You are on page 1of 58

Beta Version

INSTRUCTIONS:
1.
2.
3.
4.
5.
6.
7.

Read carefully especially the instructions in the Data Capture Form.


Refer to the Revised BGPMS Manual for the descriptions of the indicators.
In the GENERAL INFORMATION Part, write NA if not applicable.
To ENTER the data, refer to BLUE TAB tagged as ENTRY.
To PRINT the final DCF, refer to GREEN TAB tagged as PRINT.
To VIEW the scoresheet refer to YELLOW TAB tagged as SCORE.
In the PERFORMANCE AREAS, Put an "X" in the chosen box. RULE: ONLY ON
For example,
1)

X YES

NO

2)

YES

X NO

3)

X YES

X NO

4)

X YES

X NO

X NA

5)

YES

X NO

X NA

6)

X YES

NO

X NA

ure Form.
the indicators.

SCORE.
x. RULE: ONLY ONE(1) "X" mark per indicator.

Republic of the Philippines

DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT

BARANGAY

GOVERNANCE

DATA

PERFORMANCE

MANAGEMENT

CAPTURE

FORM

SYSTEM ( B G P M S )

(DCF)

BARANGAY:
Year Under Review (Preceding Yea

2015

GENERAL

INFORMATION

Region:

VI

Congressional District:Lone

Province:

Iloilo

City/Municipality:

Iloilo City

POLITICAL INFORMATION
Legal Basis of Creation

No. of Registered Voters

Date of Ratification/Plebiscit

No. of Precincts:

PHYSICAL INFORMATION
Land Area (in hectares):
x URBAN
Barangay Category:
Land
(select what is appropriate)
Classification:
Major Economic
(select what is
appropriate)
Source:

RURAL
Upland

Lowland

Agricultural

Coastal

Fishing

Landlocked

Commercial

Industrial

FISCAL INFORMATION
Total Income:
A. External Sources
Internal Revenue Allotment (IRA)

Php

Others ( share from Natl Wealth, share from E-VAT, subsidy,Php


etc)
B. Local Sources

RPT Share

Php

Fees & Charges

Php

Others

Php

Total Income

Php

DEMOGRAPHIC INFORMATION
Population:

Total No.

Source:

NSO

No. of Female:

No. of Male:

No. of Families :

No. of Labor Force:

No. of Households:

No. of Unemployed:

RBI

CBMS

Year captured:

BASIC UTILITIES/SERVICES
Largest Power Supply Distributor:

Meralco

Electric Cooperative

Renewable Energy (Solar/Wind)

Major Water Supply Level of Households:


One (water supplied by wells/spring in the barangay)Number of Households with access
to potable water supply:
Two (water supplied by public water faucets)
Three (water supplied through water faucets in individual households)
Existing Means of Transportation:

(select more than one)

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

Bus

Jeep

Taxi

Tricycle

Existing Means of Communication:

Private Vehicle

Motorcycle

(select more than one)Telephone

Horse/Carabao Banca

Mobile Phone

AWARDS/RECOGNITION RECEIVED BY THE BARANGAY OR BARANGAY OFFICIALS DURING THE YEAR UNDER REVIEW
(Pls specify title):

National Level
Regional Level
Local Level

I. Performance Area
Service Area 1.1

ADMINISTRATION

Barangay Legislation

1.1.1 Formulated/Adopted Sangguniang Barangay Internal Rules of Procedure (Yes

No

1.1.2 Implemented Sangguniang Barangay Internal Rules of Procedure (IRP)

Yes

No

1.1.3 Complied with the minimum required number of Regular Sessions


(twice a month or 24 times a year)

Yes

No

1.1.3.1

If NO, indicate below the number of sessions completed in the preceding year:

(Select only one)

20-23 sessions

12-15 sessions

16-19 sessions

11 and below sessions

1.1.4 Enacted General/Regulatory Ordinances in the preceding year

Yes

No

1.1.5 Passed Program-Related Resolutions in the preceding year


If YES, indicate number of Program-Related Resolutions passed:

Yes

No

Yes

No

More than 10

4-6

7 - 10

1-3

1.1.6 Approved Annual Budget for the Ensuing Fiscal Year


Within the Budget Calendar
1.1.7 Implemented Legislative Tracking or Monitoring System

(Manual/Computer-based)
Yes

1.1.8 Designated a Session Hall inside the Barangay Hall

Yes

No
No

1.1.9 Presence of Furniture, Fixtures, Equipment and the Minutes of Meeting in the session hall:
1.1.9.1Conference table

Yes

No

1.1.9.2Chairs

Yes

No

1.1.9.3Gavel

Yes

No

1.1.9.4Existing Records of Minutes of Meeting

Yes

No

Yes

No

Service Area 1.2 Transparency


1.2.1 Submitted Annual Report not later than March 31 of the ensuing year

If NO, select between the two choices


submitted Annual Report later than March 31 no submission given
1.2.2 Reported Semestral Accomplishments during Barangay Assembly Day ( Yes

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

No

of the preceding year

If NO, select the frequency of Semestral Accomplishments reported during BAD:


once

none

1.2.3 Posted Itemized Monthly Collections & Disbursement of the preceding yeYes
in Conspicuous Places

No

1.2.4 Posted Annual Summary of Income & Expenditures of the preceding yearYes
in Conspicuous Places

No

1.2.5 Posted Barangay Ordinances & Resolutions of the preceding year


in at least three (3) Conspicuous Places

Yes

No

Yes

No

Service Area 1.3 Citizen's Participation


1.3.1 Held Barangay Assemblies at least twice (2) a year

If NO, select the number of Barangay Assemblies held in the preceding year
once

none

1.3.2 Conducted Katipunan ng Kabataan (KK) Assembly at least once evYes


No
NA
three months
If NO, select the number of KK Assembly conducted in the preceding year
three

two

one

none

1.3.3 Inclusion of Civil Society Organization (CSO)/PO Representative as MembYes


in the following:

No

1.3.3.1Barangay Development Council (not less than 1/4 of the council)Yes

No

1.3.3.2Barangay Disaster Risk Reduction Management Committee

Yes

No

1.3.3.3Barangay Peace and Order Committee

Yes

No

1.3.3.4Barangay Council for the Protection of Children

Yes

No

1.3.4 Organized Community Service Volunteers

Yes

No

1.3.5 Implemented Programs/Projects with CSOs/POs, if any

Yes

No

Yes

No

Service Area 1.4 Development Planning


1.4.1 Organized Barangay Development Council (BDC)

1.4.2 Conducted BDC meetings at least once every six months


Yes
No
If NO, select the number of BDC meeting conducted in the preceding year
once

none

1.4.3 Implemented the Barangay Development Plan (BDP)

Yes

No

1.4.4 Integrated the following sectoral concerns into the BDP:


1.4.4.1Differently-Abled Persons

Yes

No

1.4.4.2Senior Citizens

Yes

No

1.4.4.3Children

Yes

No

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

1.4.4.4Gender & Development

Yes

No

1.4.5 Formulated Annual Investment Program of the preceding year

Yes

No

1.4.6 Created BDC Executive Committee

Yes

No

1.4.7 Adopted measures/plans to prevent and control the proliferation of


informal settlers and mendicants in the barangay.

