CHECKLIST 1
PROJECT: BIEC hall
LOCATION & GRID: GL 1 to 2 (Ax. B to C)
SL No
ACTIVITY DESCRIPTION
1
2
3
4
5
7
8
9
Tie rods in braced bays of columns are installed and tensioned to the specified
torque with nut and check nut in position.
Sidewall cladding runners installed and tighted properly.
Rafter alignment checked and found ok before installation.
10
Rafter installed is seating properly on the top cover plate of each columns,
fasteners installed and tightened.
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Final alignment of one box area checked after installation of purlins and
cleared for roof and cladding sheet installation.
Roof sheeting done as per the approved drawing/Liner sheeting
Check for leakages from roof sheeting if there is any
Side wall cladding is in proper alignment
Side cladding sheet and roof sheeting is free from dents
Alignment of edge flashing/trim done properly
Rain water down take fixing as per the approved drawing
ACCEPTED
YES
YTS
YTS
YTS
YTS
YTS
YTS
YTS
YTS
We have taken note of the above observations / various defects / shortcomings pointed out by PMC detailed as above and will attend
specifications. Subsequent to the above, if any defects are noticed by PMC prior / during / after the work execution, we undertake t
time or cost implications to the client. We also under take to ensure safety during work execution including stability of tem
ct Manager
3rd Phase J P Nagar, Bangalore- 560078
-41663711 / 2 / 3
e-mail: projectmanagers@potentialpmc.com
ACCEPTED
NO
REMARKS
Check nuts to be fixed
Contractor's Representative.