DESIGN OF UNDER TUNNEL AT Km 136.

274

CONTENTS
S. No

DESCRIPTION

CHECK SLIP

II

REPORT

III

NOTE ON DESIGN FEATURES

IV

DESIGN CALCULATIONS

Page No

1. HYDRAULIC PARTICULARS OF CANAL

2. STREAM PARTICULARS

3. M.F.L & VENTWAY

4. TRANSITIONS

12

5. TAIL CHANNEL

13

6. T.E.L.CALCULATIONS

14

7. DESIGN OF DROP WALLS

20

8. SCOUR DEPTH

21

9. DESIGN OF WINGS & RETURN WALLS

23

10. DESIGN OF HEAD WALL

27

11. STADD PRO DESIGN OF BARREL

11.1 LOAD CALCULATIONS

30

11.2 ANALYSIS OF BARREL

31

11.3 DESIGN OF EXTERNAL WALL

46

11.4 DESIGN OF INTERNAL WALL

48

11.5 DESIGN OF BASE SLAB

50

11.6 DESIGN OF TOP SLAB

52

DRAWINGS
1. INDEX MAP
2. PLAN PROFILE
3. GRID PLAN
4. LS & CS OF STREAM
5. GENERAL PLAN & SECTION
6. R C C DETAILS OF BOX , WINGS & RETURNS

CHECK SLIP TO ACCOMPANY THE SITE SURVEY OF BRIDGES


0
0
0
UNDER TUNNEL @ Km. 136.274
S.
No

Description

Remarks

Has an Index Map showing the location and any alternatives been enclosed?

Yes

Has site plan to a scale of 1:1400 giving the following information been enclosed.

Yes

a. Has the names of roads or drains with direction been

Yes

given?

b. Has the canal proposals been shown?


c.If the structure is in skew, have the angle and direction of skew

Yes
been given?

This structure is proposed


to be constructed
perpendicular to canal. The
skew if any may be
adjusted in approach and
tail channel.

d. Has the reference to B.M been given?

Yes

e. Are the levels and identification number of C.S given?

Yes

f.

Yes

Are the trial pit particulars given?

g. Have the spot levels of adjacent country been given?

Yes

i. Has the L.S of the drain been given?

Yes

ii. Are the scales adopted as 1:500 and 1:500?

Yes

Has the L.S of canal showing the site of crossing been enclosed?

Yes

Has a note on the important details of masonry works along the drain enclosed?

---

ii.If so, are the hydraulic particulars furnished?

---

Is a list of Masonry works for 3 kms U/s and D/s of structure furnished?

--Location
approved

Is the necessity for the structure explained clearly?

Have the canal chainages been given?

Yes

Have the leads for materials of construction been given?

---

10

Has any proposal depending on site conditions been marked?

---

11

If the structure is on a curve or skew is it possible to


i. To alter:

----

ii. If not have the reasons been furnished?

----

12

Have the possibilities or diversion been examined? It is a major stream cannot be


diverted.

Yes

13

Has the catchment map of the drain been furnished?

Yes

14

Have the Hydraulic particulars of the drain furnished?

Yes

15

Has any special features or relevant information been furnished?

---

16

Has certificate of levels given?

---

17

Have plans been indexed?

---

18

Are the L.S and C.S levels of corresponding points tallying?

Yes

19

Are the north points and scales noted in the plans?

Yes

REPORT TO ACCOMPANY THE SITE SURVEY FOR


STREAM CROSSING AT Km.136.274

The HP's of the canal at KM. 136.274 is as follows.


S.No.
1
2
3
4
5
6
7
8
9
10
11
12
13

Description
Discharge (R/D)
Bed width
F.S.D.
Side Slopes (inner / outer)
Bed fall
Value of Rugosity
Free board
Velocity
Top width of banks L/R
C.B.L.
F.S.L.
T.B.L.
SBL Crossing

Units
Cumecs
m
m
---m
m / sec
m
m
m
m
m

Particulars
4.090 / 4.250
3.800
1.200
1.5 :1 / 2:1
1 in 6000
0.018
0.750
0.632
6.00 / 2.50
+ 463.021
+ 464.221
+ 464.971
+ 463.633

0
0

DESIGN OF UNDER TUNNEL AT Km.136.274


NOTE ON DESIGN FEATURES
1.0 INTRODUCTION:

2.0 HYDRAULIC PARTICULARS OF CANAL:


Sl.No.
1
2
3
4
5
6
7
8
9
10
11
12
13

Description
Discharge (R / D)
Bed Width
F.S.D
Side Slopes
Bed fall
Value of rugosity
Free board
Velocity
Top Width of banks L/R
C.B.L
F.S.L
T.B.L
SBL @ crossing

Units
cumecs
m
m
------m
m/sec
m
m
m
m
m

Particulars
4.090 / 4.250
3.800
1.200
1.5 :1 / 2.0 :1
1 in 6000
0.018
0.750
0.632
6.000 / 2.500
+ 463.021
+ 464.221
+ 464.971
+ 463.633

3. STREAM PARTICULARS
Sl.No. Description
1

Catchment Area

M.F.D by Dickens formula

Units

Particulars

Sq.Km

0.349

Cumecs

8.854

Bed level of stream crossing

+ 463.633

Bed fall

---

1 in 18

Value of n (assumed)

---

0.030

Avg. depth of flow

Avg. velocity

MFL's

0.547

m/sec

4.000

i. at crossing

+ 464.103

ii. at 100 m u/s

+ 465.012

ii. at 100m d/s

+ 463.661

4. VENT WAY FOR STREAM FLOW


The canal bed level @ crossing is +463.021 and the stream bed level @ crossing is +463.633.There is head
way of 0.612 m for stream flow under the canal. Hence 1 vents of 3.5 x 1.8 m (RCC box) is proposed. Barrel
is of Box type proposed in VRCC M 20. Below the barrel 75 mm thick base in CC M10 is proposed.
Canal bed level

Thickness of roof +Sealing coat

+ 463.021

Underside of barrel

Barrel depth

1.800

Barrel floor Level

+ 460.781

0.400 + 0.04
+ 462.581

5.0 TOTAL ENERGY LEVELS:


The total energy levels are worked out from d/s of the structure. The coefficients for sudden expansion and
sudden contraction considered are 0.5 and 0.3 respectively. Similarly the coefficients for gradual expansion
and contraction considered as 0.3 and 0.2 respectively. The head over the drop is found by trial and error.
The following are T.E.L & MFLs.
S.No.

Description

M.F.L.

T.E.L

Section 8-8 (Just outside the transition)

+ 462.013

+ 462.061

Section-7-7 (Just outside the transition)

+ 462.002

+ 462.073

Section-6-6 (Just outside the exit end of barrel)

+ 461.866

+ 462.144

Section-5-5 (Just inside the barrel @ exit end) (Barrel roof level
+462.581)

+ 461.865

+ 462.146

Section-4-4 (Just inside the barrel at entrance)

+ 461.865

+ 462.174

Section-3-3 (Just outside the barrel @ entrance)

+ 461.948

+ 462.188

Section-2-2 (At the toe of drop wall)

+ 462.189

+ 462.231

+ 462.576

---------

8
Section-1-1 (Drop- 1)
As seen from the above the barrel will run full.
6. DESIGN OF DROP

The difference in barrel floor level and U/s stream bed level is to be negotiated by providing 2 drops of
1.1625m and 1.1625 m. The drop crest level considered is stream B.L.at 20m u/s ie., +463.829. The top width
and bottom width are calculated by the formula given in the CWC manual on falls. Thickness of apron and
length of apron are also calculated by the formula given in the above manual
The following are the dimensions of drop:

U/s
1 drop

2nd drop

st

1. Top Width

0.200 m

0.550

2. Bottom Width

1.200 m

1.600

3. Thickness of apron (incl W.C)

0.450 m

0.950

4. Length of apron

3.500 m

4.500

The drop wall is proposed in VCC M15 and apron is proposed to be constructed in VCC M15 using 40 MSA.
Thickness of foundation under the drop is 500 mm in VCC M15.
7.0 SCOUR DEPTHS:
The widths of transitions @ entry and exit are 7 m and 6.168 m respectively. With silt factor as 2, the
maximum scour levels on U/s & D/s works out to + 460.696 & + 459.963 respectively. The foundation of u/s
Returns and Drop is proposed @ + 460.206. Hence cut-off on U/s is not required. On D/s the foundation level
is + 460.131. Provided cut off wall at +459.281 m
8. SUB-STRUCTURE
The Barrel is of R.C.C box type and designed for earth/ water over it and earth pressure on sides. The
analysis is done in the STAAD PRO for the different load combinations i.e., U.T full with earth pressure, U.T
empty with earth pressure, left box of empty with earth pressure, right U.T empty with earth pressure and
middle box empty with earth pressure. The stresses and coefficients adopted are,

Mix proposed M20


Stress in concrete 70 kg/cm2
Stress in steel 1500 kg/cm2
Modular ratio 13.33
Lever arm coefficient 0.872
Neutral axis coefficient - 0.384 and
M.R coefficient 1.171
Thickness of the top and bottom slabs under the trough and under the bank works out to 0.4 mm. The
thickness of the External and internal walls are also 0 m. It is checked for shear and bond.
12mm thick expansion joints with 225 wide PVC water stopper are proposed at the interface of the earth bank
and the trough. They shall be filled with Asphaltic joint filler.
The Wings & Returns are designed for saturated earth pressures keeping the water face vertical and rear
batter and stability calculations are done as per T.V.A procedure.
Head walls over Earth Bank slabs are also designed in VRCC M20 as retaining walls to replace the outer
slopes of bank.
The Foundation under the wings and returns is 500 mm in VCC M15 using 40 MSA. The following are the
stresses in the Wings and returns.

Sl.
No.

