of req.|retaining walls, approved by zoning. BQ x6345
|6/17/96 - Plan revision of elevator bldg. footprint, elevations and|ramp location approved by
zoning. BQ x6345|9/23/96 - Plan revision to revise finished graded of handicap ramp|leading to
elevator bldg., involving elimination of req.|retaining walls, approved by zoning. BQ x6345
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 66 of 141
:
Business Name:
License #: 270088
COMMENT DATE
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 67 of 141
Business Name:
License #: 270088
COMMENT DATE
COMMENTER
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
COMMENTS
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
|12/4/00 PER INSPECTOR INSTRUCTION VALUE RAISED TO $3,000,000
OF WORK. JO|>>> 12/04/2000 16:37:45 OAKLE#JM OAK0821CA
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 68 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 69 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 70 of 141
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 71 of 141
Unit #:
Description: PHASE I CLAREMONT HOTEL CARRIAGE LEVEL; LOBBY LEVEL; MEZZANINE LEVEL REMODEL SUBMITTED OCT.
3, 1999. Install Construction Trailers
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 72 of 141
APN: 048H766303500
Unit #:
Description: expansion of non-conforming use - deck
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 73 of 141
Address: 41 TUNNEL RD
APN: 048H766303500
Unit #:
Description: Zoning Confirmation letter
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 74 of 141
Address: 41 TUNNEL RD
APN: 048H767002400
Unit #:
Description: Zoning determination letter to examine property information concerning use, permits, violations, noncomformity, conditi ons and site development plans.
COMMENTER
COMMENTS
APN: 048H767002700
Unit #:
Description: Zoning determination letter to examine property information concerning use, permits, violations, noncomformity, conditi ons and site development plans.
COMMENTER
COMMENTS
COMMENTER
PTS
COMMENTS
|KSL Claremont Resort Inc. ck136570 $1332.00|C Kevin Stephens, P O Box 31081, San Fran
94131. ck5465 $116.61.|>>> 01/26/2004 15:13:52 LEUNG#AY CASHTERM1
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 75 of 141
COMMENTER
PTS
COMMENTS
|DRX050225 filed in Landmarks File drawer, filed with the Claremont Lan|dmark file.|>>>
09/14/2005 08:04:30 PAVLI#J 0146
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 76 of 141
Requestor:
:
Business Name: hathaway
License #:
COMMENT DATE
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 77 of 141
COMMENTER
AROSE
COMMENTS
B. Marvin consulted (abr)
COMMENTER
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
COMMENTS
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
10/6/2016
Page 78 of 141
1/19/2014
PTS
1/19/2014
PTS
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT IN
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
|1/24/00 STATUS IS NOT APPROVED. PLANS MUST BE PLAN CHECKED. JO|TITLE 24 REPORT IN
PLM/MECH FOLDER.|7/23/00 PLAN CHECK COMPLETE, PLANS IN READY TO ISSUE FILE. JO
COMMENTER
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
COMMENTS
|3/9/01|ok to issue electrical per Marvin M. Also there will be add cost|before final re kitchen eq. &
bar eq not yet determined|gel pc II|>>> 03/09/2001 10:47:53 LOYOL#GE OAK0848CA|E
DRAWINGS HAVE BEEN ATTACHED TO THE PERMIT. ADD COST FOR THE KITCHEN|AND BAR
EQUIPMENT CAN BE OBTAINED FROM THE DRAWINGS AND THE ACTUAL|INSTALLATION.|>>>
