Yoshihiro Kuriyama
Sony EMCS (Malaysia) Sdn Bhd KL Tec,
KL Tec President
Tel: 603-89283701; Fax: 603-89221178l
E-mail: Yoshihiro.Kuriyama@ap.sony.com
______________________
Kamarul Azman Dimin
Sony EMCS (Malaysia) Sdn Bhd KL Tec,
Assistant General Manager
Tel: 603-89297212; Fax: 603-89297146
E-mail: Kamarulazman.Dimin@ap.sony.com
_______________________
Endorsed by Focal Point
Datuk Loo Took Gee,
Secretary General
Ministry of Energy, Green Technology and Water,
Malaysia
Tel: 603 8889 3711; Fax:603 8889 3177
E-mail: LooTG@kettha.gov.my
2
3. Project/Activity overview
3.1
Description
Sony EMCS (Malaysia) Sdn. Bhd KL Tec (SOEM KL)
is established in 1988 with a paid-up capital investment
of 35 million Malaysian Ringgit (RM). SOEM KL is part
of Sony Corporation Group which is one of the leading
manufacturers of electronics products for the consumer
and professional markets. SOEM KL produces LCD
television, Blu-ray disc player/recorder, and tuner.
SOEM KL is located at Bandar Baru Bangi, Selangor,
Malaysia with a build-up area of 83,101 m2 and total
employees of 6,269 (as of March 2015). Figure 2
shows SOEM KL electricity consumption by functional areas
in fiscal year (FY) 2014.
3.2
Rationale
SOEM KL energy demand is on the rise (see Figure 3). This is a critical reality for
SOEM KL; as the company grows, production increase and requirements for machineries
and equipment increase. Energy price is also expected to increase with time; with the
latest electricity tariff hike of 17% already taken place in January 2014. Furthermore,
measures to reduce energy consumption can help to mitigate global warming impact due
to fossil fuel burning. SOEM KL energy mix is solely come from electricity. SOEM KL
expenses for electricity consumption increased from RM14.2 million in FY2008 to
RM16.1 million in FY2010.
3.3
Target
According to Sony Green Management 2015 that serves as a yardstick for the
environmental activities of Sony Group worldwide until FY2015, SOEM KL is required
to reduce electricity consumption (calculated by CO2 emission reduction) by 14%, using
FY2008 as the baseline. This comes to 2% reduction per year (see Figure 4).
Reduction
25,900
25,000 23,700
20,000
23,100
22,184
23,400
22,700
21,400
25,000
34
15,900
16,864
70
60
19,250
17,800
21,677
15,000
16,895
50
17,000
40
30
10,000
5,000
20,80053
80
69
65
5,500
1,516
0 0
FY2008 Base
FY2009
3 900
20
3,936
2,355
1,023
800
10
Projection
30,000
FY2010
FY2011
FY2012
FY2013
FY2014
FY2015
SOEM KL would also like to improve on its Energy Management Matrix to Level 3
upwards. Based on the Energy Management Matrix in Figure 5, previously there was:
no energy policy
energy management is part time
responsibility
informal contacts between engineer
and a few users
cost reporting based on invoice data
informal contacts used to promote
energy efficiency
same payback criteria employed as for
other investment
After Sustainability Energy Management
Programmes implementation in FY2011,
the energy management components have
improved as indicated by blue line in
Figure 5.
Figure 5: SOEM KL Energy Management Matrix
4. Impact
______________________________________________________________________________
4.1
Energy Saving
With SEMP in place, SOEM KL electricity consumption shows a reducing trend from
FY2010 to FY2014 (see Figure 6). In this write-up, FY2010 figures will be used as the
baseline indicator to measure the progress of SOEM KL energy saving measures.
Through various energy saving measures below, SOEM KL electricity consumption had
reduced by 14% in FY2011, 36% in FY2012, and 33% in FY2013 respectively, even
though with expansion of operations and increased in production outputs (see Table 1).