Yes

No

1.5.1 Enacted Barangay Tax Ordinance with public hearing in the preceding yeYes

No

1.5.2 Conducted Barangay Fund Raising Activity

Yes

No

1.5.3 Generated Income from Barangay Economic Enterprise(s)

Yes

No

1.5.4 Updated the Barangay Revenue Code

Yes

No

1.5.5 Implemented Financial Management System following


Commission On Audit (COA) Standards

Yes

No

1.6.1.1Not more than 55% of the Local Sources allocated for Personal S Yes

No

1.6.1.2At least 20% ofthe IRA allocated for Development Fund

Yes

No

1.6.1.35% of the Regular Income allocated for Calamity/DRRM Fund

Yes

No

1.6.1.410% of General Fund allocated for Sangguniang Kabataan

Yes

No

1.6.1.55% of the General Fund allocated for Gender and Development Yes

No

1.6.1.61% of the IRA allocated for Barangay Council for the


Protection of Children (BCPC)

Yes

No

1.6.1.71% allocated for Senior Citizens and Differently-Abled Persons

Yes

No

1.4.8 Developed/Updated the following Data:


1.4.8.1Registry of Barangay Inhabitants

Yes

No

1.4.8.2Socio-Economic Profile

Yes

No

Service Area 1.5 Revenue Generation

Service Area 1.6Revenue Allocation and Utilization


1.6.1 Allocated/Utilized fund in the preceding year for the following:

1.6.2 Allocated/Utilized fund more than the minimum requirement Yes


as per RA 7160 in the preceding year for the following:

No

NA

(If answer above is No or NA, no need to answer 1.6.2.1 to 1.6.2.6)

1.6.2.1More than 20% of the IRA utilized for Development Fund

Yes

No

1.6.2.2More than 5% of the Regular Income utilized for Calamity/BDRRM Yes

No

1.6.2.3More than 10% of the Regular Fund utilized for Sangguniang KabaYes

No

1.6.2.4More than 5% of the General Fund utilized for Gender & DevelopmYes

No

1.6.2.5More than 1% of the IRA utilized for BCPC

Yes

No

1.6.2.6More than 1% utilized for Senior Citizens and/or Differently Abled Yes

No

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

Service Area 1.7

Financial Accountability

1.7.1 Prepared Certified Statement of Actual Income & Expenditures


of the preceding year

Yes

No

1.7.2 Organized a Barangay Bids and Awards Committee (BAC)

Yes

No

1.7.3 Formulated Annual Procurement Plan using National Government


Accounting Systems (NGAS)

Yes

No

1.7.4 Prepared Annual Inventory of Barangay Assets using NGAS

Yes

No

1.7.5 Prepared Barangay Financial Report using NGAS

Yes

No

1.7.6 Prepared Barangay Disbursement Report using NGAS

Yes

No

Service Area 1.8Facilities and Customer Service


1.8.1 Presence of Barangay Hall with the following Administrative Requirements:
1.8.1.1Barangay Seal displayed

Yes

No

1.8.1.2Philippine Flag in the Barangay Hall premises

Yes

No

1.8.1.3Picture of Incumbent President displayed in the office

Yes

No

1.8.1.4Organizational Chart displayed in the Barangay Hall

Yes

No

1.8.1.5List of Directory of Barangay Based Institutions (BBIs) Yes


posted

No

1.8.1.6Barangay Map posted

No

Yes

1.8.2 Presence of Functional Properties and Equipment in the Barangay Hall as Support
to the Operations of the Barangay:
1.8.2.1Office Equipment
1.8.2.1.Typewriter/Computer
Yes No
###
1.8.2.2Communication Facilities
1.8.2.2.Internet Connection
Yes No
NA
###
1.8.2.2.Telephone
Yes No
NA
1.8.2.2.Fax Machine

Yes

No

1.8.2.2.Mobile Phone/Hand-Held Radio


Yes
1.8.2.3Transportation Facilities
1.8.2.3.Patrol Vehicle/Service Vehicle/Ambulance Yes

No

1.8.2.4Emergency Equipment
1.8.2.4.Generator

Yes

NA

No

NA

No

NA

1.8.3 Established Barangay Public Information Desk

Yes

No

1.8.4 Implemented the Citizen's Charter

Yes

No

1.8.4.1Created Barangay Task Force through an EO to develop

Yes

No

and monitor the implementation of the Charter


1.8.4.2Enacted barangay ordinance for the adoption and
implementation of the Charter

Yes

No

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

1.8.4.3Posted in conspicuous places

Yes

No

1.8.4.4Printed the Citizen's Charter

Yes

No

1.8.4.5Established a Feeback Mechanism

Yes

No

1.8.5 Facilitated the issuance of Barangay Clearance in compliance based on Yes


provisions on timeliness in the Citizen Charter of the concerned barangay

No

1.8.6 Facilitated the issuance of Barangay Certification based on the provision Yes
on timeliness in the Citizen Charter of the concerned barangay

No

Serivce Area 1.9


Human Resource Management and Development
1.9.1 Filled-up Mandatory Appointive Positions in the preceding year
1.9.1.1Barangay Treasurer

Yes

No

1.9.1.2Barangay Secretary

Yes

No

1.9.2 Filled-up Other Appointive Positions in the preceding year


1.9.2.1Tanod Members

Yes

No

1.9.2.2Barangay Nutrition Scholar (BNS)

Yes

No

1.9.2.3Barangay Health Worker (BHW)

Yes

No

1.9.2.4Barangay Day Care Worker (BDCW)

Yes

No

1.9.3 Attendance to Training of the following Barangay Officials


to capacitate their specific roles and functions
1.9.3.1Disaster Risk Reduction and Management (DRRM)
and Climate Change Adaptation (CCA)
Training of Barangay Officials

