You are on page 1of 56

UDRB PACKAGE

MIAMI-DADE COUNTY

6445 NE 7TH AVE


MIAMI, FL 33138

Submitted to: Miami-Dade County


Architect of Record: Stantec
Civil/Traffic Engineer: HSQ Engineering
Lanscape Architect: Savino Miller Studio
Land Use: Greenberg Trautrig
Owner: ACRE GCDM Bay Investments, LLC.
August 01, 2016

ACRE GCDM Bay Investments,


LLC.
801 Brickell Avenue, Suite 2360
Miami, Fl 33131
T: 305.974.1505

Landscape Architect:

Savino Miller Design Studio


12345 NE 6th Avenue A
Miami, Florida 33161
T: 305.895.9082

Architect of Record:

Land Use:

Stantec
One Biscayne Tower Suite 1670
2 S Biscayne Boulevard
Miami, Florida 33131
T: 305.482.8700

Greenberg Traurig
333 SE 2 Avenue
Miami, Fl 33131
T: 305.579.0737

Civil / Traffic Engineer:

HSQ Group, Inc.


5951 Northwest 173rd Drive, Suite #4
Miami, Florida 33015
T: 954.535.5100

A-1:

Site

D-1:

Building Elevations & Sections

A-2:
A-3:
A-4:
A-5:
A-6:
A-7:
A-8:
A-9:

Boundary Survey
Boundary Survey
Boundary Survey
Location Map
Key Site Photos
Key Site Photos
Existing Site Plan
Proposed Site Plan

D-2:
D-3:
D-4:
D-5:
D-6:
D-7:
D-8:
D-9:
D-10:

Proposed Sections
Proposed Sections
Proposed Elevations
Proposed Elevations
Enlarged Elevations
Enlarged Elevations
NorthEast Perspective
SouthWest Perspective
Materials Board

B-1:

Zoning Diagrams

B-2:
B-3:
B-4:
B-5:
B-6:
B-7:
B-8:
B-9:
B-10:
B-11:

Zoning Analysis - Site Area


Zoning Analysis - Site Area
Zoning Analysis
Zoning Analysis
Zoning Analysis
Zoning Analysis
Zoning Analysis
Zoning Analysis - FLR
Vehicle Ingress and Egress Routes
Pedestrian and Transit Access

F-1:

Civil

F-2:
F-3:
F-4:
F-5:
F-6:
F-7:
F-8:

Civil Site Details


Maneuvering Diagrams
Maneuvering Diagrams
Maneuvering Diagrams
Maneuvering Diagrams
Maneuvering Diagrams
Maneuvering Diagrams

L-1:

Landscape Plans

L-2:
L-3:
L-4:
L-5:
L-6:
L-7:
L-8:
L-9:

Site & Landscape Requirements


Existing Tree Survey
Tree Management Schedule
Representative Plant Types
Landscape- Ground Level Plan
Landscape - Amenity Level Plan
Streetscape, Enlargements and Sections
Representative Paving Types

C-1:

Typical Floor Plans

C-2:
C-3:
C-4:
C-5:
C-6:
C-7:

Site Ground Floor Plan


Level P2 Floor Plan
Ground Floor Plan
Level 2 Floor Plan
Levels 3-5 Floor Plan
Roof Plan

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

Owner:

INDEX

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

PROJECT TEAM

6445 NE 7TH AVE. MIAMI, FL 33138

INDEX & PROJECT TEAM

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

6445 NE 7 AVE. MIAMI, FL 33138

SITE

Site

A-2:
A-3:
A-4:
A-5:
A-6:
A-7:
A-8:
A-9:

Boundary Survey
Boundary Survey
Boundary Survey
Location Map
Key Site Photos
Key Site Photos
Existing Site Plan
Proposed Site Plan

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

A-1:

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

A-1

6445 NE 7 AVE. MIAMI, FL 33138

LOCATION MAP

NE 71ST ST
NE 70TH ST

NE 66TH ST
NE 65TH ST

BISCAYNE BLVD

NE 2ND AVE.

N MIAMI AVE.

NE 69TH ST
NE 68TH ST
NE 67TH ST

LEGION PARK

NE 64TH ST

6445 NE 7TH AVE - MIAMI, FL


Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

NE 63RD ST
NE 62ND ST

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

NE 61ST ST

Railroad Tracks

ZONING SUBMITTAL

03.02.2016

LOCATION MAP
SCALE: NTS
PROJECT # 219420344

A-5

3 VIEW - B

SCALE: NTS

PROJECT # 219420344
Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

SCALE: NTS

NE 63RD ST

1 AERIAL - MAP
SCALE: NTS

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

2 VIEW - A

BISCAYNE BLVD

6445 NE 7 AVE. MIAMI, FL 33138

KEY SITE PHOTOS

LEGION PARK

SITE

NE 64TH ST

ZONING SUBMITTAL

03.02.2016

A-6

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

NE 63RD ST

3 VIEW - D

SCALE: NTS

PROJECT # 219420344

4 VIEW - E

SCALE: NTS

1 AERIAL - MAP
SCALE: NTS

NE 64TH ST

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

2 VIEW - C

BISCAYNE BLVD

6445 NE 7 AVE. MIAMI, FL 33138

KEY SITE PHOTOS

LEGION PARK
E

SITE

SCALE: NTS

ZONING SUBMITTAL

03.02.2016

A-7

6445 NE 7 AVE. MIAMI, FL 33138

EXISTING SITE PLAN

NE 67TH ST

NE 66TH ST

NE 64TH ST

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

NE 64TH ST

EXISTING AMERICAN
LEGION BUILDING
Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

NE 64TH TERRACE

NE 7TH AVE

BISCAYNE BLVD

NE 65TH ST

LEGION PARK

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

EXISTING - SITE PLAN


SCALE: NTS

A-8

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

NE 64TH ST

PROJECT # 219420344

PROPOSED - SITE PLAN

SCALE: NTS

LEGION PARK

317-0

6445 NE 7 AVE. MIAMI, FL 33138

NE 67TH ST

NE 64TH ST
Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

NE 64TH TERRACE
NE 7TH AVE

NE 65TH ST
BISCAYNE BLVD

PROPOSED SITE PLAN

NE 66TH ST
500-0

ZONING SUBMITTAL

03.02.2016

A-9

Zoning Diagrams

B-2:
B-3:
B-4:
B-5:
B-6:
B-7:
B-8:
B-9:
B-10:
B-11:

Zoning Analysis - Site Area


Zoning Analysis - Site Area
Zoning Analysis
Zoning Analysis
Zoning Analysis
Zoning Analysis
Zoning Analysis
Zoning Analysis - FLR
Vehicle Ingress and Egress Routes
Pedestrian and Transit Access

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

B-1:

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

6445 NE 7 AVE. MIAMI, FL 33138

ZONING DIAGRAMS

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

B-1

ZONING ANALYSIS - 6445 NE 7th Ave. Miami, Fl 33138


ACRE GCDM Bay Investments, LLC
REQUIRED / ALLOWED

PROVIDED

NOTES

N/A

Per Miami 21 Zoning Atlas

Zoning Districts
Folio : 01-3218-000-0031
Lot Area Summary

T5-R

Net Lot Area T5


Lot area, net. The total area within the lot lines excluding any street rights-of-way or other required dedications.

Folio : 01-3218-000-0031

155,915.00 SF - Net Lot Area

T5_R Total Net Lot Area (SF) - Not Including Dedicated Right of Way
Total Net Lot Area (Acres)

155,915.00 SF - Net Lot Area


3.58 Acres - Net Lot Area

Not including dedicated right of way

T5_R Total Net Lot Area (SF) - Including Dedicated Right of Way
Total Net Lot Area (Acres)

158,549.00 SF - Net Lot Area


3.64 Acres - Net Lot Area

Including dedicated right of way.

6445 NE 7 AVE. MIAMI, FL 33138

ZONING ANALYSIS - SITE AREA

* Lot Assembled prior to Miami 21 3.3.1


Note: Lot size per Miami Property Appraiser
General Lot Requirments (Article 5)
T5-R
Lot Size
Lot Width
Lot Coverage

5,000 sq.ft. Min. / 40,000 sq.ft. max.


50 ft. min.
80% Max.
124,732 GSF
N/A
Unlimited
N/A
70% Min.
50% Min.

Floor Lot Ratio (Maximum) - Article 5 | Illustration 5.9


Floor Lot Ratio (Square Footage) without Bonus
Public Benefit FLR Bonus (25%)
Frontage on Primary - NE 64th St
Frontage on Secondary - NE 7th Ave
Green/Open Space Requirements

10% Lot Area min.


15,592 GSF

117,558SF (75.4%) Provided

375'-9" (75.2%) Provided


162'-9" (51.3%) Provided

375'-9" / 500' -0" Primary Street Frontage


162'-9" / 317'-0" Secondary Street Frontage

28,715 sq ft (18.4%) Provided

Building Height
T5-R
Minimum Stories Allowed - Article 5 | Illustration 5.9
Maximum Stories Allowed - Article 5 | Illustration 5.9
Maximum Benefit Height (inclusive of all Stories)

2 Stories
5 Stories
1 Story abutting D-1

5 Stories
5 Stories
N/A

10 ft.
10 ft.
0 ft.
0 ft.

15 ft.
10.ft
0 ft.
0 ft.

Per Survey, Base building line located 5 ft from property line along NE 64th Street

Density
T5-R
Dwelling Units per Acre
Total Dwelling Units Allowed

65 du/acre max.
237 Dwelling Units

Parking Requirements
Note: On-Street Parking available on Frontage Lines shall be counted towards Parking Requirement
Residential Parking

237 Dwellling Units

Minimum of 1.5 parking spaces per Dwelling Unit + Guest Spaces


237 Dwelling Units x 1.5 Spaces per Unit = 356 Parking Spaces

Minimum of 1.0 additional visitor parking space for every 10 Dwelling Units
237 Dwelling Units / 1 space per 10 unirts = 24 Visitor Spaces
Total Residential Required Parking =

380 Parking Spaces

Total Existing Use Required Parking =

Required to provide 45 parking spaces for American Legion Use


45 Parking Spaces

Total Parking Required =

425 Parking Spaces

Existing Use Parking

NOTE: DEPENDING ON FINAL USES - A SHARED PARKING DIVISOR IS ALLOWED

380 Parking Spaces Provided

45 Parking Spaces Provided


425 Total Parking Spaces
Street Parking 17 spaces along NE 64 Street
9 spaces along NE 7th Ave
Residential (Garage) 330 spaces
Guest (Garage) 24 spaces
Legions (Garage) 45 spaces

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

T5-R
Frontage on Primary - NE 64th St
Frontage on Secondary - NE 7th Ave
Side
Rear

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

Building Setback

ZONING SUBMITTAL

03.02.2016

Not Allowed

ZONING DATA
PROJECT # 219420344

B-2

Loading Requirements
Residential

From 25,000 sf to 500,000 sf


Berth Size
420 sq. ft.
200 sq. ft.
Total Required

1 per first 100 units


1 per each additional
3

1 Provided
2 Provided
3 Provided

Other General Requirements


Bicycle Parking

Minimum 1 bicycle rack space per 20 parking spaces


425 required spaces / 20 = 22 bicycle spaces

22 spaces Provided

Parking Access
Primary Frontage
Secondary Frontage

Parking must be located in Third Layer


Parking must be located in Third Layer

Loading and Vehicular Access

From alley or secondary frontage

Vehicle Entrance Separation

Minimum - 60'-0"
Along NE 64th St
Along NE 7th Ave

Minimum Building Spacing

60 feet above level 02

6445 NE 7 AVE. MIAMI, FL 33138

ZONING ANALYSIS - SITE AREA

Parking in Third Layer


Parking in Third Layer
Secondary Frontage
Compliant
60'-5" between Vehicle Entry
154'-4" between Vehicle Entry
75'-11" between North and South Tower