STRESS STABLE

Soil (t/m)
Max

Min

wing wall @ Junction(U/s)

15.515

4.938

Horizontal wing wall & Return wall (U/s)

9.579

4.988

sloped wing wall @ junction (D/s)

11.894

4.697

Horizantal wing wall & Return wall (D/s)

4.842

4.045

8. TAIL CHANNEL
A tail channel of bed width equal to transition width on d/s is to be excavated till the barrel floor level meets the
natural stream bed level. The tail channel is proposed to be protected with 300 mm thick revetment and
pitching for a length of 5.0m . At the ends 450 mm x 450 mm profile wall is proposed in VCCM15

9. LEADING CHANNEL
The stream bed is to be re-graded up to drop wall. The leading channel is also proposed to be protected as in
the case of tail channel. Guide bunds to the extent as per site condition may be provided to train the flow

DESIGN OF UNDER TUNNEL AT Km.0.000


DESIGN OF UNDER TUNNEL AT Km.0.000
DESIGN OF UNDER TUNNEL AT Km.136.274
1. Hydraulic particulars of canal at the location of the structure
S. No
1
2
3
4
5
6
7
8
9
10
11
12
13

Description
Discharge R/D
Bed Width
Full supply depth
Free board
Bed fall
Velocity
Value of 'n'
Side slopes (I/O)
Top width of banks (L/R)
Canal bed level
Full supply level
Top of bank
GL

Units
Cumecs
m
m
m
m
m/sec

m
m
m
m
m

Particulars
4.090 / 4.250
3.800
1.200
0.750
1 in 6000
0.632
0.018
1.5 :1 / 2:1
6.0 / 2.5
+ 463.021
+ 464.221
+ 464.971
+ 463.633

2 Stream Particulars:
i)Catchment Area
=
0.349
CM3/4
ii)Dickens Formula
Q
=
where C =
for catchment areas from > 2.5 Sq. Kms
19.5
M = is the Catchment area
Q
=
8.854
iii) Stream bed level at crossing
=
463.633
iv) Stream bed level at 20m U/s
=
463.829
v) Stream bed level at 20m D/s
=
463.460
vi) Average depth of flow
=
0.547
vii) average velocity
=
4.000

Sq. Km

cumecs
m
m
m
m
m/sec

3.0. M.F.L. Calculations & Vent way:3.1 Bed fall of Stream:


1. Bed level at Km 0.000 (Crossing)
Bed level at 100 m U/S

:
:

463.633
461.740

Slope 1 in

52.8

2. Bed level at Km 0.000 (Crossing)


Bed level at 50 m U/S

:
:

463.633
461.398

Slope 1 in

22.4

3. Bed level at Km 0.000 (Crossing)


Bed level at 20 m U/S

:
:

463.633
460.008

Slope 1 in

5.5

4. Bed level at Km 0.000 (Crossing)


Bed level at 20 m D/S

:
:

463.633
458.827

Slope 1 in

4.2

5. Bed level at Km 0.000 (Crossing)


Bed level at 50 m D/S

:
:

463.633
458.287

Slope 1 in

9.4

6. Bed level at Km 0.000 (Crossing)


Bed level at 100 m D/S

:
:

463.633
458.141

Slope 1 in

18.2

Average of 1-6 = ( 52.8 + 22.4 + 5.5 + 4.2+9.4+18.21


Adopt a bed fall of 1 in
18.000
and the value of n as

18.74
say
18.000
0.0300
for calculating M.F.L's

MFL of the Cross sections:


M.F.L at 100 m U/S
M.F.L at 50 m U/S
M.F.L at 20 m U/S
M.F.L at Crossing
M.F.L at 20 m D/S
M.F.L at 50 m D/S
M.F.L at 60 m D/S

:
:
:
:
:
:
:

3.2.1 M.F.L at 100 m U/S

465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012

P
R2/3

=
=
=(
=

=
=
=

Stream bed
levels

Cal

465.012
466.243
466.280
466.152
466.147
466.077
465.110
464.558
464.499
464.463
464.535
464.814
464.904
465.693
465.700
466.178
466.286
465.736
465.223
465.196
465.130
465.152
465.416
466.089
466.495
466.602

465.012
465.012
465.012
465.012
465.012
465.012
465.012
464.558
464.499
464.463
464.535
464.814
464.904
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012
465.012

7.3
(A/P)2/3
2.5
0.4594
1 x
0.030
3.610
AxV
2.5
8.854
HENCE O.K.

Elevation

M.F.L.

:
Depth

465.012
464.616
464.277
464.103
463.944
463.794
463.661
Assuming the MFL as
Average
Depth

465.012

Distance

Area (Sq.m)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.45
0.51
0.55
0.48
0.20
0.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.227
0.483
0.531
0.513
0.337
0.153
0.054
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
2.331
0.581
0.383
0.921
2.780
0.128
0.204
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
7.33

0.000
0.000
0.000
0.000
0.000
0.000
0.529
0.281
0.203
0.472
0.937
0.020
0.011
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2.45

0.55

7.88

Cross
Chainage

-50.000
-42.795
-8.871
-6.023
-5.867
-3.800
-.964
-.383
.000
.921
3.701
3.829
5.325
5.487
17.033
25.913
26.913
28.857
31.345
33.232
35.397
38.575
40.116
42.369
50.000

7.88 )2/3

m
0.459

x 1/

18.000

m/sec
x
cumecs

466.000

3.610
=

MFL @100 m u/s

8.854 cumecs

M.F.L.
Stream bed levels

464.000
-5.000 -3.000 -1.000 1.000 3.000 5.000
-6.000 -4.000 Cross
-2.000Chainage
.000 2.000 4.000 6.000

M.F.L at 50 m U/S
M.F.L.
464.616
464.616
464.616
464.616
464.616
464.616
464.616
464.616
464.616
464.616
464.616
464.616
464.616
464.616
464.616
464.616
464.616
464.616
464.616
464.616

P
R2/3

=
=
=(
=

=
=
=

Stream bed
levels

Cal

464.616
466.368
466.400
465.931
465.630
465.056
464.894
464.608
463.990
463.993
464.312
464.305
464.392
465.528
466.126
466.317
467.250
467.273
467.283

464.616
464.616
464.616
464.616
464.616
464.616
464.616
464.608
463.990
463.993
464.312
464.305
464.392
464.616
464.616
464.616
464.616
464.616
464.616

5.9
(A/P)2/3
2.3
0.4965
1 x
0.03
3.901
AxV
2.3
8.854
HENCE O.K.

Depth

Assuming the MFL as


Average
Depth

464.616

Distance

Area (Sq.m)

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.008
0.626
0.623
0.304
0.311
0.224
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.004
0.317
0.624
0.463
0.307
0.267
0.112
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.012
2.674
0.297
2.458
0.197
0.079
0.144
0.000
0.000
0.000
0.000
0.000
5.861

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.847
0.185
1.139
0.061
0.021
0.016
0.000
0.000
0.000
0.000
0.000
2.270

0.63

6.49

Cross
Chainage

-50.000
-41.656
-28.945
-15.657
-4.161
-3.405
-2.971
-.297
.000
2.458
2.655
2.734
3.465
11.274
14.736
48.445
49.442
50.000

6.49 )2/3

m
0.497

x 1/

18.000

m/sec
x
cumecs

3.901
=

MFL @50 m u/s

8.854 cumecs

M.F.L.
Stream bed levels

Elevation

3.2.3

Cross Chainage

M.F.L at 20 m U/S
M.F.L.
464.277
464.277
464.277
464.277
464.277
464.277
464.277
464.277
464.277
464.277
464.277
464.277
464.277
464.277
464.277
464.277
464.277
464.277
464.277
464.277

P
R2/3

=
=
=(
=

=
=
=

Stream bed
levels

Cal

464.277
465.878
465.904
465.832
465.515
465.469
465.430
463.846
463.821
463.809
463.829
463.859
463.794
464.428
464.566
465.080
466.805
466.876
466.970

464.2772
464.2772
464.2772
464.2772
464.2772
464.2772
464.2772
463.846
463.821
463.809
463.829
463.859
463.794
464.2772
464.2772
464.2772
464.2772
464.2772
464.2772

4.99
(A/P)2/3
2.1
0.5316
1 x
0.03
4.176
AxV
2.12
8.854
HENCE O.K.

Assuming the MFL as

Depth

Average
Depth

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.43
0.46
0.47
0.45
0.42
0.48
0.00
0.00
0.00
0.00
0.00
0.00

464.277

Distance

Area (Sq.m)

Cross
Chainage

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.216
0.444
0.462
0.458
0.433
0.451
0.242
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.209
0.038
0.052
2.206
0.225
1.820
0.437
0.000
0.000
0.000
0.000
0.000
4.987

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.045
0.017
0.024
1.011
0.097
0.820
0.106
0.000
0.000
0.000
0.000
0.000
2.120

-50.000
-45.543
-36.027
-13.969
-5.253
-3.062
-2.296
-2.258
-2.206
.000
.225
2.045
2.619
2.851
12.137
43.384
45.963
50.000

0.48

5.47

5.47 )2/3

m
0.532

x 1/

18.000

m/sec
x
cumecs

4.176
>

8.854 cumecs

MFL @ 20 m u/s

467.000
Elevation

3.2.4

466.000

M.F.L.
Stream bed levels

465.000
464.000
463.000
-8.000 -6.000 -4.000
-2.000
.000 2.000 4.000 6.000 8.000
Cross
Chainage

M.F.L at Crossing
M.F.L.
464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103

P
R2/3

=
=
=(
=

=
=
=

Assuming the MFL as

Stream bed
levels

Cal

464.103
465.219
465.218
465.302
465.276
465.224
465.200
464.766
464.591
463.635
463.686
463.633
463.613
463.694
464.146
464.498
466.582
466.631
466.820
466.874
467.057

464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103
464.103
463.635
463.686
463.633
463.613
463.694
464.103
464.103
464.103
464.103
464.103
464.103
464.103

5.2
(A/P)2/3
2.2
0.5222
1 x
0.03
4.102
AxV
2.2
8.854
HENCE O.K.

464.103

Average
Depth

Depth

Distance

Area (Sq.m)

Cross
Chainage

-50.000
-49.224
-42.793
-15.959
-11.125
-10.590
-3.014
-2.545
-2.108
-.943
.000
1.114
2.233
2.980
3.946
37.337
38.070
40.962
42.791
50.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.468
0.417
0.470
0.490
0.409
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.234
0.442
0.443
0.480
0.449
0.204
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.214
1.165
0.943
1.114
1.119
0.675
0.000
0.000
0.000
0.000
0.000
0.000
5.2303

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.050
0.515
0.418
0.534
0.503
0.138
0.000
0.000
0.000
0.000
0.000
0.000
2.1582

0.49

5.72

5.72 )2/3

m
0.522

x 1/

18.000

m/sec
x
cumecs

4.102
=

8.854 cumecs

MFL @ Crossing

M.F.L.
Elevation

3.2.5

Stream bed levels

-15.000

-5.000

5.000

15.000

Cross Chainage

M.F.L at 20 m D/S
M.F.L.
463.944
463.944
463.944
463.944
463.944
463.944
463.944
463.944
463.944
463.944
463.944
463.944
463.944
463.944
463.944
463.944
463.944
463.944
463.944
463.944

P
R2/3

=
=
=(
=

=
=
=

Stream bed
levels

Cal

463.944
464.965
464.989
465.032
465.027
464.530
464.298
464.114
463.734
463.526
463.537
463.460
463.452
463.633
463.727
464.516
465.078
466.852
467.120

463.944
463.944
463.944
463.944
463.944
463.944
463.944
463.944
463.734
463.526
463.537
463.460
463.452
463.633
463.727
463.944
463.944
463.944
463.944

Depth

6.45
(A/P)2/3
2.3
0.4832
1 x
0.03
3.797
AxV
2.3
8.854
HENCE O.K.