Yes

No

1.9.3.2Barangay Newly-Elected Officials(BNEO)


Training of Punong Barangay

Yes

No

NA

1.9.3.3BNEO Training of the Sangguniang Barangay(SB) MembersYes

No

NA

1.9.3.4Legislative Orientation of PB and SB Members

Yes

No

1.9.3.5Records Management Training of Barangay Secretary

Yes

No

1.9.3.6NGAS Training of Barangay Treasurer

Yes

No

1.9.3.7Leadership Training of Sangguniang Kabataan

Yes

No

1.9.3.8Skills Training on Katarungang Pambarangay(KP) of


Lupong Tagapamayapa

Yes

No

Yes
1.9.3.9Skills Training of Barangay Tanods
###
1.9.3.1Skills Enhancement Training of Barangay Health Workers Yes

No

1.9.3.1Skills Enhancement Training of Barangay Nutrition Scholar Yes

No

Yes

No

1.9.3.1Skills Training of Barangay Human Rights Action Officer


(BHRAO)

II. Performance Area

SOCIAL

NA

No

SERVICES

Service Area 2.1 Health and Nutrition

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

10

2.1.1 Presence of the following Health and Nutrition Program Implementers


Yes No
2.1.1.1Barangay Nutrition Scholar (BNS)
Yes

No

2.1.2.1Botika ng Barangay

Yes

No

NA

2.1.2.2Public Comfort Room/Toilet

Yes

No

NA

2.1.2.3Communal (gulayan/herbal) Garden

Yes

No

NA

2.1.2.4Potable Water Supply System

Yes

No

2.1.1.2Barangay Health Workers (BHWs)


2.1.2 Presence of Health and Nutrition Facilities

2.1.2.5Barangay Health Station/Center

Yes

No

NA

2.1.2.6Barangay-Owned Potable Water Supply System

Yes

No

NA

2.1.3 Advocated on Health and Nutrition Programs:


2.1.3.1Operation Timbang

Yes

No

2.1.3.2Oplan Food Supplementation

Yes

No

2.1.3.3Dissemination of IEC materials


regarding Dengue, Rabies, etc

Yes

No

Yes
2.1.3.4Orientation regarding
Expanded Program on Immunization (EPI)

No

2.1.3.5"4S" for Dengue Prevention

Yes

No

2.1.3.6Senior Citizen Program

Yes

No

Service Area 2.2

Education, Culture and Sports

2.2.1 Established Education/Information Facilities


2.2.1.1Day Care Center

Yes

No

If more than one (1) Day Care Center, please indicate n


2.2.1.2Information, Learning, and Reading Center Yes

No

If more than one (1) Reading Center, please indicate n


2.2.2 Implemented Education Program
Yes

No

2.2.2.2Alternative Learning System (ALS) Program Yes

No

2.2.2.1Barangay Day Care Program

NA

2.2.3 Conducted Linggo ng Kabataan

Yes

No

2.2.4 Conducted Cultural and Sports Activities

Yes

No

Service Area 2.3 Women and Children


2.3.1 Organized Functional Barangay Council for the Protection of Children
2.3.1.1Enacted Barangay Executive Order(EO)
organizing BCPC

Yes

No

2.3.1.2Formulated Work and Financial Plan

Yes

No

on Women and Children

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

11

2.3.1.3Conducted quarterly council meetings

Yes

No

If Yes, indicate number of meetings


4 or more meetings

2 meetings

3 meetings

1 meeting

2.3.2 Implemented Republic Act No. 9262, or "Anti-Violence Against Women


and Their Children Act of 2004"
2.3.2.1Established Violence Against Women (VAW) Desk
Yes
No
2.3.2.2Recorded and referred cases of Violence Against
Women and their Children to either LSWDO,
PNP, Court, or Health Office

Yes

No

NA

2.3.2.3Issued Barangay Protection Order(BPO)

Yes

No

NA

2.3.2.4Conducted Information, Education, and


Communication(IEC) campaigns

Yes

No

Yes

No

2.3.3.2Maintained and updated list of registered Kasambaha Yes

No

2.3.3.3Maintained and updated list of registered KasambahayYes


PhilHealth, SSS & Pagibig

No

Yes

No

2.3.3 Implemented Republic Act No. 10361, "Batas Kasambahay"


2.3.3.1Established Kasambahay Desk

2.3.3.4Submitted monthly report to Public Employment


Service Office (PESO)

2.3.4 Implemented Republic Act No. 9344 or "Juvenile Justice Welfare Act" as amended by RA 10630
2.3.4.1Implemented community-based intervention programs for ChildrYes
In Conflict with the Law (CICL) and Children At Risk (CAR)

No

Service Area 2.4


Public Safety and Disaster Risk Reduction Management
2.4.1 Organized Barangay Peace and Order Committee (BPOC)
2.4.1.1Enacted Brgy. Executive Order(EO) organizing BP Yes

No

2.4.1.2Formulated Barangay Public Safety Plan

Yes

No

2.4.1.3Implemented Barangay Public Safety Plan

Yes

No

2.4.1.4Conducted regular monthly committee meetings Yes

No

if NO, indicate number of meetings


9 - 11 meetings

3 - 5 meetings

6 - 8 meetings

1 - 2 meetings

2.4.2 Established Barangay Disaster Risk Reduction and Management(BDRRM) Evacuation Cente
2.4.2.1Enacted Executive Order organizing BDRRMC Yes

No

2.4.2.2Presence of BDRRM Plan

Yes

No

2.4.2.3Presence of Contingency Plan

Yes

No

2.4.2.4Implemented BDRRM Plan

Yes

No

2.4.3 Presence of Functional Disaster Equipment

Yes

No

(If answer above is No, no need to answer 2.4.3.1 to 2.4.3.12)

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

12

2.4.3.1Hazard
Map
3.3.1.2
2.4.3.2Early Warning Devices

Yes

No

Yes

No

2.4.3.3First Aid Kit

Yes

No

2.4.3.4Hand-Held Radio

Yes

No

2.4.3.5Mobile
Phones
3.3.1.5
2.4.3.6Rescue vehicle (banca/raft/truck/others)