PROJECT SITE
ZONING - MAP
SCALE: NTS

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

ZONING DATA

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

B-3

SIDE

SIDE

LEGION PARKING
21

LEGION PARKING
08

LEGION PARKING
15

LEGION PARKING
22

LEGION PARKING
09

LEGION PARKING
16

LEGION PARKING
23

LEGION PARKING
27

LEGION PARKING
03

LEGION PARKING
10

LEGION PARKING
17

LEGION PARKING
24

LEGION PARKING
28

LEGION PARKING
04

LEGION PARKING
11

LEGION PARKING
18

LEGION PARKING
25

LEGION PARKING
29

LEGION PARKING
05

LEGION PARKING
12

LEGION PARKING
19

LEGION PARKING
26

LEGION PARKING
30

POOL EQUIP.
122

DN

ELEV. LOBBY

Room

Room

EXISTING USE
AMERICAN LEGION
15,000 SF

205 GARAGE
26 STREET PARKING

DN

LEGION PARKING
21

LEGION PARKING
08

LEGION PARKING
15

LEGION PARKING
22

LEGION PARKING
09

LEGION PARKING
16

LEGION PARKING
23

LEGION PARKING
27

LEGION PARKING
03

LEGION PARKING
10

LEGION PARKING
17

LEGION PARKING
24

LEGION PARKING
28

LEGION PARKING
04

LEGION PARKING
11

LEGION PARKING
18

LEGION PARKING
25

LEGION PARKING
29

LEGION PARKING
05

LEGION PARKING
12

LEGION PARKING
19

LEGION PARKING
26

LEGION PARKING
30

DN

DN
LEGION ACCESS

DN

DN

POOL EQUIP.
122

DN

12

LEGION PARKING
14

ELEV. LOBBY

TRASH ROOM

LEGION PARKING
31

GE-1
005

2
DN

P1 GARAGE LEVEL

RAMP UP 14% SLOPE


LENGTH = 18'

Room

GROUP FITNESS

10

11

12

13

14

15

16

17

LEGION
PARKING
32

LEGION
LEGION
PARKING PARKING
33
34

LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING
38
37
36
35

LEGION
LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING PARKING
43
42
41
40
39

LEGION
LEGION
PARKING PARKING
45
44

Room

EXISTING USE
AMERICAN LEGION
15,000 SF

205 GARAGE
26 STREET PARKING

DN

10

11

12

13

14

15

16

17

LEGION
PARKING
32

LEGION
LEGION
PARKING PARKING
33
34

LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING
38
37
36
35

LEGION
LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING PARKING
43
42
41
40
39

LEGION
LEGION
PARKING PARKING
45
44

10

11

12

13

14

15

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

3
1

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

10

11

12

13

14

15

16

17

18

19

20

21

22

23

P
SLO
14%
P UP H = 18'
T
LENG

LOADING
UP

ELEV.
LOBBY

DOMESTIC PUMP RM
105

P
P

DN

TRASH ROOM

85-9

10

11

12

13

14

15

16

17

18

COMM. RM.
113

10

11

12

13

14

10

11

12

13

24

25

26

27

28

29

30

31

32

VENTILATION
BLOCK

15

16

17

18

19

20

21

22

23

24

25

14

15

16

17

18

19

20

21

22

23

RAMP

RAMP DN 14% SLOPE


LENGTH = 57'-1 3/4"

LOADING

EMERGENCY GENERATOR
108

55

P
P

RAMP DN 8% SLOPE
LENGTH =12'

ELEV.
LOBBY

DOMESTIC PUMP RM
105

MAINTENANCE
107

P
P

PL

P
P

STORAGE

8
8

10
DN

TRASH ROOM

RAMP DN 8% SLOPE
LENGTH = 12'

11

WAITING

DN

DN

CONF. ROOM

DN

LEASING

ART LOBBY
103

FIRE PUMP RM
106

DN

FIRE COMM. CENTER


139

OFFICE

P
1
P

PL

8' PARKING

8' PARKING

10' TRAVEL LANE

10' TRAVEL LANE


CL

CL

NE 64TH STREET

94

93

NE 64TH STREET
P

91

92

90

88
89

87

94

93

91

92

500-0

PRIMARY FRONTAGE

PROPERTY LINE/SITE AREA: 155,915 sf

LOT COVERAGE: 117,558 sf

PRIMARY FRONTAGE
FRONTAGE REQUIRED: 70% MIN
PROVIDED: 375 - 9 / 500 = 75.2%
SECONDARY FRONTAGE
FRONTAGE REQUIRED: 50% MIN
PROVIDED: 162 - 9 / 317 = 51.3%

LOT COVERAGE PERCENTAGE: Max 80%


PROVIDED: 75.4%
117,558 sf/155,915 sf = 75.4%

SECOND LAYER

BASE BUILDING LINE


SECOND LAYER
THIRD LAYER

SIDE FRONTAGES
BASE BUILDING LINE
THIRD LAYER

LOT COVERAGE- DIAGRAM

FRONTAGES- DIAGRAM
SCALE: NTS

315-4

PRIMARY FRONTAGE

SCALE: NTS

4
4

9
1

Room
104

5
5

LOUNGE

6
6
P
P

GE-2
141

MAIL ROOM

24

UP

7
7
P
P

MAIN ELEC RM
109

P
SLO
14%
P UP H = 18'
T
LENG

DN

10

OFFICE

23

RAM
DN

FIRE COMM. CENTER


139

22

5
4

EMERG ELEC RM
112

WAITING

LEASING

DN

21

DN
UP

20

3
BIKE CENTER
114

RAMP DN 8% SLOPE
LENGTH = 12'

11

19

NEW BUILDING

UP

ART LOBBY
103

FIRE PUMP RM
106

10
DN

TRASH
111

CONF. ROOM

8
8

DN 10

MAINTENANCE
107

3
Room
104

EMERGENCY GENERATOR
108

P
P

STORAGE

RAMP DN 8% SLOPE
LENGTH = 12'

RAMP DN 14% SLOPE


LENGTH = 57'-1 3/4"

RAMP DN 8% SLOPE
LENGTH = 12'

RAMP

RAMP UP 10% SLOPE

4
4

PE

RAMP DN 8% SLOPE
LENGTH = 30'

DN
UP

RAM

RAMP DN 8% SLOPE
LENGTH =12'

7
UP

55

P
P

GE-2
141

TRASH
111

5
5

LOUNGE

7
6

MAIN ELEC RM
109

6
6
P
P

24

VENTILATION
BLOCK

MAIL ROOM

5
4

EMERG ELEC RM
112

7
7
P
P

SIDE

COMM. RM.
113

% SLO

NE 7TH AVE

BIKE CENTER
114

317-0

SECONDARY FRONTAGE

NEW BUILDING

GE-3

10

P
1

SECONDARY FRONTAGE

16

PE

% SLO

DN 10

12

RAMP DN 8% SLOPE
LENGTH = 30'

FITNESS RM

FPL
115

NE 7TH AVE

GE-3

19

GROUP FITNESS

4
FITNESS RM

FPL
115

P
RAMP
DN

P1 GARAGE LEVEL

RAMP UP 14% SLOPE


LENGTH = 18'

PET SPA
117

DN

LEGION PARKING
20

LEGION PARKING
07

LEGION PARKING
02

RAMP
DN

GE-1
005

19

LEGION PARKING
31

DN

LEGION PARKING
13

LEGION PARKING
06

90

60-5
88
89

87

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

DN

DN
TRASH ROOM

LEGION PARKING
01

KAYAK CENTER
118

DN

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

DN
LEGION ACCESS

8% SLOP
RAMP DN
= 30'
LENGTH

DN

TRASH ROOM
120

20 '- 0" REQUIRED


PEDESTRIAN PATHWAY

22

SIDE

LEGION PARKING
14

8' PARKING

LEGION PARKING
07

LEGION PARKING
02

LOADING

8% SLOP
RAMP DN
= 30'
LENGTH

LEGION PARKING
20

25

RAMP UP 10% SLOPE

DN

LEGION PARKING
13

LEGION PARKING
06

10' TRAVEL LANE

LEGION PARKING
01

33

DN

20 '- 0" REQUIRED


PEDESTRIAN PATHWAY

22

10' TRAVEL LANE

P
TRASH ROOM
120

KAYAK CENTER
118

PET SPA
117

25

77- 0

8' PARKING

10' TRAVEL LANE

10' TRAVEL LANE

33

LOADING

6445 NE 7 AVE. MIAMI, FL 33138

ZONING ANALYSIS

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

B-4

SIDE

SIDE

LEGION PARKING
14

LEGION PARKING
21

LEGION PARKING
08

LEGION PARKING
15

LEGION PARKING
22

LEGION PARKING
09

LEGION PARKING
16

LEGION PARKING
23

LEGION PARKING
27

LEGION PARKING
03

LEGION PARKING
10

LEGION PARKING
17

LEGION PARKING
24

LEGION PARKING
28

LEGION PARKING
04

LEGION PARKING
11

LEGION PARKING
18

LEGION PARKING
25

LEGION PARKING
29

LEGION PARKING
05

LEGION PARKING
12

LEGION PARKING
19

LEGION PARKING
26

LEGION PARKING
30

3
DN

ELEV. LOBBY

TRASH ROOM

RAMP
DN

GE-1
005

PET SPA
117

LEGION PARKING
22

LEGION PARKING
09

LEGION PARKING
16

LEGION PARKING
23

LEGION PARKING
27

Room

205 GARAGE
26 STREET PARKING

LEGION PARKING
03

LEGION PARKING
10

LEGION PARKING
17

LEGION PARKING
24

LEGION PARKING
28

LEGION PARKING
04

LEGION PARKING
11

LEGION PARKING
18

LEGION PARKING
25

LEGION PARKING
29

LEGION PARKING
05

LEGION PARKING
12

LEGION PARKING
19

LEGION PARKING
26

LEGION PARKING
30

DN

DN

POOL EQUIP.
122

DN

12

EXISTING USE
AMERICAN LEGION
15,000 SF

DN

DN
LEGION ACCESS

ELEV. LOBBY

TRASH ROOM

LEGION PARKING
31

GE-1
005

2
DN

P1 GARAGE LEVEL

RAMP UP 14% SLOPE


LENGTH = 18'

Room

GROUP FITNESS

10

11

12

13

14

15

16

17

LEGION
PARKING
32

LEGION
LEGION
PARKING PARKING
33
34

LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING
38
37
36
35

LEGION
LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING PARKING
43
42
41
40
39

LEGION
LEGION
PARKING PARKING
45
44

Room

EXISTING USE
AMERICAN LEGION
15,000 SF

205 GARAGE
26 STREET PARKING

DN

10

11

12

13

14

15

16

17

LEGION
PARKING
32

LEGION
LEGION
PARKING PARKING
33
34

LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING
38
37
36
35

LEGION
LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING PARKING
43
42
41
40
39

LEGION
LEGION
PARKING PARKING
45
44

20 REQUIRED
PEDESTRIAN PATH

10

11

12

13

14

15

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

10 SETBACK

2
3

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

10

11

12

13

14

15

16

17

18

19

20

21

22

23

P
SLO
14%
P UP H = 18'
T
LENG

LOADING
UP

ELEV.
LOBBY

DOMESTIC PUMP RM
105

P
P

DN

TRASH ROOM

10

11

12

13

14

15

16

17

18

COMM. RM.
113

10

11

12

13

14

10

11

12

13

24

25

26

27

28

29

30

VENTILATION
BLOCK

3
P

15

16

17

18

19

20

21

22

23

24

25

RAMP

14

15

16

17

18

19

20

21

22

RAMP DN 14% SLOPE


LENGTH = 57'-1 3/4"

