You are on page 1of 418

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Instrument air compressor

EQUIPMENT CODE

: TNL/CPP/TGH/IAC/001

EQUIPMENT DETAILS

: Ingersol rand

DATE

DESCRIPTION OF THE WORK DONE

18.10.2013

Oil Filter Was changed by M/S Service Engineer at 500 Running Hours

24.11.2013

Receiver Tank Auto Drain valve was fixed and found normal.

03.12.2013

IAC-1 was put in service. RH - 3081, LH - 1408

13.01.2014

IAC-1 was put in service. RH - 3156, LH - 1438

02.05.2014

AMC Work done.RH -4092, LH -1777.

09.06.2014

AMC Work done.RH -4700 , LH -2012.

22.07.2014

AMC Work done.RH -4956,LH- 2103.

30.09.2014

OIL topupped was topupped 2 liters. RH -5368,LH -2363.

05.11.2014

AMC (AIr Filter cleaned). RH-5890 ,LH- 2494

21.01.2015

AMC (AIr Filter cleaned). RH-6213 ,LH- 2605

27.02.2015

AMC (AIr Filter cleaned).RH -6486, LH - 2698.

06.04.2015

AMC (AIr Filter cleaned).RH -7344, LH - 2999.

22.05.2015

AMC (AIr Filter cleaned).RH-8061 ,LH -3281

08.07.2015

AMC (AIr Filter cleaned).RH -8379, LH -3408

24.08.2015

AMC (AIr Filter cleaned).RH -8393, LH -3410, drain trap was cleaned

16.10.2015

AMC (AIr Filter cleaned).RH -8438, LH -3425, drain trap was cleaned

03.11.2015

Compressor area power junction box was inter changed to


new placed and taken on line

11.12.2015

AMC (AIr Filter cleaned).RH -8660, LH -3508, painted with corrosion pipe line.

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

20.01.2016

AMC (AIr Filter cleaned) .RUNNING HOURS-8943 , LH - 3631

09.02.2016

Instrument air compressor -1 air filter and controller, sensor was cleaned

03.03.2016

AMC (AIr Filter cleaned).RH -9252, LH - 3750, drain trap was cleaned

09.03.2016

Instrument air compressor -1 air filter and controller, sensor was cleaned

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

Oil Filter-1 No, P NO : 39911631WIM

CBM

Timer Based Auto Drain Valve-3 No's

CBM

Nil

CBM

Nil

OTH

Oil Filter - 1 No ,Airfilter - 2 NO'S

OTH

Nil

OTH

NIL

CBM

OIL topupped -2 liters (P.NO 38459582)

OTH

Nil

OTH

Nil

INCHARGE SIGNATURE

OTH

Nil

OTH

OIL top-up -2 liters (P.NO 38459582)

OTH

OIL Seperator - 01 NO ,Oil filter. 01 NO


Oil - 30litters

OTH

Nil

OTH

Nil

OTH

Nil

OTH

OTH

Anchor fastner 8mm - 04 NOS

OTH

paint -1/4ltr, brush -1'' - 01 no

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

OTH

PM

OTH

PM

SPARES CONSUMED
NIL
NIL
NIL
NIL

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Instrument air compressor

EQUIPMENT CODE

: TNL/CPP/TGH/IAC/002

EQUIPMENT DETAILS

: Ingersol rand

DATE

DESCRIPTION OF THE WORK DONE

03.12.2013

IAC-2 was Put in stand by

23.12.2013

IAC-2 was stopped

13.01.2014

IAC-2 was Put in stand by

13.03.2014

Found cylinder seal was damaged.Nowseal was repaired with Tefflon


TAPE , receiving spare materials,it will be replaced.

02.05.2014

AMC

09.06.2014

AMC

22.07.2014

AMC

12.08.2014

Loading / Un loading Power cylinder was replaced

30.9.2014

AMC (AIr Filter cleaned)

05.11.2014

AMC (AIr Filter cleaned)

24.12.2014

Loading and Unloading power cylinder connecting Link rod Was replaced

23.01.2015

AMC (AIr Filter cleaned)

27.02.2015

AMC (AIr Filter cleaned)

19.03.2015

Loading and Unloading power cylinder connecting was serviced.

06.04.2015

AMC (AIr Filter cleaned)

22.05.2015

AMC (AIr Filter cleaned)

08.07.2015

AMC (AIr Filter cleaned)

24.08.2015

AMC (AIr Filter cleaned),RH -6513,LD -2663 hrs

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE
16.10.2015

DESCRIPTION OF THE WORK DONE


AMC (AIr Filter cleaned), RH -7224 hrs, LD -2884 hrs, ultra coolant oil was

topupped
11.12.2015
20.1.01.2016

AMC (AIr Filter cleaned),RH -7532,LD -3062 hrs


AMC (AIr Filter cleaned),RH -

, LD -

19.02.2016

Instrument air compressor -2 air filter and controller, sensor was cleaned

03.03.2016

AMC (AIr Filter cleaned).RH -RH -8051, LH -3279, drain trap was cleaned

19.03.2016

Instrument air compressor -2 air filter and controller, sensor was cleaned

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

OTH

Oil Filter-1 NO`s

OTH

Nil

OTH

Nil

CBM

Pneumatic cylinder.

OTH

Nil

INCHARGE SIGNATURE

OTH

Nil

CBM

Power cylinder connecting ROD. PN39586656

OTH

Nil

OTH

Nil

CBM

Nil

OTH

OTH

OTH

OTH

Nil
Nil
Nil
Nil

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

OTH

Ultra collant oil - 4 litters

OTH

Nil

OTH

Nil

PM

Nil

OTH

NIL

PM

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Instrument air compressor

EQUIPMENT CODE

: TNL/CPP/TGH/IAC/003

EQUIPMENT DETAILS

: Ingersol rand

DATE

DESCRIPTION OF THE WORK DONE

03.12.2013

IAC-3 was put in Stand By, RH -676 , LH -304

09.06.2014

AMC, RH -2318, LD -949

22.07.2014

AMC , RH-2849,LD - 1196

30.09.2014

OIL Filter was replaced,RH -3520, LD -1448

05.11.2014

AMC (AIr Filter cleaned), RH - 3530, LD -1452.

12.11.2014

Temparature switch was repaced by new one.,RH -3629,LD -1500

21.01.2015

AMC, RH -4381, LD -1769

23.01.2015

IAC -3 loading and un loading cylinder was replaced. RH -

27.02.2015

AMC,RH - 4976,LD -1997

06.04.2015

AMC,RH - 4983,LD -1997

22.05.2015

AMC,RH -5372, LD -2160

08.07.2015

AMC,RH -5747, LD -2298

24.08.2015

AMC,RH -6028, LD -2482. Drain trap was cleaned

16.10.2015

AMC,RH -6735, LD -2745

11.12.2015

AMC,RH -7362, LD -3006, all motor bearing grease work done

29.12.2015

Instrument air compressor -3 air filter and controller, sensor was cleaned

31.12.2015

Instrument air compressor -3 cooling fan motor bearing was replaced


by Elect Dept after trail was taken

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

31.12.2015

Ro plant -A PH sensor was checked

20.01.2016

AMC , RH -7543, LH -3064

03.03.2016

AMC (AIr Filter cleaned).RH -8248, LH -3330, drain trap was cleaned

29.03.2016

Instrument air compressor -3 cooling fan motor bearing was replaced

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

Nil

OTH

Nil

OTH

CBM

Oil Filter-1 NO`s (P NO : 39911631WIM )

OTH

Nil

CBM

Temparature switch - 01 NO

CBM

Nil

CBM

Pneumatic cylinder

OTH

Nil

OTH

Air filter - 01 NO ( moistureremoving)

Cooling fan motor bearing replaced

INCHARGE SIGNATURE

OTH

Nil

OTH

Nil

OTH

Oil Filter-1 NO`s


Ultracoolant oil -2litters

OTH

Nil

OTH

Nil

PM

Nil

PM

NIL

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

NIL

CBM

NIL

OTH

NIL

PM

NIL

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Service air compressor

EQUIPMENT CODE

: TNL/CPP/BOH/SAC/001

EQUIPMENT DETAILS

: ELGI

DATE

DESCRIPTION OF THE WORK DONE

19.11.2013

Oil Filter was replaced at 1500 Hrs

03.12.2013

SAC-1 was started

13.01.2014

SAC-1 was put in Stand By

15.04.2014

AMC , RH-62.23,LD - 36.12

10.06.2014

AMC ,RH-62.23,LD - 36.12

17.06.2014

AMC

12.07.2014

AMC ,RH-91.3,LD - 27.18

13.10.2014

AMC , RH -107.44, LD -42.08

19.12.2014

AMC , RH-130.1,LD - 46.5

12.02.2015

AMC , RH-225.18,LD - 71.7

21.02.2015

Cooling fan- 1 bearing problem, RH-225.18,LD - 71.7

08.04.2015

AMC , RH-225.18,LD - 71.7

22.04.2015

AMC , RH-438,LD - 155 ,SAC -1 Blow down valve was serviced

05.06.2015

AMC , RH-438,LD - 156

19.08.2015

AMC , RH- 469.30 , LH -168.28.