03/10/2001 10:40:23 MILLE#MA OAK0293CA|ADDITIONAL INSPECTION VISITS SHOULD BE
TRIGGERED BY THE ADD COSTS.|>>> 03/10/2001 10:41:49 MILLE#MA OAK0293CA
|3/9/01|ok to issue electrical per Marvin M. Also there will be add cost|before final re kitchen eq. &
bar eq not yet determined|gel pc II|>>> 03/09/2001 10:47:53 LOYOL#GE OAK0848CA|E
DRAWINGS HAVE BEEN ATTACHED TO THE PERMIT. ADD COST FOR THE KITCHEN|AND BAR
EQUIPMENT CAN BE OBTAINED FROM THE DRAWINGS AND THE ACTUAL|INSTALLATION.|>>>
03/10/2001 10:40:23 MILLE#MA OAK0293CA|ADDITIONAL INSPECTION VISITS SHOULD BE
TRIGGERED BY THE ADD COSTS.|>>> 03/10/2001 10:41:49 MILLE#MA OAK0293CA
|3/9/01|ok to issue electrical per Marvin M. Also there will be add cost|before final re kitchen eq. &
bar eq not yet determined|gel pc II|>>> 03/09/2001 10:47:53 LOYOL#GE OAK0848CA|E
DRAWINGS HAVE BEEN ATTACHED TO THE PERMIT. ADD COST FOR THE KITCHEN|AND BAR
EQUIPMENT CAN BE OBTAINED FROM THE DRAWINGS AND THE ACTUAL|INSTALLATION.|>>>
03/10/2001 10:40:23 MILLE#MA OAK0293CA|ADDITIONAL INSPECTION VISITS SHOULD BE
TRIGGERED BY THE ADD COSTS.|>>> 03/10/2001 10:41:49 MILLE#MA OAK0293CA
|3/9/01|ok to issue electrical per Marvin M. Also there will be add cost|before final re kitchen eq. &
bar eq not yet determined|gel pc II|>>> 03/09/2001 10:47:53 LOYOL#GE OAK0848CA|E
DRAWINGS HAVE BEEN ATTACHED TO THE PERMIT. ADD COST FOR THE KITCHEN|AND BAR
EQUIPMENT CAN BE OBTAINED FROM THE DRAWINGS AND THE ACTUAL|INSTALLATION.|>>>
03/10/2001 10:40:23 MILLE#MA OAK0293CA|ADDITIONAL INSPECTION VISITS SHOULD BE
TRIGGERED BY THE ADD COSTS.|>>> 03/10/2001 10:41:49 MILLE#MA OAK0293CA
|3/9/01|ok to issue electrical per Marvin M. Also there will be add cost|before final re kitchen eq. &
bar eq not yet determined|gel pc II|>>> 03/09/2001 10:47:53 LOYOL#GE OAK0848CA|E
DRAWINGS HAVE BEEN ATTACHED TO THE PERMIT. ADD COST FOR THE KITCHEN|AND BAR
EQUIPMENT CAN BE OBTAINED FROM THE DRAWINGS AND THE ACTUAL|INSTALLATION.|>>>
03/10/2001 10:40:23 MILLE#MA OAK0293CA|ADDITIONAL INSPECTION VISITS SHOULD BE
TRIGGERED BY THE ADD COSTS.|>>> 03/10/2001 10:41:49 MILLE#MA OAK0293CA
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 79 of 141
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 80 of 141
COMMENTER
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
COMMENTS
|Ok to issue per F/C comments: provide bonding per NEC and manuf.|installation
instructions.|>>> 02/27/2006 09:18:13 LEE#C 0209
|Ok to issue per F/C comments: provide bonding per NEC and manuf.|installation
instructions.|>>> 02/27/2006 09:18:13 LEE#C 0209
|Ok to issue per F/C comments: provide bonding per NEC and manuf.|installation
instructions.|>>> 02/27/2006 09:18:13 LEE#C 0209
COMMENTER
COMMENTS
COMMENTER
COMMENTS
10/6/2016
Page 81 of 141
Address: 41 TUNNEL RD
APN: 048H767002200
Unit #:
Description: ELECTRICAL FOR T.I. FOR 2 BALLROOMS: REPLACE W/NEW LIGHTING
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 82 of 141
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 83 of 141
COMMENT DATE
COMMENTER
COMMENTS
COMMENTER
IRAMIREZ
IRAMIREZ
COMMENTS
In Ready to Issue file for contractor to pick up No fees due
In Ready to Issue file for contractor to pick up No fees due
COMMENTER
1/26/2015
1/29/2015
1/29/2015
1/29/2015
1/29/2015
1/29/2015
1/29/2015
1/29/2015
1/26/2015
RPILI
TJULL
TJULL
TJULL
TJULL
TJULL
TJULL
TJULL
RPILI
1/26/2015
RPILI
1/26/2015
RPILI
COMMENTS
ISSUE TO OWNER OR CONTRACTOR; OR AGENTS OF.
