CHECKLIST 1
PROJECT: BIEC hall
LOCATION & GRID: GL 1 to 2 (Ax. B to C)
SL No

ACTIVITY DESCRIPTION

1
2
3
4
5

Anchor bolt alignment is as per the approved drawings.


Orientation of column installed is as per the approved drawings.
Column alignment (verticality) done is within permissible limits.
Anchor bolts tigthned to the specified torque and check nut installed.
Column alignment w r t adjacent column is with in permissible limits.

Column alignment w r t column on opposite row is with in permissible limits.


i) CTC distance at bottom, center and top level of column checked and found
ok.
ii) Diagonal distance between opposite row columns at bottom, center and top
levels checked and found ok.

7
8
9

Tie rods in braced bays of columns are installed and tensioned to the specified
torque with nut and check nut in position.
Sidewall cladding runners installed and tighted properly.
Rafter alignment checked and found ok before installation.

10

Rafter installed is seating properly on the top cover plate of each columns,
fasteners installed and tightened.

11

CTC between adjacent rafters checked and found ok.

12

All bracing members installed and tightened.

13
14
15
16
17
18

Purlins checked for straightness and found ok.


Purlins installed and tightened to the rafters.
Sag and anti sag rods installed and properly tightened.
CTC between purlins checked and found ok.
Gutter support members installed are checked for its level.
Final painting done on all members.

19
20
21
22
23
24
25

Final alignment of one box area checked after installation of purlins and
cleared for roof and cladding sheet installation.
Roof sheeting done as per the approved drawing/Liner sheeting
Check for leakages from roof sheeting if there is any
Side wall cladding is in proper alignment
Side cladding sheet and roof sheeting is free from dents
Alignment of edge flashing/trim done properly
Rain water down take fixing as per the approved drawing

ACCEPTED
YES

YTS

YTS
YTS

YTS
YTS
YTS
YTS
YTS

Observations / Corrective Actions Required

We have taken note of the above observations / various defects / shortcomings pointed out by PMC detailed as above and will attend
specifications. Subsequent to the above, if any defects are noticed by PMC prior / during / after the work execution, we undertake t
time or cost implications to the client. We also under take to ensure safety during work execution including stability of tem

ct Manager
3rd Phase J P Nagar, Bangalore- 560078

-41663711 / 2 / 3
e-mail: projectmanagers@potentialpmc.com

ACCEPTED
NO

REMARKS
Check nuts to be fixed

NA- Snug tight done

GL 1-2 wall bracing bolt loose @


Ax. C
Yet to start

B/w GL 1-2 @ Ax. C gap in truss


top chord connection to strut
beams,Truss bottom chordcolumn connection bolts missing

GL 1-2 roof bracing bolt missing


b/w Ax. B-C, GL 1-C bolt missing
in truss-strut tube connection

Work in progress as per dwg

Signature of PPM Representative


e and will attend / rectify the same to bring it in line with the
we undertake to rectify / re-construct the same without any
g stability of temporary supports / shuttering etc.

Contractor's Representative.