LOADING

ELEV.
LOBBY

DOMESTIC PUMP RM
105
Room
104

EMERGENCY GENERATOR
108

55

MAIL ROOM

6
6

23

P
P

24

5
5

LOUNGE

P
P

RAMP DN 8% SLOPE
LENGTH =12'

4
4

7
7
P
P

0 SETBACK

GE-2
141

P
SLO
14%
P UP H = 18'
T
LENG

DN

10

MAIN ELEC RM
109

MAINTENANCE
107

P
P

P
P

STORAGE

8
8

10
DN

TRASH ROOM

RAMP DN 8% SLOPE
LENGTH = 12'

11

WAITING

DN

DN

CONF. ROOM

DN

LEASING

ART LOBBY
103

FIRE PUMP RM
106

DN

FIRE COMM. CENTER


139

OFFICE

PL

P
1
P

PL
8' PARKING

10' TRAVEL LANE

10' TRAVEL LANE

30 SETBACK

CL

NE 64TH STREET

94

93

91

92

90

88
89

87

94

PRIMARY FRONTAGE

CL

NE 64TH STREET
P

93

91

92

90

PROPERTY LINE
BASE BUILDING LINE

SECOND LAYER

SECOND LAYER
PRIMARY AND SECONDARY FRONTAGE SETBACK (10-0)
(NOTE: SET BACK ALONG NE 64TH ST IS ,15-0
OFFSET 5-0 DUE TO LOCATION OF BASE BUILDING LINE)

THIRD LAYER
PROPERTY LINE
BASE BUILDING LINE

THIRD LAYER
25-0 SETBACK
(NOTE: SET BACK ALONG NE 64TH ST IS , 30-0
OFFSET 5-0 DUE TO LOCATION OF BASE BUILDING

SETBACKS - DIAGRAM
SCALE: NTS

PRIMARY FRONTAGE

FIRST LAYER

SCALE: NTS

32

UP

8' PARKING

LAYERS - DIAGRAM

31

OFFICE

23

RAM
DN

FIRE COMM. CENTER


139

22

5
4

EMERG ELEC RM
112

WAITING

LEASING

DN

21

DN
UP

20

3
BIKE CENTER
114

RAMP DN 8% SLOPE
LENGTH = 12'

11

19

NEW BUILDING

UP

ART LOBBY
103

FIRE PUMP RM
106

10
DN

TRASH
111

CONF. ROOM

8
8

DN 10

MAINTENANCE
107

3
Room
104

EMERGENCY GENERATOR
108

P
P

STORAGE

RAMP DN 8% SLOPE
LENGTH = 12'

RAMP DN 14% SLOPE


LENGTH = 57'-1 3/4"

RAMP DN 8% SLOPE
LENGTH = 12'

RAMP

RAMP UP 10% SLOPE

4
4

PE

RAMP DN 8% SLOPE
LENGTH = 30'

DN
UP

RAM

RAMP DN 8% SLOPE
LENGTH =12'

7
UP

55

P
P

GE-2
141

TRASH
111

5
5

LOUNGE

7
6

MAIN ELEC RM
109

6
6
P
P

24

VENTILATION
BLOCK

MAIL ROOM

5
4

EMERG ELEC RM
112

7
7
P
P

SIDE

COMM. RM.
113

% SLO

NE 7TH AVE

BIKE CENTER
114

SECONDARY FRONTAGE

NEW BUILDING

GE-3

10

P
1

SECONDARY FRONTAGE

16

PE

% SLO

DN 10

12

RAMP DN 8% SLOPE
LENGTH = 30'

15 SETBACK

25 SETBACK

FPL
115

NE 7TH AVE

FITNESS RM

25 SETBACK
GE-3

19

GROUP FITNESS

4
FITNESS RM

FPL
115

P
RAMP
DN

Room

P1 GARAGE LEVEL
DN

LEGION PARKING
15

19

LEGION PARKING
31

DN

RAMP UP 14% SLOPE


LENGTH = 18'

LEGION PARKING
21

LEGION PARKING
08

DN

DN

POOL EQUIP.
122

LEGION PARKING
14

88
89

87

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

LEGION PARKING
20

LEGION PARKING
07

LEGION PARKING
02

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

DN

DN

LEGION PARKING
13

LEGION PARKING
06

LEGION ACCESS

8% SLOP
RAMP DN
= 30'
LENGTH

DN

LEGION PARKING
01

KAYAK CENTER
118

DN

SIDE

LEGION PARKING
07

LEGION PARKING
02

TRASH ROOM
120

8% SLOP
RAMP DN
= 30'
LENGTH

LEGION PARKING
20

LOADING

20 '- 0" REQUIRED


PEDESTRIAN PATHWAY

22

RAMP UP 10% SLOPE

DN

LEGION PARKING
13

LEGION PARKING
06

25

0 SETBACK

8' PARKING

LEGION PARKING
01

33

DN

20 '- 0" REQUIRED


PEDESTRIAN PATHWAY

22

10' TRAVEL LANE

P
TRASH ROOM
120

KAYAK CENTER
118

PET SPA
117

25

10' TRAVEL LANE

8' PARKING

10' TRAVEL LANE

10' TRAVEL LANE

33

LOADING

6445 NE 7 AVE. MIAMI, FL 33138

ZONING ANALYSIS

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

B-5

SIDE

SIDE

33

LEGION PARKING
01

KAYAK
CENTER

UP

TRASH

LEGION PARKING
08

GE-4
003

LEGION PARKING
16

LEGION PARKING
23

LEGION PARKING
03

LEGION PARKING
10

LEGION PARKING
17

LEGION PARKING
24

LEGION PARKING
04

LEGION PARKING
11

LEGION PARKING
18

LEGION PARKING
25

LEGION PARKING
29

LEGION PARKING
05

LEGION PARKING
12

LEGION PARKING
19

LEGION PARKING
26

LEGION PARKING
30

LEGION PARKING
06

LEGION PARKING
13

LEGION PARKING
20

LEGION PARKING
27

LEGION PARKING
31

LEGION PARKING
21

LEGION PARKING
28

LEGION PARKING
32

LEGION
ACCESS

LOBBY

ELEV LOBBY

RAMP UP 14% SLOPE


LENGTH = 18'

19

12

RAMP
DN

EXISTING USE
AMERICAN LEGION
15,000 SF

GE-4
003
GE-1
005

6' - 6"

LEGION
LEGION LEGION
PARKING PARKING PARKING
33
34
35

DN

LEGION
LEGION
PARKING PARKING
37
36

LEGION
LEGION
LEGION
LEGION
LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING PARKING PARKING PARKING PARKING
45
44
43
42
41
40
39
38

DN

FPL

10

NEW BUILDING
7
7

COMM.
RM

P
P
6
6
P
P
5
5

NEW BUILDING

EMERG
ELEC RM

SIDE

NE 7TH AVE

BIKE
CENTER

P
P

P2 GARAGE LEVEL

RAMP DN 8% SLOPE
LENGTH = 21'

FIRE
COM.

SIDE

195 GARAGE SPACES


MAIN
ELEC RM

VENTILATION
BLOCK

MAIN
LOBBY

P
P

TRASH

RAMP DN 14% SLOPE


LENGTH = 57'-1 3/4"

P
SLO
14%
P UP H = 18'
T
LENG

8
8

RAMP DN 8% SLOPE
LENGTH = 12'

LOADING

RAM

RAMP DN 8% SLOPE
LENGTH = 24'

ELEV.
LOBBY

DOM PUMP
STORAGE
RM.

FIRE PUMP
RM.

RAMP DN 14% SLOPE


LENGTH = 57'-1 3/4"

ART LOBBY

PE

ART LOBBY

UP

RAMP UP 10% SLOPE

UP

LEASING

DN 10

55

MAINTENANCE

RAMP

EMERGENCY
GENERATOR

P
% SLO

STOR.
P

4
4

P
P

RAMP DN 8% SLOPE
LENGTH = 21'

NE 7TH AVE

SECONDARY FRONTAGE

SIDE
UP

LEGION PARKING
14

LEGION PARKING
07

POOL
EQUIP.

RAMP DN 8% SLOPE
LENGTH = 12'

RAMP DN 14% SLOPE


LENGTH = 57'-1 3/4"

SECONDARY FRONTAGE

P2 GARAGE LEVEL
195 GARAGE SPACES

TYPICAL STREET PARKING DIMENSION 8 x 20

NEW BUILDING
NE 7TH AVE

SECONDARY FRONTAGE

DN

UP

22 BICYCLE SPACES

DN

PET SPA

LEGION PARKING
22

LEGION PARKING
09

20 '- 0" REQUIRED


PEDESTRIAN PATHWAY

22

SLOPE
RAMP DN 8%
LENGTH = 30'

GE-1
005

LEGION PARKING
15

LEGION PARKING
02

ELEV LOBBY

6' - 6"

25

LOADING
8' PARKING

10' TRAVEL LANE

10' TRAVEL LANE

SIDE

UP

6445 NE 7 AVE. MIAMI, FL 33138

ZONING ANALYSIS

P
1
P

PL
8' PARKING
ELEV.
LOBBY

10' TRAVEL LANE

CL

TYPICAL STREET PARKING DIMENSION 8 x 20


94

PRIMARY FRONTAGE

91

92

93

90

88
89

PRIMARY FRONTAGE

PARKING REQUIRED:
Residential Uses________________ 356 spaces
Guest _________________________ 24 spaces
Legion ________________________ 45 spaces
TOTAL REQUIRED SPACES = 425 Spaces
TOTAL REQUIRED BICYCLE SPACES = 22 Spaces

PARKING PROVIDED:
Level 00
Garage _______________________ 195 spaces
Residential ______________ 191spaces
Handicap________________ 4 spaces
TOTAL COMPLIANT SPACES ______ 195 spaces

PARKING PROVIDED:
Ground Level
Street Parking _________________ 17 spaces (NE 64 ST)
Street Parking _________________ 9 spaces (NE 7 AV)
Garage _______________________ 205 spaces
Residential ______________ 131spaces
Handicap________________ 5 spaces
Guest __________________ 24 spaces
Legions ________________ 45 spaces
TOTAL COMPLIANT SPACES _____ 231 spaces

TOTAL COMPLIANT SPACES PROVIDED: 425 SPACES


NE 64TH STREET

TOTAL BICYCLE SPACES PROVIDED: 22 SPACES


(LOCATED IN BIKE CENTER)

PRIMARY FRONTAGE
SECOND LAYER
THIRD LAYER

PARKING REQUIRED:
Residential Uses________________ 356 spaces
Guest _________________________ 24 spaces
Legion ________________________ 45 spaces
TOTAL REQUIRED SPACES = 425 Spaces
TOTAL REQUIRED BICYCLE SPACES = 22 Spaces

PARKING LEVEL 0- DIAGRAM


SCALE: NTS

PROJECT # 219420344

PARKING PROVIDED:
Level 00
Garage _______________________ 195 spaces
Residential ______________ 191spaces
Handicap________________ 4 spaces
TOTAL COMPLIANT SPACES ______ 195 spaces

PARKING LEVEL P1- DIAGRAM


SCALE: NTS

PARKING PROVIDED:
Ground Level
Street Parking _________________ 17 spaces (NE 64 ST)
Street Parking _________________ 9 spaces (NE 7 AV)
Garage _______________________ 205 spaces
Residential ______________ 131spaces
Handicap________________ 5 spaces
Guest __________________ 24 spaces
Legions ________________ 45 spaces
TOTAL COMPLIANT SPACES _____ 231 spaces