6
5
5.1
4.7
4
4 4.1
4.3
4.6 4.54.5
Electricity
Consumption
(kWh)
%
Saving
in kWh
Electricity
Cost (RM)
%
Saving
in RM
2010
56,112,584
N/A
16,079,965
N/A
2011
48,212,226
14%
14,989,483
7%
2012
35,692,730
36%
11,606,725
28%
2013
37,362,475
33%
12,544,108
22%
2014
37,627,488
33%
14,171,403
12%
3.9
3.53.53.5
3.0
3.4
3.2 3.2
2.9
3.03.13.13.1
3 3.1
3.33.3
2.9
2.6 2.7
3.2
3.1
2.8
2.3
Savings
CO2 (ton)
115
1212
586
63
30
790
2,796
1469
118
1263
13
165
4,766
7,794
143
101
1817
115
376
56
50
121
146
247
345
48
260
627
177
165
4,794
kWh
153,585
1,622,101
784,046
84,548
67,416
1,057,425
3,769,121
1,966,094
157,303
1,691,249
17,136
221,184
6,380,000
10,432,966
191,540
134,729
2,432,000
153,560
504,000
74,880
67,595
161,741
195,538
331,200
461,713
64,632
348,333
839,793
237,000
221,184
6,419,438
Feb
Oct
Dec
Aug
Apr
Jun
Feb
Oct
Dec
Aug
Apr
Jun
Feb
Oct
Dec
Aug
Apr
Jun
Feb
Oct
Dec
Aug
Apr
Year
4.24.2 4.3
Jun
5.1
4.84.8 4.7 4.8
RM
38,400
350,200
244,100
19,000
16,854
264,400
932,954
491,500
39,300
585,400
4,284
55,296
1,900,000
3,075,780
47,900
40,400
608,00
46,100
151,200
22,500
20,300
48,500
58,700
99,400
138,500
19,400
104,500
251,900
13,066,355
66,355
14,182,010
Investment
RM
40,000
74,000
235,000
500,100
849,100
33,400
202,000
203,000
432,500
11,600,000
12,470,900
74,000
215,500
280,000
477,500
1,047,000
Payback period
Year
0.2
3.9
13.9
1.9
0.9
0.8
0.3
47.4
7.8
6.1
4.1
0.7
0.9
0.02
7.2
0.1
The implemented energy saving measures were segregated into zero investment projects
and with-investment projects with their gained savings is shown in Table 3.
4.2
Environmental Effect
Green Management 2015 focuses on four key environmental perspectives curbing
climate change, resource conservation, controlling chemical substances and promoting
biodiversity. At present, every Sony product negatively affects the environment to some
degree throughout its life cycle thereof. To ensure Sony ability not only to conduct its
business in a responsible manner, but also to take responsibility for the environmental
impact of every Sony product at each stage of its lifecycle, Sony have divided the product
lifecycle into six stages: research and development, product planning and design,
procurement, operations, logistics, and take back and recycling.
SOEM KL operations are directly related with three stages: product planning and design,
operations and logistics.
Product Planning and Design Activities
Perspective
Climate
change
Resource
Chemical
Target
Achievement
(as of FY2013)
43%
44%
35%
Complied for
BVR & PVC
Recycle
BDP-S6200
30%
8G BDP (BDP-S1100 & BDP-S3100) - 1,030g
Side panel: 35 g
PC
Virgin
Recycle
265 mm
40%
Main panel: 264 g
USB cover: 1 g
Button: 2 g
All model
PS
Virgin
Recycle
65%
Loading mecha: 107 g
Logistics activities
Perspective
Achievement
(as of FY2013)
Target
Climate
change
Resource
33%
68&
EPS packaging
Vertical loading
Nesting packaging
Horizontal loading
Operations activities
Perspective
Climate
change
Resource
Achievement
(as of FY2013)
Target
Reduce GHG emission by 14%
50%
80%
16%
Chemical
Biodiversity
146%
Tree planting,
school projects
Using 2011 Malaysia CDM baseline emission factor of 0.000747 ton CO2/kWh, Table 6
shows the SOEM KL carbon emission for FY2010 to FY2014. SOEM KL had managed
to reduce its carbon emission by 13,808 ton CO2 with the implementation of all energy
saving measures listed above.