Building permit not required per Dave Harlan to reduce pole height 4' - existing pole to remain
Building permit not required per Dave Harlan to reduce pole height 4' - existing pole to remain
Building permit not required per Dave Harlan to reduce pole height 4' - existing pole to remain
Building permit not required per Dave Harlan to reduce pole height 4' - existing pole to remain
Building permit not required per Dave Harlan to reduce pole height 4' - existing pole to remain
Building permit not required per Dave Harlan to reduce pole height 4' - existing pole to remain
Building permit not required per Dave Harlan to reduce pole height 4' - existing pole to remain
PER Joel Garcia OKAY TO COMBINE PLANS UNDER 1 ELECTRICAL PERMIT; APPLICATION AND
APPROVED PLANS IN THE READY TO ISSUE FILE.
PER Joel Garcia OKAY TO COMBINE PLANS UNDER 1 ELECTRICAL PERMIT; APPLICATION AND
APPROVED PLANS IN THE READY TO ISSUE FILE.
PER Joel Garcia OKAY TO COMBINE PLANS UNDER 1 ELECTRICAL PERMIT; APPLICATION AND
APPROVED PLANS IN THE READY TO ISSUE FILE.
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 84 of 141
1/26/2015
RPILI
1/26/2015
RPILI
1/26/2015
RPILI
1/26/2015
RPILI
1/26/2015
1/26/2015
1/26/2015
1/26/2015
1/26/2015
1/26/2015
RPILI
RPILI
RPILI
RPILI
RPILI
RPILI
COMMENTER
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
COMMENTS
OT.REQUESTED
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
Notified Thad, Fees
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 85 of 141
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Notified
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Thad,
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
Fees
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 86 of 141
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/28/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
due
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
&
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
Hold
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
for
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
Bldg.
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
permit
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
B1501429
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 87 of 141
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 88 of 141
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 89 of 141
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
COMMENTER
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
COMMENTS
7-10-15:
7-10-15:
7-10-15:
7-10-15:
7-10-15:
7-10-15:
7-10-15:
7-10-15:
7-10-15:
7-10-15:
7-10-15:
7-10-15:
7-10-15:
Notify
Notify
Notify
Notify
Notify
Notify
Notify
Notify
Notify
Notify
Notify
Notify
Notify
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
$1,053.10
$1,053.10
$1,053.10
$1,053.10
$1,053.10
$1,053.10
$1,053.10
$1,053.10
$1,053.10
$1,053.10
$1,053.10
$1,053.10
$1,053.10
due.
due.
due.
due.
due.
due.
due.
due.
due.
due.
due.
due.
due.
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 90 of 141
COMMENT DATE
COMMENTER
COMMENTS
COMMENTER
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
COMMENTS
7-4-15: Notify Garret & Edgar; $1,734.29 due.
7-27-15: Correct previous comment: Notify Garret
7-27-15: Correct previous comment: Notify Garret
7-27-15: Correct previous comment: Notify Garret
7-27-15: Correct previous comment: Notify Garret
7-27-15: Correct previous comment: Notify Garret
7-27-15: Correct previous comment: Notify Garret
7-27-15: Correct previous comment: Notify Garret
7-27-15: Correct previous comment: Notify Garret
7-27-15: Correct previous comment: Notify Garret
7-27-15: Correct previous comment: Notify Garret
7-27-15: Correct previous comment: Notify Garret
7-27-15: Correct previous comment: Notify Garret
7-27-15: Correct previous comment: Notify Garret
7-27-15: Correct previous comment: Notify Garret
7-4-15: Notify Garret & Edgar; $1,734.29 due.
7-4-15: Notify Garret & Edgar; $1,734.29 due.
7-4-15: Notify Garret & Edgar; $1,734.29 due.
7-4-15: Notify Garret & Edgar; $1,734.29 due.
7-4-15: Notify Garret & Edgar; $1,734.29 due.
7-4-15: Notify Garret & Edgar; $1,734.29 due.
7-4-15: Notify Garret & Edgar; $1,734.29 due.
7-4-15: Notify Garret & Edgar; $1,734.29 due.
7-4-15: Notify Garret & Edgar; $1,734.29 due.
7-4-15: Notify Garret & Edgar; $1,734.29 due.
7-4-15: Notify Garret & Edgar; $1,734.29 due.
7-4-15: Notify Garret & Edgar; $1,734.29 due.
7-4-15: Notify Garret & Edgar; $1,734.29 due.