TOTAL COMPLIANT SPACES PROVIDED: 425 SPACES


TOTAL BICYCLE SPACES PROVIDED: 22 SPACES
(LOCATED IN BIKE CENTER)

SECOND LAYER
THIRD LAYER

87

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

NE 64TH STREET

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

NE 64TH STREET

ZONING SUBMITTAL

03.02.2016

B-6

SIDE

SIDE

LEGION PARKING
14

LEGION PARKING
21

LEGION PARKING
08

LEGION PARKING
15

LEGION PARKING
22

LEGION PARKING
09

LEGION PARKING
16

LEGION PARKING
23

LEGION PARKING
27

LEGION PARKING
03

LEGION PARKING
10

LEGION PARKING
17

LEGION PARKING
24

LEGION PARKING
28

LEGION PARKING
04

LEGION PARKING
11

LEGION PARKING
18

LEGION PARKING
25

LEGION PARKING
29

LEGION PARKING
05

LEGION PARKING
12

LEGION PARKING
19

LEGION PARKING
26

LEGION PARKING
30

3
DN

ELEV. LOBBY

TRASH ROOM

RAMP
DN

GE-1
005

PET SPA
117

LEGION PARKING
09

LEGION PARKING
16

LEGION PARKING
23

LEGION PARKING
27

Room

205 GARAGE
26 STREET PARKING

LEGION PARKING
03

LEGION PARKING
10

LEGION PARKING
17

LEGION PARKING
24

LEGION PARKING
28

LEGION PARKING
04

LEGION PARKING
11

LEGION PARKING
18

LEGION PARKING
25

LEGION PARKING
29

LEGION PARKING
05

LEGION PARKING
12

LEGION PARKING
19

LEGION PARKING
26

LEGION PARKING
30

DN

DN

POOL EQUIP.
122

DN

12

EXISTING USE
AMERICAN LEGION
15,000 SF

DN

DN
LEGION ACCESS

ELEV. LOBBY

TRASH ROOM

LEGION PARKING
31

GE-1
005

2
DN

P1 GARAGE LEVEL

RAMP UP 14% SLOPE


LENGTH = 18'

Room

GROUP FITNESS

10

11

12

13

14

15

16

17

LEGION
PARKING
32

LEGION
LEGION
PARKING PARKING
33
34

LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING
38
37
36
35

LEGION
LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING PARKING
43
42
41
40
39

LEGION
LEGION
PARKING PARKING
45
44

Room

EXISTING USE
AMERICAN LEGION
15,000 SF

205 GARAGE
26 STREET PARKING

DN

10

11

12

13

14

15

16

17

LEGION
PARKING
32

LEGION
LEGION
PARKING PARKING
33
34

LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING
38
37
36
35

LEGION
LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING PARKING
43
42
41
40
39

LEGION
LEGION
PARKING PARKING
45
44

10

11

12

13

14

15

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

10

11

12

13

14

15

16

17

18

19

20

21

22

23

P
SLO
14%
P UP H = 18'
T
LENG

LOADING
UP

ELEV.
LOBBY

DOMESTIC PUMP RM
105

P
P

DN

TRASH ROOM

11

12

13

14

15

16

17

18

11

COMM. RM.
113

10

11

12

13

14

FIRE COMM. CENTER


139

OFFICE

21

22

23

24

25

26

27

28

29

30

31

32

NOT COUNTED IN
PLAZA CALCULATIONS

EMERG ELEC RM
112

15

16

17

18

19

20

21

22

23

24

25

VENTILATION
BLOCK

10

11

12

13

14

15

16

17

18

19

20

21

22

23

RAMP DN 14% SLOPE


LENGTH = 57'-1 3/4"

RAMP

LOADING

ELEV.
LOBBY

DOMESTIC PUMP RM
105

Room
104
EMERGENCY GENERATOR
108

55

RAMP DN 8% SLOPE
LENGTH =12'

MAINTENANCE
107

P
P

PL

P
P

STORAGE

8
8

10
DN

TRASH ROOM

RAMP DN 8% SLOPE
LENGTH = 12'

11

WAITING

DN

DN

CONF. ROOM

DN

LEASING

ART LOBBY
103

FIRE PUMP RM
106

DN

FIRE COMM. CENTER


139

OFFICE

P
1
P

PL

8' PARKING

8' PARKING

10' TRAVEL LANE

10' TRAVEL LANE


CL

CL

NE 64TH STREET

94

91

92

93

NE 64TH STREET
P

90

88
89

87

94

93

91

92

PRIMARY FRONTAGE
PROPERTY LINE / SITE AREA: 155,915 sf

SECOND LAYER

BASE BUILDING LINE

THIRD LAYER

SECOND LAYER

BASE BUILDING LINE

90

88
89

87

THIRD LAYER

PROPERTY LINE/SITE AREA: 155,915 sf

OPEN SPACE: 28,715 sf

PLAZA_CIVIC SPACE = 13,459 SF provided

OPEN SPACE REQUIRED: 10% MIN

MIN REQUIRED = 1/8 of an Acre (5,445 sf) per Article 4 Table 7

PLAZA CIVIC SPACE - DIAGRAM

PRIMARY FRONTAGE

SCALE: NTS

4
4

UP

P
P

UP

5
5

LOUNGE

GE-2
141

6
6
P
P

P
SLO
14%
P UP H = 18'
T
LENG

MAIL ROOM

24

MAIN ELEC RM
109

7
7
P
P

RAM
DN

10

WAITING

DN

DN

20

DN
UP

19

3
BIKE CENTER
114

RAMP DN 8% SLOPE
LENGTH = 12'

LEASING

ART LOBBY
103

FIRE PUMP RM
106

10

10
DN

NEW BUILDING

TRASH
111

CONF. ROOM

8
8

DN 10

MAINTENANCE
107

3
Room
104

EMERGENCY GENERATOR
108

P
P

STORAGE

RAMP DN 8% SLOPE
LENGTH = 12'

RAMP DN 14% SLOPE


LENGTH = 57'-1 3/4"

RAMP DN 8% SLOPE
LENGTH = 12'

RAMP

RAMP UP 10% SLOPE

4
4

PE

RAMP DN 8% SLOPE
LENGTH = 30'

DN
UP

RAM

RAMP DN 8% SLOPE
LENGTH =12'

7
UP

55

P
P

GE-2
141

TRASH
111

5
5

LOUNGE

7
6

MAIN ELEC RM
109

6
6
P
P

24

VENTILATION
BLOCK

MAIL ROOM

5
4

EMERG ELEC RM
112

DN 10

SIDE

7
7
P
P

% SLO

NE 7TH AVE

COMM. RM.
113

NE 7TH AVE

3
BIKE CENTER
114

SECONDARY FRONTAGE

NEW BUILDING

GE-3

10

P
1

SECONDARY FRONTAGE

16

PE

12

FITNESS RM

FPL
115

% SLO

RAMP DN 8% SLOPE
LENGTH = 30'

GE-3

19

GROUP FITNESS

4
FITNESS RM

FPL
115

P
RAMP
DN

Room

P1 GARAGE LEVEL
DN

LEGION PARKING
22

19

LEGION PARKING
31

DN

RAMP UP 14% SLOPE


LENGTH = 18'

LEGION PARKING
15

DN

DN

POOL EQUIP.
122

LEGION PARKING
21

LEGION PARKING
08

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

LEGION PARKING
14

OPEN SPACE PERCENTAGE:


28,715 sf / 155,195 sf = 18.4 %

OPEN SPACE- DIAGRAM


SCALE: NTS

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

DN

DN

LEGION PARKING
20

LEGION PARKING
07

LEGION PARKING
02

LEGION ACCESS

8% SLOP
RAMP DN
= 30'
LENGTH

DN

LEGION PARKING
13

LEGION PARKING
06

SIDE

LEGION PARKING
07

LEGION PARKING
02

LEGION PARKING
01

KAYAK CENTER
118

DN

8% SLOP
RAMP DN
= 30'
LENGTH

LEGION PARKING
20

TRASH ROOM
120

20 '- 0" REQUIRED


PEDESTRIAN PATHWAY

22

RAMP UP 10% SLOPE

DN

LEGION PARKING
13

LEGION PARKING
06

25

LOADING

8' PARKING

LEGION PARKING
01

33

DN

20 '- 0" REQUIRED


PEDESTRIAN PATHWAY

22

10' TRAVEL LANE

P
TRASH ROOM
120

KAYAK CENTER
118

PET SPA
117

25

10' TRAVEL LANE

8' PARKING

10' TRAVEL LANE

10' TRAVEL LANE

33

LOADING

6445 NE 7 AVE. MIAMI, FL 33138

ZONING ANALYSIS

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

B-7

6445 NE 7 AVE. MIAMI, FL 33138

ZONING ANALYSIS

SIDE

10 TRIANGLE
TRASH ROOM
120
LEGION PARKING
01

DN

LEGION PARKING
13

LEGION PARKING
20

LEGION PARKING
07

LEGION PARKING
14

LEGION PARKING
21

LEGION PARKING
08

LEGION PARKING
15

LEGION PARKING
22

LEGION PARKING
09

LEGION PARKING
16

LEGION PARKING
23

LEGION PARKING
27

LEGION PARKING
03

LEGION PARKING
10

LEGION PARKING
17

LEGION PARKING
24

LEGION PARKING
28

LEGION PARKING
04

LEGION PARKING
11

LEGION PARKING
18

LEGION PARKING
25

LEGION PARKING
29

LEGION PARKING
05

LEGION PARKING
12

LEGION PARKING
19

LEGION PARKING
26

LEGION PARKING
30

LEGION PARKING
06

LEGION PARKING
02

1
1

DN

LEGION ACCESS

DN

DN

POOL EQUIP.
122

DN

ELEV. LOBBY

TRASH ROOM

LEGION PARKING
31

Room

PE

P1 GARAGE LEVEL

Room

EXISTING USE
AMERICAN LEGION
15,000 SF

205 GARAGE
26 STREET PARKING

DN

19

12

RAMP
DN

GE-1
005

DN

RAMP UP 14% SLOPE


LENGTH = 18'

DN

8% SLO
RAMP DN
= 30'
LENGTH

20 '- 0" REQUIRED


PEDESTRIAN PATHWAY

22

DN

KAYAK CENTER
118

PET SPA
117

25

LOADING

8' PARKING

10' TRAVEL LANE

10' TRAVEL LANE

33

GROUP FITNESS

10

11

12

13

14

15

16

17

LEGION
PARKING
32

LEGION
LEGION
PARKING PARKING
33
34

LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING
38
37
36
35

LEGION
LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING PARKING
43
42
41
40
39

LEGION
LEGION
PARKING PARKING
45
44

4
FITNESS RM

FPL
115

GE-3

10

11

12

13

14

15

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

10

P
1

NEW BUILDING

2
3

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

10

11

12

13

14

15

16

17

18

19

20

21

22

23

LOADING
UP

ELEV.
LOBBY

DOMESTIC PUMP RM
105

10
DN

TRASH ROOM

RAMP DN 8% SLOPE
LENGTH = 12'

11

WAITING

DN

DN

DN

LEASING

ART LOBBY
103

FIRE PUMP RM
106

DN

FIRE COMM. CENTER


139

OFFICE

RAMP

DN 10

MAINTENANCE
107

8
8

CONF. ROOM

3
Room
104

EMERGENCY GENERATOR
108

RAMP DN 8% SLOPE
LENGTH = 12'

RAMP DN 14% SLOPE


LENGTH = 57'-1 3/4"

STORAGE

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

P
P

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

RAMP UP 10% SLOPE

DN
UP

55

4
4

P
P
RAMP DN 8% SLOPE
LENGTH = 30'