Year
Energy
Consumption (kWh)
CO2 Emission
(ton)
% Saving
2010
56,112,584
41,916
N/A
2011
48,212,226
36,015
14%
2012
35,692,730
26,662
36%
2013
37,362,475
27,910
33%
2014
37,627,488
28,108
33%
Pulp cushion
Carton waste
Carton
1. Waste recycling
SOEM KL had implemented closed loop carton and paper
waste recycling since FY2009. All carton and paper from
7
incoming parts packaging wastes are sent to recycler. The recycler will processes these
carton and paper wastes into pulp cushion and carton, which will be used back in SOEM
KL as products packaging (see Figure 10). Until FY2013, SOEM KL had successfully
reduced 13,301 tonnes of waste with this activity.
2. Volatile Organic Compound (VOC) reduction
Through Printed Wiring Boards design change, the use of wave soldering machines were
replaced with spot dip machines. This enabled SOEM KL to reduce the amount of VOC
used in its soldering operation through lesser usage of flux and thinner. Total VOC
reduction saving due to this activity was 57 tonnes.
4.3
Economic Effect
4.3.1 Investment
Energy efficiency and energy conservation investments are given the same consideration
as for all other investments by SOEM KL Top Management. Generally, all investment
will be appraised using the Simple Payback Period (see Figure 11).
SPP = Total amount of investment / Annual saving
Investment with
payback less
than 1 year
Zero investment
Investment with
payback within 3
years
Investment with
payback more
than 3 years
However, operational and safety consideration may sometime carry more weight than the
above financial consideration alone.
4.3.2
Payback period
Table 7 below shows SOEM KL investment for energy saving measures for FY2011 to
FY2014 and their payback period.
Year
Investment
(RM)
Cost saving
( RM)
Payback period
(Year)
2011
849,100
932,954
0.9
2012
12,470,900
3,075,780
4.1
2013
1,047,000
14,182,010
0.1
2014
1,040,481
975,000
1.1
From the investment, SOEM KL had saved RM933,000 in FY2011, RM3.1 million in
FY2012, RM14.2 million in FY2013 and RM0.975 Million in FY2014.. Total payback
period was 0.9 year for FY2011, 4.1 year for FY2012, 0.1 year for FY2013, and 1.1 year
for FY2014 respectively.
4.4
kWh
Production Quantity
In FY2010, SOEM KL EEI was 5.1 kWh/ unit. SOEM KL had achieved EEI of 4.3 in
FY2011 i.e. 16% reduction, 3.3 in FY2012 i.e. 35% reduction, 2.6 in FY2013 i.e. 49%
reduction and 2.9 in FY2014 i.e. reduction of 43% (see Table 8).
Year
Energy Consumption
(kWh)
Production Quantity
(unit)
Energy Efficiency
Index
2010
(baseline)
56,112,584
11,096,238
5.1
2011
48,212,226
11,294,000
4.3
2012
35,692,730
10,920,600
3.3
2013
37,362,475
14,197,000
2.6
2014
37,627,488
13,101,200
2.9
5. Sustainability
SOEM KL strives to ensure that its energy management measures are sustainable through
involvement from all levels, support from top management and short and long term planning as
well as continuous monitoring and improvement.