29.01.2016

AMC , RH -2502 , LH -665

14.02.2016

SAC air compressor - 2 air filter and controller, sensor was cleaned

14.03.2016

AMC , RH - , LH -

TYPE OF WORK : PM - Preventive maint.

MPCV was serviced.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

Oil Filter-1 No

CBM

Nil

CBM

Nil

OTH

Oil Filter-1 No ,Oil filter -01 No, OIL -10lit

OTH

suction damper blow off valve ' O" ring

OTH

OIL separeator -01 no, Oil-60ltr

OTH

Airfilter, Oil separator - 01 no

OTH

SAC -3 controller was inter changed

OTH

SAC -2 Cooling Fan inter changed to SAC -1

OTH

SAC -1 Air filter was cleaned

CBM

Nil

INCHARGE SIGNATURE

OTH

Nil

OTH

Nil

OTH

Nil

OTH

Nil

OTH

Oil - 03 litters

PM

Nil

OTH

Nil

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Service air compressor

EQUIPMENT CODE

: TNL/CPP/BOH/SAC/002

EQUIPMENT DETAILS

: ELGI

DATE
19.11.2013

DESCRIPTION OF THE WORK DONE


Oil leakage found in the Screw O/L to Receiver tank Connecting
Metal line

23.11.2013

Damaged Hose was replaced from SAC-3

03.12.2013

SAC-2 was put in Stand By

13.01.2014

SAC-2 was started,RH -982, LD- 464.23

15.04.2014

AMC , RH-1180 ,LD - 490

10.06.2013

AMC , RH-1740,LD -674

12.07.2014

AMC , RH-2362,LD - 832

13.10.2014

AMC , RH-3534,LD - 1251

19.12.2014

AMC , RH-4580,LD - 1605

24.12.2014

Cooling fan Was replaced new one,RH -4549,LD -1609

12.02.2015

AMC , RH-5151,LD - 1758

08.04.2015

AMC , RH-5211,LD - 1772

05.06.2015

AMC , RH-5672,LD - 1920

19.08.2015

AMC , RH - 6714.39

05.11.2015

SAC air compressor - 2 discharge hose air leakage was arrested

15.12.2015

SAC air compressor - 2 air filter and controller, sensor was cleaned

29.01.2016

AMC ,RH -7410 , LH -2436

14.03.2016

AMC , RH - , LH -

, LH -2317.25

, oil filters was replced and oil topupped done

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

NIL

CBM

NIL

CBM

Nil

CBM

Nil

OTH

Oil Filters-2 No's

OTH

Air Filter-1 No`s

OTH

Airfilter, oil filter cleaned

OTH

SAC -2 Oil topupped -60 liter

OTH

SAC - 2 Oil topupped 7liters

CBM

Cooling fan - 01 NO

INCHARGE SIGNATURE

OTH

SAC -2 Air filter was cleaned

OTH

SAC -2 Air filter was cleaned

OTH

SAC -2 Air filter was cleaned

OTH

Nil

CBM

NIL

CBM

NIL

OTH

NIL

OTH

OIL -2 itters,

t. BD - Break down maint. OTH : Other maint.

oil filter -02 NOS

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Service air compressor

EQUIPMENT CODE

: TNL/CPP/BOH/SAC/003

EQUIPMENT DETAILS

: ELGI

DATE
20.11.2013

DESCRIPTION OF THE WORK DONE


Screw End discharge Hose to Receiver Tank has been removed and
the same was fixed in SAC-2

03.12.2013

SAC-3 Isolated Condition

13.01.2014

SAC-3 Isolated Condition

10.06.2014

AMC ( SAC-3 isolate condition),RH -242.18, LD -72.14

12.07.2014

AMC ( SAC-3 isolate condition),RH -242.18, LD -72.14

11.08.2014

3'' Air discharge Hose was Replaced,RH -242.18, LD -72.14

13.10.2014

AMC ,RH-65.59, LD-35.59

19.12.2014

AMC , RH-165.50 ,LD - 52

12.02.2015

AMC , RH-531 ,LD - 141

08.04.2015

AMC

05.06.2015

AMC , RH-762 ,LD - 141

22.06.2015

CONTROLLER problem,RH -1541,LD -821

19.08.2015

AMC , RH-2810.27 , LH -997.53

27.11.2015

SAC air compressor - 3 air filter and controller, sensor was cleaned

27.12.2015

SAC air compressor - 3 air filter and controller, sensor was cleaned

29.01.2016

AMC , RH -3934 , LH -1224, Controllor was serviced

14.03.2016

AMC , RH - , LH -

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

CBM

Nil

CBM

Nil

OTH

Nil

OTH

Nil

CBM

3'' Air Discharge hose

OTH

Nil

OTH

Controller was reset.all

OTH

Nil

INCHARGE SIGNATURE

OTH

SAC -3 Air filter was cleaned

OTH

NIl

CBM

Nil

OTH

Nil

PM

Nil

PM

Nil

OTH

Oil - 04 litters

OTH

Nil

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Service air compressor

EQUIPMENT CODE

: TNL/CPP/TGH/ADY/001

EQUIPMENT DETAILS

: ELGI

DATE

DESCRIPTION OF THE WORK DONE

07.11.2013

Dryer Oultlet Diaphargm Valves were serviced

08.07.2013

Outlet Disphargm Valve Solenoid Valves were serviced.

27.11.2013

Dryer Exhaust Valve was serviced.

04.12.2013

Dryer-1 has been taken in service.

16.12.2013

Dryer-1 was stopped.

23.12.2013

Dryer-1 was started.

03.12.2013

Dryer-1 was stopped.

13.01.2014

Dryer-1 was started.

02.08.2014

Dryer Oultlet Diaphargm Valves were serviced.

10.10.2014

Dryer inlet and outlet valve was serviced.

18.11.2014
06.1.2015
07.04.2015

Tower -1 Small pin hole leakages.


Dryer -1 & 2 By pass valve Modification Work done.
Tower -1 Small hole was arrested with M seal. Inlet and Outlet valve
serviced and taken in line

09.03.2015

Before , after filter was cleaned after that trail was taken 30 min

20.04.2015

Dryer inlet and outlet valve was serviced.

19.08.2015

Air dryer - 1 Exhaust valve was checked

09.10.2015

Before , after filter was cleaned after that trail was taken 30 min

09.11.2015

Before , after filter was cleaned after that trail was taken 30 min

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

09.12.2015

Air dryer -1 Inlet air filter was checked and found O.K

09.02.2016

Air dryer -1 Inlet &outlet filter was checked and found O.K

09.03.2016

Air dryer -1 Inlet &outlet filter was checked and found O.K

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

INCHARGE SIGNATURE

CBM

Nil

SD

Nil

CBM

Nil

PM

Nil

PM

Nil

CBM

Nil

PM

Nil

PM

Nil

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

PM

NIL

PM

NIL

PM

NIL

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Service air compressor

EQUIPMENT CODE

: TNL/CPP/TGH/ADY/002

EQUIPMENT DETAILS

: ELGI

DATE

DESCRIPTION OF THE WORK DONE

19.11.2013

Dryer Inlet Diaphargm Valves were Serviced and found O.K

19.11.2013

Dryer Outlet Diaphargm Valves was Serviced.

27.11.2013

Dryer was serviced by Service Engineer M/S.S.S.Associates

04.12.2013

dryer was stopped.

16.12.2013

dryer-2 was started

23.12.2013

dryer-2 was stopped

03.01.2014

dryer-2 was started

13.01.2014

dryer-2 was stopped

13.02.2014

dryer-2 inlet seperator elemnent damaged condition.