&
&
&
&
&
&
&
&
&
&
&
&
&
&
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
Edgar;
$2,046.99
$2,046.99
$2,046.99
$2,046.99
$2,046.99
$2,046.99
$2,046.99
$2,046.99
$2,046.99
$2,046.99
$2,046.99
$2,046.99
$2,046.99
$2,046.99
due.
due.
due.
due.
due.
due.
due.
due.
due.
due.
due.
due.
due.
due.
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
CB
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 91 of 141
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 92 of 141
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 93 of 141
Unit #:
Description: SERVICE CHANGE TO BACK BUILDING AND NEW BUILDING
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 94 of 141
License #: 232759
COMMENT DATE
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 95 of 141
:
Business Name:
License #: 477637
COMMENT DATE
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 96 of 141
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 97 of 141
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 98 of 141
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Page 99 of 141
COMMENTER
COMMENTS
COMMENTER
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
COMMENTS
|6/24/98 MET WITH JUDY NELSON, CLAREMONT HOTEL PROJECT MGR., TO|INSPECT GUEST
BATHROOM LIGHTING FIXTURES FOR TITLE 24 ENERGY|COMPLIANCE. BOTH FIXTURES, LISTED
AND LABELED SURFACE MOUNTED FLOURES|FIXTURE AND RECESSED FLUORESCENT
PERMATWIST BASE REPLACEMENT/ADAPTER|SYSTEM, MEET TITLE 24 ENERGY COMPLIANCE.
JUDY WILL ARRANGE FOR FINAL|INSPECTION WHEN ALL THE FIXTURES ARE
INSTALLED.|M.MILLET X4786|7/2/98 INFORMED JUDY NELSON THAT PROPOSED FIXTURES ON
FAX LETTER|MET TITTLE 24 REQ'S. FINAL APPROVAL WHEN INSTALLED AND
INSPECTED.|M.MILLET, X4786|10/30/98 INFORMED JUDY NELSON THAT FAXED LETTER
(10/30/98) FROM LIGHT|MANUFACTURER STATING FIXTURES SHOULD HAVE UL LABELS
ATTACHED WAS NOT|SUFFICIENT, LABELS MUST BE ON THE INSTALLED PRODUCT.|M.MILLET,
X4786|5/13/99 INSTALLED FLUORECENT FIXTURES IN FORTY GUESTROOM BATHROOMS|COMPLY
WITH TILE 24 AND LISTING/LABELING OF THE PRODUCT. THIS WAS THE|LAST CORRECTION
NOTICE ITEM LEFT TO FINAL THE PERMIT.|M.MILLET, X4786
|6/24/98 MET WITH JUDY NELSON, CLAREMONT HOTEL PROJECT MGR., TO|INSPECT GUEST
BATHROOM LIGHTING FIXTURES FOR TITLE 24 ENERGY|COMPLIANCE. BOTH FIXTURES, LISTED
AND LABELED SURFACE MOUNTED FLOURES|FIXTURE AND RECESSED FLUORESCENT
PERMATWIST BASE REPLACEMENT/ADAPTER|SYSTEM, MEET TITLE 24 ENERGY COMPLIANCE.
JUDY WILL ARRANGE FOR FINAL|INSPECTION WHEN ALL THE FIXTURES ARE
INSTALLED.|M.MILLET X4786|7/2/98 INFORMED JUDY NELSON THAT PROPOSED FIXTURES ON
FAX LETTER|MET TITTLE 24 REQ'S. FINAL APPROVAL WHEN INSTALLED AND
INSPECTED.|M.MILLET, X4786|10/30/98 INFORMED JUDY NELSON THAT FAXED LETTER
(10/30/98) FROM LIGHT|MANUFACTURER STATING FIXTURES SHOULD HAVE UL LABELS
ATTACHED WAS NOT|SUFFICIENT, LABELS MUST BE ON THE INSTALLED PRODUCT.|M.MILLET,
X4786|5/13/99 INSTALLED FLUORECENT FIXTURES IN FORTY GUESTROOM BATHROOMS|COMPLY
WITH TILE 24 AND LISTING/LABELING OF THE PRODUCT. THIS WAS THE|LAST CORRECTION
NOTICE ITEM LEFT TO FINAL THE PERMIT.|M.MILLET, X4786
|6/24/98 MET WITH JUDY NELSON, CLAREMONT HOTEL PROJECT MGR., TO|INSPECT GUEST
BATHROOM LIGHTING FIXTURES FOR TITLE 24 ENERGY|COMPLIANCE. BOTH FIXTURES, LISTED
AND LABELED SURFACE MOUNTED FLOURES|FIXTURE AND RECESSED FLUORESCENT
PERMATWIST BASE REPLACEMENT/ADAPTER|SYSTEM, MEET TITLE 24 ENERGY COMPLIANCE.
