Professional Documents
Culture Documents
1.
SCOPE OF APPLICATION
This checking instruction applies only to documents prepared on the basis of the Technical Instructions
09PIR-F02.
2.
AIM
This checking instruction serves as in internal basis for the engineering of piping in chemical and industrial
plant. It contains special stipulations about the substantive execution of checking documents. General and
organisational stipulations for the checking and approval of documents are set down in QA Instruction QA
0100-A03.
In case the checker is of the opinion that the checking should be more than specified in this document he must
do so and also keep Engineering Manager / HOD-PI informed.
3.
DEFINITIONS
For definitions refer QA 0100-A02.
4.
4.1
General
If any data in the documents do not tally with the basic checking data, these will be corrected by the checker
and given back to the staff member in charge for correction work and re-submission for checking.
The results of the checking are to be documented in master copies. After carrying in all corrections into the
original, there follows the approval as described in QAI QA 0100-A03.
4.2
Piping model
All errors, as well as missing components or text, will be recorded. After correction by the person in charge
and the model builder the model will be checked again . Revisions, which become necessary arising out of
client requests or through design and process engineering deviations to the basic data, must be authorised.
Only after authorisation are the revisions carried out and the model once more checked and approved.
4.3
5.
EXECUTION OF CHECKING
The scope of checking described in the following sections, can possibly be reduced, if the feed through of
information can be assured by the use of EDP application systems. (Avoidance of multiple checking).
Under column "Basic data for checking" the stipulations shall never be treated as exhaustive , Whatever
additional basic data are required for checking ,the checker is authorised to refer additional data to achieve the
desired results.
Rev. 3
09PIR-P01 Page 3
5.1.1
Checking
Co-checking
./.
Approval
Basic data
for checking
Scope of checking
Part 1 General:
-
PE-data
Allocation of pipe classes to process fluids
Consideration of requirements from legal
regulations as e.g. classification of flow
medium according to ANSI/ASME, IBR regulations etc.
3
2,4,3,8.
As per regulations
All items
- Annexures, if any
1,4,6,8
1,2,3,4,8
All
Rev. 3
09PIR-P01 Page 4
5.1.2
Checking
Co-checking
L-PI co-checks tech. Spec. of special parts which are governed by layouts.
Approval
Basic data
for checking
1.
2.
3.
4.
5.
Scope of checking
1,2,3,
Rev. 3
09PIR-P01 Page 5
5.2
P&I diagrams for utility stations and distribution systems (WS No.08)
Checking
The Lead Piping engineer checks the distribution systems Part (a) & (c) completely
(100%) & others as spotcheck on the basis of this Checking Instruction.
(Utility station by PE not covered here)
Co-Checking :
L-PE ; checks /comments for process engineering information including Part -b.
Approval
Basic data
for checking :
1.
2.
3.
4.
5.
6.
7.
Scope of checking
a)
Information content
b)
1,2,3.
4,6
Rev. 3
09PIR-P01 Page 6
5.3
Checking
The Departments Nominated Specialist Engineer (DSE-PI); checks Sl. No. (a), (b), (d)
completely (100%) on the basis of this Checking Instruction.
Co-Checking :
----------
Approval
The Lead Piping Engineer approves the Support Specification, Standard Support drawings
and non-stress category special supports.
The Department Nominated Approving Authority (DM-SE) approves the stress-category
special supports.
Basic data
for checking :
1.
2.
3.
4.
5.
6.
7.
8.
9.
Scope of checking
a)
1,4
c)
6,7,8,9
Rev. 3
09PIR-P01 Page 7
5.4
Checking
The Nominated Specialist Engineer (NSE-PI); checks completely (100%) on the basis of
this Checking Instruction.
Co-Checking :
----------
Approval
for checking :
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Scope of checking
Pipe runs:
-
3,4
1,5,6,7,8,9,10
Piping components :
- Substantive correct arrangement of valves,
instrumentation, control elements, special
components, drains, vents, etc.