Yes

No

Yes

No

2.4.3.7Transistor Radio

Yes

No

2.4.3.8Mega Phone

Yes

No

2.4.3.9Flashlight

Yes

No

2.4.3.1Television

Yes

No

2.4.3.1Fire Extinguisher

Yes

No

2.4.3.1Generator

Yes

No

2.4.4.1Enacted Barangay EO organizing BADAC

Yes

No

2.4.4.2Conducted councils' meetings

Yes

No

2.4.4.3Implemented policies to counter drug abuse

Yes

No

2.4.5.1Constituted ten (10) to twenty (20) members Yes


of the Lupong Tagapamayapa

No

2.4.5.2Conducted Lupon meetings at least once a moYes

No

2.4.4 Organized Barangay Anti-Drug Abuse Council (BADAC)

2.4.5 Implemented the Katarungang Pambarangay (KP) Law

If YES, indicate the number of meetings


(Select only one)

12 or more

6 to 8

9 to 11

1 to 5
Yes

2.4.5.3Acted/Referred disputes filed


2.4.5.3.1Number of disputes fil

No

###

2.4.5.3.2Number of disputes settle


2.4.5.3.3Rate of Dispute Resolution Effici

(2.4.5.3.2 divided by 2.4.5.3.1 x = ###

2.4.6 Designated Barangay Human Rights Action Officer (BHRAO)

Yes

No

2.4.7 Barangay Tanod conducted Regular Ronda or Foot Patrol

Yes

No

No

NA

If YES, indicate number of tanods


2.4.8 Implemented Street Lighting/Illumination Project in the preceding Yes

III. Performance Area E C O N O M I C

DEVELOPMENT

Service Area 3.1 Agriculture and Fisheries Development


3.1.1 Presence of Barangay Agricultural Support Services

Yes

No

NA

(If answer above is No or NA, no need to answer 3.1.1.1 to 3.1.1.4)

3.1.1.1Thresher and other post-harvest equipment

Yes

No

3.1.1.2Multi-purpose pavement

Yes

No

3.1.1.3Planting materials distribution system

Yes

No

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

13

Yes

3.1.1.4Farm product collection and buying stations

No

3.1.2 Organized Barangay Fisheries and Aquatic Resource


Management Committee (BFARMC)

Yes

No

NA

No

NA

(If answer above is No or NA, no need to answer 3.1.3.1 to 3.1.3.2)

3.1.3.1Implemented Barangay Fisheries Development Pro Yes

No

Yes

No

3.1.3.2Installed communal or backyard fishponds

3.1.3 Maintained Farm-to-Market Roads and Bridges / Access to Core Road Yes

Service Area 3.2


Entrepreneurship, Business and Industry Promotion
3.2.1 Presence of Major Barangay Economic Enterprises

Yes

No

(If answer above is No, no need to answer 3.2.1.1 to 3.2.1.4)

3.2.1.1Flea or Satellite Market (Talipapa)

Yes

No

NA

3.2.1.2Water Works

Yes

No

NA

3.2.1.3Wharf

Yes

No

NA

3.2.1.4Others

Yes

No

3.2.2 Established Barangay Livelihood Program (e.g. soap making, candle makYes
chocolate making, etc)

No

3.2.3 Registered Barangay Micro Business Enterprise (BMBE) in the BMBE RegiYes

No

3.2.4 Presence of support programs to promote cooperativism

No

Yes

3.2.5 Presence of support programs on job and employment creation


Yes
No
(i.e. job for cash for work, emergency employment generation program, etc)

IV. Performance AreaE

NVIRONMENTAL

MANAGEMENT

Service Area 4.1Natural Resource Management


4.1.1 Implemented Clean and Green Program in the Barangay

Yes

No

(If answer above is No, no need to answer 4.1.1.1 to 4.1.1.3)

4.1.1.1Conducted Clean and Green Activities

Yes

No

4.1.1.2Organized Green Brigade or related activities

Yes

No

4.1.1.3Conducted Tree Planting and Preservation ActivitiesYes


Urban Greening

No

4.1.2 Support to Conservation Program (i.e. mangrove preservation,


artificial reef, fish sanctuary, forest conservation, etc)

Yes

No

4.2.1 Organized Barangay Ecological Solid Waste Management CommitteeYes

No

NA

Service Area 4.2Waste Management and Pollution Control

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

14

4.2.2 Enacted Ordinances/Resolutions on Solid Waste Management

Yes

No

4.2.3 Formulated Barangay Solid Waste Management Action Plan

Yes

No

4.2.4 Implemented Waste Segregation and Volume Control

Yes

No

4.2.5 Implemented Garbage Collection Scheme

Yes

No

4.2.6 Presence of Materials Recovery Facility in the Barangay

Yes

No

4.2.7 Maintained Sewerage/Drainage Canal

Yes

No

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

NA

15

PMS)

Industrial

(Solar/Wind)

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

16

REVIEW

##
###

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

17

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

18

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

19

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

20

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

21

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

22

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

23

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

24

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

25

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

26

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

27

REMARKS

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

28

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

29

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

30

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

31

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

32

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

33

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

34

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

35

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

36

DILG/NBOO/CAPDD/BGPMS' DCF Ver. 1.1 cy2014

37

Republic of the Philippines

FINAL COPY

DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT

BARANGAY

GOVERNANCE

PERFORMANCE

DATA

MANAGEMENT

CAPTURE

FORM

SYSTEM ( B G P M S )

(DCF)

BARANGAY:
Year Under Review (Preceding Yea

2015

GENERAL

INFORMATION

Region:

VI

Congressional District:LONE

Province:

ILOILO

City/Municipality:

ILOILO CITY

POLITICAL INFORMATION
Legal Basis of Creation

No. of Registered Voters0

Date of Ratification/Plebiscit December 30, 1899

No. of Precincts:

PHYSICAL INFORMATION
Land Area (in hectares):
Barangay Category:

X URBAN

Land Classification:

RURAL

Upland

Major Economic Source:

Lowland

Agricultural

Coastal

Fishing

Landlocked

Commercial

Industrial

FISCAL INFORMATION
Total Income:
A. External Sources
Internal Revenue Allotment (IRA)

Php
##
Others (share from Natl Wealth, share from E-VAT, subsidy,Php
etc)

B. Local Sources

RPT Share

Php

Fees & Charges


Others
Others

Php
Php

Php

Total Income
DEMOGRAPHIC INFORMATION
Population:

Total No.