Assuming the MFL as


Average
Depth

463.944

Distance

Area (Sq.m)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.21
0.42
0.41
0.48
0.49
0.31
0.22
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.105
0.314
0.412
0.445
0.488
0.401
0.264
0.108
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.559
0.096
0.254
2.054
0.236
2.500
0.154
0.597
0.000
0.000
0.000
6.45

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.059
0.030
0.105
0.915
0.115
1.003
0.041
0.065
0.000
0.000
0.000
2.33

0.49

6.94

Cross
Chainage

-50.000
-47.791
-44.378
-42.171
-24.867
-6.644
-3.417
-2.404
-2.308
-2.054
.000
.236
2.736
2.890
5.062
14.064
37.695
50.000

6.94 )2/3

m
0.483

x 1/

18.000

m/sec
x
cumecs

3.797
=

8.854 cumecs

MFL @ 20 m D/S

M.F.L.
465.000
Elevation

3.2.6

Stream bed levels

464.000
463.000
-10.000

-5.000
.000
Cross Chainage

5.000

10.000

M.F.L at 50 m D/S
M.F.L.
463.794
463.794
463.794
463.794
463.794
463.794
463.794
463.794
463.794
463.794
463.794
463.794
463.794
463.794
463.794
463.794
463.794
463.794
463.794

P
R2/3

=
=
=(
=

=
=
=

Stream bed
levels

Cal

463.794
464.709
464.696
464.456
464.389
463.404
463.314
463.296
463.248
463.294
463.450
463.675
464.149
466.188
466.522
466.712
466.816
467.016

463.794
463.794
463.794
463.794
463.794
463.404
463.314
463.296
463.248
463.294
463.450
463.675
463.794
463.794
463.794
463.794
463.794
463.794

5.1
(A/P)2/3
2.2
0.5234
1 x
0.03
4.112
AxV
2.2
8.854
HENCE O.K.

Depth

Assuming the MFL as


Average
Depth

463.794

Distance

Area (Sq.m)

0.00
0.00
0.00
0.00
0.00
0.39
0.48
0.50
0.55
0.50
0.34
0.12
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.195
0.435
0.489
0.522
0.523
0.422
0.231
0.059
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.202
0.268
0.504
1.449
0.629
1.208
0.606
0.273
0.000
0.000
0.000
0.000
0.000
5.14

0.000
0.000
0.000
0.000
0.039
0.117
0.246
0.756
0.329
0.509
0.140
0.016
0.000
0.000
0.000
0.000
0.000
2.15

0.55

5.68

Cross
Chainage

-50.000
-35.465
-26.983
-2.732
-2.221
-1.953
-1.449
.000
.629
1.837
2.443
3.533
23.331
26.722
29.200
30.429
50.000

5.68 )2/3

m
0.523

x 1/

18.000

m/sec
x
cumecs

4.112
=

8.854 cumecs

MFL @ 50 m D/S

M.F.L.
Stream bed levels
Elevation

3.2.7

-7.000

-2.000
Cross Chainage

3.000

10

M.F.L at 60 m D/S
M.F.L.
463.661
463.661
463.661
463.661
463.661
463.661
463.661
463.661
463.661
463.661
463.661
463.661
463.661
463.661
463.661
463.661
463.661
463.661
463.661

P
R2/3

=
=
=(
=

=
=
=

Stream bed
levels

Cal

463.661
464.630
464.619
464.587
464.553
464.407
463.469
463.128
463.086
463.016
463.214
463.418
463.928
463.974
465.098
466.068
466.620
466.777

463.661
463.661
463.661
463.661
463.661
463.661
463.469
463.128
463.086
463.016
463.214
463.418
463.661
463.661
463.661
463.661
463.661
463.661

4.4
(A/P)2/3
2.1
0.5477
1 x
0.03
4.303
AxV
2.1
8.854
HENCE O.K.

Depth

Assuming the MFL as


Average
Depth

463.661

Distance

Area (Sq.m)

0.00
0.00
0.00
0.00
0.00
0.00
0.19
0.53
0.57
0.64
0.45
0.24
0.00
0.00
0.00
0.00
0.00
0.00

0.000
0.000
0.000
0.000
0.000
0.096
0.362
0.554
0.610
0.546
0.345
0.121
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.101
0.240
1.407
0.491
1.245
0.390
0.557
0.000
0.000
0.000
0.000
0.000
4.431

0.000
0.000
0.000
0.000
0.000
0.010
0.087
0.779
0.299
0.680
0.135
0.068
0.000
0.000
0.000
0.000
0.000
2.057

0.64

5.08

Cross
Chainage

-50.000
-39.950
-34.646
-30.084
-2.632
-2.138
-1.898
-.491
.000
1.245
1.635
2.804
2.953
14.400
27.272
33.882
50.000

5.08 )2/3

m
0.548

x 1/

18.000

m/sec
x
cumecs

4.303
=

8.854 cumecs

MFL @ 60 m D/S

466.000
Elevation

3.2.8

M.F.L.
Stream bed levels

465.000
464.000
463.000
-15.000 -10.000 Cross
-5.000 Chainage
.000
5.000 10.000 15.000

11

3.2 Vent Way:


Max. flood discharge
Allowing a velocity of
The area of vent way required
=
Provide

8.854
2.000
vent of R.C.C box of size

=
=

8.854 cumecs
2.000 m/sec in barrel

4.427 m2
3.50

Assuming the barrel will runs full , the area of flow will be
The velocity in the barrel is
1.416

Fillet

Canal Bed level


Thickness of roof +SC
Intermediate wall thickness of trough
Underside of barrel
Vent height
Floor level
Length of Barrel

m/sec.

0.15

=
=

1.80

( including fillets)

=
<
HENCE O.K.

6.266 m2
2 m/sec.

x 0.150 m

+ 463.021
0.40 + 0.040
0.00 m
+ 462.581
1.800 m
+ 460.781
20.050

=
=
=
=

4.0 Transitions:
4.1 u/s Transition:
Lacey's Perimeter=
60% of 14.283 =

4.8 Q 0.5

14.283 m
8.57 m

Length of U/s transition is proposed as


to be
7.0
m with a splay of 3 : 1.

7.000 m

3.50

m. The width at the transition at end works out

3.50 m
3
1
3.5

4.2 d/s Transition:


Length of d/s transition proposed as
to be
6.2
m with a splay of 5 : 1.

6.67 m. The width at the transition at end works out

3.50 m

6.168

5
1
6.7
The depth of flow at the end of transition arrived is adopting BY WASH WEIR formula.
Q=
1.05 d3/2 x L
8.854 = 1.050 x d3/2 x
6.168
d3/2 =
1.37
d =
1.23 m
say
d
=
1.23 m

12

5.0 Tail Channel:


Depth in the tail channel @ the exit of D/s transition

1.23 m

Bed level of tail channel is kept same as the floor level at the end of D/s transition
=
Side slopes ( for inner side ) are proposed as 1 : 1
Maximum flow level
=
+ 460.781
+
1.23
=
Bed width is kept same as the width of D/s transition at the end i.e.

+ 460.781
+ 462.013 m
6.168

462.013
8.632
1 :1
1.232
460.781
6.17
Area of flow

=
=

Velocity (V)

=
=

From Manning's formula


V
where
n
P
R
S1/2

=
=
=
=
=
=
=
=
=

Provide a bed fall of 1 in

m
6.168
9.117

1.0 x
sq.m.

1.232

1.232

8.854 / 9.117
0.971 m/sec
(1/n) R2/3 S1/2
0.030
6.168
+ 22 x
1.232
9.653
m
9.117
9.65262222
0.944
m
V x n / R2/3
0.971
x
0.030
2/3
0.944
0.0303
0.0009
or
1 in
Say
1 in
1080.0

1087.0
1080

for the tail channel till it meets the natural stream bed level.

13

6.0 T.E.L. Calculations:


U/S

D/S
12

78

FLOW

56

6.2

7.00

34

3.5 m

1
34
12

56

3.5

6.67

78

Section 8 - 8 : Just outside the transition( at the exit end)


+

462.013

1.232
1 :1
+

460.781
6.168
m

Max. flood discharge


Max. Flood Level
Floor level
Depth of flow available

=
=
=
=

8.854
462.013
460.781
1.232

Area of flow

=
=
=

( 6.2
9.117
8.854
9.117
0.971
0.971
0.0481
462.013
462.013
462.061
6.168
9.653

Velocity

=
=
=
=
=
=
=
=

V2/2g
MFL at 8 - 8
TEL at 8 - 8
Wetted Perimeter

cumecs
m
m
m
+ 1.0 x
sq.m.

m/sec
2
/
m

1.232 )

(2

x 1.232

x 9.81 )

0.0481

+ 2

2.000

x 1.232

Section 7 - 7 : (Just inside the transition at the exit end)


462.002
1.221

460.781
6.17
Assume depth of flow
A
Wetted Perimeter

=
=
=
=

V2/2g

=
=
=
=

Loss of head due to


sudden expansion

1.221 m
6.168
x 1.221
6.2
+ 2
8.610 m
8.854

7.5

1.176 2 /
0.0704 m
0.50 x
( 0.0704
0.0112

=
1.221
>

7.531 sq.m.

8.57 m.

1.176

(2

x 9.81 )

m/sec

0.0481)

(Due to change in velocity from section 8 - 8 to section 7 - 7)


TEL@7-7 wrt section 8-8
=
462.061
+
0.0112
=
462.073
TEL at section 7 - 7 wrt assumed depth
=
460.781
+ 1.221 + 0.0704
=
462.073
HENCE O.K.

14

Section 6 - 6 : (Just outside the barrel at the exit end)


461.866

1.085
460.781
3.50
Assume depth of flow
A

=
=

1.085 m
3.5
x 1.085

=
=
=

3.5

V
V2/2g

+ 2

8.854
2.332

1.0850

/ 3.798
2

(2

3.798

sq.m.