20.7.2014

dryer-2 inlet seperator elemnent was replaced

18.11.2014

Dryer -2 Air inlet valve and Tower-1 , 2 Exhaust valve was serviced

06.01.2015

dryer -1 & 2 By pass valve Modification Work done

21.05.2015

dryer-2 inlet and outlet seperator elemnent was replaced

10.08.2015

Air dryer -2 Inlet air filter was checked and found O.K

19.10.2015

Air dryer -2 Inlet air filter was checked and found O.K

19.11.2015

Air dryer -2 Inlet air filter was checked and found O.K

19.12.2015

Air dryer -2 Inlet air filter was checked and found O.K

19.02.2016

Air dryer -2 Inlet air filter was checked and found O.K

19.03.2016

Air dryer -2 Inlet air filter was checked and found O.K

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Air Inlet filter - 01 NO

INCHARGE SIGNATURE

CBM

Nil

SD

Nil

PM

Nil

PM

Nil

PM

Nil

PM

Nil

PM

Nil

PM

Nil

PM

Nil

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Sox and Nox analyser

EQUIPMENT CODE

: TNL/CPP/BAX/ANA/001

EQUIPMENT DETAILS

: ABB

DATE

DESCRIPTION OF THE WORK DONE

21.11.2013

Analyzer was calibrated by zero & Span Calibration Gas.

22.11.2013

Acid Filter was cleaned. Now under observation.

04.01.2014

condensate fault in the Analyzer. Then filter paper was repalced,now


system is running normal

05.01.2014

condensate fault in the Analyzer. Then filter paper was repalced.Now


system is running normal.

06.01.2014

condensate fault in the Analyzer. Then filter paper was repalced.Now


system is running normal.

08.01.2014

condensate fault in the Analyzer. Then filter paper was repalced.Now


system is running normal.

19.02.2014

condensate line hose was removed and it was rerouted for free flow.

03.04.2014

Unit-1 Peritatlic Pump got jam.Pump was .checked and found that
delivery hose was too heavy.Now system has been diverted with Unit-2

16.05.2014

condensate fault in the Analyzer. Then filter paper was repalced.

20.06.2014

Zero gas calibration work done

25.07.2014

Condensate fault in the Analyzer. Then filter paper was repalced

23.09.2014

Found Analyser Cermic filter damaged, so replaced and Span gas


calibration work done

08.12.2014

Sox, NOX sample Cell was inspected. Sox, NOX,CO analyser Zero,Span
gas calibration work done

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE
10.12.2015
07.01.2015
20.02.2015

DESCRIPTION OF THE WORK DONE


Sample gas Solinode valve was serviced and taken on line
Analyser sensor was inspected and cleaning and calibration work done
Acid Filter was cleaned. Now under observation.

04.03.2015

condensate filter was replaced and now working normal

23.03.2015

condensate filter was replaced and now working normal

04.04.2015

SOX , NOX system was de dusted and condensate filter was replaced and now
workin normal

04.08.2015

SOX , NOX system was de dusted and condensate filter was replaced and now
workin normal

04.09.2015

SOX , NOX system was de dusted and condensate filter was replaced and now
workin normal

06.10.2015

SOX , NOX system was de dusted and Acid filter was replaced

23.11.2015

SOX , NOX system was de dusted .

04.12.2015

SOX , NOX system was de dusted . Ceramic filter inspection work done

23.01.2016

SOX , NOX system was de dusted .

04.02.2016

SOX , NOX system was de dusted .

06.02.2016

SOX , NOX system was de dusted . Ceramic filter inspection work done

23.02.2016

SOX , NOX system was de dusted . Ceramic filter inspection work done

04.03.2016

SOX , NOX system was de dusted .

23.03.2016

SOX , NOX system was de dusted . Ceramic filter inspection work done

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

Nil

CBM

Nil

CBM

Acid Filter-1No

CBM

Acid Filter-1No

CBM

Acid Filter-1No

CBM

Acid Filter-1No

CBM

Acid Filter-1No

INCHARGE SIGNATURE

CBM

CBM

Nil

CBM

Acid Filter-1No

CBM

Nil

CBM

Acid Filter-1No

CBM

Ceramic filter - 01 no

CBM

Nil

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

CBM

CBM

CBM

CBM

CBM

PM

Condensate filter - 01 NO

PM

Condensate filter - 01 NO

Condensate filter - 01 NO

PM

PM
CBM

2
2

SPARES CONSUMED
2 way solinode valve -01 NO
Nil
Nil
Acid Filter-1No
Acid Filter-1No

Acid Filter-1No
Nil

SD

CBM

Nil

PM

Nil

Nil

INCHARGE SIGNATURE

SD

Nil

PM

Nil

PM

Nil

PM

Nil

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: SPM analyser

EQUIPMENT CODE

: TNL/CPP/BAX/SPM/001

EQUIPMENT DETAILS

: ABB

DATE

DESCRIPTION OF THE WORK DONE

28.06.2014

Zero calibration work done

04.07.2014

Receving and sending transmitter lens was cleaned

07.01.2015

Sending and receivng transmitter was cleaned and Zero calibration work
done

11.09.2015

Sending and receivng transmitter was cleaned and Zero calibration work

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Oxygen analyser

EQUIPMENT CODE

: TNL/CPP/BAX/OXY/001

EQUIPMENT DETAILS

: ABB

DATE

DESCRIPTION OF THE WORK DONE

22.3.2014

Probe was inspected and cleaned

28.06.2014

O2 probe ceramic filter was cleaned

01.08.2014

Zero gas calibration work done

01.08.2014

Air filter replaced and taken on line

29.10.2014

Oxygen analyser cross checked with standard gas - 4% and 8.1 %


showing DCS And Local. O2 - 3.94 % and 8.1 %

04.01.2015

Oxygen analyser was inspected and ceramic filter inspection work done

28.03.2015

Oxygen analyser was inter changed to APH rear side

20.05.2015

Oxygen analyser was cross checked with portable O2 analyser.


{ O2-3.6 (DCS) & O2 - 6.8 (Port) }

26.09.2015

Oxygen analyser cross checked with standard gas - 4% and 8.1 %

05.12.2015

boiler rear side O analyse new sample point fixed and dummy provided

06.01.2016

O RH S analyser was showed error value and ceramic filter cleaned

07.01.2016

O RH side analyser was showed error value , so flange side - 01 No's


bolt was replaced and calibrated with Std gas 1.09 and instrument air

09.01.2016

O-1140A transmitter replaced & calibrated with STD gas 1.01 & 4.0 and 8.1

09.01.2016

O RH side analyser 1140 was interchanged to 1140A

12.01.2016

O2 analyser -1140A probe was checked electrode/ thermo well failure ,


so replaced new analyser and taken on line

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

26.02.2016

Oxygen analyser - 1 & 2 was cleaned and inspection work done

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

Nil

CBM

Nil

CBM

Nil

CBM

Air filter regulator - 01 NO

CBM

Nil

CBM

Nil

CBM

Pintype lug- 40Nos,1pair cable- 35 mtr

CBM

Nil

CBM

Nil

INCHARGE SIGNATURE

CBM

Nil

SD

Nil

CBM

Nil

CBM

Nil

CBM

Oxygen transmitter - 01 NO

CBM

Nil

CBM

Oxygen analyser - 01 NO

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SD

SPARES CONSUMED
NIL

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Burner

EQUIPMENT CODE

: TNL/CPP/BOH/OGBR/001

EQUIPMENT DETAILS

: ISCAN COEN

DATE
21.09.2014

DESCRIPTION OF THE WORK DONE


Burner 1 all pneumatic valve , flame scanner, Igniter and combustion
damper was cleaned and trail was taken

29.12.2014

Burner 1 all pneumatic valve , flame scanner, Igniter and combustion


damper was cleaned and trail was taken

28.03.2015

Burner 1 all pneumatic valve , flame scanner, Igniter and combustion


damper was cleaned and trail was taken

14.05.2015

Burner 1 all pneumatic valve , flame scanner, Igniter and combustion


damper was cleaned and trail was taken

03.12.2015

Burner 1 all pneumatic valve , flame scanner, Igniter and combustion

07.12.2015

Burner Oil gun was removed . Burner - 1 ,4 Oil Gun was kept in store

Oil gun thread damaged condition


02.01.2016

Burner 1 all pneumatic valve , flame scanner, Igniter and combustion


damper was cleaned

02.02.2016

Burner 1 all pneumatic valve , flame scanner, Igniter and combustion


damper was cleaned

02.03.2016

Burner 1 all pneumatic valve , flame scanner, Igniter and combustion


damper was cleaned

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

NIL

SD

NIL

SD

NIL

SD

NIL

SD

NIL

SD

NIL

INCHARGE SIGNATURE

PM

NIL

PM

NIL

PM

NIL

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Burner

EQUIPMENT CODE

: TNL/CPP/BOH/OGBR/002

EQUIPMENT DETAILS

: ISCAN COEN

DATE
21.09.2014

DESCRIPTION OF THE WORK DONE


Burner 2 all pneumatic valve , flame scanner, Igniter and combustion
damper was cleaned and trail was taken