Source:

NSO

RBI

No. of Female:

No. of Male:

No. of Families :

No. of Labor Force:

No. of Households:

No. of Unemployed:

CBMS

Year captured:

BASIC UTILITIES/SERVICES
Largest Power Supply Distributor:

Meralco

Electric Cooperative

Renewable Energy (Solar/Wind)

Major Water Supply Level of Households:


One (water supplied by wells/spring in the barangay)Number of Households with
access to potable water supply:
Two (water supplied by public water faucets)

Three (water supplied through water faucets in individual households)


Existing Means of Transportation:
Bus

Jeep

Taxi

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

(select more than one)

Tricycle

Private Vehicle

Motorcycle

Horse/Carabao Banca
38

Existing Means of Communication:

(select more than one)Telephone

Mobile Phone

AWARDS/RECOGNITION RECEIVED BY THE BARANGAY OR BARANGAY OFFICIALS DURING THE YEAR UNDER REVIEW
(Pls specify title):

National Level
Regional Level
Local Level

I. Performance Area
Service Area 1.1

ADMINISTRATION

Point Score Service


Area
SubIndica Averag
Indicat
tors
e
ors

Barangay Legislation

1.1.1 Formulated/Adopted Sangguniang Barangay Internal Rules of Procedure Yes

No

1.1.2 Implemented Sangguniang Barangay Internal Rules of Procedure (IRP)

Yes

No

1.1.3 Complied with the minimum required number of Regular Sessions


(twice a month or 24 times a year)

Yes

No

0.00

1.1.3.1

If NO, indicate below the number of sessions completed in the preceding year:

(Select only one)

20-23 sessions

12-15 sessions

16-19 sessions

11 and below sessions

1.1.4 Enacted General/Regulatory Ordinances in the preceding year

Yes

No

1.1.5 Passed Program-Related Resolutions in the preceding year


Yes
If YES, indicate the number of Program-Related Resolutions passed:

No

0.00

More than 10

4-6

7 - 10

1-3

1.1.6 Approved Annual Budget for the Ensuing Fiscal Year


Within the Budget Calendar

Yes

1.1.7 Implemented Legislative Tracking or Monitoring System

(Manual/Computer-based)
Yes

1.1.8 Designated Session Hall inside the Barangay Hall

Yes

0.00

No

No

No

1.1.9 Presence of Furniture, Fixtures, Equipment and the Minutes of Meeting in the session hall: 0.00
1.1.9.1Conference table

Yes

No

1.1.9.2Chairs

Yes

No

1.1.9.3Gavel

Yes

No

1.1.9.4Existing Records of Minutes of Meeting

Yes

No

Total Point Score 0.00


Point Score Service
Area
SubIndica
Indicat
Averag
tors
ors
e

Service Area 1.2 Transparency


1.2.1 Submitted Annual Report not later than March 31 of the ensuing year

Yes

No

0.00

No

0.00

If NO, select between the two choices


submitted Annual Report later than March 31 no submission given
1.2.2 Reported Semestral Accomplishments during Barangay Assembly Day Yes
of the preceding year

If NO, select the frequency of Semestral Accomplishments reported during BAD:


0.00
DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

39

once

none

0.00
Yes

No

1.2.4 Posted Annual Summary of Income & Expenditures of the preceding ye Yes
in Conspicuous Places

No

1.2.5 Posted Barangay Ordinances & Resolutions of the preceding year


in at least three (3) Conspicuous Places

No

1.2.3 Posted Itemized Monthly Collections & Disbursement of the preceding


in Conspicuous Places

Yes

Total Point Score 0.00


Point Score Service
Area
SubIndica
Indicat
Averag
tors
ors
e

Service Area 1.3 Citizen's Participation


1.3.1 Held Barangay Assemblies at least twice (2) a year

Yes

0.00

No

If NO, select the number of Barangay Assemblies held in the preceding year
once

none
0.00

1.3.2 Conducted Katipunan ng Kabataan (KK) Assembly at least once e Yes


No
NA
three months
If NO, select the number of KK Assembly conducted in the preceding year
three

two

one

none

1.3.3 Inclusion of Civil Society Organization (CSO)/PO Representative as Me


in the following:

0.00

Yes

No

1.3.3.1Barangay Development Council (not less than 1/4 of the counci Yes

1.3.3.2Barangay Disaster Risk Reduction Management Committee

Yes

. No
No

1.3.3.3Barangay Peace and Order Committee

Yes

No

1.3.3.4Barangay Council for the Protection of Children

Yes

No

1.3.4 Organized Community Service Volunteers

Yes

No

1.3.5 Implemented Programs/Projects with CSOs/POs, if any

Yes

No

###

Total Point Score 0.00


Point Score Service
Area
SubIndica
Indicat
tors Averag
ors
e

Service Area 1.4 Development Planning


No

1.4.2 Conducted BDC meetings at least once every six months


Yes
No
If NO, select the number of BDC meeting conducted in the preceding year

1.4.1 Organized Barangay Development Council (BDC)

once

Yes

none

1.4.3 Implemented the Barangay Development Plan (BDP)

Yes

No

1.4.4 Integrated the following sectoral concerns into the BDP:

0.00

1.4.4.1Differently-Abled Persons

Yes

No

1.4.4.2Senior Citizens

Yes

No

1.4.4.3Children

Yes

No

1.4.4.4Gender & Development

Yes

No

1.4.5 Formulated Annual Investment Program of the preceding year


DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

Yes

No

0.00
0

40

1.4.6 Created BDC Executive Committee

Yes

No

1.4.7 Adopted measures/plans to prevent and control the proliferation of


informal settlers and mendicants in the barangay.

Yes

No

1.4.8 Developed/Updated the following Data:

0.00

1.4.8.1Registry of Barangay Inhabitants

Yes

No

1.4.8.2Socio-Economic Profile

Yes

No

0
Total Point Score 0.00

Point Score Service


Area
SubIndica Averag
Indicat
tors
e
ors

Service Area 1.5 Revenue Generation


1.5.1 Enacted Barangay Tax Ordinance with public hearing in the preceding

Yes

No

1.5.2 Conducted Barangay Fund Raising Activity

Yes

No

1.5.3 Generated Income from Barangay Economic Enterprise(s)

Yes

No

1.5.4 Updated the Barangay Revenue Code

Yes

No

1.5.5 Implemented Financial Management System following


Commission On Audit (COA) Standards

Yes

No

0.00

Total Point Score 0.00

Point Score Service


Area
SubIndica Averag
Indicat
tors
ors
e

Service Area 1.6Revenue Allocation and Utilization


1.6.1 Allocated/Utilized fund in the preceding year for the following:
1.6.1.1Not more than 55% of the Local Sources allocated for Personal Yes