JUDY WILL ARRANGE FOR FINAL|INSPECTION WHEN ALL THE FIXTURES ARE
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
|6/24/98 MET WITH JUDY NELSON, CLAREMONT HOTEL PROJECT MGR., TO|INSPECT GUEST
BATHROOM LIGHTING FIXTURES FOR TITLE 24 ENERGY|COMPLIANCE. BOTH FIXTURES, LISTED
AND LABELED SURFACE MOUNTED FLOURES|FIXTURE AND RECESSED FLUORESCENT
PERMATWIST BASE REPLACEMENT/ADAPTER|SYSTEM, MEET TITLE 24 ENERGY COMPLIANCE.
JUDY WILL ARRANGE FOR FINAL|INSPECTION WHEN ALL THE FIXTURES ARE
INSTALLED.|M.MILLET X4786|7/2/98 INFORMED JUDY NELSON THAT PROPOSED FIXTURES ON
FAX LETTER|MET TITTLE 24 REQ'S. FINAL APPROVAL WHEN INSTALLED AND
INSPECTED.|M.MILLET, X4786|10/30/98 INFORMED JUDY NELSON THAT FAXED LETTER
(10/30/98) FROM LIGHT|MANUFACTURER STATING FIXTURES SHOULD HAVE UL LABELS
ATTACHED WAS NOT|SUFFICIENT, LABELS MUST BE ON THE INSTALLED PRODUCT.|M.MILLET,
X4786|5/13/99 INSTALLED FLUORECENT FIXTURES IN FORTY GUESTROOM BATHROOMS|COMPLY
WITH TILE 24 AND LISTING/LABELING OF THE PRODUCT. THIS WAS THE|LAST CORRECTION
NOTICE ITEM LEFT TO FINAL THE PERMIT.|M.MILLET, X4786
|6/24/98 MET WITH JUDY NELSON, CLAREMONT HOTEL PROJECT MGR., TO|INSPECT GUEST
BATHROOM LIGHTING FIXTURES FOR TITLE 24 ENERGY|COMPLIANCE. BOTH FIXTURES, LISTED
AND LABELED SURFACE MOUNTED FLOURES|FIXTURE AND RECESSED FLUORESCENT
PERMATWIST BASE REPLACEMENT/ADAPTER|SYSTEM, MEET TITLE 24 ENERGY COMPLIANCE.
JUDY WILL ARRANGE FOR FINAL|INSPECTION WHEN ALL THE FIXTURES ARE
INSTALLED.|M.MILLET X4786|7/2/98 INFORMED JUDY NELSON THAT PROPOSED FIXTURES ON
FAX LETTER|MET TITTLE 24 REQ'S. FINAL APPROVAL WHEN INSTALLED AND
INSPECTED.|M.MILLET, X4786|10/30/98 INFORMED JUDY NELSON THAT FAXED LETTER
(10/30/98) FROM LIGHT|MANUFACTURER STATING FIXTURES SHOULD HAVE UL LABELS
ATTACHED WAS NOT|SUFFICIENT, LABELS MUST BE ON THE INSTALLED PRODUCT.|M.MILLET,
X4786|5/13/99 INSTALLED FLUORECENT FIXTURES IN FORTY GUESTROOM BATHROOMS|COMPLY
WITH TILE 24 AND LISTING/LABELING OF THE PRODUCT. THIS WAS THE|LAST CORRECTION
NOTICE ITEM LEFT TO FINAL THE PERMIT.|M.MILLET, X4786
|6/24/98 MET WITH JUDY NELSON, CLAREMONT HOTEL PROJECT MGR., TO|INSPECT GUEST
BATHROOM LIGHTING FIXTURES FOR TITLE 24 ENERGY|COMPLIANCE. BOTH FIXTURES, LISTED
AND LABELED SURFACE MOUNTED FLOURES|FIXTURE AND RECESSED FLUORESCENT
PERMATWIST BASE REPLACEMENT/ADAPTER|SYSTEM, MEET TITLE 24 ENERGY COMPLIANCE.