5.67

2.332

m/sec

0.277

x 9.81 )
=

Friction losses on D/s transition


average Area

( 7.531 +

3.798) /

5.664

sq.m.

Average Perimeter

( 8.570 +

5.670) /

7.120

Mean Depth R

5.664

/ 7.120

0.796

Velocity

( 1.176 +

2.332) /

1.754

in

741

0.0704)

S1/2

=
=

V x n / R2/3
1.754
x 0.018
2/3
0.796
0.03676405

S1/2

0.00135

or

Friction losses

=
=

0.00135
0.0090

x 6.67

Loss of head due to gradual expansion

=
=
(Due to change in velocity from section 7-7 to section 6-6)
TEL@ 6-6 wrt section 7-7 =
=
=
TEL at section 6-6 wrt assumed depth

m/sec

=
=

0.3 x
0.0620
462.073
462.144

(0.2771

0.0620

0.0090045

460.781
+ 1.085 + 0.2771
462.144
HENCE O.K.

15

Section 5 - 5 : (Just inside the barrel at the exit end)


3.500
461.865

1.084
460.781
3.500
Assume depth of flow
A

=
=
=

V2/2g

1.084 m
( 3.500
x 1.084 3.772
sq.m.
8.854

2.348

Loss of head due to Sudden Expansion


TEL at section 5-5 wrt Section 6-6

TEL at section 5-5 wrt assumed depth

2 x 1 x 0.5 x 0.15 x 0.15 )

/ 3.772
/

=
x 9.81 )
=
( 0.281 0.277 )

2.348

m/sec

0.2809

(2

=
=
=
=

0.5 x
0.002
462.144
462.146

=
=

460.781
+ 0.281
462.146
HENCE O.K.

0.002

+ 1.084

As the depth of the flow is more than the barrel depth , hence area of the barrel is taken in to consideration
Assume depth of flow
A

=
=
=

V2/2g

1.800 m
( 3.500
x 1.800 6.278
sq.m.
8.854

1.410

TEL at section 5-5 wrt assumed depth

2 x 1 x 0.5 x 0.15 x 0.15 )

/ 6.278
2

=
=

=
(2

462.581
462.682

x 9.81 )
=

1.410

m/sec

0.1014

+ 0.101

Section 4 - 4 : (Just inside the barrel at the entrance end)


3.50
461.865

1.084
460.781
3.50
Depth of flow available

1.084

=
=

( 3.50
3.749

x 1.08 sq.m.

8.854

/ 3.749

V2/2g

2.362

Head loss due to

4 x 0.5 x 0.15 x 0.15)

=
(2

=
=

0.3 x
0.0010

2.362 m/sec
x 9.81 )
(0.2843

0.2843 m

0.2809)

3.749

Friction Losses:
A

( 3.500

8.854

3.50

=
=

A/P
3.749

x 1.08 / 3.749
+ 2 x

/ 5.668

4 x 0.5 x 0.15 x 0.15 )


=

2.362 m/sec

1.084

sq.m.

5.668

0.661 m

0.0180

16

Length of Barrel

hf

=
Where
=
=

20.05 m
f2 x L/R x V2/2g
f2 = a( 1 + b/R)
0.00316 (1 + 0.03 /
0.003

hf

=
=

0.003
0.028 m

TEL @ 4 - 4 wrt
to previous section

462.146
462.174

0.661 )

( 20.05

/ 0.661)

0.2843

0.0285

Section 3 - 3 : (Just outside the barrel at the entrance end)


3.5
461.948

1.1670
460.781
3.5
Assume depth of flow of

1.167

3.5

3.500

8.854

V2/2g

Loss of head due to sudden contraction


=
0.3 x

2.168

( 0.2843

m
x

1.167

+2 x

1.167

4.0845
2

(2
=
-

0.2400)

(Due to change in velocity from section 4 - 4 to section 3 - 3)


TEL at 3 - 3 wrt section 4 4
=
462.174
=
462.188
TEL at section 3 - 3 wrt assumed depth

=
460.781
=
462.188
HENCE O.K.

4.085 sq.m.
5.834

2.168 m/sec
x 9.81 )
0.2400 m
=

0.0133

1.167

0.0133

0.240

17

Section 2 - 2 : (At the toe of the drop wall)


7.000
462.189

1.408
460.781
7.000
Assume a depth of flow of
A
=

1.408 m
7.000
x

7.000

8.854

V2/2g

=
=

1.41
+2 x

/ 9.856

0.898 2 /
0.0411 m

9.856

sq.m.

1.408

9.816

0.898

m/sec

(2

x 9.81 )

Friction losses on u/s transition


average Area

( 4.085 +

9.856) /

6.970

sq.m.

Average Perimeter

( 5.834 +

9.816) /

7.825

Mean Depth R

6.970

/ 7.825

0.891

Velocity

( 2.168 +

0.898) /

1.533

in

1124

0.0398

0.0031

0.0411

S1/2

=
=

S1/2

=
Friction losses

=
=
Loss of head due to gradual contraction
=
0.2 x (
=
0.0398

V x n / R2/3
1.533
x 0.018
2/3
0.891
0.02980653
0.00089

or

0.00089
0.0031

x 3.50

0.2400

(Due to change in velocity from section 3 - 3 to section 2 - 2)


TEL at 2 - 2 wrt section 3 - 3
=
462.188
=
462.231
TEL at section 2 - 2 wrt assumed depth
=
=

m/sec

460.781
+ 1.408
462.231
HENCE O.K.

0.0411 )

18

Note: As the height of drop 3.048 m. hence it is splitting two drops


Section 1 - 1 : (At the drop wall)

I) For Drop 1 of 1.524 m


462.576
0.387
0.271

0.000

462.189

0.200
462.305
1.408
75 mm wearing coat

1.524

460.781
460.706
460.331
q

8.854
7.000
=
1.265
q = 1.705 h3/2 + 0.8 (2gh)XH
1.265
=
1.705
1.265
=
1.705
0.7419
Solving for h,
h
0.7420

Cumecs / running metre


+ 0.8 (2g) h1/2 x
+
1.3725

h3/2
h3/2

h3/2

0.805

0.387
x

h1/2

h1/2

=
0.387
=
0.7420 ( LHS =RHS )
Hence Assumed Depth of flow is Correct

MFL over the drop wall

Wetted Perimeter P

=
=

462.305
462.576 m
7.000
7.550

+
m

0.271

0.271
<

8.570 m

II) For Drop 2 of 1.524 m


464.6483
0.819

462.576
0.000

463.829
0.271
1.524
462.305
462.155

8.854
7.000
=
1.265
q = 1.705 h3/2 + 0.8 (2gh)XH
1.265
=
1.705
1.265
=
1.705
0.7419
Solving for h,
h
0.7420

Cumecs / running metre


+ 0.8 (2g) h1/2 x
+
0.0000

h3/2
h3/2

h3/2

0.000

0.000
x

h1/2

h1/2

=
0.819
=
0.7420 ( LHS =RHS )
Hence Assumed Depth of flow is Correct

MFL over the drop wall

Wetted Perimeter P

=
=

463.829
464.648 m
7.000
8.640

+
m

0.819

0.819
>

8.570 m

19

7.0 Design of Drop walls :


7.1 U/s Drops
a) Top Width of drop wall :
Top Width of drop wall
where d

Top width of drop wall

I) For Drop 1 of 1.524 m

However provide

=
=
=
=
=
0.200

d/()
Maximum depth of flow over drop wall
Density of C.C =
2.4
0.271
2.4
0.175
m top width

b) Base width of drop wall :


Base width of drop wall = H + d + (W.C)/()
where d
=
Max. depth of flow over drop wall
=
H
=
Height of drop wall
=
W.C
=
Thickness of wearing coat
=

=
Density of Masonry
=
Base width
=
1.524
+ 0.271
+
0.075
=
1.207
m
However provide the base width of drop wall =
1.200 m
c) Thickness of Apron:
Thickness of apron t
where d
h
t

=
=
=
=
=
0.450

However provide

0.271
1.524
0.075
2.400

m
m
m
2.4

0.55 (d + h)
Max. depth of flow over drop wall
difference of u/s & d/s water levels
0.55

0.271
+
0.446
m
m thick including 0.075 m wearing coat

=
=
0.387

0.271 m
0.387 m

d) Length of Apron:
Length

2 x dc
+ 2 x dch
=
=
2x
0.271
=
1.2 m
However provide
3.500
m

7.1 U/s Drops


a) Top Width of drop wall :
Top Width of drop wall
where d

Top width of drop wall

+2x

0.271

=
=
=
=
=
0.550

d/()
Maximum depth of flow over drop wall
Density of C.C =
2.4
0.819
2.4
0.529
m top width

b) Base width of drop wall :


Base width of drop wall = H + d + (W.C)/()
where d
=
Max. depth of flow over drop wall
=
H
=
Height of drop wall
=
W.C
=
Thickness of wearing coat
=

=
Density of Masonry
=
Base width
=
1.524
+ 0.819
+
0.075
=
1.561
m
However provide the base width of drop wall =
1.600 m

However provide

0.387

II) For a Drop of 1.725 m

However provide

c) Thickness of Apron:
Thickness of apron t
where d
h
t

=
=
=
=
=
0.950

0.819
1.524
0.075
2.400

0.55 (d + h)
Max. depth of flow over drop wall
difference of u/s & d/s water levels
0.55

0.819
+
0.935
m
m thick including 0.075 m wearing coat

m
m
m
2.4

=
=
2.072

0.819 m
2.072 m

d) Length of Apron:
Length

2 x dc
+ 2 x dch
=
=
2x
0.819
=
4.30 m
However provide
4.500
m

+2x

0.819

2.072

20

8.0 Scour Depth:


a) on u/s side:
Length of drop wall
q

=
=
=

7.0
8.854
/ 7.000
1.265
cumecs per meter run

=
=
=
=
=

1.35 (q2/f)1/3
2
(adopted from IS 7784 / Part I Para 7.5)
(q2/f)1/3
1.35
1.35
( 1.265 2 /
2 1/3 )
1.253
m

=
=
=

1.5 D'

U/s MFL over the drop wall


Scour Level
Foundation level of drop wall

=
=
=

462.576
460.696
460.206

HENCE OK

U/s MFL over the drop wall


Scour Level
Foundation level of drop wall
b) on D/s side:
Width of apron at exit end
q

=
=
=

464.648
462.768
461.655

HENCE OK

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

6.17
8.854 /
1.435
1.35 (q2/f)1/3
2
1.35
1.35 ( (
1.363
1.5 D'
1.50
2.045
+462.013
+459.963
+460.781
+460.131
+459.281

Scour depth (D')


where f = silt factor
Nominal scour depth
D'
Max. Scour depth

1.50
1.880 m

1.253
Say

1.880

Drop 1:

Drop 2:

Scour depth (D')


where f = silt factor
Nominal scour depth

Maximum Scour depth

D/s MFL
Scour Level
Floor level
Foundation level
Provide cutoff wall up to

m
6.168
cumecs/m.run
(adopted from IS 7784 / Part I Para 7.5)
(q2/f)1/3
)2 / (
1.435
2 ) )1/3
m
x
m

1.363
Say

2.050

HENCE OK

21

9 DESIGN OF WING WALLS AND RETURNS:


9.1 DESIGN OF WING WALL AT THE JUNCTION OF HEAD WALL : U/s

(2-2)

464.871
W3
W4

W1

4.165

W2
0.3

1.60

0.5

0.3

460.706

2.1
0.5 B

W5

460.206
2.70

Taking Moments about (A)

Load
W1
W2
W3
Pv
Ph

Particulars

0.5
0.5
0.0384
0.1340

x 0.500
x 1.600
x 1.600
x 2.100
x 2.100

x 4.165
x 4.165
x 4.165
x 4.165
x 4.165

x 2.400
x 2.400
x 2.100
^2
^2

Force
V
5.000
8.000
6.997
1.399

4.882

21.396

L.A.