29.12.2014

Burner 2 all pneumatic valve , flame scanner, Igniter and combustion


damper was cleaned and trail was taken

28.03.2015

Burner 2 all pneumatic valve , flame scanner, Igniter and combustion


damper was cleaned and trail was taken

14.05.2015

Burner 2 all pneumatic valve , flame scanner, Igniter and combustion


damper was cleaned and trail was taken

07.08.2015

Burner - 2 oil gun nozzle was damaged , so interchanged - Burner -4

03.12.2015

Burner 2 all pneumatic valve , flame scanner, Igniter and combustion

02.01.2016

Burner 2 all pneumatic valve , flame scanner, Igniter and combustion


damper was cleaned

02.02.2016

Burner 2 all pneumatic valve , flame scanner, Igniter and combustion


damper was cleaned

02.03.2016

Burner 1 all pneumatic valve , flame scanner, Igniter and combustion


damper was cleaned

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

NIL

SD

NIL

SD

NIL

SD

NIL

PM

NIL

SD

NIL

INCHARGE SIGNATURE

PM

NIL

PM

NIL

PM

NIL

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT
EQUIPMENT CODE

: BOILER
: Burner

EQUIPMENT DETAILS

: ISCAN COEN

DATE
21.09.2014

: TNL/CPP/BOH/OGBR/003

DESCRIPTION OF THE WORK DONE


Burner 3 all pneumatic valve , flame scanner, Igniter and combustion
damper was cleaned and trail was taken

29.12.2014

Burner 3 all pneumatic valve , flame scanner, Igniter and combustion


damper was cleaned and trail was taken

28.03.2015

Burner 3 all pneumatic valve , flame scanner, Igniter and combustion


damper was cleaned and trail was taken

14.05.2015

Burner 3 all pneumatic valve , flame scanner, Igniter and combustion


damper was cleaned and trail was taken

03.12.2015

Burner 3 all pneumatic valve , flame scanner, Igniter and combustion

02.01.2016

Burner 3 all pneumatic valve , flame scanner, Igniter and combustion

damper was cleaned


02.03.2016

Burner 1 all pneumatic valve , flame scanner, Igniter and combustion


damper was cleaned

06.03.2016

LDO main oil valve Sov was checked

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

NIL

SD

NIL

SD

NIL

SD

NIL

SD

NIL

PM

NIL

INCHARGE SIGNATURE

PM

NIL

CBM

NIL

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVATE

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMMID


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Swas sytem

EQUIPMENT CODE

: TNL/CPP/DMP/SWA/001

EQUIPMENT DETAILS

: ABB

DATE
07.02.015

DESCRIPTION OF THE WORK DONE


Feed water , Drum water, Makeup water, Condensate water, Ph
transmitter was calibrated with 4 and 9.2 solution and Checked 7.

09.02.2015

Feed water , Drum water, Makeup water, Condensate water, saurated


steam, calibrated with 4 and 9.2 solution and compared with Ph 7

10.02.2015

Drum water Phosphate analyser Zero, regent clibration work done

10.02.2015

Super heated sample silica analyser Zero, regent clibration work done

10.02.2015

Feed water hydrazine analyser Zero and regent calibration work done

15.02.2015

Drum water sample Phosphate analyser Zero,

clibration work done

12.02.2015

Drum water sample Phosphate analyser Zero,

clibration work done

17.02.2015

Feed water sample hydrazine analyser Regent solution was topupped.

18.02.2015

Drum water sample Phosphate analyser Zero,

clibration work done

21.02.2015

Drum water sample Phosphate analyser Zero,

clibration work done

24.02.2015

Drum water sample Phosphate analyser Zero,

clibration work done

13.03.2015

Feed water , Drum water, Makeup water, Condensate water, Ph


transmitter was calibrated

14.03.2015

Feed water hydrazen analyser regent solution was topupped

04.04.2015

All PH sensor calibration work done

22.04.2015

Silica ananalyser regent solution was topupped

04.08.2015

All PH sensor calibration work done

10.08.2015

Saws Panel Hydrazine analyser impulse line leakage was arrested

TYPE OF WORK : PM - Preventive maint. CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. OTH : Other maint.

DATE
13.08.2015

DESCRIPTION OF THE WORK DONE


SWAS Panel Feed water Cooler sample line was connected with
seriously to Deaerator cooler because of temparature reduce.

14.08.2015

SWAS Panel Feed water Cooler was cleaned with HCL

17.08.2015

All PH sensor was calibrated

15.09.2015

Swas system silica analyser Inlet filter was checked

06.10.2015

Silica ananalyser regent solution was topupped

14.11.2015

All PH sensor was calibrated

10.12.2015

Phosphate analyser Zero calibration was done

15.12.2015

Hydrazine analyser regent solution was changed

18.12.2015

All Ph sensor was calibrated ( Except condensate PH sensor)


with Standard solution 4.0 and 9.2 ph .

18.12.2015

Condensate sampling line Back pressure regulator was calibrated

26.12.2015

Silica analyzer Regent solution was top upped


after zero calibration done

30.12.2015

Feed water PH transmitter cross checked with Std solution


9.18 , the value are 8.75 ph, 31.9 deg, slop 90.4%

09.01.2016

Condensate sampling line ACW line Ph meter and sensor was replaced

12.01.2016

Condensate PH analyser 4.0 , 9.0, 7.0 calibrated with standard solution

14.01.2016

Swas drain line jammed was cleaned

14.01.2016

Hydrazine regent solution was top upped

TYPE OF WORK : PM - Preventive maint. CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. OTH : Other maint.

DATE
28.01.2016
03.02.2016
08.02.2016
14.02.2016
27.02.2016
01.03.2016
08.03.2016

DESCRIPTION OF THE WORK DONE


Phosphate regeneration solution was top upped
Hydrazine regent solution was top upped
Swas all Ph transmitter was checked
Swas drain line jammed was cleaned
Saturated steam line isolation valve was replaced
Hydrazine regent solution was top upped
Swas all Ph transmitter was checked

TYPE OF WORK : PM - Preventive maint. CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. OTH : Other maint.

RVICES PRIVATE LIMITED.

YAN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

CBM

SPARES CONSUMED
NIL
NIL

CBM

NIL
NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

INCHARGE SIGNATURE

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

PM

NIL

CBM

NIL

PM

NIL

CBM

NIL

wn maint. OTH : Other maint.

TYPE OF WORK

MANNING

CBM

CBM

PM

CBM

CBM

NIL

PM

NIL

CBM

CBM

SPARES CONSUMED
NIL

NIL
NIL
NIL

NIL

NIL

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

INCHARGE SIGNATURE

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

wn maint. OTH : Other maint.

TYPE OF WORK

MANNING

CBM
CBM
PM
PM
PM
CBM
PM

2
2
2
2
2
2
2

SPARES CONSUMED
NIL
NIL
NIL
NIL
NIL
NIL
NIL

INCHARGE SIGNATURE

wn maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Drum level indicator

EQUIPMENT CODE

: TNL/CPP/BOH/SLI/001

EQUIPMENT DETAILS

: Level state

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Drum level indicator

EQUIPMENT CODE

: TNL/CPP/BOH/SLI/002

EQUIPMENT DETAILS

: Level state

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Feed water control valve - 100%

EQUIPMENT CODE

: TNL/CPP/BOH/FCV/002

EQUIPMENT DETAILS

: MIL

DATE

DESCRIPTION OF THE WORK DONE

21.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

29.12.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001
VERSION NO : 2013/14/15
TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Feed water control valve - 30%

EQUIPMENT CODE

: TNL/CPP/BOH/FCV/001

EQUIPMENT DETAILS

: MIL

DATE

DESCRIPTION OF THE WORK DONE

21.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

29.12.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Spray water control valve

EQUIPMENT CODE

: TNL/CPP/BOH/DSH/001

EQUIPMENT DETAILS

: MIL

DATE

DESCRIPTION OF THE WORK DONE

21.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

29.12.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Spray water control valve

EQUIPMENT CODE

: TNL/CPP/BOH/DSH/002

EQUIPMENT DETAILS

: MIL

DATE

DESCRIPTION OF THE WORK DONE

21.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

29.12.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: SA fan -1 suction damper

EQUIPMENT CODE

: TNL/CPP/BOH/SAP/001

EQUIPMENT DETAILS

: Keltron

DATE

DESCRIPTION OF THE WORK DONE

28.06.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

25.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

02.01.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: SA fan -1 Discharge

EQUIPMENT CODE

: TNL/CPP/BOH/SAD/002

EQUIPMENT DETAILS

: Rotex control

DATE

DESCRIPTION OF THE WORK DONE

28.06.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

25.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

02.01.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: SA fan -2 suction damper