JUDY WILL ARRANGE FOR FINAL|INSPECTION WHEN ALL THE FIXTURES ARE
INSTALLED.|M.MILLET X4786|7/2/98 INFORMED JUDY NELSON THAT PROPOSED FIXTURES ON
FAX LETTER|MET TITTLE 24 REQ'S. FINAL APPROVAL WHEN INSTALLED AND
INSPECTED.|M.MILLET, X4786|10/30/98 INFORMED JUDY NELSON THAT FAXED LETTER
(10/30/98) FROM LIGHT|MANUFACTURER STATING FIXTURES SHOULD HAVE UL LABELS
ATTACHED WAS NOT|SUFFICIENT, LABELS MUST BE ON THE INSTALLED PRODUCT.|M.MILLET,
X4786|5/13/99 INSTALLED FLUORECENT FIXTURES IN FORTY GUESTROOM BATHROOMS|COMPLY
WITH TILE 24 AND LISTING/LABELING OF THE PRODUCT. THIS WAS THE|LAST CORRECTION
NOTICE ITEM LEFT TO FINAL THE PERMIT.|M.MILLET, X4786
|6/24/98 MET WITH JUDY NELSON, CLAREMONT HOTEL PROJECT MGR., TO|INSPECT GUEST
BATHROOM LIGHTING FIXTURES FOR TITLE 24 ENERGY|COMPLIANCE. BOTH FIXTURES, LISTED
AND LABELED SURFACE MOUNTED FLOURES|FIXTURE AND RECESSED FLUORESCENT
PERMATWIST BASE REPLACEMENT/ADAPTER|SYSTEM, MEET TITLE 24 ENERGY COMPLIANCE.
JUDY WILL ARRANGE FOR FINAL|INSPECTION WHEN ALL THE FIXTURES ARE
INSTALLED.|M.MILLET X4786|7/2/98 INFORMED JUDY NELSON THAT PROPOSED FIXTURES ON
FAX LETTER|MET TITTLE 24 REQ'S. FINAL APPROVAL WHEN INSTALLED AND
INSPECTED.|M.MILLET, X4786|10/30/98 INFORMED JUDY NELSON THAT FAXED LETTER
(10/30/98) FROM LIGHT|MANUFACTURER STATING FIXTURES SHOULD HAVE UL LABELS
ATTACHED WAS NOT|SUFFICIENT, LABELS MUST BE ON THE INSTALLED PRODUCT.|M.MILLET,
X4786|5/13/99 INSTALLED FLUORECENT FIXTURES IN FORTY GUESTROOM BATHROOMS|COMPLY
WITH TILE 24 AND LISTING/LABELING OF THE PRODUCT. THIS WAS THE|LAST CORRECTION
NOTICE ITEM LEFT TO FINAL THE PERMIT.|M.MILLET, X4786
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
:
Business Name:
License #: 651371
COMMENT DATE
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
COMMENTS
|11/30/99 ELECTRICAL PLAN SHEETS DELIVERED.|12/01/99 ELECTRICAL PLAN SHEETS TO ELEC.
SR INSPECTOR. JO|12/08/99 ELECTRICAL PLAN READY, ROLLED PLANS IN READY TO ISSUE|FILE.
FEES DUE $732.10. JO
|11/30/99 ELECTRICAL PLAN SHEETS DELIVERED.|12/01/99 ELECTRICAL PLAN SHEETS TO ELEC.
SR INSPECTOR. JO|12/08/99 ELECTRICAL PLAN READY, ROLLED PLANS IN READY TO ISSUE|FILE.
FEES DUE $732.10. JO
|11/30/99 ELECTRICAL PLAN SHEETS DELIVERED.|12/01/99 ELECTRICAL PLAN SHEETS TO ELEC.
SR INSPECTOR. JO|12/08/99 ELECTRICAL PLAN READY, ROLLED PLANS IN READY TO ISSUE|FILE.
FEES DUE $732.10. JO
|11/30/99 ELECTRICAL PLAN SHEETS DELIVERED.|12/01/99 ELECTRICAL PLAN SHEETS TO ELEC.
SR INSPECTOR. JO|12/08/99 ELECTRICAL PLAN READY, ROLLED PLANS IN READY TO ISSUE|FILE.