Moment

1.850
1.067
0.533
1.666

9.250
8.533
3.732
8.133

29.648

Lever arm

29.65

21.396

1.386

Eccentricity

1.386

1.05

0.336

allowable 'e' (b/6)

stresses

0.350 m
21.40
2.10

(1

10.19 x

Maximum compressive stress

19.960 t/m2

Minimum compressive stress

0.417 t/m2

>

0.336

(1

HENCE OK
x
2.100

0.336

0.959 )

Taking Moments about (B)


Load
W1
W2
W3
W4
W5
Pv
Ph

Particulars

0.5
0.5

0.0384
0.1340

x 0.500
x 1.600
x 1.600
x 0.300
x 2.700
x 2.100
x 2.100

x 4.165
x 4.165
x 4.165
x 4.165
x 0.500
x 4.665
x 4.665

x 2.400
x 2.400
x 2.100
x 2.100
x 2.400
^2
^2

Force
V
4.998
7.997
6.997
2.624
3.24
1.755

6.124
27.611

Moment

2.150
1.367
0.833
0.150
1.350
1.866

10.746
10.929
5.831
0.394
4.374
11.427

43.700

Lever arm

43.70

27.611

1.583

Eccentricity

1.583

1.35

0.233

allowable 'e' (b/6)

stresses

=
=

L.A.
H

0.450 m
27.611
2.70
10.226

Maximum compressive stress

15.515 t/m2

Minimum compressive stress

4.938 t/m2

>

0.233

(1

(1

HENCE OK

x
2.70
0.517 )

0.233 )

23

9.2 DESIGN OF WING WALL & RETURN : U/S

(SECTION 1-1 & 1a-1a )


465.048

W3

W1

W4
W2
0.3
0.5

2.893

1.10

0.500
1.6

0.3

462.155

W5

461.655
2.20

Taking Moments about (A)


Load
W1
W2
W3
Pv
Ph

Particulars

0.5
0.5
0.0384
0.1340

x 0.500
x 1.100
x 1.100
x 2.100
x 2.100

x 2.893
x 2.893
x 2.893
x 2.893
x 2.893

x 2.400
x 2.400
x 2.100
^2
^2

Force
V
3.472
3.819
3.342
0.675

2.356

11.308

L.A.

Moment

1.350
0.733
0.367
1.1573

4.687
2.801
1.225
2.726

11.439

Lever arm

11.44

11.308

1.012

Eccentricity

1.012

0.80

0.212

allowable 'e' (b/6)

stresses

0.267 m
11.31
1.60

7.07

Maximum compressive stress

12.676 t/m2

Minimum compressive stress

1.459 t/m2

>

0.212

(1

(1

HENCE OK
x
1.60

0.212

0.794)

Taking Moments about (B)


Load
W1
W2
W3
W4
W5
Pv
Ph

Particulars

0.5
0.5

0.0384
0.1340

x 0.500
x 1.100
x 1.100
x 0.300
x 2.200
x 2.100
x 2.100

x 2.893
x 2.893
x 2.893
x 2.893
x 0.500
x 3.393
x 3.393

x 2.400
x 2.400
x 2.100
x 2.100
x 2.400
^2
^2
V

Force
V
3.472
3.819
3.342
1.823
2.64
0.929

L.A.

Moment

1.650
1.033
0.667
0.150
1.100
1.3573

5.729
3.946
2.228
0.273
2.904
4.398

19.478

3.240
16.024

Lever arm

19.48

16.024

1.216

Eccentricity

1.216

1.10

0.116

allowable 'e' (b/6)

=
stresses

0.367 m

>

0.116

(1

(1

16.024
2.20

7.284

Maximum compressive stress

9.579 t/m2

Minimum compressive stress

4.988 t/m2

HENCE OK
6

x
2.20

0.116 )

0.315 )

24

9.5 DESIGN OF SLOPED WING WALL AT THE JUNCTION OF HEAD WALL : D/s

(3-3)

464.121
W3
W4

W1

3.340

W2
0.30

1.2

0.5

0.5

0.3

460.781

1.7
B

W5

460.281
2.30

Taking Moments about (A)

Load
W1
W2
W3
Pv
Ph

Force
V
4.010
4.800
4.208
0.900

Particulars

0.5
0.5
0.0384
0.1340

0.500
1.200
1.200
2.1
2.1

3.340
3.340
3.340
3.340
3.340

2.4
2.4
2.1
^2
^2

3.139

13.918

L.A.

Moment

1.450
0.800
0.400
1.336

5.815
3.840
1.683
4.194

15.532

Lever arm

15.53

13.918

1.116

Eccentricity

1.116

0.85

0.266

allowable 'e' (b/6)

stresses

0.283 m
13.92
1.70

(1

8.19 x

Maximum compressive stress

15.872 t/m2

Minimum compressive stress

0.502 t/m2

>

0.266

(1

HENCE OK
x
1.700

0.266

0.939 )

Taking Moments about (B)


Load
W1
W2
W3
W4
W5
Pv
Ph

Force
V
4.008
4.810
4.208
2.104
2.76
1.189

Particulars

0.5
0.5

0.0384
0.1340

0.5
1.200
1.200
0.300
2.300
2.1
2.1

3.340
3.340
3.340
3.340
0.500
3.840
3.840

2.4
2.4
2.1
2.1
2.4
^2
^2

4.149

19.079

L.A.

Moment

1.750
1.100
0.700
0.150
1.150
1.536

7.014
5.291
2.946
0.316
3.174
6.373

25.114

Lever arm

25.11

19.079

1.316

Eccentricity

1.316

1.15

0.166

allowable 'e' (b/6)

stresses

=
=

0.383 m
19.079
2.30
8.295

Maximum compressive stress

11.894 t/m2

Minimum compressive stress

4.697 t/m2

>

0.166

(1

(1

HENCE OK

x
2.30
0.434 )

0.166 )

25

9.6 DESIGN OF WING WALL : D/S HORIZONTAL WING &RETURNS

(4-4 & 5-5 )

462.413
W3

W1
1.632

W4
0.3
0.5

W2
A

0.500

0.50

0.3

460.781

1
B

W5

460.281
1.600

Taking Moments about (A)


Load

Force

Particulars

W1

L.A.

Moment

0.500

1.632

2.4

1.960

0.750

1.470

W2

0.5

0.500

1.632

2.4

1.000

0.333

0.333

W3
Pv
Ph

0.5
0.0384
0.1340

0.500
2.1
2.1

1.632
1.632
1.632

2.1
^2
^2

0.857
0.215

0.167
0.653

0.143
0.489

0.749

4.032

2.435

Lever arm

2.44

4.032

0.604

Eccentricity

0.604

0.50

0.104

allowable 'e' (b/6)

>

0.104

stresses

(1

(1

0.167
4.032
1.000

4.03

Maximum compressive stress

6.549 t/m2

Minimum compressive stress

1.515 t/m2

HENCE OK
x
1.00

0.104

0.624 )

Taking Moments about (B)


Load
W1
W2
W3
W4
W5
Pv
Ph

Force
V
1.958
0.979
0.857
1.028
1.92
0.367

Particulars

0.5
0.5

0.0384
0.1340

0.5
0.500
0.500
0.300
1.600
2.1
2.1

1.632
1.632
1.632
1.632
0.500
2.132
2.132

2.4
2.4
2.1
2.1
2.4
^2
^2
V

L.A.

Moment

1.050
0.633
0.467
0.150
0.800
0.8528

2.056
0.620
0.400
0.154
1.536
1.091

1.279

7.109

5.857

Lever arm

5.86

7.109

0.824

Eccentricity

0.824

0.80

0.024

allowable 'e' (b/6)

stresses

0.267 m
7.109
1.60

>

0.024

(1

(1

4.443

Maximum compressive stress

4.842 t/m2

Minimum compressive stress

4.045 t/m2

HENCE OK
6

x
1.60

0.024 )

0.090 )

26

10. DESIGN OF HEADWALL


10.1 ENTRY & EXIT

464.971

W1

A
0.400

W2

0.2
1.50

1.990

1.30

600.035
462.981

462.581
For M 20 Grade Concrete
c
m
t

=
=
=

70 kg/cm2
13
1900 kg/cm2

k
j
R

=
=
=

0.324
0.892
10.115 kg/cm2

Pa

wh Ka

where Ka

Cos x Cos - Cos2 - Cos2


Cos + Cos2 - Cos2

As

26.56 and

Ka

0.894 x

0.894 x

(
(

30

0.894
0.894
0.673
1.115

+
)
)

0.80
0.80

0.75
0.75

0.54

To fix preliminary dimensions of the wall components:


i)
Width of base slab (b)
=
0.6
x
Height
=
0.6
x
2.390
=
1.434 say
1.50 m
ii)
Thickness of base slab :

0.4 m

iii)
Thickness of stem :
Clear height of the wall (H1) =
Earth pressure on the Stem =
P1 =

1.990
w H12

2.1

1.99

2
=

1.99
(surcharge due to traffic)