UP

OPE
% SL
P 14 18'
U
P
RAM NGTH =
LE

RAMP DN 8% SLOPE
LENGTH =12'

TRASH
111

P
P

GE-2
141

5
5

LOUNGE

7
6

MAIN ELEC RM
109

10 TRIANGLE

6
6
P
P

24

VENTILATION
BLOCK

MAIL ROOM

5
4

EMERG ELEC RM
112

P
P

PE

COMM. RM.
113

7
7

% SLO

NE 7TH AVE

BIKE CENTER
114

SIDE

SECONDARY FRONTAGE

16

P
1
P

PL
8' PARKING

25 TRIANGLE

10' TRAVEL LANE


CL

NE 64TH STREET

94

93

92

91

90

88
89

87

ZONING SUBMITTAL

PRIMARY FRONTAGE

PROPERTY LINE/SITE AREA: 155,915 sf


BASE BUILDING LINE

VISIBILITY TRIANGLES - DIAGRAM


SCALE: NTS

03.02.2016

SECOND LAYER
THIRD LAYER
5 VISIBILITY TRAINGLE
10 VISIBILITY TRIANGLE
25 VISIBILITY TRIANGLE

PROJECT # 219420344

B-8

TRASH ROOM
120

KAYAK CENTER
118
DN

LEGION PARKING
13

LEGION PARKING
20

LEGION PARKING
07

LEGION PARKING
14

LEGION PARKING
21

LEGION PARKING
08

LEGION PARKING
15

LEGION PARKING
22

LEGION PARKING
09

LEGION PARKING
16

LEGION PARKING
23

LEGION PARKING
27

LEGION PARKING
03

LEGION PARKING
10

LEGION PARKING
17

LEGION PARKING
24

LEGION PARKING
28

LEGION PARKING
18

LEGION PARKING
25

LEGION PARKING
29

LEGION PARKING
19

LEGION PARKING
26

LEGION PARKING
30

LEGION PARKING
06

LEGION PARKING
02

UP

GE-4
003

2
6' - 6"

LEGION PARKING
04

LEGION PARKING
11

LEGION PARKING
05

LEGION PARKING
12

DN

DN

DN

DN

ELEV. LOBBY

TRASH ROOM

RAMP
DN

GE-1
005

Room

PE

DN

P1 GARAGE LEVEL

RAMP UP 14% SLOPE


LENGTH = 18'

Room

12

EXISTING USE
AMERICAN LEGION
15,000 SF

205 GARAGE
26 STREET PARKING

DN

GROUP FITNESS

10

11

10

12

13

14

15

16

17

LEGION
PARKING
32

12

13

14

15

16

17

LEGION
LEGION
PARKING PARKING
33
34

LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING
38
37
36
35

LEGION
LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING PARKING
43
42
41
40
39

LEGION
LEGION
PARKING PARKING
45
44

4
FITNESS RM

FPL
115
GE-3

NEW BUILDING

11

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

NE 7TH AVE

3
2

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

GE-2
141

DN
UP

UP

ELEV.
LOBBY

DOMESTIC PUMP RM
105
Room
104

EMERGENCY GENERATOR
108

DN

TRASH ROOM

RAMP DN 8% SLOPE
LENGTH = 12'

11

WAITING

DN

DN

CONF. ROOM
LEASING

DN

ART LOBBY
103

FIRE PUMP RM
106

DN

FIRE COMM. CENTER


139

OFFICE

RAMP

DN 10

MAINTENANCE
107

8
8

55

3
2

LOADING

STORAGE

RAMP DN 8% SLOPE
LENGTH = 12'

RAMP DN 14% SLOPE


LENGTH = 57'-1 3/4"

PE

ELEV.
LOBBY

Level
LEVEL 2
RESID. LEVEL 2
RESID. LEVEL 2
LEVEL 02

Name
AMENITY
RESID. FLOOR COMMON
RESID. NET
BALCONIES AND TERRACES

Level
RESID. LEVEL 3-5
RESID. LEVEL 3-5
LEVEL 3-5

Name
RESID. FLOOR COMMON
RESID. NET
BALCONIES AND TERRACES

P
P

10

RAMP UP 10% SLOPE

UP

SLO
14%
18'
P UP
TH =
LENG

4
4

P
P
RAMP DN 8% SLOPE
LENGTH = 30'

RAM

RAMP DN 8% SLOPE
LENGTH =12'

UP

RAMP DN 14% SLOPE


LENGTH = 57'-1 3/4"

P
P

MAIN ELEC RM
109

5
5

LOUNGE

TRASH
111

UP

6
6
P
P

VENTILATION
BLOCK

MAIL ROOM

5
4

EMERG ELEC RM
112

7
7
P
P

% SLOP

NE 7TH AVE

COMM. RM.
113

Name
AMENITY
BLDG COMMON
BOH
PARKING
LEGION FACILITY

10

195 GARAGE SPACES

BIKE CENTER
114

Level
LEVEL 01
LEVEL 01
LEVEL 01
LEVEL 01
LEVEL 01

P2 GARAGE LEVEL

Name
BLDG COMMON
BOH
PARKING

19

LEGION PARKING
31

DN

Level
LEVEL 00 PARKING
LEVEL 00 PARKING
LEVEL 00 PARKING

DN

DN

POOL EQUIP.
122

LEGION ACCESS

8% SLO
RAMP DN
= 30'
LENGTH

PET SPA
117

GE-1
005

20 '- 0" REQUIRED


PEDESTRIAN PATHWAY

22

DN

LEGION PARKING
01

ELEV LOBBY

25

LOADING

8' PARKING

10' TRAVEL LANE

10' TRAVEL LANE

33

P
1

Area (SF)
FLR per floor Number of Floors Total
1,592
1592
1
1,592
105
105
1
105
70,687
70687
1
70,687
72,384 SF
Area (SF)
FLR per floor Number of Floors Total
6748
1
6,748
6,748
10576
1
10,576
10,576
5773
1
5,773
5,773
79369
1
79,369
79,369
15000
15,000
1
15,000
117,466 SF
Area (SF)
FLR per floor Number of Floors Total
2484
2484
1
2484
10690
1
10,690
10,690
48531
48,531
1
48,531
43703
43,703
1
43,703
105,408 SF
Area (SF)
FLR per floor Number of Floors Total
9098
3
27,294
9,098
52477
52,477
3
157,431
4343
4,343
3
13,029
197,754 SF

6445 NE 7 AVE. MIAMI, FL 33138

ZONING ANALYSIS - FLR

TOTAL PROPOSED BUILDING

PL
8' PARKING

493,012 SF

10' TRAVEL LANE


CL

NE 64TH STREET

Level
LEVEL 01
LEVEL 01
LEVEL 01
LEVEL 01
LEVEL 01

Name
AMENITY
BLDG COMMON
BOH
PARKING
LEGION FACILITY

Level
LEVEL 2
RESID. LEVEL 2
RESID. LEVEL 2
LEVEL 02

Name
AMENITY
RESID. FLOOR COMMON
RESID. NET
BALCONIES AND TERRACES

Level
RESID. LEVEL 3-5
RESID. LEVEL 3-5
LEVEL 3-5

Name
RESID. FLOOR COMMON
RESID. NET
BALCONIES AND TERRACES

493,012 SF

TOTAL PROPOSED BUILDING

Level 01 Diagram

Area (SF)
FLR per floor Number of Floors Total
1,592
1592
1
1,592
105
105
1
105
70,687
70687
1
70,687
72,384 SF
Area (SF)
FLR per floor Number of Floors Total
6748
1
6,748
6,748
10576
1
10,576
10,576
5773
1
5,773
5,773
79369
1
79,369
79,369
15000
15,000
1
15,000
117,466 SF
Area (SF)
FLR per floor Number of Floors Total
2484
2484
1
2484
10690
1
10,690
10,690
48531
48,531
1
48,531
43703
43,703
1
43,703
105,408 SF
Area (SF)
FLR per floor Number of Floors Total
9098
3
27,294
9,098
52477
52,477
3
157,431
4343
4,343
3
13,029
197,754 SF

SCALE: NTS

88

90

89

Level
LEVEL 00 PARKING
LEVEL 00 PARKING
LEVEL 00 PARKING

Name
BLDG COMMON
BOH
PARKING

Level
LEVEL 01
LEVEL 01
LEVEL 01
LEVEL 01
LEVEL 01

Name
AMENITY
BLDG COMMON
BOH
PARKING
LEGION FACILITY

Level
LEVEL 2
RESID. LEVEL 2
RESID. LEVEL 2
LEVEL 02

Name
AMENITY
RESID. FLOOR COMMON
RESID. NET
BALCONIES AND TERRACES

Level
RESID. LEVEL 3-5
RESID. LEVEL 3-5
LEVEL 3-5

Name
RESID. FLOOR COMMON
RESID. NET
BALCONIES AND TERRACES

87

Area (SF)
FLR per floor Number of Floors Total
1,592
1592
1
1,592
105
105
1
105
70,687
70687
1
70,687
72,384 SF
Area (SF)
FLR per floor Number of Floors Total
6748
1
6,748
6,748
10576
1
10,576
10,576
5773
1
5,773
5,773
79369
1
79,369
79,369
15000
15,000
1
15,000
117,466 SF
Area (SF)
FLR per floor Number of Floors Total
2484
2484
1
2484
10690
1
10,690
10,690
48531
48,531
1
48,531
43703
43,703
1
43,703
105,408 SF
Area (SF)
FLR per floor Number of Floors Total
9098
3
27,294
9,098
52477
52,477
3
157,431
4343
4,343
3
13,029
197,754 SF

TOTAL PROPOSED BUILDING

RESID. FLOOR COMMON


3839

0'-0" SETBACK AT
REAR/SIDE FRONTAGE

493,012 SF

0'-0" SETBACK AT
REAR/SIDE FRONTAGE

FR

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

N_RESIDENTIAL UNITS
12729

FR

N_RESIDENTIAL UNITS
10884

Gross vs Net
AMENITY
RESID. FLOOR COMMON
5259

COMMON AREA
N_RESIDENTIAL UNITS

S_RESIDENTIAL UNITS
9643

S_RESIDENTIAL UNITS
14902

30'-0" SETBACK AT
PRIMARY FRONTAGE
GARAGE
15'-0" SETBACK AT
PRIMARY FRONTAGE

RESID. FLOOR COMMON

Level
LEVEL 00 PARKING
LEVEL 00 PARKING
LEVEL 00 PARKING

Name
BLDG COMMON
S_RESIDENTIAL UNITS
4319 BOH
PARKING

BASE BUILDING LINE

Level 02 Diagram
SCALE: NTS

Name
AMENITY
BLDG COMMON
BOH
PARKING
LEGION FACILITY

Level
LEVEL 2
RESID. LEVEL 2
RESID. LEVEL 2
LEVEL 02

Name
AMENITY
RESID. FLOOR COMMON
RESID. NET
BALCONIES AND TERRACES

Level
RESID. LEVEL 3-5
RESID. LEVEL 3-5
LEVEL 3-5

Name
RESID. FLOOR COMMON
RESID. NET
BALCONIES AND TERRACES

TOTAL PROPOSED BUILDING

PROJECT # 219420344

Level 03-05 Diagram


SCALE: NTS

Level
LEVEL 01
LEVEL 01
LEVEL 01
LEVEL 01
LEVEL 01

Name
AMENITY
BLDG COMMON
BOH
PARKING
LEGION FACILITY

Level
LEVEL 2
RESID. LEVEL 2
RESID. LEVEL 2
LEVEL 02

Name
AMENITY
RESID. FLOOR COMMON
RESID. NET
BALCONIES AND TERRACES

Level
RESID. LEVEL 3-5
RESID. LEVEL 3-5
LEVEL 3-5

Name
RESID. FLOOR COMMON
RESID. NET
BALCONIES AND TERRACES

TOTAL PROPOSED BUILDING

0'-0" SETBACK AT REAR/SIDE


FRONTAGE

Level
LEVEL 01
LEVEL 01
LEVEL 01
LEVEL 01
LEVEL 01

Area (SF)
FLR per floor Number of Floors Total
1,592
1592
1
1,592
105
105
1
105
70,687
70687
1
70,687
72,384 SF
Area (SF)
FLR per floor Number of Floors Total
6748
1
6,748
6,748
10576
1
10,576
10,576
5773
1
5,773
5,773
79369
1
79,369
79,369
15000
15,000
1
15,000
117,466 SF
Area (SF)
FLR per floor Number of Floors Total
2484
2484
1
2484
10690
1
10,690
10,690
48531
48,531
1
48,531
43703
43,703
1
43,703
105,408 SF
Area (SF)
FLR per floor Number of Floors Total
9098
3
27,294
9,098
52477
52,477
3
157,431
4343
4,343
3
13,029
197,754 SF