EQUIPMENT CODE

: TNL/CPP/BOH/SAP/003

EQUIPMENT DETAILS

: Keltron

DATE

DESCRIPTION OF THE WORK DONE

28.06.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

25.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

02.01.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: SA fan -2 Discharge

EQUIPMENT CODE

: TNL/CPP/BOH/SAD/004

EQUIPMENT DETAILS

: Rotex control

DATE

DESCRIPTION OF THE WORK DONE

28.06.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

25.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

02.01.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: SA furnace flow control valve

EQUIPMENT CODE

: TNL/CPP/BOH/SAF/005

EQUIPMENT DETAILS

: Rotex control

DATE

DESCRIPTION OF THE WORK DONE

28.06.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

25.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

02.01.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: PA fan -1 suction damper

EQUIPMENT CODE

: TNL/CPP/BOH/PAF/001

EQUIPMENT DETAILS

: Keltron

DATE

DESCRIPTION OF THE WORK DONE

28.06.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

25.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

02.01.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.09.2015

PA fan - 2 VFD modification signal cable was Laid. 75 meter

27.09.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Sigmal cable - 75 Mtr

SD

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: PA fan -2suction damper

EQUIPMENT CODE

: TNL/CPP/BOH/PAF/002

EQUIPMENT DETAILS

: Keltron

DATE

DESCRIPTION OF THE WORK DONE

28.06.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

25.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

02.01.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.09.2015

PA fan - 2 VFD modification signal cable was Laid. 75 meter

27.09.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

09.10.2015

PA fan - 2 VFD modification signal cable was Laid 69 meter

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Sigmal cable - 75 Mtr

SD

OTH

Sigmal cable - 69 Mtr

SD

Nil

SD

Nil

INCHARGE SIGNATURE

SD

Nil

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: PA fan wind box

EQUIPMENT CODE

: TNL/CPP/BOH/PAW/003

EQUIPMENT DETAILS

: Rotex

DATE

DESCRIPTION OF THE WORK DONE

28.06.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

25.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

02.01.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.09.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: PA fan wind box

EQUIPMENT CODE

: TNL/CPP/BOH/PAW/004

EQUIPMENT DETAILS

: Rotex

DATE

DESCRIPTION OF THE WORK DONE

28.06.2014

Pa fan to wind box damper -1100 positioner replaced with PA bypass


damper, calibration work done

25.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

02.01.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.09.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Soot blowing control

EQUIPMENT CODE

: TNL/CPP/BOH/SBV/001

EQUIPMENT DETAILS

: MIL

DATE

DESCRIPTION OF THE WORK DONE

21.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

29.12.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.09.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Soot blowing control

EQUIPMENT CODE

: TNL/CPP/BOH/CBV/001

EQUIPMENT DETAILS

: MIL

DATE

DESCRIPTION OF THE WORK DONE

21.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

29.12.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.09.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: APH Bypass SA

EQUIPMENT CODE

: TNL/CPP/BOH/APHBY/006

EQUIPMENT DETAILS

: Rotex

DATE
28.06.2014

DESCRIPTION OF THE WORK DONE


PA fan to wind box damper -1100 positioner replaced with PA bypass
damper, calibration work done

27.09.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: APH Bypass PA

EQUIPMENT CODE

: TNL/CPP/BOH/APHBY/005

EQUIPMENT DETAILS

: Rotex

DATE
27.09.2015

DESCRIPTION OF THE WORK DONE


Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SD

SPARES CONSUMED
Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: ID fan -1 suction damper

EQUIPMENT CODE

: TNL/CPP/BOH/IDP/001

EQUIPMENT DETAILS

: Keltron

DATE

DESCRIPTION OF THE WORK DONE

28.06.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

25.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

02.01.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.09.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

25.01.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

PM

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: ID fan -2 suction damper

EQUIPMENT CODE

: TNL/CPP/BOH/IDP/001

EQUIPMENT DETAILS

: Keltron

DATE

DESCRIPTION OF THE WORK DONE

28.06.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

25.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

02.01.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.09.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

25.01.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

PM

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Coal mix SA secondry flow

EQUIPMENT CODE

: TNL/CPP/BOH/CSMA/007

EQUIPMENT DETAILS

: Rotex

DATE

DESCRIPTION OF THE WORK DONE

28.06.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

25.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

02.01.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.09.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: SA flow to Burner

EQUIPMENT CODE

: TNL/CPP/BOH/SAB/008

EQUIPMENT DETAILS

: Rotex

DATE

DESCRIPTION OF THE WORK DONE

28.06.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

25.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

02.01.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.09.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: LDO flow control Valve

EQUIPMENT CODE

: TNL/CPP/BOH/LDV/001

EQUIPMENT DETAILS

: RK control

DATE

DESCRIPTION OF THE WORK DONE

21.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

29.12.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.09.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

24.03.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

PM

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: LDO recirculation control Valve

EQUIPMENT CODE

: TNL/CPP/BOH/LRV/001

EQUIPMENT DETAILS

: MIL

DATE

DESCRIPTION OF THE WORK DONE

21.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

29.12.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.09.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

24.03.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

PM

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Loop seal vent control Valve

EQUIPMENT CODE

: TNL/CPP/BOH/LSB/001

EQUIPMENT DETAILS

: MIL

DATE

DESCRIPTION OF THE WORK DONE

21.09.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

29.12.2014

Positioner Valve stem cleaned and feed back cross checked with DCS

28.03.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

14.05.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

27.09.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

05.12.2015

Positioner Valve stem cleaned and feed back cross checked with DCS

06.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

27.02.2016

Positioner Valve stem cleaned and feed back cross checked with DCS

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

SD

Nil

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Uninterupped power supply

EQUIPMENT CODE

: TNL/CPP/DCS/UPS/002

EQUIPMENT DETAILS

: NUTECH ENGG

DATE

DESCRIPTION OF THE WORK DONE

29.05.2014

Failure of SMPS was replaced and taken on line

19.09.2014

AMC visted

24.12.2014

AMC visted

05.01.2015

Inverter IGBT was replaced and taken on line

25.03.2015

AMC visted

30.06.2015

AMC visted

20.10.2015

AMC visted

19.03.2016

AMC visted ( UPS totally checked and working normal )

30.03.2016

All electronic card was cleaned, Battery charging problem was rectified

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

OTH

SMPS card

OTH

NIL

OTH

NIL

OTH

Inverter card

OTH

NIL

OTH

NIL

OTH

NIL

OTH

NIL

OTH

Battery drive card, & charge card

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Uninterupped power supply

EQUIPMENT CODE

: TNL/CPP/DCS/UPS/001

EQUIPMENT DETAILS

: NUTECH ENGG

DATE

DESCRIPTION OF THE WORK DONE

29.05.2014

Failure of SMPS was replaced and taken on line

19.09.2014

AMC visted

24.12.2014

AMC visted

05.01.2015

Inverter IGBT was replaced and taken on line

25.03.2015

AMC visted

30.06.2015

AMC visted

20.10.2015

AMC visted

19.03.2016

AMC visted ( UPS totally checked and working normal )

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

OTH

SMPS card

OTH

NIL

OTH

NIL

OTH

Inverter card

OTH

NIL

OTH

NIL

OTH

NIL

OTH

NIL

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Uninterupped power supply

EQUIPMENT CODE

: TNL/CPP/CHP/UPS/004

EQUIPMENT DETAILS

: NUTECH ENGG

DATE

DESCRIPTION OF THE WORK DONE

19.09.2014

AMC visted

24.12.2014

AMC visted

25.03.2015

AMC visted

30.06.2015

AMC visted

20.10.2015

AMC visted

10.12.2015

AMC visted,

19.03.2016

AMC visted ( UPS totally checked and working normal )

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

OTH

NIL

OTH

NIL

OTH

NIL

OTH

NIL

OTH

NIL

OTH

OTH

batrrery driver card was replacd


NIL

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: TURBINE
: Uninterupped power supply

EQUIPMENT CODE

: TNL/CPP/DM/UPS/003

EQUIPMENT DETAILS

: NUTECH ENGG

DATE

DESCRIPTION OF THE WORK DONE

02.09.2013

UPS changeover sensing transformer was changed by service engineer

25.03.2015

AMC visted

30.06.2015

AMC visted

20.10.2015

AMC visted

19.03.2016

AMC visted ( UPS totally checked and working normal )

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

OTH

NIL

OTH

NIL

OTH

NIL

OTH

NIL

OTH

NIL

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Thermocouple

EQUIPMENT CODE

: TNL/CPP/BMI/TC/001

EQUIPMENT DETAILS

: GOA Instruments

DATE
08.10.2013

DESCRIPTION OF THE WORK DONE


Cable was found damaged condition. cable has been replaced and found
normal in DCS.

