There are 2 alternatives for this case study, The Nowegian Salmon Processing
Facility, Trondheim. It is either the current equipment will be retained and used or
modernization would take place and improve the existing equipment. Current
equipment will have their costs for maintenance paid for already but the
Modernized equipment to installed would cost $10,000 per week, although the cost
for training existing workers will be negligible since the Modernized equipment are
easy to use and is user friendly. The $10,000 per week includes both principal and
interest as well as manufacturer installation of the equipment.
Evaluation of Alternatives
The tool used in this study is the measure of productivity since the main issue
in Norwegian Salmon Processing Facility, Trondheim is that the firm is contemplating
a plant modernization to upgrade the existing equipment. There are two
alternatives for this case study either to retain the current equipment or to purchase
and implement the new equipment for plant modernization.
Single Factor Productivity (labor)
Current labor productivity
150
20
200
=
20
75 pounds
salmon
labor hour
100 pounds
labor hour
Multi-factor Productivity
Current Productivity
1500 x 16 x
=
New Productivity
3.53 pounds
salmon
dollar
= 4.10 pounds
salmon
dollar