CONRETE PROPORTIONING
Class A
Class B
Vol. computed =
Bags of Cement=
Vol. of Sand =
Vol. of Gravel =
cu.m.
0
0
0
Class C
Vol. computed =
Bags of Cement=
Vol. of Sand =
Vol. of Gravel =
cu.m.
0
0
0
Vol. computed =
Bags of Cement=
Vol. of Sand =
Vol. of Gravel =
Class D
Vol. computed =
Bags of Cement=
Vol. of Sand =
Vol. of Gravel =
cu.m.
0
0
0
Vol. computed =
Bags of Cement=
Vol. of Sand =
Vol. of Gravel =
cu.m.
0
0
0
33.6
m.
m.
m.
(4' x 8')
4.876 m.
16 ft.
4.266 m.
14 ft.
Column Scaffoldings
Heigth =
3
m.
No.Col.=
6
m.
Length of lumber =
5.3333
8
4.66667
7
Beam Formworks
Width =
0.2
m.
Depth =
0.3
m.
Length =
6
m.
# Beam=
2
Length of lumber =
4.876 m.
4.266 m.
Area =
10.8
16 ft.
14 ft.
Beams Scaffoldings
34.1
Length of lumber =
5.3333
8
4.66667
7
66.526
12.8333
30.048
2.4
35.6928
agonal Bracing =
39.3865
ertical Supports =
15.75
orizontal Supports =
70.8754
13.14
91.2
4.125
11.28
0.8796
13.3756
ertical Supports =
25.575
orizontal Supports =
29.859
59.3069
DIA.
#3
#4
#5
#6
#8
#9
DIA.
8mm
10mm
12mm
13mm
16mm
20mm
25mm
28mm
30mm
32mm
36mm
5.00
1.98
3.08
4.44
5.21
7.90
12.33
19.27
24.17
27.75
31.57
39.96
6.00
2.37
3.70
5.33
6.25
9.47
14.80
23.12
29.00
33.29
37.88
47.95
STEEL REINFORCEMENT
Footing Reinforcement
(Need Checking)
Width =
Length =
#.Ftng =
No. of bars along length =
No. of bars along width =
1
1
6
4
4
m.
m.
pcs
pcs.
pcs.
6.7
0.4
3
0.3
0.25
12mm
10mm
m.
m.
pcs.
m.
m.
Column Reinforcement
Width =
Length =
13.50
5.33
8.32
11.99
14.07
21.32
33.29
52.02
65.25
74.91
85.23
107.88
1.00
0.3960
0.6162
0.8880
1.0420
1.5800
2.4660
3.8540
4.8340
5.5500
6.3140
7.9920
Height =
#of Col.=
No. of Main. Vert. Bars =
4.3 m.
6 pcs.
4
Spacing:
1
8
Rest
@
@
@
0.05
0.1
0.15
Beam Reinforcement
Width =
Depth =
Length =
#beams=
No. of Main. Vert. Bars =
0.2
0.3
4.5
2
6
Spacing:
1
8
Rest
@
@
@
0.05
0.06
0.12
9
3
0.3
o.c. mm.
100
125
150
175
200
225
250
275
300
Given Data:
2.878
2.749
2.643
2.554
2.332
2.225
2.138
2.065
1.819
1.737
1.669
1.612
Bar Size: 5m
1.473
1.405
1.350
1.304
1.166
1.113
1.069
1.033
Bar multipier =
Slab Length =
4.7
Slab Width =
4.3
Spacing of Main Reinforcement =
150mm
Temp. Bars Spacing =
250mm
Length of tie wire =
25 cm
0.111
0.101
0.091
0.086
0.133
0.121
0.109
0.103
0.163
o.c. mm.
100
125
150
175
200
225
250
275
300
Given Data:
Bar multipier =
Slab Length =
7.2
Slab Width =
7.2
Spacing of Main Reinforcement =
100mm
Temp. Bars Spacing =
250mm
Length of tie wire =
25 cm
0.437
BY BAR LENGTH
Bar Dia. =
Bar Length =
Bar Pcs. =
KGS.
BY LINEAR LENGTH
10mm
6.00
3.00
Bar Dia. =
Total Length =
11.1
KGS.
8mm
5.20
19.22544
24 m.
24 m.
0.4528301887 kgs.
3.685
1.6
5.2
0.2201257862 kgs.
35.333333333 say
36
7.0588235294 say
0.85 m.
18.92
30.857142857
4.0754716981 kgs.
46.666666667 say
47
7.0588235294 say
0.85 m.
9.9
13.428571429
2.6603773585 kgs.
35.2
1.608490566 kgs.
71.22004
3.29423
158.112
22.65408
MASONRY WORKS
Cement and Sand per 100 CHB for Mortar
Chb Size
4 in.
6 in.
8 in.
Sand
in
cu.m
0.35
0.675
1.000
Cement and Sand per 100 CHB for CHB Plaster (plaster thickness: 16 mm average)
No.of face
to be
plastered
One Face
Two Face
2
sq. m.
6
in.
Chb Size =
No. of face plstrd =
1
Wall Area =
Mortar: Class =
CementMultipier =
6.072
Sand Multipier =
No of Bags of Cement =
Sand in Cu.m. =
Plaster: Class =
CementMultipier =
2.304
Sand
in
cu.m
0.128
0.256
26
0.675
1.57872
0.1755
Sand Multipier =
No of Bags of Cement =
Sand in Cu.m. =
0.128
0.59904
0.03328
12
sq. m.
VerticalSpacing =
0.80
HorizontalSpacing= 0.60
Per Block:
Wall Area =
Wall ht. =
Wall lngt =
6
20
m.
m.
m.
m.
Vert. multiplier =
6 m.
6 m.
3.328
4.472
1.48396 kgs.
0.172