04.03.2014

Furnace Temp Transmitter TIT-1123A thermocouple replaced

26.09.2014

Funace BED bottom new thermowell replaced with modification TE-1107

26.09.2014

Funace BED bottom new thermowell replaced with modification TE-1111

26.09.2014

Funace BED TOP LHS side new thermowell replaced TE-1108)

02.01.2015

Well inpection work done. thermo well ceramic material


Boiler top RHS thermowell damaged , so replaced TE -1105

27.03.2015

Boiler Bed Top temparaure element was replaced ( TE - 1105A)

26.03.2015

Boiler 1st pass temparature element was checked. ( TE-1108,1107,1111)

27.03.2015
26.03.2015
26.4.2015

TE-1122A, Furnace top temperature element was replaced


2nd pass temparature element was checked
Boiler Bed Top temparaure element was replaced ( TE - 1105A)
Cable was damaged which was replaced by laying new cable from field to

05.05.2015

TE - 1172 Cylone Return temperature element(900mm)

14.05.2015

TE - 1184 Cyclone bottom temperature element ( length - 700mm)

26.4.2015

Boiler Bed Top temparaure element was replaced ( TE - 1105A)


Cable was damaged which was replaced by laying new cable from field to

13.05.2015

2nd pass temparature element was checked

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

27.09.2015

Boiler bed T/C inspected, LHS bed was damaged and it was replaced

27.01.2016

Furnace Mid temperature element -1122A & 1123B

26.02.2016

All 1st pass and 2nd pass temperature element was inspected

27.02.2016

Boiler bed thermocouple RHS WAS replaced

22.03.2016

Cyclone return temp element TE -1185 was checked

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

SD

Thermowell - 01 no

SD

Thermowell - 01 no

SD

Thermowell - 01 no

SD

Thermowell - 01 no

SD

SD

Thermowell - 01 no

SD

Thermowell - 01 no

SD

INCHARGE SIGNATURE

SD

SD

SD

SD

Thermowell - 01 no

SD

Thermowell - 01 no

SD

Thermowell - 01 no

SD

SD

t. BD - Break down maint. OTH : Other maint.

Thermowell - 01 no

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Thermowell - 01 no

SD

Thermowell - 02 no

SD

NIL

SD

NIL

CBM

NIL

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Ash handling system power cylinder

EQUIPMENT CODE

: TNL/CPP/AHP/PC/001

EQUIPMENT DETAILS

: Mcwaber

DATE

DESCRIPTION OF THE WORK DONE

27.06.2013

ESP -1 conveying SOV was serviced

27.06.2013

ESP -1 field orifice Availble- 15, 6 Hole dummied

27.06.2013

ESP -2 field orifice Availble- 12, 4 Hole dummied

27.06.2013

ESP -3 field orifice Availble- 12, 4 Hole dummied

27.06.2013

ESP -4field orifice Availble- 12, 5 Hole dummied

05.10.2013

APH - 2 SOV was serviced and found normal.

20.10.2013
21.10.2013
13.11.2013
13.11.2013

ESP- 4th and 5 th SOV was serviced


APH- 1 Seal was replaced by Mechanical.Now system is running normal
BAC - 1Dome seal was replaced and found normal.
BAC -1 NRV & Booster line was cleaned. Now system is running normal

09.12.2013
10.12.2013
18.12.2013
06.02.2014

BAC -2 damaged seal was replaced and trial was taken found normal.
BAC -2 found pilot vale jam and it was replaced.
BAC -1 New Air Filter Regulator was replaced and found O.K
ESP - 1st Conveying SOV and air filter reagulator was serviced

07.02.2014

ESP -5 th cylinder line was jam and lubrication was done

09.02.2014

BAC - 1 Puppet valve removed and cleaned.

14.04.2014
20.4.2014
22.5.2014
20.5.2014

All ash handling system lubricator was filled with oil.


ESP -2nd field Piston removed and lubricated, then again fixed.
BAC -2 Seal was chenged into new one.
BAC -1 Seal was chenged into new one.

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE
07.07.2014
12.08.2014
29.08.2014
30.08.2014
31.08.2014
14.09.2014
15.29.2014
01.10.2014
04.10.2014

DESCRIPTION OF THE WORK DONE


ESP -4 th and 5th field Dome valve solenoid valve serviced
APH -1 seal pressure switch calibration work done
4th and 5th Seal, vessel conveying pressure switch Calibration done
3rd Seal, vessel , conveying pressure switch Calibration work done
Seal, vessel , conveying pressure switch Calibration work done
Esp. -2nd field air filter regulator was serviced
ESP-2 power cylinder Quick exhaust valve was replaced
ESP -4 and 5 Ash system Power cylinder was serviced
ESP -4 th Ash system Lube oil was topupped work done

8.11.2014

4th 3rd slave Ash system Power cylinder checked , lubricated

13.11.2014

APH - 1 Slave system air hose leakage was arrested and taken in line

04.11.2014

ESP -4th & 5th field Air regulator was serviced

28.11.2014

BAC Doom Seal was replaced by Mech. Limit switch was adjusted

04.12.2014

ESP -2 nd field Ash system lube oil filter bowl leakage was arrested

15.12.2014

APH ash system lube oil top upped was done

20.12.2014

APH ash system Dome SOV was serviced

22.12.2014

ESP - 4th field slave-1 pneumatic cylinder seal kit was replaced

29.12.2014

APH ash system lube oil Bowl leakage was arrested

01.02.2015

ESP - 1 st field service air line oriffice- 02 dummy hole was provided.
NOW total - 15 holes, 7 dummy and 08 open condition

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE
01.02.2015

DESCRIPTION OF THE WORK DONE


ESP - 2 nd field service air line oriffice- 02 dummy hole was provided.
NOW total - 12 holes, 6 dummy and 06 open condition

02.02.2015

ESP - 2nd Dome power cylinder conecting link rod problem was solved

03.02.2015

APH SYSTEM - 1 Dome Sov was be serviced

06.02.2015

ESP - 4th field slave -2 system power cylinder seal kit was replaced

09.02.2015

APH SYSTEM - 2 Dome Sov was be serviced

23.02.2015

ESP - 4th field slave -2 system seal pressure switch was checked

24.02.2015

APH SYSTEM - 1 & 2 air filter was cleaned and lube oil was top up

07.03.2015

ESP- SYSTEM - 1 & 5 air filter was cleaned and lube oil was top up

17.03.2015

APH SYSTEM - 1 & 2 lube oil was top up

23.03.2015

APH SYSTEM - 1 Dome cylinder to was serviced after taken on line

09.05.2015

ESP-SYSTEM - 5 th field system pneumatic cylinder was serviced

19.05.2015

ESP- SYSTEM - 3 rd field pneumatic cylinder seal kit was replaced

01.06.2015

ESP -4th field master cylinder seal kit was replaced and SOV serviced

02.06.2015

ESP -4th field and 3rd conveying system lube oil filter was changed

04.08.2015
12.08.2015

ESP - 4th system power cylinder Quick exhaust valve was replaced
ESP - 1st field Dome seal was replaced By mech Dept. after taken on line

14.08.2015

ESP - 4th field Dp filter was cleaned

22.08.2015

ESP - 3rd field Dome SOV was serviced

31.08.2015
01.09.2015

ESP - 4th & 5 th field conveying line valve Air filter leakage was arrested
APH - 1 & 2 Pneumatic cylinder was serviced

TYPE OF WORK : PM - Preventive maint.