5.1
5.2
10
5.3
kWh
Saving
CO2 (ton)
RM
Investment
RM
Payback period
Year
4,773,128
4,773,128
3,565
3,565
692,600
7,000
692,607
66,667
753,333
500,000
873,333
400,000
2,593,333
50
563
374
652
299
1,938
20,000
226,000
150,000
262,000
120,000
778,000
67,000
168,000
136,000
76,000
200,000
647,000
3.4
0.7
0.9
0.3
1.7
0.8
200,000
300,000
70,000
184,667
613,333
193,333
1,561,333
149
224
52
138
458
144
1,165
60,000
90,000
21,000
55,400
184,000
58,000
468,400
276,000
90,000
23,000
98,000
400,000
121,000
1,008,000
4.6
1
1.1
1.8
2.2
2.1
2.2
4,000,000
667,667
4,667,667
2,988
499
3,487
1,200,000
200,000
1,400,000
4,500,000
667,000
5,167,000
3.8
3.3
3.7
For long-term plan, SOEM KL is now working toward a four-star Green Star assessment
rating (refer Figure 18), signifying that it had met mid-term targets. Progress is evaluated
according to some 230 qualitative assessment criteria.
Quantitative
Chemical
Substances
(Class 3)
Chemical
Substances
(VOC)
Resources (Water)
Qualitative
Greenhouse
4 Gasses
3
2
1
0
Resources
(Waste)
Biodiversity
Resources
(Waste
Recycling
Rate)
Chemical
S b
Greenhouse
4
Gasses
3
2
1
0
Resources
(Waste)
Resources
(Water)
Figure 18: SOEM KL Green Star assessment rating for FY2013 reduction targets
11
Ultimately, as part of Sony Group, SOEM KL has its Road to Zero plan; Sonys global
environmental plan which is to achieve zero environmental footprint throughout the
lifecycle of our products and business activities by FY2050.
5.3.1
Organisation Structure
SOEM KL revamped its Energy Management approach in FY2011, focusing on how to
increase the energy efficiency within its operations by the operations members
themselves. Energy saving was no longer facility departments responsibility only.
Figure 19 shows the SOEM KL Energy Management Committee structure which is made
up from KL Tec President and representatives from energy-related functional areas.
Chairman
KL Tec President
Energy Manager
Reg. Control
Production
Engineering
Design
Plant
Maintenance
5.3.2
5.4
Capacity Building
To ensure the continuity of energy conservation measures, SOEM KL introduced various
new activities to complement the existing ones. The engagement of all employees and
commitment from top management is important for the programmes success.
5.4.1
Activities
Nightly Back to Basic, Go to Genba (BBGG) inspection by top management.
Monthly energy saving audit by top management (see Figure 16).
Road to Zero awareness programme through banners, posters and E-Learning.
12
Figure 24: Energy saving promotion through Environmental Corner, notice boards, banners Figure 25: Daily energy awareness
communication
5.4.2
Educational Training
Induction training on environmental awareness for all new employees.
Internal training for energy saving projects members.
External techical trainings for projectss members.
Attended Energy Manager training course under ASEAN Energy Management
Scheme (AEMAS).
Attended energy related workshops organised by governmental bodies.
Visited Malaysia GreenTech and Suruhanjaya Tenaga to learn about their Green
Building practices.
Best practices sharing during annual Pan Asian Sony Environmental Conference.
Visited Japan to learn about energy saving best practices from other Sony
companies.
Nine months consultation by Sony Headquarters team during FY2013 Energy
Saving Project.
13
6. Replicability
__________________________________________________________________
6.1
6.2
Technology
Measure 1: Chiller air conditioning system installation.
Methodology: SOEM KL previous air conditioning systems consisted of 51 units of
Water Cooled Package Unit (WCPU) with lifespan between 10 to 22 years old. Their
performance and efficiency deteriorated with age, and with it, increased their
maintenance costs. We estimated the WCPU system efficiency (COP) at 1.18 kW/RT at
the time of replacement.
14
With the installation of new chillers with COP of 6.2 kW/RT, SOEM KL saved about
5,800,000 kWh/ year.