25'-0" FRONT SETBACK AT


SECONDARY FRONTAGE
GARAGE

Name
BLDG COMMON
BOH
PARKING

30'-0" SETBACK AT
PRIMARY FRONTAGE
GARAGE

15'-0" SETBACK AT
PRIMARY FRONTAGE
BASE BUILDING LINE

10'-0" FRONT SETBACK AT


SECONDARY FRONTAGE

Level
LEVEL 00 PARKING
LEVEL 00 PARKING
LEVEL 00 PARKING

UNITS
Area (SF) S_RESIDENTIAL
FLR per
floor Number of Floors Total
1,592
1592
1
1,592
105
105
1
105
70,687
70687
1
70,687
72,384 SF
Area (SF)
FLR per floor Number of Floors Total
6748
1
6,748
6,748
10576
1
10,576
10,576
5773
1
5,773
5,773
79369
1
79,369
79,369
15000
15,000
1
15,000
117,466 SF
Area (SF)
FLR per floor Number of Floors Total
2484
2484
1
2484
10690
1
10,690
10,690
48531
48,531
1
48,531
43703
43,703
1
43,703
105,408 SF
Area (SF)
FLR per floor Number of Floors Total
9098
3
27,294
9,098
52477
52,477
3
157,431
4343
4,343
3
13,029
197,754 SF

493,012 SF

AMENITY
BALCONY /TERRACE
BUILDING COMMON
PARKING
BOH
RESI FLOOR COMMON
RESI NET SF
LEGION FACILITY

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Name
BLDG COMMON
BOH
PARKING

25'-0" FRONT SETBACK AT


SECONDARY FRONTAGE
GARAGE

SCALE: NTS

Level
LEVEL 00 PARKING
LEVEL 00 PARKING
LEVEL 00 PARKING

10'-0" FRONT SETBACK AT


SECONDARY FRONTAGE

Level 00 Diagram

91

92

93

94

0'-0" SETBACK AT REAR/SIDE


FRONTAGE

NE 64TH STREET

ZONING SUBMITTAL

03.02.2016

493,012 SF

B-9

NE 68th St
NE 68th St

NE 64th St

NE 63rd St

NE 62nd St

VEHICLE INGRESS
SCALE: NTS

NE 66th St

NE 64th Terrace

NE 64th St

NE 63th St

NE 62nd St

NE 65th St

SITE

NE 67th St

NE 64th Terrace

SITE

NE 64th St

NE 63rd St

NE 62nd St

VEHICLE EGRESS
SCALE: NTS

NE 63th St

NE 62nd St

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

NE 65th St

NE 67th St

BISCAYNE BLVD

NE 66th St

NE 67th St

BISCAYNE BLVD

NE 67th St

NE 68th St

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

NE 68th St

6445 NE 7 AVE. MIAMI, FL 33138

VEHICLE INGRESS AND EGRESS ROUTES

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

B-10

NE 68th St
NE 68th St

NE 64th St

NE 63rd St

NE 62nd St

PEDESTRIAN ACCESS

NE 66th St

NE 64th Terrace

NE 64th St

NE 63th St

NE 62nd St

NE 67th St

NE 65th St

SITE
NE 64th St

NE 63rd St

NE 62nd St

TRANSIT STOP LOCATIONS


SCALE: NTS

NE 64th Terrace

SITE

NE 64th St

NE 63th St

NE 62nd St

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

NE 65th St

SCALE: NTS

NE 67th St

BISCAYNE BLVD

NE 66th St

NE 67th St

BISCAYNE BLVD

NE 67th St

NE 68th St

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

NE 68th St

6445 NE 7 AVE. MIAMI, FL 33138

PEDESTRIAN AND TRANSIT ACCESS

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

B-11

6445 NE 7 AVE. MIAMI, FL 33138

TYPICAL FLOOR PLANS

Typical Floor Plans

C-2:
C-3:
C-4:
C-5:
C-6:
C-7:

Site Ground Floor Plan


Level P2 Floor Plan
Ground Floor Plan
Level 2 Floor Plan
Levels 3-5 Floor Plan
Roof Plan

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

C-1:

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

C-1

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

6445 NE 7 AVE. MIAMI, FL 33138

SITE GROUND FLOOR PLAN

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

SITE GROUND - FLOOR PLAN

SCALE: 1 = 30-0
0
30
90

C-2

6445 NE 7 AVE. MIAMI, FL 33138

LEVEL P2 FLOOR PLAN

UP

ELEV LOBBY

GE-4
003
GE-1
005

6' - 6"

DN
DN

P2 GARAGE LEVEL

UP

RAMP DN 14% SLOPE


LENGTH = 57'-1 3/4"

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

NE 7TH AVE

195 GARAGE SPACES

UP

ELEV.
LOBBY

Base Building Line


Property Line

NE 64TH STREET

LEVEL -P2 - FLOOR PLAN


SCALE: 1 = 20-0

20

60

03.02.2016

FIRST LAYER
SECOND LAYER

PROJECT # 219420344

ZONING SUBMITTAL

THIRD LAYER

C-3

33

8' PARKING

10' TRAVEL LANE

25

22

LOADING

10' TRAVEL LANE

20 '- 0" REQUIRED


PEDESTRIAN PATHWAY

TRASH ROOM
120

DN

LEGION PARKING
01

KAYAK CENTER
K
118
DN

LEGION PARKING
13

LEGION PARKING
20

LEGION PARKING
07

LEGION PARKING
14

LEGION PARKING
21

LEGION PARKING
08

LEGION PARKING
15

LEGION PARKING
22

LEGION PARKING
06

LEGION PARKING
02

DN

DN
LEGION ACCESS

DN

DN

1
1

2
PET SPA
117

LEGION PARKING
16

LEGION PARKING
23

LEGION PARKING
27

LEGION PARKING
03

LEGION PARKING
10

LEGION PARKING
17

LEGION PARKING
24

LEGION PARKING
28

LEGION PARKING
04

LEGION PARKING
11

LEGION PARKING
18

LEGION PARKING
25

LEGION PARKING
29

LEGION PARKING
05

LEGION PARKING
12

LEGION PARKING
19

LEGION PARKING
26

LEGION PARKING
30

POOL EQUIP.
122

ELEV. LOBBY

TRASH ROOM

2
DN

P1 GARAGE LEVEL

Room

Room

12

EXISTING USE
AMERICAN LEGION
15,000 SF

205 GARAGE
26 STREET PARKING

DN

19

GE-1
005

DN

RAMP UP 14% SLOPE


R
LENGTH = 18'

P
RAMP
DN

LEGION PARKING
31

OPE
N 8% SL
RAMP D
= 30'
LENGTH

LEGION PARKING
09

6445 NE 7 AVE. MIAMI, FL 33138

GROUND FLOOR PLAN

GROUP FITNESS

10

11

12

13

14

15

16

17

LEGION
PARKING
32

LEGION
LEGION
PARKING PARKING
34
33

LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING
35
36
37
38

LEGION
LEGION
LEGION
LEGION
LEGION
PARKING PARKING PARKING PARKING PARKING
39
40
43
41
42

LEGION
LEGION
PARKING PARKING
45
44

4
FITNESS RM

FPL
115

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

GE-3

10

P
1
2
3

7
7

11' - 0"
COMM. RM.
113

2
1

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

P
P

MAIL ROOM

6
6

3
5
4

EMERG ELEC RM
112

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

5
5

LOUNGE

P
P

6
MAIN ELEC RM
109

GE-2
141

LOADING
UP

2
1

DOMESTIC PUMP RM
105

8
8

10
DN

TRASH ROOM

RAMP DN 8% SLOPE
LENGTH = 12'

11

WAITING

DN

DN

CONF. ROOM

LEASING

DN

ART LOBBY
103

FIRE PUMP RM
106

DN

FIRE COMM. CENTER


139

RAMP
DN

MAINTENANCE
107

ELEV.
LOBBY

Room
104
EMERGENCY GENERATOR
108

RAMP DN 8% SLOPE
LENGTH = 12'

RAMP DN 14% SLOPE


LENGTH = 57'-1 3/4"

DN
UP

P
P

STORAGE

RAMP
P UP
P 10% SLOPE
SLOP

P
P
RAMP DN 8% SLOPE
LENGTH = 30'

UP

OPE
% SL
4
1
18'
P UP
RAM NGTH =
LE

4
4

TRASH
111

RAMP DN 8% SLOPE
LENGTH =12'

10% S
LOPE

VENTILATION
BLOCK

P
P

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

BIKE CENTER
ENTER
114
1

2
P
1
P

Base Building Line


8' PARKING

Property Line

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

NE 7TH AVE

ZONING SUBMITTAL

03.02.2016

10' TRAVEL LANE


CL

NE 64TH STREET

FIRST LAYER
SECOND LAYER

PROJECT # 219420344

LEVEL 01 - FLOOR PLAN


SCALE: 1 = 20-0

20

60

THIRD LAYER

C-4

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

6445 NE 7 AVE. MIAMI, FL 33138

LEVEL 2 FLOOR PLAN

Base Building Line


Property Line

ZONING SUBMITTAL

03.02.2016

FIRST LAYER
SECOND LAYER
PROJECT # 219420344

LEVEL 02 - FLOOR PLAN


SCALE: 1 = 20-0

20

60

THIRD LAYER

C-5

6445 NE 7 AVE. MIAMI, FL 33138

LEVELS 3-5 FLOOR PLAN


500' - 0"
64' - 9"

425' - 3"

10' - 0"

9' - 0"

9' - 0"

PL

UNIT C14
2 BD/ 2 BA
308N

UNIT B1
1 BD / 1 BA
306N

UNIT C13
2 BD/ 2 BA
307N

UNIT B1
1 BD / 1 BA
305N

UNIT B1
1 BD/ 1 BA
304N

UNIT C12
2 BD / 2 BA
301N

UNIT B2
1 BD / 1 BA
302N

UNIT B2
1 BD/ 1 BA
303N

68' - 0"

UP

UNIT C12
2 BD/ 2 BA
328N

UNIT B1
1 BD / 1 BA
327N

UNIT C1
2 BD / 2 BA
326N

UNIT C11
2 BD/ 2 BA
325N

ELEC. RM.