No

1.6.1.2at least 20% of the IRA allocated for Development Fund

Yes

No

1.6.1.35% of the Regular Income allocated for Calamity/BDRRM Fund

Yes

No

1.6.1.410% of General Fund allocated for Sangguniang Kabataan

Yes

No

1.6.1.55% of the General Fund allocated for Gender and Development Yes

No

1.6.1.61% of the IRA allocated for Barangay Council for the


Protection of Children (BCPC)

Yes

No

1.6.1.71% allocated for Senior Citizens and Differently-Abled Persons

Yes

No

1.6.2 Allocated/Utilized fund more than the minimum requirement Yes


as per RA 7160 in the preceding year for the following:

No

###

0.00

NA

1.6.2.1More than 20% of the IRA utilized for Development Fund

Yes

No

1.6.2.2More than 5% of the Regular Income utilized for Calamity/BDRR

Yes

No

1.6.2.3More than 10% of the Regular Fund utilized for Sangguniang Ka

Yes

No

1.6.2.4More than 5% of the General Fund utilized for Gender & Develo

Yes

No

1.6.2.5More than 1% of the IRA utilized for BCPC

Yes

No

1.6.2.6More than 1% utilized for Senior Citizens and/or Differently Able Yes

No

Total Point Score 0.00

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

Point Score Service


Area
Averag
e

41

Service Area 1.7

SubIndica
Indicat
tors
ors

Financial Accountability

1.7.1 Prepared Certified Statement of Actual Income & Expenditures


of the preceding year

Yes

No

1.7.2 Organized Barangay Bids and Awards Committee (BAC)

Yes

No

1.7.3 Formulated Annual Procurement Plan using National Government


Accounting Systems (NGAS)

Yes

No

1.7.4 Prepared Annual Inventory of Barangay Assets using NGAS

Yes

No

1.7.5 Prepared Barangay Financial Report using NGAS

Yes

No

1.7.6 Prepared Barangay Disbursement Report using NGAS

Yes

No

Service
Area
Averag
e

0.00

Total Point Score 0.00


Point Score Service
Area
SubIndica
Averag
Indicat
tors
ors
e

Service Area 1.8Facilities and Customer Service


1.8.1 Presence of Barangay Hall with the following Administrative Requirements:

0.00

1.8.1.1Barangay Seal displayed

Yes

No

1.8.1.2Philippine Flag in the Barangay Hall premises

Yes

No

1.8.1.3Picture of Incumbent President displayed in the office

Yes

No

1.8.1.4Organizational Chart displayed in the Barangay Hall

Yes

No

1.8.1.5List of Directory of Barangay Based Institutions (BBIs)


posted

Yes

No

1.8.1.6Barangay Map posted

Yes

No

1.8.2 Presence of Functional Properties and Equipment in the Barangay Hall as Support
to the Operations of the Barangay:
1.8.2.1Office Equipment
1.8.2.1.Typewriter/Computer
Yes No
###
1.8.2.2Communication Facilities
1.8.2.2.Internet Connection
Yes No
NA
###
1.8.2.2.Telephone
Yes No
NA
1.8.2.2.Fax Machine

Yes

No

1.8.2.2.Mobile Phone/Hand-Held Radio


Yes
1.8.2.3Transportation Facilities
1.8.2.3.Patrol Vehicle/Service Vehicle/Ambulanc Yes

No

1.8.2.4Emergency Equipment
1.8.2.4.Generator

Yes

###

0
0
0
0

NA

###
No

NA

No

NA

1.8.3 Established Barangay Public Information Desk

Yes

No

1.8.4 Implemented the Citizen's Charter

Yes

No

1.8.4.1Created Barangay Task Force through an EO to develop

Yes

No

and monitor the implementation of the Charter


1.8.4.2Enacted barangay ordinance for the adoption and
implementation of the Charter

Yes

No

1.8.4.3Posted in conspicuous places

Yes

No

1.8.4.4Printed the Citizen's Charter

Yes

No

1.8.4.5Established a Feeback Mechanism

Yes

No

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

42

1.8.5 Facilitated the issuance of Barangay Clearance in compliance based on Yes


provisions on timeliness in the Citizen Charter of the concerned barangay

No

1.8.6 Facilitated the issuance of Barangay Certification based on the provisi


on timeliness in the Citizen Charter of the concerned barangay

No

Yes

Total Point Score ###

Point Score Service


Area
SubIndica
Averag
Indicat
tors
ors
e

Serivce Area 1.9


Human Resource Management and Development
1.9.1 Filled-up Mandatory Appointive Positions in the preceding year
1.9.1.1Barangay Treasurer

Yes

No

1.9.1.2Barangay Secretary

Yes

No

1.9.2 Filled-up Other Appointive Positions in the preceding year


1.9.2.1Tanod Members

Yes

No

1.9.2.3Barangay Nutrition Scholar (BNS)

Yes

No

1.9.2.4Barangay Health Worker (BHW)

Yes

No

1.9.2.5Barangay Day Care Worker (BDCW)

Yes

No

0
0.00

1.9.3 Attendance to Training of the following Barangay Officials


to capacitate their specific roles and functions
1.9.3.1Disaster Risk Reduction and Management (DRRM)
and Climate Change Adaptation (CCA)
Training of Barangay Officials

Yes

No

1.9.3.2Barangay Newly-Elected Officials(BNEO)


Training of Punong Barangay

Yes

No

NA

1.9.3.3BNEO Training of the Sangguniang Barangay(SB) Membe Yes

No

NA

1.9.3.4Legislative Orientation of PB and SB Members

Yes

No

1.9.3.5Records Management Training of Barangay Secretary

Yes

No

1.9.3.6NGAS Training of Barangay Treasurer

Yes

No

1.9.3.7Leadership Training of Sangguniang Kabataan

Yes

No

1.9.3.8Skills Training on Katarungang Pambarangay(KP) of


Lupong Tagapamayapa

Yes

No

Yes
1.9.3.9Skills Training of Barangay Tanods
###
1.9.3.1Skills Enhancement Training of Barangay Health Workers Yes

No

No

1.9.3.1Skills Enhancement Training of Barangay Nutrition Schol Yes

No

Yes

No

1.9.3.1Skills Training of Barangay Human Rights Action Officer


(BHRAO)