Measure 2: Building Management System for air
conditioning.
Methodology: Further energy savings were achieved through
Building Management System real-time monitoring &
controlling of air-conditioning usage. Most SOEM KL facilities
are in use at all hours, but many non-production areas are not
occupied especially at night. During this time, the airconditioning could be shutdown. Another 1,966,094 kWh/ year
saving was gained from this shutdown mode.
Figure 27: Building Management System
Figure 28: Example of Eco Challenge activities Air-conditioning & machine improvement
15
approximately half the power lost of magnetic ballasts. Lamp efficacy also increases (by
approximately 10%) when the lamp operates at a frequency above 20 kHz.
Energy saving gained was 22,472 kWh/ year.
Measure 7: Delamping
Methodology: Overlighting an area is simply a waste of energy since there is little
benefit in maintaining light levels higher than the recommended levels. Delamping
involves
the
removal
of
unnecessary
lamps
to
reduce
energy
consumption while ensuring that adequate light levels are maintained. SOEM KL has
adopted the recommended lighting level at workplace from Malaysian Standard MS
1525:2007 - Code of Practice on Energy Efficiency as its illuminance standard.
Total 948 units of lamps were removed which amounted to saving of 288,314 kWh/ year.
Measure 8: LED lights Installation.
Methodology: LED light offers the potential of reducing lighting energy requirements by
76%, with additional savings being realized in reduced air-conditioning costs as LED
light with lower energy use translate into reduced cooling loads.
SOEM KL has installed 5,884 units of LED light mostly at Production areas which
operating 24 hours. Energy saving gained was 1,057,425 kWh/ year.
Measure 9: Compressed air leakage reduction.
Methodology: Air leakages are a significant source of wasted energy in a compressed air
system, sometimes wasting 20 to 30 percent of a compressors output. The leak
prevention program consists of identification, tagging, repair and verification.
Energy saving gained from this activity was 1,813,641 kWh/ year.
Measure 10: PC optimization.
Methodology: There were 321 units of PC used at production lines to
display various machines operating data. Using new IGTP server to
directly retrieve the data, 244 units of PC could be eliminated. Energy
saving gained was 64,632 kWh/ year.
Figure 30: PC optimisation at Auto Mount
Measure 11: Clean Booth Fan Filter Unit (FFU) speed reduction.
Methodology: By using inverter, FFU motor frequency had been reduced from 60Hz to
50H, thus its speed reduces while still maintaining the dust filtration requirement.
Energy saving gained was 161,741 kWh/ year.
Measure 12: Compressor shut down during non-working day
Methodology: Since the compressed air demand is
lower on Sunday, one compressor could be shut down.
Energy saving gained was 74,880 kWh/ year.
16
7. Originality
______________________________________________________________________________
Measure: LCD K-Box conveyor-less system operation
Methodology: Insteads of conveyor system, SOEM KL has installed
14 new LCD K-Box lines using Yazaki pipes as the lines structure.
With this conveyor-less concept, there is no electricity required. The
concept makes future lines modification easier and cheaper for
investment too.
SOEM KL saved 237,000 kWh/ year with this
innovation. Besides this, SOEM KL managed to save RM13 million
of the installation costs for all 14 lines.
Figure 32: LCD K-Box Conveyor-less system operation
Measure: Reflow oven thermal insulation
Methodology: Reflow ovens were retro-fitted with thermal insulation to
prevent heat transfer to the surrounding area. A well insulated oven consumes
less energy through shorter initial heating time, more stable temperature and
longer duty cycle of the heating elements. Less heat generated to the ambient
air also translates to reduce load on the centralised air conditioning system.
Total energy saving gained was 839,793 kWh/ year.
Measure: Reflow oven cooling mode temperature reduction.
Methodology: Reflow ovens cooling mode temperature have been reduced
from 150oC to 50oC during weekend or non working day. Energy saving
gained was 331,200 kWh/ year.