Ka

2
=

2.245

This acts at an angle of =


26.56
PH1 =
P1 . Cos
=
2.245
=
2.007
acting at H1/3 from slab top

0.54

t
to the horizontal
x
t

0.894

27

Bending moment at A
M

PH1

H1

/3

=
=
=

2.007
1.331
1.331
10.115
11.471

x
t-m
x
x
cm

1.99

/3

16

Providing

100000
100
<
HENCE OK

20 cm

30 mm

mm bars and a clear cover of


=
=

the effective thickness

Ast

=
=

Minimum reinforcement
required

200
162

1.331
0.892
x
4.848 cm2

=
=

16
=
=

Provide

30

mm bars ( A =
2.011
x
4.848
41.481 cm

16 mm bars@

30

100000
1900

x
16.2

0.12 % of bd
0.12
x
100
2.4 cm2

Spacing of

mm

20 x

100

2.011 cm2)
100

cm c/c

Check for shear:


Tv

=
=

V
2007

/ bd
/ 100

1.239
HENCE SAFE

<

x
Tc

16.2
=

2.397

Kg/cm2

28

Distribution Reinforcement:
=
=

0.12 % of bd
0.12
x
100
2.400 cm2

Area of reinforcement on each face =


=
2.400
2
Spacing of

1.2

0.503

100

cm2

0.503 cm2)
100

1.2
41.917 cm c/c

=
Provide

mm bars (A =

8
=

20 x

8 mm bars @

8 mm bars @
30
cm c/c.
(B)
8 mm bars @
30
cm c/c.
(c)

30

16
30

cm c/c.

mm bars@
cm c/c

(A)

150
150
1300
Main bars of the Barrel Slab

BAR BENDING SCHEDULE:


(m)
S.No.
1

Designation
A

Dia
16

Spacing
300

Length of bar
3230

No. of bars
15

Quantity
43.1

Total
Length
48.45

4240

14

23.7

59.36

1670.00

14

9.4

23.38

76.2 Kgs

131.19

1930

1300
2

300

4240

300

300

1070
300
Total

29

10.2. DESIGN OF HEADWALL( EXIT)


464.971
2:
1

0.75
W3

W1

A
0.400

0.2
1.00

0.4

464.221

W2

1.240

0.80

462.981

D
462.581

For M 20 Grade Concrete


c
m
t

=
=
=

70 kg/cm2
13
1900 kg/cm2

k
j
R

=
=
=

0.324
0.892
10.115 kg/cm2

Pa

wh Ka

where Ka

Cos x Cos - Cos2 - Cos2


Cos + Cos2 - Cos2

As

26.56 and

Ka

0.894 x

0.894 x

(
(

30

0.894
0.894
0.673
1.115

+
)
)

0.80
0.80

0.75
0.75

0.54

To fix preliminary dimensions of the wall components:


i)
Width of base slab (b)
=
0.6
x
Height
=
0.6
x
1.640
=
0.984 say
1.00 m
ii)
Thickness of base slab :

0.4 m

iii)
Thickness of stem :
Clear height of the wall (H1) =
Earth pressure on the Stem =
P1 =

1.240
w H12

1.2

2.1

2.44

2
=

2.44
(surcharge due to traffic)

Ka

2
=

3.376

This acts at an angle of =


26.56
PH1 =
P1 . Cos
=
3.376
=
3.018
acting at H1/3 from slab top

0.54

t
to the horizontal
x
t

0.894

32

Bending moment at A
M

PH1

H1

/3

=
=
=

3.018
2.455
2.455
10.115
15.579

x
t-m
x
x
cm

2.44

/3

But minimum of top width of head wall is taken as


Providing
the effective thickness

100000
100
<
20 cm
HENCE OK
200
mm

20 mm bars and a clear cover of


=
200
30
=
160
mm
Ast

2.455
0.892
x
9.053 cm2

=
Minimum reinforcement
required

=
=

Spacing of

20
=
=

Provide

16

100000
1900

20 x

mm bars ( A =
3.142
x
9.053
34.707 cm

20 mm bars@

10

0.12 % of bd
0.12
x
100
2.4 cm2

30 mm
-

30

100

3.142 cm2)
100

cm c/c

Check for shear:


Tv

=
=

V
3018

/ bd
/ 100

1.886
HENCE SAFE

<

Distribution Reinforcement:
=
=

0.12 % of bd
0.12
x
100
2.400 cm2

Area of reinforcement on each face =


=
2.400
2
Spacing of

8 mm bars (A =
0.503
x
1.2
=
41.917 cm c/c
8 mm bars @
Ld =

s / 4bd =

16
=

Kg/cm2

100

cm2

0.503 cm2)
100

30
45

3.132

20 x

1.2

Provide

x
Tc

cm c/c.
=

360 mm

33

8 mm bars @
30
cm c/c.
(B)
8 mm bars @
30
cm c/c.
(c)

20
30

mm bars@
cm c/c

(A)

150
150
800
Main bars of the Barrel Slab

BAR BENDING SCHEDULE:


(m)
S.No.
1

Designation
A

Dia
20

Spacing
300

Length of bar
1980

No. of bars
15

Quantity
26.4

Total
Length
29.7

4240

15.3

38.16

1670.00

15.03

1180

800
2

300

4240

300

300

1070
300
Total

47.7 Kgs

82.89

34

7525

12525
10.190

10.25

20.050
3500

6670

0.0

200

3500

2500

2925

3800

2925

6000

1500

-269718

276388

1.042
1.563
(U/s Sloped wing)

2:1
200

464.971

(D/s
1950

wing&return)

464.871

464.221
464.871

(U/s wing& Return)

464.971

462.576

464.221

462.981

40

DROP 1

1.200
463.021

Sealing
462.581

400 mm slab

598.980

464.121
462.981

400 mm slab
462.581

598.98

463.829
1.795
1.8
460.781
460.781
460.331

460.781
400 mm slab

400 mm slab

460.306

460.706

460.781
75 mm thick wearing coat

0.000
1
5:
0.

460.706
U/s

460.706

-459.300

460.306
460.156

0.45
459.281
down stream

1750

3.5

2223.3333333

3.5

3.5

7000

0.3

7947
3

3.5

1750

2223.3333

3500

20050

6670

Details of Inputs for Quantity Estimate of Under Tunnel

S.No
1
2
3
4
5
6
7
8
9
10
11
12
13

Code
CBW
CSSLOPE
CBL
FSL
TBL
GLACROSS
CA
MFD
SBLUS
SBLDS
TWBLS
TWBRS
BHEIGHT
BWIDTH
NOVENTS
THWCOAT
THTSLAB
THBSLAB
THSWALLS
THIWALLS

14
15
16
17
18
19
20
21

BLUC
BLUCB
TLB
TWB
THB
FILLET
USBTL
FLRLVL
LUSSPLAY
LUSTRAN
WUSTRAN
LDSTRAN
WDSTRAN
LDSSPLAY

Input Description
Canal Bed Width
Canal Side Slopes
CBL
FSL
TBL
G.L @ Crossing
Catchment area
Discharge by Dicken's Formula
Stream bed level at 20 m U/S
Stream bed level at 20 m D/S
Top width of Bank(L)
Top width of Bank(R)
Barrel
Height
Width
No. of Vents
Thickness of Wearing coat
UNDER EARTH BANK
Thickness of top slab
Thickness of bottom slab
Thickness of side walls
Thickness of intermediate walls
UNDER CANAL
Thickness of top slab
Thickness of bottom slab
Thickness of side walls
Thickness of intermediate walls
Barrel Length Under Canal
Barrel Length Under Bank
Total Length of the barrel
Total Width of the barrel
Total height of the barrel
Fillet
Under Side of Barrel top level
Floor level
Length of U/S Splayed
Length of U/S transition
Apron length of drop
Width of U/S transition
Length of D/S transition
Width of D/S transition
Length of D/S Splayed

=
=
=
=
=
=
=
=
=
=
=
=

Value
3.800
1.5 : 1
463.021
464.221
464.971
463.633
0.349
8.854
463.829
463.460
6.000
2.500

Unit
m
m
m
m
m
Km2
m3/s
m

=
=
=
=

1.800
3.500
1
0.075

m
m

=
=
=
=

0.400
0.400
0.300
0.000

m
m
m
m

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

0.400
0.400
0.300
0.000
3.800
16.250
20.050
4.100
2.675
0.150 x 0.150
462.581
460.781
3.913
3.500
3.500
7.000
6.670
6.168
6.802

m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m

22
23
24

HWLENTR
HWLEXIT
THHW
THHWEXIT
HHWENTR
HHWEXIT
FLTH
BCOURSE
SCOAT
THOL

Level of Head wall (Entry)


Level of Head wall (Exit)
Thickness of Headwall
Thickness of Headwall exit
25
Height of Head wall (Entry)
26
Height of Head wall (Exit)
27
Floor Thickness
28
Base Course
29
Sealing coat
30
Canal Lining
Thickness
Total Length U/s & D/s
31
Stream Lining
Thickness
Total Length U/s & D/s
SPW
Size of Profile walls
WPWUS width of Profile wall(U/s)
WPWDS width of Profile wall(D/s)
32
Drop Walls (First)
TWDROPFIRSTTop width of Drop wall
BWDROPFIRSTBottom width of Drop wall
DDROPFIRST Depth of Drop wall
USTHAPRNFIRST
Thickness of Apron(U/s)
USLAPRNFIRSTLength of Apron(U/s)
HDROPFIRST Height of the Drop wall
LVLAPRNFIRSTApron level
33
Sloped Wing Wall U/S @ Junction of HW
USSWWTL Top level of wall
USSWWFNL Foundation Level
USSWWFND Depth of Foundation
USSWWTHST Thickness of Wall (Straight portion)
USSWWTHSL Thickness of Wall (Sloped portion)
USSWWH Height of the wall
USSWWOS Offset to wall
USSWWBWFNBase width of foundation
USSWWL Length
34
Horizontal wing wall
USHWWTL Top level of wall
USHWWFNL Foundation Level
USHWWFND Depth of Foundation
USHWWTHST Thickness of Wall (Straight portion)
USHWWTHSL Thickness of Wall (Sloped portion)