0.00

NA

Total Point Score 0.00

II. Performance Area

SOCIAL

SERVICES

Service Area 2.1 Health and Nutrition


2.1.1 Presence of the following Health and Nutrition Program Implementers
Yes No
2.1.1.1Barangay Nutrition Scholar (BNS)
2.1.1.2Barangay Health Workers (BHWs)

Yes

No

Point Score Service


Area
SubIndica Averag
Indicat
tors
e
ors

0.00
0
0
###

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

43

###

2.1.2 Presence of Health and Nutrition Facilities


2.1.2.1Botika ng Barangay

Yes

No

NA

2.1.2.2Public Comfort Room/Toilet

Yes

No

NA

2.1.2.3Communal (gulayan/herbal) Garden

Yes

No

NA

2.1.2.4Potable Water Supply System

Yes

No

2.1.2.5Barangay Health Station/Center

Yes

No

NA

2.1.2.6Barangay-Owned Potable Water Supply System

Yes

No

NA

2.1.3 Advocated on Health and Nutrition Programs:

###

0.00

2.1.3.1Operation Timbang

Yes

No

2.1.3.2Oplan Food Supplementation

Yes

No

2.1.3.3Dissemination of IEC materials


regarding Dengue, Rabies, etc

Yes

No

2.1.3.4Orientation regarding Expanded


Program on Immunization (EPI)

Yes

No

2.1.3.5"4S" of Dengue Prevention

Yes

No

2.1.3.6Senior Citizen Program

Yes

No

0
Total Point Score ###

Service Area 2.2

Point Score Service


Area
SubIndica
Indicat
Averag
tors
ors
e

Education, Culture and Sports

0.00

2.2.1 Established Education/Information Facilities


Yes

2.2.1.1Day Care Center

No

If more than one (1) Day Care Center, please indicate n


2.2.1.2Information, Learning, and Reading Center Yes

No

If more than one (1) Reading Center, please indicate


2.2.2 Implemented Education Program

###

2.2.2.1Barangay Day Care Program

Yes

No

2.2.2.2Alternative Learning System Program

Yes

No

###

NA

2.2.3 Conducted Linggo ng Kabataan

Yes

No

2.2.4 Conducted Cultural and Sports Activities

Yes

No

Total Point Score ###


Point Score Service
Area
SubIndica Averag
Indicat
tors
e
ors

Service Area 2.3 Women and Children


2.3.1 Organized Functional Barangay Council for the Protection of Children
2.3.1.1Enacted Barangay Executive Order(EO)
organizing BCPC

Yes

No

2.3.1.2Formulated Work and Financial Plan

Yes

No

Yes

No

0.00

on Women and Children


2.3.1.3Conducted quarterly council meetings

If Yes, indicate number of meetings


4 or more meetings
DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

2 meetings
44

3 meetings

1 meeting

2.3.2 Implemented Republic Act No. 9262, or "Anti-Violence Against Women


and Their Children Act of 2004"
2.3.2.1Established Violence Against Women (VAW) Desk
Yes
No

2.3.2.2Recorded and referred cases of Violence Against


Women and their Children to either LSWDO,
PNP, Court, or Health Office

Yes

2.3.2.3Issued Barangay Protection Order(BPO)

Yes

No

2.3.2.4Conducted Information, Education, and


Communication(IEC) campaigns

Yes

No

Yes

No

2.3.3.2Maintained and updated list of registered Kasambaha Yes

No

2.3.3.3Maintained and updated list of registered Kasambah Yes


PhilHealth, SSS & Pagibig

No

Yes

No

No

NA

###
0

NA

2.3.3 Implemented Republic Act No. 10361, "Batas Kasambahay"


2.3.3.1Established Kasambahay Desk

2.3.3.4Submitted monthly report to Public Employment


Service Office (PESO)

2.3.4 Implemented Republic Act No. 9344 or "Juvenile Justice Welfare Act" as amended by RA 1
2.3.4.1Implemented community-based intervention programs for Child Yes
In Conflict with the Law (CICL) and Children At Risk (CAR)

No

Total Point Score 0.00

Service Area Public


2.4
Safety and Disaster Risk Reduction Management

Point Score Service


Area
SubIndica Averag
Indicat
tors
ors
e

2.4.1 Organized the Barangay Peace and Order Committee (BPOC)


2.4.1.1Enacted Brgy. Executive Order(EO) organizing

Yes

No

2.4.1.2Formulated Barangay Public Safety Plan

Yes

No

2.4.1.3Implemented Barangay Public Safety Plan

Yes

No

2.4.1.4Conducted regular monthly committee meetings Yes

No

0.00

If NO, indicate number of meetings


9 - 11 meetings

3 - 5 meetings

6 - 8 meetings

1 - 2 meetings

2.4.2 Established the Barangay Disaster Risk Reduction and Management(BDRRM) Evacuation C
2.4.2.1Enacted Executive Order organizing BDRRMC Yes

No

2.4.2.2Presence of BDRRM Plan

Yes

No

2.4.2.3Presence of Contingency Plan

Yes

No

2.4.2.4Implemented BDRRM Plan

Yes

No

2.4.3 Presence of Functional Disaster Equipment

Yes

0.00

No

2.4.3.1Hazard
Map
3.3.1.2
2.4.3.2Early Warning Devices

Yes

No

Yes

No

2.4.3.3First Aid Kit

Yes

No

2.4.3.4Hand-Held Radio

Yes

No

0
0

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

45

2.4.3.5Mobile
Phones
3.3.1.5
2.4.3.6Rescue vehicle (banca/raft/truck/others)

Yes

No

Yes

No

2.4.3.7Transistor Radio

Yes

No

2.4.3.8Mega Phone

Yes

No

2.4.3.9Flashlight

Yes

No

2.4.3.1Television

Yes

No

2.4.3.1Fire Extinguisher

Yes

No

2.4.3.1Generator

Yes

No

###

2.4.4 Organized the Barangay Anti-Drug Abuse Council (BADAC)


2.4.4.1Enacted Brgy. EO organizing BADAC

Yes

No

2.4.4.2Conducted councils' meetings

Yes

No

2.4.4.3Implemented policies to counter drug abuse

Yes

No

2.4.5.1Constituted ten (10) to twenty (20) members Yes


of the Lupong Tagapamayapa

No

2.4.5.2Conducted Lupon meetings at least once a

Yes

No

0.00

Yes

No

2.4.5 Implemented the Katarungang Pambarangay (KP) Law

If YES, indicate the number of meetings


(Select only one)