DATE

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O


DESCRIPTION OF THE WORK DONE

06.10.2015

ESP - 1 B hopper high level switch was checked after taken on line

07.10.2015

ESP - 1st field quick exhaust valve was replaced

17.10.2015

ES - 1st field slave Dome seal was replaced By mech . after taken on line

26.10.2015

ESP Bend house inlet air blower temperature switch was checked

01.11.2015

ESP - 4th & 5 th field

06.11.2015

APH - 1 & 2 surge hopper level switch was cleaned and calibration done

07.11.2015

ESP- 1 to 5 conveying system was cleaned and tightness was checked

10.11.2015

ESP - 3rd & 4th field conveying system AFR was cleaned

12.11.2015

ESP - 5th & 4th field level probe was cleaned and calibration work done

12.11.2015

ESP - 2nd field level probe was cleaned and calibration work done

15.11.2015

Service air receiver tank auto drain valve was serviced

15.11.2015

ESP - 5th & 4th field level probe was cleaned and calibration work done

DP filter leakage was arrested

and put in probe mode


17.11.2015

ESP - 3nd field level probe was cleaned and calibration work done

18.11.2015

ESP-4th field dome open/close SOV Serviced and fixed

20.11.2015

ESP-1st field slave power cylinder new seal kit replaced and taken in line

24.11.2015

Ash system conveying line auto drain valve SOV was serviced

30.11.2015

ESP-3rd field level probe was checked

07.12.2015

ESP - 1B, 3B & 4th field Level probe was checked

16.12.2015

ESP - 1 to 5 ash system was cleaned and lube oil was top upped

26.12.2015

APH- 1 & 2 ash conveying system instrument was cleaned .

23.12.2015

APH - 2 ash conveying gate valve was replaced from BAC - 1 system

TYPE OF WORK : PM - Preventive maint.


DATE

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O


DESCRIPTION OF THE WORK DONE

26.12.2015

APH - 2 ash conveying system master vessel probe was checked

30.12.2015

ESP - 2n field & 3 rd pneumatic cylinder Quick exhaust valve checked

16.02.2016

APH - 1 ash conveying line SOV was serviced after taken on line

06.02.2016

ESP - 1st field Slave power cylinder seal kit was replaced

09.02.2016

ESP -1 st slave dome seal was replaced by mech dept after taken line

13.02.2016

ESP -1 st slave dome seal was replaced by mech dept after taken line

15.02.2016

ESP -1 st slave dome seal was replaced by mech dept after taken line

16.02.2016

ESP -1 st slave dome seal was replaced by mech dept after taken line

17.02.2016

ESP -1 st slave dome seal was replaced by mech dept after taken line

17.02.2016

APH -1 & 2 all conveying system was cleaned and lube oil was checked

18.02.2016

Fly ash silo all instrument was cleaned

26.02.2016

ESP - 3rd field dome SOV was serviced and taken on line

28.02.2016

APH - 2 all conveying system was cleaned and lube oil was checked

28.02.2016

ESP-3rd and 4th field High level hopper level switch was checked

01.03.2016

ESP - 3 rd field Conveying on off valve feed back was checked

02.03.2016

ESP - 2nd master & ESP -3 slave hopper level switch was checked

17.03.2016

ESP -1 st slave dome seal was replaced by mech dept after taken line

18.03.2016

Fly ash silo all instrument was cleaned

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

SPARES CONSUMED

DOME SEAL -01 NO


DOME SEAL -01 NO

INCHARGE SIGNATURE

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

DOME SEAL -01 NO


AIR filter regulator - 01 NO

DOME SEAL -01


DOME SEAL -01

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

SPARES CONSUMED
NIL
NIL
NIL
NIL
NIL
NIL
Quick Exhaust valve- 01 no
NIL
NIL
NIL
NIL
NIL
DOME SEAL -01 NO
NIL
NIL
NIL

INCHARGE SIGNATURE

CBM

CBM

CBM

CBM

Pneumatic cylinder seal kit - 01


NIL
NIL
NIL

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

CBM

Pneumatic cylinder seal kit - 01 NO

CBM

Pneumatic cylinder seal kit - 01NO

CBM

LUBE OIL FILTER - 01 NO

CBM

Pneumatic cylinder seal kit - 01 NO

CBM

NIL
NIL
Pneumatic cylinder seal kit - 01
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL

NIL

INCHARGE SIGNATURE

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

t. BD - Break down maint. OTH : Other maint.


TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

NIL

CBM

Quick exhaust valve - 01 NO

CBM

CBM

CBM

CBM

PM

CBM

CBM

CBM

CBM

CBM

CBM

NIL

CBM

NIL

NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL

INCHARGE SIGNATURE

CBM

CBM

CBM

CBM

CBM

CBM

CBM

Pneumatic cylinder seal kit - 01 NO


NIL
NIL
NIL
NIL
NIL
2 NIL

t. BD - Break down maint. OTH : Other maint.


TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

NIL

CBM

NIL

CBM

CBM

CBM

CBM

PM

CBM

NIL
NIL
NIL
NIL
NIL
NIL

INCHARGE SIGNATURE

CBM

PM

PM

CBM

CBM

CBM

NIL

CBM

NIL

CBM

NIL

PM

NIL

PM

NIL
NIL
NIL
NIL

NIL

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Teparature scanneer

EQUIPMENT CODE

: TNL/CPP/BMI/TS/005

EQUIPMENT DETAILS

: Masi bus

DATE

DESCRIPTION OF THE WORK DONE

28.09.2014

ID fan-2 temparature scanner was replaced

10.01.2015

ID fan-1 & 2 temparature scanner termination tightness was checked

10.01.2015

SA fan - 1 & 2 temperature scanner termination tightness was checked

10.01.2015

PA fan - 1 & 2 temperature scanner termination tightness was checked

10.01.2015

Loop seal blower fan -1 2 scanner termination tightness was checked

02.02.2015

Loop seal blower fan - 2 scanner termination tightness was checked

04.04.2015

ID fan-1 temparature scanner was replaced

05.09.2015

Loop seal blower -1 temperature scanner termination tightness checked

26.09.2015

SA, PA FAN bearing RTD was checked

23.12.2015

Loop seal blower # 2 motor NDE temperature to be checked

25.01.2016

PA fan - 01 & ID fan - 01 Scanner was checked

25.01.2016

PA fan - 02 & ID fan - 02 Scanner was checked

04.02.2016

Loop seal blower fan -1 2 scanner termination tightness was checked

20.02.2016

Loop seal blower 2 temperature scanner termination tightness checked

04.03.2016

Loop seal blower fan -1

20.03.2016

Loop seal blower 2 temperature scanner termination tightness checked

TYPE OF WORK : PM - Preventive maint.

scanner termination tightness was checked

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

SD

Scanner - 01 NO

SD

NIL

CBM

NIL

SD

NIL

CBM

NIL

CBM

NIL

CBM

Scanner - 01 NO

PM

NIL

SD

NIL

CBM

NIL

PM

NIL

PM

NIL

PM

NIL

PM

NIL

PM

NIL

PM

NIL

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Transmitter

EQUIPMENT CODE

: TNL/CPP/BOH/ITR/001

EQUIPMENT DETAILS

: ABB

DATE
12.09.2013

DESCRIPTION OF THE WORK DONE


Transmitter was isolated and gland leakage was arrested by mech.
After that transmitter was taken in line. found normal

18.11.2013

Main steam PressureTransmitter was isolated and leakage arrested.

11.12.2013

ID -1 discharge pressure transmitter zero trim was done

12.12.2013

Furnace Pressure transmitter dummy flange was modified


dummy cap which will be easy for us for flushing.

18.12.2013

SA fan to furnace inlet flow transmitter was calibrated

01.02.2014

FT -6022 Transmitter was relocated in zero meter floor and impulse line
routing was changed.Now It is under observation.

08.02.2014

HP heter level Transmitter was flushed for one time, and taken in line,

04.03.2014

Furnace TEMP Transmitter was checked and found voltage drop from
DCS Cable. Now DCS glass fuse was changed.

03.05.2014

Impluse Line was flushed with instrument air.

22.09.2014

All Draft transmitters impulse line was purged

22.09.2014

All Drum Water level , Feed water flow, SA fan Air Flow, PA fan Air flow,

22.09.2014

Soot blower transmitters was calibrated

22.09.2014

CBD tank local level transmitter HP Side and Lp side inter changed after
that taken on line

23.09.2014

Drum pressure transmitter impulse line condensate pot leakage


arresting work done

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

03.01.2015

All Draft transmitters impulse line was purged

02.01.2015

All Drum Water level , Feed water flow, SA fan Air Flow, PA fan Air flow,
Soot blower transmitters was calibrated

03.04.2015

CBD tank local level transmitter HP Side and Lp side inter changed after
that taken on line

06.05.2015

Cyclone return feed ing pressure transmitter PT - 1171 was calibrated.