FEES DUE $732.10. JO
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
APN: 048H767001900
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
COMMENTER
COMMENTS
APN: 048H767002000
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
COMMENTER
COMMENTS
APN: 048H767002100
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
COMMENTER
COMMENTS
APN: 048H767002200
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENTER
COMMENTS
APN: 048H767002300
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
COMMENTER
COMMENTS
APN: 048H767002400
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
COMMENTER
COMMENTS
APN: 048H767002500
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
APN: 048H767002700
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
COMMENTER
COMMENTS
APN: 048H767002803
Unit #:
Description: Environmental Review for a proposal at the Claremont Hotel, a designate City Landmark, that will include
improvements to site circulation, expansion of the existing club facilities, and 45 new residential units.
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
PTS
COMMENTS
|Landmark|Applicant: The Landmarks Preservation Advisory Board (LPAB)|Owner: KSL
Corporation|Case File Number: LM01-404|Planning Permits Required: Rezone the building and site
to|Landmark status|General Plan: Urban Residential|Zoning: R-70 High Density Residential/S-14
Community|Restoration Development Zone|Environmental Determination: Exempt, Section 15061
(3) and|15331, State CEQA Guidelines; General Rule and Historical|Resource
Restoration/Rehabilitation.|Historic Status: A1+Highest Importance/Area of Primary|Importance
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
1/19/2014
PTS
(currently on the Preservation Study List)|Service Delivery District: II - North Oakland|City Council
District: 1|For further information: Contact case planner|Patricia McGowan at 510-238-3063.
|NOTE: On 7/30/02 the City Council approved Ordinance No. 12438 CMS|Ordinance rezoning the
Hotel Building located at 41 Tunnel Road|(Historic Name: Claremont Hotel; current name: The
Claremont Resort|and Spa) to a designated landmark pursuant to Section 17.102.030 of|the
Oakland Planning Code and Rezoning all other portions of the|property at 41 Tunnel Road and
2829 Claremont Avenue to Add S-4|Design Review Combining Zone, to the underlying zones
pursuant to|Chapter 17.144 of the Oakland Planning Code.|>>> 08/02/2002 14:20:53 JACKS#SL
0087
COMMENTER
COMMENTS
COMMENTER
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
COMMENTS
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
10/6/2016
Address: 41 TUNNEL RD
APN: 048H766303500
Unit #:
Description: Mechanical for ducting
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENT DATE
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
License #:
COMMENT DATE
4/9/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
5/27/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
COMMENTER
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
COMMENTS
OT.REQUESTED
Notified Edgar, Fess
Notified Edgar, Fess
Notified Edgar, Fess
Notified Edgar, Fess
Notified Edgar, Fess
Notified Edgar, Fess
Notified Edgar, Fess
Notified Edgar, Fess
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
due
due
due
due
due
due
due
due
COMMENTER
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
COMMENTS
OT requested 6-5-15.
7-10-15; Notify Edgar;
7-10-15; Notify Edgar;
7-10-15; Notify Edgar;
7-10-15; Notify Edgar;
7-10-15; Notify Edgar;
OT requested 6-5-15.
OT requested 6-5-15.
OT requested 6-5-15.
OT requested 6-5-15.
$926.87
$926.87
$926.87
$926.87
$926.87
due.
due.
due.
due.
due.
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENTER
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
COMMENTS
8-18-15:
8-18-15:
8-18-15:
8-18-15:
8-18-15:
8-18-15:
8-18-15:
8-18-15:
Notify
Notify
Notify
Notify
Notify
Notify
Notify
Notify
Garret
Garret
Garret
Garret
Garret
Garret
Garret
Garret
&
&
&
&
&
&
&
&
Edgar:
Edgar:
Edgar:
Edgar:
Edgar:
Edgar:
Edgar:
Edgar:
$1,488.38
$1,488.38
$1,488.38
$1,488.38
$1,488.38
$1,488.38
$1,488.38
$1,488.38
due.
due.
due.
due.
due.
due.
due.
due.
CB
CB
CB
CB
CB
CB
CB
CB
COMMENTER
COMMENTS
COMMENTER
COMMENTS
10/6/2016
Address: 41 TUNNEL RD
APN: 048H766303500
Unit #:
Description: 3A/C UNITS 72 REGISTERS 4 FANS 22 FIRE DAMPERS 6 ELE DUCT HT
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
10/6/2016
Address: 41 TUNNEL RD
APN: 048H766303500
Unit #:
Description: 3 BOILERS 3 FLUES
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
License #: 270088
COMMENT DATE
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
:
Business Name:
License #: 394397
COMMENT DATE
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENTER
COMMENTS
COMMENTER
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
COMMENTS
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
|1/24/00 STATUS IS NOT
PLM/MECH FOLDER.