12 or more

6 to 8

9 to 11

1 to 5

2.4.5.3Acted/Referred disputes filed


2.4.5.3.1Number of disputes fil

###

2.4.5.3.2Number of disputes settle


2.4.5.3.3Rate of Dispute Resolution Effici

(2.4.5.3.2 divided by 2.4.5.3.1 x =

###

###

2.4.6 Designated Barangay Human Rights Action Officer (BHRAO)

Yes

No

2.4.7 Barangay Tanod conducted Regular Ronda or Foot Patrol

Yes

No

No

NA

If YES, indicate number of tanods


2.4.8 Implemented Street Lighting/Illumination Project in the precedin Yes

Total Point Score ###

III. Performance Area E C O N O M I C

DEVELOPMENT

Point Score Service


Area
SubIndica Averag
Indicat
tors
e
ors

Service Area 3.1 Agriculture and Fisheries Development


3.1.1 Presence of Barangay Agricultural Support Services
3.1.1.1Thresher and other post-harvest equipment

Yes

No

0.00

NA

Yes

No

3.1.1.2Multi-purpose pavement

Yes

No

3.1.1.3Planting materials distribution system

Yes

No

3.1.1.4Farm product collection and buying stations

Yes

No

3.1.2 Organized Barangay Fisheries and Aquatic Resource


Management Committee (BFARMC)

Yes

No

0.00

NA

3.1.2.1Implemented Barangay Fisheries Development P

Yes

No

3.1.2.2Installed communal or backyard fishponds

Yes

No

###

0
DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

46

3.1.3 Maintained Farm-to-Market Roads and Bridges / Access to Core Road Yes

No

NA

Total Point Score 0.00


Point Score Service
Area
SubIndica Averag
Indicat
tors
e
ors

Service Area 3.2


Entrepreneurship, Business and Industry Promotion
3.2.1 Presence of Major Barangay Economic Enterprises

Yes

###

No

3.2.1.1Flea or Satellite Market (Talipapa)

Yes

No

NA

3.2.1.2Water Works

Yes

No

NA

3.2.1.3Wharf

Yes

No

NA

3.2.1.4Others

Yes

No

3.2.2 Established Barangay Livelihood Program (e.g. soap making, candle m Yes
chocolate making, etc)

No

3.2.3 Registered Barangay Micro Business Enterprise (BMBE) in the BMBE Re Yes

No

3.2.4 Presence of support programs to promote cooperativism

No

Yes

###

3.2.5 Presence of support programs on job and employment creation


Yes
No
(i.e. job for cash for work, emergency employment generation program, etc)

Total Point Score ###

IV. Performance AreaE

NVIRONMENTAL

MANAGEMENT

Service Area 4.1Natural Resource Management


4.1.1 Implemented Clean and Green Program in the Barangay

Yes

Point Score Service


Area
SubIndica Averag
Indicat
tors
e
ors

0.00

No

4.1.1.1Conducted Clean and Green Activities

Yes

No

4.1.1.2Organized Green Brigade or related activities

Yes

No

4.1.1.3Conducted Tree Planting and Preservation Activiti Yes


Urban Greening

No

4.1.2 Support to Conservation Program (i.e mangrove preservation,


artificial reef, fish sanctuary, forest conservation, etc)

Yes

No

###
0

NA

Total Point Score 0.00


Point Score Service
Area
SubIndica Averag
Indicat
tors
e
ors

Service Area 4.2Waste Management and Pollution Control


4.2.1 Organized Barangay Ecological Solid Waste Management Commit

Yes

No

0.00

4.2.2 Enacted Ordinance/Resolution on Solid Waste Management

Yes

No

0.00

4.2.3 Formulated Barangay Solid Waste Management Action Plan

Yes

No

0.00

4.2.4 Implemented Waste Segregation and Volume Control

Yes

No

4.2.5 Implemented Garbage Collection Scheme

Yes

No

0.00

4.2.6 Presence of Materials Recovery Facility in the Barangay

Yes

No

0.00

4.2.7 Maintained Sewerage/Drainage Canal

Yes

No

0.00

NA

Total Point Score

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

0.00

###

47

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

48

REMARKS

##
###

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

49

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

50

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

51

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

52

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

53

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

54

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

55

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

56

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

57

BGPMS

Barangay
City/Municipalit Iloilo City
Iloilo
Province
Region
VI
Date

SCORESHE

2015

Year Under Revie

Performance Index

Color Code

Remark

Err:518

Err:518
Err:518

PERFORMANCE AREA

Color Code

Administration

Err:518

Social Services
Economic
Development
Environmental
Management
Service Area

Average

Performance Level

Err:518

###

Err:518

###

Err:518

###

Err:518

###

Total Average

Err:518

Color Code

Average
0.00
0.00
#DIV/0!
0.00
0.00
#DIV/0!
0.00
#DIV/0!
0.00
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

Performance Level
1
1
#DIV/0!
1
1
#DIV/0!
1
#DIV/0!
1
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

#DIV/0!

Barangay Legislation
1

Transparency
1

Citizen's Participation
#DIV/0!

Development Planning
1

Revenue Generation
Revenue Allocation and
Utilization
Financial Accountability

#DIV/0!

Facilities and Customer Service


#DIV/0!

Human Resource Devt and Mgt


1

Health and Nutrition

#DIV/0!

Education, Culture and Sports

#DIV/0!

Women and Children

#DIV/0!

Public Safety and DRRM

#DIV/0!

Agricultural & Fisheries Devt

#DIV/0!

Entrep., Busi. & Industry Promot

#DIV/0!

Natural Resource Management

#DIV/0!

Waste Management and


Pollution Control

#DIV/0!

Legend
Range

Remark

Remark

Tally
Level/Index

0.00

0.24

0.25

0.49

0.50

0.74

0.75

0.99

Color

Remarks

Non-Compliant to the minimum requirements of the


1991 LGC and other Laws; Needed prompt
Red
action/intervention to expedite the current
performance level of the barangay.
Needs major reinforcement(s) on barangay's
Yellow compliance to the minimum requirements of the 1991
LGC and other Laws.
Needs minor reinforcement(s) in regard to the
Blue barangay's compliance to the minimum requirements
of the 1991 LGC and other Laws.
Compliant to the minimum requirements of the 1991
Green LGC and other Laws; Sustain the good practice in the
barangay governance.

DILG/NBOO/CAPDD/DCF Ver 1.1 cy2014

Level

Count

58

You might also like