=
=
=
=
=
=
=
=
=

464.971
464.971
0.200
0.200
1.990
1.990
0.500
0.150
0.040

m
m
m

=
=

0.100
15.000

=
=
=
=
=

0.100
10.000
0.450 x 0.450
9.084
9.432

m
m

=
=
=
=
=
=
=

0.200
1.200
0.500
0.450
3.500
1.524
460.781

m
m
m
m
m
m
m

=
=
=
=
=
=
=
=
=

464.871
460.206
0.500
0.500
1.600
4.165
0.300
2.700
-0.355

m
m
m
m
m
m
m
m
m

=
=
=
=
=

465.048
461.655
0.500
0.500
1.100

m
m
m
m
m

m
m
m
m
m

m
m

35

36

37

38

39
40

41

USHWWH Height of the wall


USHWWOS Offset to wall
USHWWBWFNBase width of foundation
USHWWL Length
Return wall
USRWTL Top level of wall
USRWFNL Foundation Level
USRWFND Depth of Foundation
USRWTHST Thickness of Wall (Straight portion)
USRWTHSL Thickness of Wall (Sloped portion)
USRWH
Height of the wall
USRWOS Offset to wall
USRWBWFN Base width of foundation
USRWL
Length
Sloped Wing Wall D/S @ Junction of HW
DSSWWTL Top level of wall
DSSWWFNL Foundation Level
DSSWWFND Depth of Foundation
DSSWWTHST Thickness of Wall (Straight portion)
DSSWWTHSL Thickness of Wall (Sloped portion)
DSSWWH Height of the wall
DSSWWOS Offset to wall
DSSWWBWFNBase width of foundation
DSSWWL Length
Horizontal wing on D/s
DSHWWL Length
DSHWWTL Top level of wall
DSHWWFNL Foundation Level
DSHWWTHST Thickness of Wall (Straight portion)
DSHWWTHSL Thickness of Wall (Sloped portion)
DSHWWH Height of the wall
DSHWWOS Offset to wall
DSHWWBWFNBase width of foundation
Return Wall D/S
DSRWL
Length
DSRWTL Top level of wall
DSRWFNL Foundation Level
DSRWTHST Thickness of Wall (Straight portion)
DSRWTHSL Thickness of Wall (Sloped portion)
DSRWH
Height of the wall
DSRWOS Offset to wall
DSRWBWFN Base width of foundation
DSCL
D/S Cut off level
DSCW
D/S Cut off width
RTH
300 mm Thick Revetment
USRL
Revetment Length(U/s)
Side length
USSL
DSRL
Revetment Length(D/s)

=
=
=
=

2.893
0.300
2.200
3.855

m
m
m
m

=
=
=
=
=
=
=
=
=

465.048
461.655
0.500
0.500
1.100
2.893
0.300
2.200
2.119

m
m
m
m
m
m
m
m
m

=
=
=
=
=
=
=
=
=

464.121
460.281
0.500
0.500
1.200
3.340
0.300
2.300
3.416

m
m
m
m
m
m
m
m
m

=
=
=
=
=
=
=
=

3.254
462.413
460.281
0.500
0.500
1.632
0.300
1.600

m
m
m
m
m
m
m
m

=
=
=
=
=
=
=
=
=
=
=
=

2.532
462.413
460.281
0.500
0.500
1.632
0.300
1.600
459.281
0.450
0.300
6.000

m
m
m
m
m
m
m
m
m
m
m
m

=
=

1.073
5.000

m
m

42

DSSL
Side length
TOL
Top of Lining
USMFL
MFL U/S
DSMFL
MFL D/S
QREQ
Discharge required
QDES
Discharge designed
CSLOUTER Canal side slope outer
BFALLca Bed fall of Canal
Nca
Value of rugosity for Canal
Vca
Velocity of canal
Vbarl
Velocity of Barrel
DFDSTRANS Depth of flow in ds transition
Ntc
Value of rugosity for Tail channel
Sstc
Side slopes for Tail channel
BFALLtc
Bed fall of Tail channel
Vtc
Velocity of Tail channel
USSWWHWSCmax
US Sloped wing wall at HW stress in concrete max
USSWWHWSCmin
US Sloped wing wall at HW stress in concrete min
USSWWHWSSmax
US Sloped wing wall at HW stress on soil max
USSWWHWSSmin
US Sloped wing wall at HW stress on soil min
USWWRWSCmax
US wing wall& return wall stress in concrete max
USWWRWSCmin
US wing wall& return wall stress in concrete min
USWWRWSSmax
US wing wall& return wall stress on soil max
USWWRWSSmin
US wing wall& return wall stress on soil min
DSSWWHWSCmax
DS Sloped wing wall at HW stress in concrete max
DSSWWHWSCmin
DS Sloped wing wall at HW stress in concrete min
DSSWWHWSSmax
DS Sloped wing wall at HW stress on soil max
DSSWWHWSSmin
DS Sloped wing wall at HW stress on soil min
DSW&RSCmaxDS wing & return stress in concrete max
DSW&RSCminDS wing & return stress in concrete min
DSW&RSSmaxDS wing & return stress on soil max
DSW&RSSmin DS wing & return stress on soil min
LUS_TRANS_SLOPE
LDS_TRANS_SLOPE
43
Barrel Reinforcement (Earth pressure)
Dia of
Spacing
Type
Nos
Bar(mm)
(mm)
1
2
3
4
5
6
7
8
9 (a)
9 (b)
10
12

12
12
12
12
16
12
12
16
12
12
10
10

240
300
240
300
300
240
240
300
150
150
250
200

68
55
68
55
55
68
68
55
109
109
140
82

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

1.942
464.821
464.648
462.013
4.090
4.250
2.0:1
1 in 6000.0
0.018
0.632
1.416
1.23
0.030
1.0:1
1080.000
0.971
19.960
0.417
15.515
4.938
12.676
1.459
9.579
4.988
15.872
0.502
11.894
4.697
6.549
1.515
4.842
4.045
0.333
0.200

=
=
=
=
=
=
=
=
=
=
=
=
=

256.284
207.289
179.822
89.027
368.514
256.284
179.822
230.321
272.742
272.742
1404.321
185.462
3902.631

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

=
=
=
=
=
=
=
=
=
=
=
=

48.996
48.996
34.378
21.043
48.996
41.458
29.089
21.043
65.058
65.058
283.827
62.301

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

Length of
Each bar(m)
4.240
4.240
2.975
1.821
4.240
4.240
2.975
2.650
2.815
2.815
16.25
3.664
Total

Barrel Reinforcement (Water pressure)


Type

Dia of
Bar(mm)

Spacing
(mm)

Nos

Length of
Each bar(m)

1
2
3
4
5
6
7
8
9 (a)
9 (b)
10
12

12
12
12
12
12
12
12
12
12
12
10
10

300
300
300
300
300
360
360
300
150
150
250
200

13
13
13
13
13
11
11
13
26
26
121
19

4.240
4.240
2.975
1.821
4.240
4.240
2.975
1.821
2.815
2.815
3.80
5.312

Total
44

a
b
c
45

a
b
c

Head wall reinforcement (At entry)


Dia of
Spacing
Type
Bar(mm)
(mm)
A
B
C

16
8
8

300
300
300

Head wall reinforcement (At exit)


Dia of
Spacing
Type
Bar(mm)
(mm)
A
B
C

16
8
8

300
300
300

Nos

Length (m)

15
14
14

3.23
4.24
1.670
Total

Nos

Length (m)

15
14
14

3.23
4.24
1.67
Total

Grand Total

770.240

Kg

=
=
=
=

76.563
23.451
9.237
109.250

Kg
Kg
Kg
Kg

=
=
=
=

76.563
23.451
9.237
109.250
4891.4
244.6
5.500

Kg
Kg
Kg
Kg

MT

DETAILED ESTIMATE OF UNDER TUNNEL AT Km.55.515


S.
No

Description

Excavation in all kinds of soil including boulders up to


0.30 m dia. for foundations of canal cross drainage
and other appurtenant structures and placing the
excavated stuff neatly in specified dump area or
disposing off the same as directed etc., complete with
initial lead upto50 m and initial lift up to 3 m.

Unit

Under Barrel
U/s
Transition floor on u/s
Wings at Junction of Head wall
Horizontal wing
Returns
Drop wall
Stream Profile wall
Canal Profile wall
D/S
Transitions D/S
Wings at Junction of Head wall
Horizontal Wings
Returns
Cut off wall
Stream Profile wall
Canal Profile wall
Total

No.

20.050

4.100

3.477

285.827

1
2
2
2
1
1
1

3.500
-0.355
3.855
2.119
5.250
0.450
0.450

5.250
2.700
2.200
2.200
1.500
9.084
9.650

3.573
3.623
2.174
2.174
2.024
0.450
0.450

65.654
-6.938
36.872
20.272
15.939
1.840
1.954

1
2
2
2
1
1
1

6.670
3.416
3.254
2.532
6.168
0.450
0.450

4.834
2.300
1.600
1.600
0.450
9.432
9.650

3.179
3.179
3.179
3.179
4.179
0.450
0.450

102.500
49.954
33.102
25.758
11.599
1.910
1.954
649.000

20.050

4.100

0.150

12.331
12.331

1
2
2
2

2.000
-0.355
3.855
2.119

5.250
2.700
2.200
2.200

0.450
0.500
0.500
0.500

4.725
-0.957
8.480
4.662

5.250

1.500

0.500

3.938

6.670
3.416

4.834
2.300

0.500
0.500

16.121
7.857

3.254
2.532

1.600
1.600

0.500
0.500

5.206
4.051

6.168

0.450

1.500

4.163

-0.355
3.855
2.119

1.300
1.050
1.050

4.165
2.893
2.893

-3.840
23.420
12.877

Cum

Providing and laying insitu vibrated M-10 ( 28 days


cube compressive strength not less than10 N / sq
mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for piers
and abutments including cost of all materials, labour,
machinery,form work, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing,
curing etc., complete with initial lead up to 50 m and
all lifts.
Base course
Cum

Qty

Providing and laying in situ vibrated M-15 ( 28 days


cube compressive strength not less than15 N / sq
mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates for
foundation filling including cost of all materials,
machinery, labour, form work,cleaning, batching,
mixing, placing in position, levelling, vibrating,
finishing, curing etc.,complete with initial lead upto 50
m and all lifts.
Foundation U/S
Transition for first drop
Wings at Junction of Head wall
Horizontal wing
Returns
Drop wall
Foundation D/s
Transitions Floor (D/s)
Wings at Junction of Head wall
Horizontal Wings
Returns
Cut off wall
Body wall
U/s
Wings at Junction of Head wall
Horizontal wing
Returns

2
2
2
1

2
2
2

S.
No

Description

No.