FR

68' - 0"

UNIT D2
3 BD / 3 BA
N
309N

STAIR
ST - 06

FR

UP

UP

UNIT C
C15
2 BD/ 2 BA
310N
N

UNIT B1
1 BD / 1 BA
312N

UNIT A2
STUDIO / 1 BA
313N

UNIT B1
1 BD/ 1 BA
314N

UNIT B1
1 BD / 1 BA
315N

UNIT B1
1 BD / 1 BA
316N

UNIT B1
1 BD / 1 BA
317N

UNIT A3
STUDIO / 1 BA
318N

UNIT A3
STUDIO / 1 BA
319N

UNIT C1.1
2 BD / 2 BA
320N

UNIT B1
1 BD / 1 BA
321N

UNIT A1
1 ST/ 1 BA
322N

UNIT B1
1 BD / 1 BA
323N

UNIT C10
2 BD / 2 BA
324N

UNIT C4
2 BD/ 2 BA
313S

UNIT C3
2 BD / 2BA
314S

UNIT B1
1 BD / 1 BA
312S

PL

7"
153' -

UNIT C7.1
2 BD/ 2 TH
311S

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

UNIT C1
2 BD / 2TH
315S

UNIT C2
2 BD / 2TH
316S

UNIT B1
1 BD / 1 BA
317S

UNIT B1
1 BD / 1 BA
210S

UNIT B1
1 BD/ 1 BA
319S

UNIT B2
1 BD / 1 BA
320S

UNIT B1
1 BD /1 BA
322S

UNIT B2
1 BD/ 1 BA
321S

UNIT B1
1 BD /1 BA
323S

UNIT B1
1 BD /1 BA
324S

UNIT C8
2 BD / 2 BA
325S

UNIT A5
STUDIO / 1 BA
326S

UNIT C1
2 BD / 2 BA
327S

UNIT D1
3 BD/ 2 BA
328S

ELEC. RM
68' - 0"

STORAGE

UNIT C1
2 BD / 2 BA
318S

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

PL

317' - 0"

157' - 0"

3' - 10"

NE 7TH AVE

67' - 1"

75' - 11"
DISTANCE BETWEEN BUILDINGS

5' - 0"

UNIT B1
1 BD / 1 BA
311N

UP

BOH
UNIT C1
2 BD / 2TH
308S

UNIT C6
2 BD/ 2 BA
307S

UNIT C1
2 BD / 2 BA
306S

UNIT B1
1 BD / 1 BA
305S

UNIT A3
STUDIO / 1 BA
304S

UNIT A3
STUDIO / 1 BA
303S

UNIT B1
1 BD / 1 BA
302S

UNIT B3
1 BD / 1 BA
A
301S

UNIT B1
1 BD / 1 BA
333S

UNIT A4
STUDIO / 1 BA
332S

UNIT A4.1
STUDIO / 1 BA
331S

UNIT C7
2 BD/ 2 BA
330S

UNIT D1
3 BD / 2 BA
329S

15' - 0"

UNIT C5
2 BD / 2TH
309S

PL

10' - 0"

36' - 10"

423' - 4"
500' - 0"

29' - 9"

Base Building Line


Property Line

ZONING SUBMITTAL

03.02.2016

FIRST LAYER
SECOND LAYER
PROJECT # 219420344

TYPICAL LEVEL - FLOOR PLAN


SCALE: 1 = 20-0

20

60

THIRD LAYER

C-6

6445 NE 7 AVE. MIAMI, FL 33138

ROOF PLAN

ROOF BELOW

NE 7TH AVE

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

ROOF BELOW

Base Building Line


Property Line

NE 64TH STREET

ZONING SUBMITTAL

03.02.2016

FIRST LAYER
SECOND LAYER
PROJECT # 219420344

ROOF PLAN
SCALE: 1 = 20-0

20

60

THIRD LAYER

C-7

Building Elevations & Sections

D-2:
D-3:
D-4:
D-5:
D-6:
D-7:
D-8:
D-9:
D-10:

Proposed Sections
Proposed Sections
Proposed Elevations
Proposed Elevations
Enlarged Elevations
Enlarged Elevations
NorthEast Perspective
SouthWest Perspective
Materials Board

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

D-1:

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

6445 NE 7 AVE. MIAMI, FL 33138

BUILDING ELEVATIONS & SECTIONS

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

D-1

KEY - MAP
SCALE: NTS

6445 NE 7 AVE. MIAMI, FL 33138

PROPOSED SECTIONS

Base flood elevation 10-0 NGVD


per FEMA qualification standards.
Design flood elevation to be
11-0 NGVD (10-0 NGVD +1-0)

SECTION CALL OUT

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

SCALE: NTS

ZONING SUBMITTAL

03.02.2016

1 CROSS SECTION
SCALE: 1/16 = 1-0

PROJECT # 219420344

D-2

2
KEY - MAP
SCALE: NTS

6445 NE 7 AVE. MIAMI, FL 33138

PROPOSED SECTIONS

Base flood elevation 10-0 NGVD


per FEMA qualification standards.
Design flood elevation to be
11-0 NGVD (10-0 NGVD +1-0)

SECTION CALL OUT

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

SCALE: NTS

ZONING SUBMITTAL

03.02.2016

2 LONGITUDINAL SECTION
SCALE: 1 = 20-0

PROJECT # 219420344

D-3

KEY - MAP
SCALE: NTS

6445 NE 7 AVE. MIAMI, FL 33138

PROPOSED ELEVATIONS

1 WEST - ELEVATION
0

20

60

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

SCALE: 1 = 20-0

ZONING SUBMITTAL

03.02.2016

2 SOUTH - ELEVATION
SCALE: 1 = 20-0

PROJECT # 219420344

20

60

D-4

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

KEY - MAP

SCALE: NTS

SCALE: 1 = 20-0

2 NORTH - ELEVATION
SCALE: 1 = 20-0

PROJECT # 219420344
0
20

6445 NE 7 AVE. MIAMI, FL 33138

PROPOSED ELEVATIONS
2

1 EAST - ELEVATION
60

ZONING SUBMITTAL

03.02.2016

D-5

Portland Cement Plaster


Color: White (TYP.)

Aluminum Window
Wall System (TYP.)

Aluminum Window
Wall System (TYP.)

Metal Railing System


Color: Anodized Aluminum

Portland Cement Plaster


Color: Gray (TYP.)

Portland Cement Plaster


Color: White (TYP.)

6445 NE 7 AVE. MIAMI, FL 33138

ENLARGED ELEVATIONS

Precast Ventilation Block


Screen Wall Color: Gray (TYP)

1 WEST - ELEVATION
Aluminum Window
Wall System (TYP.)

Portland Cement Plaster


Color: Brown

Metal Railing System


Color: Anodized Aluminum

Portland Cement Plaster


Color: Gray (TYP.)

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Portland Cement Plaster


Color: White (TYP.)

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

SCALE: NTS

ZONING SUBMITTAL

03.02.2016

Precast Ventilation Block


Screen Wall Color: Gray (TYP)

Portland Cement Plaster


Color: White (TYP.)

Aluminum Window
Wall System (TYP.)

2 SOUTH - ELEVATION
SCALE: NTS

PROJECT # 219420344

D-6

Metal Railing System


Color: Anodized Aluminum

Aluminum Window
Wall System (TYP.)

6445 NE 7 AVE. MIAMI, FL 33138

ENLARGED ELEVATIONS

Aluminum Window
Wall System (TYP.)

Portland Cement Plaster


Color: White (TYP)

Portland Cement Plaster


Color: White (TYP)

1 EAST - ELEVATION

Metal Railing System


Color: Anodized Aluminum

Aluminum Window
Wall System (TYP.)

Portland Cement Plaster Eyebrows (TYP)


Color: Gray

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Portland Cement Plaster


Color: White (TYP.)

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

SCALE: NTS

ZONING SUBMITTAL

03.02.2016

Portland Cement Plaster


Color: White (TYP.)

Portland Cement Plaster


Color: White (TYP.)

Aluminum Window
Wall System (TYP.)

Aluminum Window
Wall System (TYP.)

2 NORTH - ELEVATION
SCALE: NTS

PROJECT # 219420344

D-7

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

6445 NE 7 AVE. MIAMI, FL 33138

NORTHEAST PERSPECTIVE

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

D-8

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

6445 NE 7 AVE. MIAMI, FL 33138

SOUTHWEST PERSPECTIVE

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

D-9

6445 NE 7 AVE. MIAMI, FL 33138

MATERIALS BOARD

VENTILATION BLOCK

METAL RAILING SYSTEM

ALUMINUM AND GLASS WINDOW WALL

WHITE STUCCO

COMPOSITE DECKING

CONCRETE PAVING

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

CONCRETE

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

D-10

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

PROJECT # 219420344

F-1:
Civil

F-2:
F-3:
F-4:
F-5:
F-6:
F-7:
F-8:
Civil Site Details
Maneuvering Diagrams
Maneuvering Diagrams
Maneuvering Diagrams
Maneuvering Diagrams
Maneuvering Diagrams
Maneuvering Diagrams
HSQ Group, Inc.
5951 Northwest 173rd Drive, Suite #4
Miami, Florida 33015
T: 305.535.5100

6445 NE 7 AVE. MIAMI, FL 33138

CIVIL

ZONING SUBMITTAL

03.02.2016

F-1

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

HSQ Group, Inc.


5951 Northwest 173rd Drive, Suite #4
Miami, Florida 33015
T: 305.535.5100

6445 NE 7 AVE. MIAMI, FL 33138

CIVIL SITE DETAILS

Valley Gutter Details


NO SCALE

Mountable Curb Details

NO SCALE

PROJECT # 219420344

Parking Striping Details


NO SCALE

ZONING SUBMITTAL

03.02.2016

F-2

Stantec Architecture Inc.


One Biscayne Tower Suite 1670
2 South Biscayne Boulevard
Miami, FL 33131-1804
Tel:

(305) 482-8700 /

Fax:

(305) 482-8770

www.stantec.com

Copyright Reserved
The Contractor shall verify and be responsible for all dimensions. DO
NOT scale the drawing - any errors or omissions shall be reported to
Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

HSQ GROUP, INC.


Engineers Planners Surveyors
5951 Northwest 173rd Drive, Suite 4
Miami, Florida 33015 786.534.3621

P
AAS
HTO
200
1(
US)

DN

C26258 LB7924

10

20

FEET

UP

19.00

P
3.00

DN

DN

AASHT
O 2001
(
US)

1'
0"

1'
0"

UP

US)
AASHTO 2001(

AA
SH
TO

20
01
(
US
)

SCALE: 1"=10'

11.00

feet

Width

: 7.00

Track

: 6.00

Lock to Lock Time

: 6.0

Steering Angle

: 31.6

UP

US)
AASHTO 2001(

DN

A01

AA
SH
TO

20
01
(
US
)

ANTONIO QUEVEDO, P.E. #59471

20
01
(
US
)

P
US)
AASHTO 2001(

AA
SH
TO

P
AASHTO 2001 (US)

8/2/2016

N.E. 64th STREET


P

AASHTO 2001(
US)

AASHTO 2001(
US)

Revision

By

Appd

YYYY.MM.DD

Issued

By

Appd

YYYY.MM.DD

P
Z:
\
HSQ Dade\
Ci
vi
lPr
oj
ect
s\
2015\
151079 Legi
ons East
\
Dr
awi
ngs\
Exhi
bi
t
s & Pr
esent
at
i
ons\
Si
t
e M aneuver
abi
l
i
t
y Pl
an\
151079SM P001.
dgn

AASHTO
2001(
US)

P
US)
1(
AASHTO 200

GMP 08/02/2016

ACRE GCDM Bay Investments, LLC

Legions East Parcel Development


1

6445 NE 7 Avenue
Miami, Florida

Title

SITE MANEUVERABILITY PLAN

Project No.
1510-79

Revision

Scale
1"-20'

Drawing No.

MP-1

Stantec Architecture Inc.


One Biscayne Tower Suite 1670
2 South Biscayne Boulevard
Miami, FL 33131-1804
Tel:

(305) 482-8700 /

Fax:

(305) 482-8770

www.stantec.com

Copyright Reserved
The Contractor shall verify and be responsible for all dimensions. DO
NOT scale the drawing - any errors or omissions shall be reported to
Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

HSQ GROUP, INC.