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
1/19/2014
PTS
COMMENTER
COMMENTS
COMMENTER
1/20/2014
PTS
1/20/2014
PTS
1/20/2014
PTS
1/20/2014
PTS
1/20/2014
PTS
1/20/2014
PTS
COMMENTS
|Faxed receipt to Norm Hayes of Anderson,Rowe
01/15/2002 09:54:06 LEUNG#AY CASHTERM1
|Faxed receipt to Norm Hayes of Anderson,Rowe
01/15/2002 09:54:06 LEUNG#AY CASHTERM1
|Faxed receipt to Norm Hayes of Anderson,Rowe
01/15/2002 09:54:06 LEUNG#AY CASHTERM1
|Faxed receipt to Norm Hayes of Anderson,Rowe
01/15/2002 09:54:06 LEUNG#AY CASHTERM1
|Faxed receipt to Norm Hayes of Anderson,Rowe
01/15/2002 09:54:06 LEUNG#AY CASHTERM1
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
1/20/2014
PTS
1/20/2014
PTS
|Faxed receipt to Norm Hayes of Anderson,Rowe & Buckley Inc.|fax 415-282-3583. Annie|>>>
01/15/2002 09:54:06 LEUNG#AY CASHTERM1
|Faxed receipt to Norm Hayes of Anderson,Rowe & Buckley Inc.|fax 415-282-3583. Annie|>>>
01/15/2002 09:54:06 LEUNG#AY CASHTERM1
|Faxed receipt to Norm Hayes of Anderson,Rowe & Buckley Inc.|fax 415-282-3583. Annie|>>>
01/15/2002 09:54:06 LEUNG#AY CASHTERM1
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENTER
COMMENTS
COMMENTER
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
COMMENTS
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
4/9/2015
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
WWADA
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
OT.REQUESTED
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
License #: 729664
COMMENT DATE
COMMENTER
6/9/2015
7/10/2015
CBURNS
CBURNS
7/10/2015
CBURNS
7/10/2015
CBURNS
7/10/2015
CBURNS
7/10/2015
CBURNS
7/10/2015
CBURNS
7/10/2015
CBURNS
6/9/2015
6/9/2015
6/9/2015
6/9/2015
6/9/2015
6/9/2015
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
CBURNS
COMMENTS
OT requested 6-5-15.
Notify Edgar: $1071.01 due.
conditions. 7-10-15; CB.
Notify Edgar: $1071.01 due.
conditions. 7-10-15; CB.
Notify Edgar: $1071.01 due.
conditions. 7-10-15; CB.
Notify Edgar: $1071.01 due.
conditions. 7-10-15; CB.
Notify Edgar: $1071.01 due.
conditions. 7-10-15; CB.
Notify Edgar: $1071.01 due.
conditions. 7-10-15; CB.
Notify Edgar: $1071.01 due.
conditions. 7-10-15; CB.
OT requested 6-5-15.
OT requested 6-5-15.
OT requested 6-5-15.
OT requested 6-5-15.
OT requested 6-5-15.
OT requested 6-5-15.
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
License #: 729664
COMMENT DATE
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Description:
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
Unit #:
Description: TRAP PRIMERS REQ.
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
APN: 048H766303500
Unit #:
Description: DEMO & RELOCATE MISC PIPING FOR ELEVATOR SHAFT
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENT DATE
COMMENTER
COMMENTS
COMMENTER
COMMENTS
APN: 048H767002700
Unit #:
Description: Major Conditional Use Permit and Regular Design Review for improvements to the 22-acre Claremont Hotel
site to create expansions to the existing club, the Increase of resort facilities, and the creation of 44 residential dwellings
units.
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENT DATE
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENT DATE
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
APN: 048H766303500
Unit #:
Description: CABARET
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
APN: 048H767002200
Unit #:
Description: to operate a general retail sale within claremont hotel loby
COMMENTER
COMMENTS
COMMENTER
COMMENTS
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016
COMMENTER
COMMENTS
https://adhoc1.accela.com/AdhocReportWeb/Report/rs.aspx?p=htmlreport&print=1&refrn...
10/6/2016