Qty

Drop wall (first)


Stream Profile walls

1
1

5.250
0.450

0.700
9.084

1.524
0.450

5.601
1.840

Canal Profile wall

0.450

9.650

0.450

1.954

d/s
Wings at Junction of Head wall
Horizontal Wings

2
2

3.416
3.254

1.100
0.750

3.340
1.632

25.101
7.966

2
1

2.532
0.450

0.750
9.432

1.632
0.450

6.198
1.910

0.450

9.650

0.450

1.954
144.000

Inside Barrel
Transition floor on U/s

1
1

20.050
3.500

3.500
5.250

0.075
0.075

5.263
1.378

Transitions D/s
Sealing coat in the Trough
Total

1
1

6.670
3.800

4.834
4.100

0.075
0.040

2.418
0.623

Returns
Stream Profile walls
Canal Profile wall
Total

Unit

Cum

Providing and laying insitu M- 20 ( 28 days cube


compressive strength not less than 20 N /sq.mm )
grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for
wearing coat including cost of all materials,
machinery, labour, form work,cleaning, batching,
mixing, placing in position in alternate panels,
levelling, compacting,finishing, curing, packing joints
with asphalt mortar etc., complete with initial lead
upto 50 m
Wearing Coat

Cum

10.000

Providing and laying in situ vibrated M-20 ( 28 days


cube compressive strength not less than20 N / sq
mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for deck
slab & kerb including cost of all materials,machinery,
labour, form work,scaffolding, cleaning, batching,
mixing, placing in position, levelling, vibrating,
finishing, curing etc., complete with initial lead upto
50 m and all lifts. ( Cement content : 300 kg / cum )
Head wall (entry)
Head wall (exit)
Box Under Canal

1
1

4.100
4.100

0.200
0.200

1.990
1.990

1.632
1.632

Side Walls
Base Slab under canal

2
1

3.800
3.800

0.300
3.500

2.675
0.400

6.099
5.320

Top Slab under canal


Box Under Bank

3.800

3.500

0.400

5.320

Side Walls
Base Slab under canal
Top Slab under canal
Total

2
1
1

16.250

0.300

2.675

26.081

16.250
16.250

3.500
3.500

0.400
0.400

22.750
I74

Cum

Providing, fabricating and placing in position MT


reinforcement steel bars for RCC works including
cleaning, straightening, cutting, bending, hooking,
lapping, welding wherever required,tying with1.25 mm
dia soft annealed steel wire, including cost of all
materials, machinery, labour etc.,complete with initial
lead upto 50 and all lifts.
Providing and filling murrum / gravely soil ( CNS soil )
for foundation or around pipes including breaking
clods, spreading in layers of 10 to 15 cm, watering,
compaction by earth masters to achieve density
control of not less than 95 percent etc., complete with
lead upto 50 m and all lifts.
cum
Providing and fixing 20 mm thick 150 mm depth
tarfelt expansion joint filler boards for cement
concrete lining of canal including cost of all materials,
labour etc., complete with all leads and lifts. Consider
100 m length of expansion joint.

69.000

5.500

423.669

S.
No

Description

No.

Qty

2
2

3.800
2.275

7.600
4.550
13.000

Horizontal

3.800

7.600

Verticals
Total

2.275

4.550
13.000

Horizontal
Verticals
Total
9

Unit

Rmt

Providing and fixing 100 mm dia perforated PVC


pipes 40 cm long for Weep holes including cost of all
materials, labour, drilling 8 mm dia holes etc.
complete with all leads and lifts. Consider 10 Nos 100
mm dia PVC pipes 40 cm long each

Rmt

ABSTRACT ESTIMATE OF UNDER TUNNEL AT Km.55.515


S.
No.

Description

Qty.

Unit

Rate

Amount
in LAKHS

Excavation in all kinds of soil including boulders up to


0.30 m dia. for foundations of canal cross drainage
and other appurtenant structures and placing the
excavated stuff neatly in specified dump area or
disposing off the same as directed etc., complete
with initial lead upto50 m and initial lift up to 3 m.
649.00

Cum

0.00

12.33

Cum

0.00

144.00

Cum

0.00

69.00

Cum

0.00

10.00

Cum

0.00

5.50

MTS

0.00

423.67

Cum

0.00

13.00

Rmt

0.00

Providing and laying insitu vibrated M-10 ( 28 days


cube compressive strength not less than10 N / sq
mm ) grade cement concrete using 40 mm down size
approved, clean, hard, graded aggregates for piers
and abutments including cost of all materials, labour,
machinery,form work, cleaning, batching, mixing,
placing in position, levelling, vibrating, finishing,
curing etc., complete with initial lead up to 50 m and
all lifts.
Providing and laying in situ vibrated M-15 ( 28 days
cube compressive strength not less than15 N / sq
mm ) grade cement concrete using 80 mm down size
approved, clean, hard, graded aggregates for
foundation filling including cost of all materials,
machinery, labour, form work,cleaning, batching,
mixing, placing in position, levelling, vibrating,
finishing, curing etc.,complete with initial lead upto 50
m and all lifts.

Providing and laying in situ vibrated M-20 ( 28 days


cube compressive strength not less than20 N / sq
mm ) grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for deck
slab & kerb including cost of all materials,machinery,
labour, form work,scaffolding, cleaning, batching,
mixing, placing in position, levelling, vibrating,
finishing, curing etc., complete with initial lead upto
50 m and all lifts. ( Cement content : 300 kg / cum )

Providing and laying insitu M- 20 ( 28 days cube


compressive strength not less than 20 N /sq.mm )
grade cement concrete using 20 mm down size
approved, clean, hard, graded aggregates for
wearing coat including cost of all materials,
machinery, labour, form work,cleaning, batching,
mixing, placing in position in alternate panels,
levelling, compacting,finishing, curing, packing joints
with asphalt mortar etc., complete with initial lead
upto 50 m

Providing, fabricating and placing in position


reinforcement steel bars for RCC works including
cleaning, straightening, cutting, bending, hooking,
lapping, welding wherever required,tying with1.25
mm dia soft annealed steel wire, including cost of all
materials, machinery, labour etc.,complete with initial
lead upto 50 and all lifts.

Providing and filling murrum / gravely soil ( CNS soil )


for foundation or around pipes including breaking
clods, spreading in layers of 10 to 15 cm, watering,
compaction by earth masters to achieve density
control of not less than 95 percent etc., complete with
lead upto 50 m and all lifts.

Providing and fixing 20 mm thick 150 mm depth


tarfelt expansion joint filler boards for cement
concrete lining of canal including cost of all materials,
labour etc., complete with all leads and lifts. Consider
100 m length of expansion joint.

Providing and fixing 100 mm dia perforated PVC


pipes 40 cm long for Weep holes including cost of all
materials, labour, drilling 8 mm dia holes etc.
complete with all leads and lifts. Consider 10 Nos
100 mm dia PVC pipes 40 cm long each
Total Amount in Crores

13.00

Rmt

0.00
0.000

1
2
Under Tunnel
FSD

Free board

4.090
3.800
1.200
0.750

Outer slopes

Width of Right bank

Width of Left bank

0.632
1.500
2.000
6.000
2.500 +463.021 +464.221 +464.971 +463.633
1
3.500
4
3.500 +462.013 25.550 +462.576 +462.013 0.200 +464.971 1.990
0.200 464.221
1.240 +464.871

Base width of foundation

Thickness of foundation

0.500
1.600
4.165
2.700
0.500
465.048
461.655 0.500 1.100 2.893 2.200 0.500
465.048
461.655

Base width of foundation

Thickness of foundation

1.100
2.893
2.200
0.500 464.121 460.281

Base width of foundation

Thickness of foundation

1.200
3.340
2.300
0.500
462.413

Base width of foundation

Thickness of foundation

0.500
0.500
1.632
1.600
0.500
462.413
460.281

Base width of foundation

Thickness of foundation

Transition Length

Transition Width

Splay length

Transition Length

Transition Width

0.500
1.632
1.600
0.500
3.500
7.000
3.913
6.670
6.168
6.675
0.200
1.200 1.524

Apron Length

0.450
3.500 0.550

Height

Apron thickness

1.600
1.524
0.950
4.500
0.300
0.300
10.485
9.653 0.000

D/s length

Profile walls
( 0.45 x 0.45)

U/s length

D/s

Protection works
( 5.0m length)

U/s

D/s

U/s Drop 2

U/s

U/s Drop 1

Apron Length

Bottom width

Top width

Apron thickness

Transitions D/s

Height

Bottom width

Transitions U/s

Top width

D/s Return wall

Splay length

Height of wall

0.500

Thickness of Wall (Sloped portion)

D/s Wing wall _ Horizontal

Thickness of Wall (Straight


portion)

Foundation level

Top level

Height of wall

460.281

Thickness of Wall (Sloped portion)

D/s Wing wall _ Sloped

Thickness of Wall (Straight


portion)

Foundation level

Top level

Height of wall

0.500

Thickness of Wall (Sloped portion)

U/s Return wall

Thickness of Wall (Straight


portion)

Foundation level

Top level

Height of wall

0.500

Thickness of Wall (Sloped portion)

U/s Wing wall_ Horizontal

Thickness of Wall (Straight


portion)

Foundation level

Top level

Thickness of foundation

Base width of foundation

Height of wall

Thickness of Wall (Sloped portion)

Thickness of Wall (Straight


portion)

U/s Wing wall _ Sloped

Foundation level

Top level

Height of wall

+460.206

Thickness of Wall (Sloped portion)

Head wall exit

Thickness of Wall (Straight


portion)

Foundation level

Top level

Height

Head wall entry

Top level

Thickness

Height

Barrel

Top level

Thickness

D/s MFL

U/s MFL

Length of barrel

MFL @ exit of barrel

Width of barrel

1.800 +462.581 +460.781 0.30 0.20 0.40 0.40

No of Fillets ( 0.15 x 0.15)

Bottom slab thickness

Stream Particulars

Top slab thickness

Internal wall thickness

External wall thickness

Sill level of barrel

Under side level of barrel

Height of barrel

Width of barrel

0.349 460.008 458.827 0.040 0.750 0.150

No of vents

Base coarse

Wearing coat

Sealing coat

SBL @ 20m D/s

SBL @ 20m U/s

C.A

GL

TBL

FSL

CBL

Side slopes

1 in 6000

Velocity

Bed Fall

Bed Width

82.493
Discharge

CHAINAGE

DESCRIPTION

S.NO

Hydraulic Particulars
Cut off wall
0.45 x 0.45

6.168