26.05.2015

LSB Discharge pressure switch calibration was done ( PR - 1400mmwc)

26.05.2015

LSB Discharge pressure switch calibration was done ( PR - 1400mmwc)

27.05.2015

CYCLONE separator Right, middle, collection bed pressure checked

03.06.2015

All Draft transmitters impulse line was purged

10.06.2015

CBD tank level transmitter Upper range value (1100mmwc) was changed

10.06.2015

DM tank level transmitter Upper range value was checked (3700mmwc)

16.08.2015

Drum pressure transmitter Isolation valve gland leakage was arrested

26.09.2015
27.09.2015

Furnace draft transmitter was flush out work done


Drum pressure transmitter impulse line isolation valve gland packing

was replaced Mech dept after taken on line


28.09.2015

All Drum Water level , Feed water flow, SA fan Air Flow, PA fan Air flow,
Soot blower transmitters was calibrated

03.10.2015

Loop seal return flow trnasmitter URV range was changed to


1000MMWC ( OLD - 500)

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

03.11.2015

Furnace draft transmitter was flush out work done

08.11.2015

PA wind box flow transmitter was cleaned and zero trimming work done

09.11.2015

ESP outlet Pr transmitter was flushed and taken on line

04.12.2015

pa to furnace flow transmitter(1103) zero trimmed and it was installed

04.12.2015

furnace Draft 1141A & SA flow 1092 transmitters are calibrated


& zero trim was done

06.12.2015

All draft transmitter flushing work done

05.01.2016

Drum pr transmitter isolation valve leakage was arrested BY mech


Dept after taken on line

11.01.2016

All draft transmitter - 1127 flushing work done

21.01.2016

All draft transmitter - 1132 & 1127 flushing work done

24.01.2016

LDO recirculation Pressure transmitter was cleaned

05.02.2016

Cyclone draft transmitter - 1126 flushing work done

06.02.2016

All draft transmitter - 1127 flushing work done

08.02.2016

Boiler main steam flow transmitter Hp side impulse line leakage was
arrested after taken on line

16.02.2016

All draft transmitter - 1124C , 1126 & 1127 flushing work done

24.02.2016

LDO recirculation Pressure transmitter and valves was cleaned

25.02.2016

Bunker level transmitter -2 Radar type level transmitter was installed

26.02.2016

Furnace draft pressure transmitter -1124C was calibrated

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

27.02.2016

Drum pressure transmitter Isolation valve was replaced

08.03.2016

Bunker level transmitter 3 radar type level transmitter was replaced

23.03.2016

Mainsteam pressure transmitter was inter changed to Mainsteam


header pressure transmitter

24.03.2016

Mainsteam pressure transmitter calibrated after inter changed to

Mainsteam header pressure transmitter

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

INCHARGE SIGNATURE

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

NIL

SD

NIL

SD

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

CBM

NIL

SD

NIL

NIL

INCHARGE SIGNATURE

SD

NIL

CBM

NIL

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

NIL

CBM

NIL

CBM

NIL

SD

NIL

SD

NIL

SD

NIL

CBM

NIL

CBM

NIL

INCHARGE SIGNATURE

CBM

NIL

PM

NIL

PM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

PM

NIL

CBM

NIL

SD

NIL

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

SD

Isolation valve - 01 NO

CBM

Radarr type level transmitter -01

CBM

NIL

CBM

NIL

INCHARGE SIGNATURE

t. BD - Break down maint. OTH : Other maint.

ENMAS O & M SERVICES PRIVAT

2 * 35 MW POWER PLANT , TULSYAN NEC LIMITED.GUMM


EQUIPMENT HISTORY CARD
AREA
NAME OF THE EQUIPMENT

: BOILER
: Transmitter

EQUIPMENT CODE

: TNL/CPP/BOH/IPG/001

EQUIPMENT DETAILS

: General

DATE

DESCRIPTION OF THE WORK DONE

12.09.2013

HP dosing pressure gauge leakage was arrested and found normal.

04.12.2014

HP dosing Pressure gauge leakage was arrested and found normal

04.03.2014

LP dosing Gauge leakage was arrested and found normal.

08.03.2014
01.08.2014
23.09.2014

ACW - 3 D p Gauge was calibrated and zero correctrion was done.


Loop seal blower discharge pressure gauge to be calibrated
Drum Pressure Gauge 8'' and range 250 kg/cm2 was replaced

23.09.2014

Feedwater, Drum, main steam line pressure gauge was calibrated

02.11.2014

HP dosing pump pressure gauge - 1 was calibrated

16.12.2014

LDO header pressure gauge was calibrated

17.12.2014

HP dosing discharge pr gauge was calibrated

17.12.2014

LDO header NEW (0- 6000MMwc) pressure gauge was calibrated

23.12.2014

HP dosing discharge pr gauge was calibrated

02.01.2015

BFP -1 discharge pressure Gauge impulse line leakage was arrested

02.01.2015

Instrument pr transmitter , SAC pr transmitter calibrated

30.01.2015

Furnas outlet pressure transmitter PT - 1124A was flushed

17.02.2015

furnace pr transmitter 1124-A Flushing work completed and taken in line

03.03.2015

HP dosing pump - 1 & 3 discharge gauge was calibirated

04.03.2015

Boiler feed pump 1 suction pressure gauges was calibirated

13.03.2015

HP dosing pump - 2 discharge gauge was calibirated

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DATE

DESCRIPTION OF THE WORK DONE

30.03.2015

CBD tanke level transmitter was checked

13.04.2015

HP dosing pump - 2 discharge gauge was calibirated

04.04.2015

Boiler feed pump 1 suction pressure gauges was calibirated

13.04.2015

CBD tank local pressure gauge calibration work done

16.04.2015

Boiler feed pump 2 pressure gauges was calibrated

19.04.2015

LP dosing pump - 2discharge gauge was calibrated

03.06.2015

Soot blowing Pr gauge leakage was arrested

02.07.2015

Soot blowing Pr gauge leakage was arrested

03.08.2015

CBD tank pressure gauge line tightness was checked

19.08.2015
28.09.2015

Lp dosing pump - 2 discharge pressure gauge calibration work done


Drum Pressure Gauge 8'' and range 250 kg/cm2 was replaced

28.09.2015

Feedwater, Drum, main steam line pressure gauge was calibrated

21.09.2015

Service water pump PG was calibrated

03.10.2015

HP dosing pump- 2 pressure gauge was calibrated

02.11.2015

BFP cooling water line pressure gauge was calibrated

03.11.2015

HP dosing pump -1 pressure gauge was calibrated

13.01.2016

HP dosing pressure gauge - 2 was calibrated

24.01.2016

LDO recirculation Pressure gauges was cleaned

28.01.2016

All draft transmitter - 1124 A, B,C flushing work done

03.02.2016

HP dosing pressure gauge - 1 was calibrated

TYPE OF WORK : PM - Preventive maint.

DATE

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

DESCRIPTION OF THE WORK DONE

04.02.2016

LP dosing pressure gauge - 1 was calibrated

13.02.2016
19.02.2016
23.02.2016
27.02.2016
04.03.2016
13.03.2016
18.03.2016
19.03.2016
23.03.2016

HP dosing pressure gauge - 2 was calibrated


LP dosing pressure gauge - 2 was calibrated
HP dosing pressure gauge - 3 was calibrated
Drum pressure gauge isolation valve gland leakage was arrested
LP dosing pressure gauge - 1 was calibrated
HP dosing pressure gauge - 2 was calibrated
Silica analyser Display not showing , so it was checked power card fail condition
LP dosing pressure gauge - 2 was calibrated
HP dosing pressure gauge - 3 was calibrated

TYPE OF WORK : PM - Preventive maint.

CBM- Condition based maint. SD - Shutdown maint. BD - Break down maint. O

VICES PRIVATE LIMITED.

AN NEC LIMITED.GUMMIDIPOONDI - 601201.

ENT HISTORY CARD


FORMET NO : 001

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

NIL

SD

NIL

SD

NIL

CBM

NIL

CBM

NIL

CBM

NIL

CBM

pressure gauge- 01 no

CBM

NIL

INCHARGE SIGNATURE

SD

NIL

SD

NIL

CBM

NIL

CBM

NIL

PM

NIL

PM

NIL

PM

NIL

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

CBM

PM

NIL

PM

NIL

CBM

NIL

PM

NIL

PM

NIL

CBM

CBM

NIL

CBM

NIL

PM

NIL

SD

Pressure gauge - 01 NO

SD

NIL

PM

NIL

PM

NIL

PM

NIL

PM

NIL

PM

NIL

PM

NIL

NIL

NIL

INCHARGE SIGNATURE

CBM

NIL

PM

NIL

t. BD - Break down maint. OTH : Other maint.

TYPE OF WORK

MANNING

SPARES CONSUMED

PM

NIL

PM
PM
PM
SD
PM
PM
CBM
PM
PM

2
2
2
2
2
2
2
2
2

NIL
NIL
NIL
NIL
NIL
NIL
NIL
NIL

t. BD - Break down maint. OTH : Other maint.

INCHARGE SIGNATURE