Engineers Planners Surveyors
5951 Northwest 173rd Drive, Suite 4
Miami, Florida 33015 786.534.3621
C26258 LB7924

10

20

DN

FEET

U A)
S (C
L 1999
C
TA

TA L
C- S
19 U
99
(
CA
)

UP

SCALE: 1"=10'

21.00

DN

1'
0"

UP

TAC1999(
CA)

LSU

LSU

TAC1999
(
CA)

1'
0"

2.62

11.15

LSU

feet

Width

: 8.53

Track

: 8.53

Lock to Lock Time

: 6.0

Steering Angle

: 40.8

UP

DN

DN

A01

LSU

LS

U
TAC
1999
(
CA)

LSU

LSU

TAC-1999 (CA)

TAC1999(
CA)

TAC1999(
CA)

ANTONIO QUEVEDO, P.E. #59471

8/2/2016

N.E. 64th STREET

LSU
TAC-1999 (CA)

By

Appd

YYYY.MM.DD

Issued

By

Appd

YYYY.MM.DD

L
SU
TAC1999(
CA)

L
SU
Z:
\
HSQ Dade\
Ci
vi
lPr
oj
ect
s\
2015\
151079 Legi
ons East
\
Dr
awi
ngs\
Exhi
bi
t
s & Pr
esent
at
i
ons\
Si
t
e M aneuver
abi
l
i
t
y Pl
an\
151079SM P002.
dgn

Revision

SU )
L
A

C
(
1999
TAC-

TAC1999(
CA)

GMP 08/02/2016

ACRE GCDM Bay Investments, LLC

Legions East Parcel Development


1

6445 NE 7 Avenue
Miami, Florida

Title

SITE MANEUVERABILITY PLAN

Project No.
1510-79

Revision

Scale
1"-20'

Drawing No.

MP-2

Stantec Architecture Inc.


One Biscayne Tower Suite 1670
2 South Biscayne Boulevard
Miami, FL 33131-1804
Tel:

(305) 482-8700 /

Fax:

(305) 482-8770

www.stantec.com

Copyright Reserved
The Contractor shall verify and be responsible for all dimensions. DO
NOT scale the drawing - any errors or omissions shall be reported to
Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

HSQ GROUP, INC.


Engineers Planners Surveyors
5951 Northwest 173rd Drive, Suite 4
Miami, Florida 33015 786.534.3621
C26258 LB7924

10

0
DN

k
uc
r
T
e
r
i
F tom
D- Cus
M

UP

20

FEET
SCALE: 1"=10'

46.83

DN

5.00

DN

21.33

MD-Fire Truck

feet

Width

: 7.87

Track

: 7.87

Lock to Lock Time

: 6.0

Steering Angle

: 45.3

Cust
om

UP

DN

M DFi
r
e Tr
uck

1'
0"

1'
0"

UP

A01

MD

-F
i
re
Tr
Cu
st
uc
om
k

ANTONIO QUEVEDO, P.E. #59471

8/2/2016

MDF
i
r
eT
r
u
c
k
Cus
t
om

N.E. 64th STREET


Revision

By

Appd

YYYY.MM.DD

Issued

By

Appd

YYYY.MM.DD

k
c
u
r
eT
r
i
F
MDCustom

Z:
\
HSQ Dade\
Ci
vi
lPr
oj
ect
s\
2015\
151079 Legi
ons East
\
Dr
awi
ngs\
Exhi
bi
t
s & Pr
esent
at
i
ons\
Si
t
e M aneuver
abi
l
i
t
y Pl
an\
151079SM P003.
dgn

k
c
u
r
eT
r
i
F
MDom
t
Cus

GMP 08/02/2016

ACRE GCDM Bay Investments, LLC

Legions East Parcel Development


1

6445 NE 7 Avenue
Miami, Florida

Title

SITE MANEUVERABILITY PLAN

Project No.
1510-79

Revision

Scale
1"-20'

Drawing No.

MP-3

Stantec Architecture Inc.


One Biscayne Tower Suite 1670
2 South Biscayne Boulevard
Miami, FL 33131-1804
Tel:

(305) 482-8700 /

Fax:

(305) 482-8770

www.stantec.com

Copyright Reserved
The Contractor shall verify and be responsible for all dimensions. DO
NOT scale the drawing - any errors or omissions shall be reported to
Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

HSQ GROUP, INC.


Engineers Planners Surveyors
M

5951 Northwest 173rd Drive, Suite 4

D
Fi
r
e

Miami, Florida 33015 786.534.3621


C26258 LB7924

P
u
Cu m

DN

st
om

UP

10

pe
rT
r
uc
k

20

FEET
SCALE: 1"=10'

M DFi
r
e Pum perTr
uck

1'
0"

M DFi
r
e

7.33

UP

DN

DN

17.33

MD-Fire Pumper Truck

feet

Width

: 8.28

Track

: 6.83

Lock to Lock Time

: 6.0

Steering Angle

: 41.5

Cust
om

DN

1'
0"

UP

Pum per
Tr
uck
Cust
om

32.17

A01

r
T
ru
ck

ANTONIO QUEVEDO, P.E. #59471

P
u

Cu m
st
om pe

8/2/2016

-F
i
re

k
c
u
r
T
r
e
mp
ePu
r
i
F
MD-

N.E. 64th STREET

Custom

k
c
u
r
T
r
e
mp
ePu
r
i
F
MD-

Z:
\
HSQ Dade\
Ci
vi
lPr
oj
ect
s\
2015\
151079 Legi
ons East
\
Dr
awi
ngs\
Exhi
bi
t
s & Pr
esent
at
i
ons\
Si
t
e M aneuver
abi
l
i
t
y Pl
an\
151079SM P004.
dgn

Custom

MDF
i
r
ePu
mp
e
r
T
r
u
c
Cus
k
t
om

Revision

By

Appd

YYYY.MM.DD

Issued

By

Appd

YYYY.MM.DD

k
c
u
r
T
r
e
mp
u
ePustom
r
i
F
C
MD

GMP 08/02/2016

ACRE GCDM Bay Investments, LLC

Legions East Parcel Development


1

6445 NE 7 Avenue
Miami, Florida

Title

SITE MANEUVERABILITY PLAN

Project No.
1510-79

Revision

Scale
1"-20'

Drawing No.

MP-4

Stantec Architecture Inc.


One Biscayne Tower Suite 1670
2 South Biscayne Boulevard
Miami, FL 33131-1804
Tel:

(305) 482-8700 /

Fax:

(305) 482-8770

www.stantec.com

Copyright Reserved
The Contractor shall verify and be responsible for all dimensions. DO
NOT scale the drawing - any errors or omissions shall be reported to
Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that

TAC1999(
CA)

LOADING
LOADING AREA

HSQ GROUP, INC.

DN

12 X 45

Engineers Planners Surveyors

LSU

CA)
1999(
TAC-

LSU

authorized by Stantec is forbidden.

5951 Northwest 173rd Drive, Suite 4


Miami, Florida 33015 786.534.3621
C26258 LB7924

10

20

LSU

CA)
1999(
TAC-

FEET
SCALE: 1"=10'
UP

21.00

LOADING
AREA

)
LS 99(CA
19
CTA

2.62

SU
L
CA)
1999(
TAC-

LSU

TA
S
C19 U
99
(
CA
)

CA)
(
1999
TAC

LSU

CA)
1999(
TAC-

DN

L
SU

LSU

LSU

TAC1999(
CA)

TAC-1999 (CA)

TAC-1999 (CA)

11.15

LSU

feet

Width

: 8.53

Track

: 8.53

Lock to Lock Time

: 6.0

Steering Angle

: 40.8

Z:
\
HSQ Dade\
Ci
vi
lPr
oj
ect
s\
2015\
151079 Legi
ons East
\
Dr
awi
ngs\
Exhi
bi
t
s & Pr
esent
at
i
ons\
Si
t
e M aneuver
abi
l
i
t
y Pl
an\
151079SM P005.
dgn

N.
E.7th AVEN U E

ANTONIO QUEVEDO, P.E. #59471

8/2/2016

Revision

By

Appd

YYYY.MM.DD

Issued

By

Appd

YYYY.MM.DD

GMP 08/02/2016

ACRE GCDM Bay Investments, LLC

Legions East Parcel Development


1

6445 NE 7 Avenue
Miami, Florida

Title

SITE MANEUVERABILITY PLAN

Project No.
1510-79

Revision

Scale
1"-20'

Drawing No.

MP-5

Stantec Architecture Inc.


One Biscayne Tower Suite 1670
2 South Biscayne Boulevard
Miami, FL 33131-1804
Tel:

(305) 482-8700 /

Fax:

(305) 482-8770

www.stantec.com

Copyright Reserved
The Contractor shall verify and be responsible for all dimensions. DO
NOT scale the drawing - any errors or omissions shall be reported to
Stantec without delay.
The Copyrights to all designs and drawings are the property of
Stantec. Reproduction or use for any purpose other than that
authorized by Stantec is forbidden.

Engineers Planners Surveyors

LSU

5951 Northwest 173rd Drive, Suite 4

T
AC1999(
CA)

Miami, Florida 33015 786.534.3621

LSU

CA)
1999(
ACT

HSQ GROUP, INC.

C26258 LB7924

10

20

FEET

T
AC1999(
CA)

T
AC1999(
CA)

LSU

LSU

SCALE: 1"=10'

21.00

DN

U
S
L
CA)
1999(
ACT

U
S
L

CA)
999(
1
C
A
T

U
S
L

CA)
99(
9
1
AC
T

2.62

UP

U
S
L

LSU

CA)
1999(
ACT

T
AC1999(
CA)

LSU

CA)
1999(
ACT

57'-1 3/4"

11.15

LSU

feet

Width

: 8.53

Track

: 8.53

Lock to Lock Time

: 6.0

Steering Angle

: 40.8

LOADING AREA
10 X 20

LOADING

N.
E.7th AVEN U E

DN

ANTONIO QUEVEDO, P.E. #59471

8/2/2016

Z:
\
HSQ Dade\
Ci
vi
lPr
oj
ect
s\
2015\
151079 Legi
ons East
\
Dr
awi
ngs\
Exhi
bi
t
s & Pr
esent
at
i
ons\
Si
t
e M aneuver
abi
l
i
t
y Pl
an\
151079SM P006.
dgn

N.E. 64th STREET

Revision

By

Appd

YYYY.MM.DD

Issued

By

Appd

YYYY.MM.DD

GMP 08/02/2016

ACRE GCDM Bay Investments, LLC

Legions East Parcel Development


1

6445 NE 7 Avenue
Miami, Florida

Title

SITE MANEUVERABILITY PLAN

Project No.
1510-79

Revision

Scale
1"-20'

Drawing No.

MP-6

Landscape Plans

L-2:
L-3:
L-4:
L-5:
L-6:
L-7:
L-8:
L-9:

Site & Landscape Requirements


Existing Tree Survey
Tree Management Schedule
Representative Plant Types
Landscape- Ground Level Plan
Landscape - Amenity Level Plan
Streetscape, Enlargements and Sections
Representative Paving Types

One Biscayne Tower Suite 1670


Two South Biscayne Blvd, Miami, Fl 33131
T. 305.482.8700
www.stantec.com

Lic#: AA26000733
Jonathan Cardello
Lic#: AR93391

L-1:

Savino Miller Design Studio


12345 NE 6th Avenue
Miami, Florida 33161
T: 305.895.9082

6445 NE 7 AVE. MIAMI, FL 33138

LANDSCAPE PLANS

ZONING SUBMITTAL

03.02.2016

PROJECT # 219420344

L-1

You might also like