- Sequence of assembly and dimensions
6,7,9,10 and
Standard Engineering requirements
2,3
Rev. 3
09PIR-P01 Page 8
5.5.1
Piping study and layout drawings (including pipe rack) (WS-No.17 and 25) (For Non-Model areas)
Checking
Approval
L-PI approves piping study and layout drawings (WS No.17 & 25).
Basic data
for checking :
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12
13.
14.
15.
16.
17.
Piping specification
Support specification
Line list
P & I diagrams
Overall plot plan (for pipe rack drawings)
Unit plot plan
Overall plans for steel structures
Civil engineering design drawings
Equipment specifications
Manufacturer's data (fabrication drawing)
Stress analysis of pipelines
IC data list for individual devices
Vessel nozzles data sheet
Technical Instruction 09PIR-F01 "Design Instructions for above-ground piping"
Technical Instruction 09PIR-F02 "Preparation of Piping (PIR) Documents"
UR 9253-21 Part 1 "Pressure and leak testing of piping"
General Engineering Specification.
Scope of checking
a)
Pipe runs:
b)
5,6,7,8
4
Piping components:
d)
3,4
c)
4,14
1,12
Pipe supports:
2,11,7,8,9
Rev. 3
09PIR-P01 Page 9
5.5.1
Piping study and layout drawings (WS-No.17 and 25)(For Non-Model Areas)
Scope of checking
e)
Equipment:
9,10
6
9,13
4,10
f)
Consideration of required free space for escape ways,
operating, maintenance, erection/disassembly of
equipment and piping
7,8,6,9.
g)
Consideration of requirements for cleaning, pressure and
leak test
16
h)
i)
Rev. 3
09PIR-P01 Page 10
5.5.2
Piping study and layout drawings (including pipe rack) (WS-No.17 and 25) (For areas covered by
plastic model)
Checking
Approval
L-PI approves piping study and layout drawings (WS No.17 & 25).
Basic data
for checking :
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12
13.
14.
15.
16.
17.
Piping specification
Support specification
Line list
P & I diagrams
Overall plot plan (for pipe rack drawings)
Unit plot plan
Overall plans for steel structures
Civil engineering design drawings
Equipment specifications
Manufacturer's data (fabrication drawing)
Stress analysis of pipelines
IC data list for individual devices
Vessel nozzles data sheet
Technical Instruction 09PIR-F01 "Design Instructions for above-ground piping"
Technical Instruction 09PIR-F02 "Preparation of Piping (PIR) Documents"
UR 9253-21 Part 1 "Pressure and leak testing of piping"
General Engineering Specification.
Scope of checking
a)
-
b)
Pipe runs:
Piping designation, branches, measurement points,
direction of flow, slope data, insulation and
heating data, total numbers of lines drawn
5,6,7,8
4
Piping components:
d)
3,4
c)
4,14
1,12,
Pipe supports:
2,11,7,8,9
Rev. 3
09PIR-P01 Page 11
5.5.2
Piping study and layout drawings (WS-No.17 and 25)(For areas covered by plastic model)
Scope of checking
e)
-
Equipment:
Equipment shape, designation, nozzle number and size
Reference dimensions from structure
Nozzle orientation and elevation
Battery limits
9,10
6
9,13
4,10
f)
Consideration of required free space for escape ways,
operating, maintenance, erection/disassembly of
equipment and piping
7,8,6,9
g)
Consideration of requirements for cleaning, pressure and
leak test
16
h)
i)
Rev. 3
09PIR-P01 Page 12
5.6
Checking
Co-Checking:
Approval
Basic data
for checking :
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Scope of checking
a)
-
b)
Pipe runs:
Piping designation, branches, measurement points,
direction of flow, data, insulation and
heating, lines to be shown on model
3,4,5,6,13.
2,3,4,6
NOTE-1
-Piping to check Sl.Nos.a, b, d, e, f, g, h
-Process to check Sl.Nos. c(i), c(iii), f, g, h
-Instrumentation to check Sl.Nos. c(ii) & c(iii)
-Electrical to check Sl.No. c(ii)
-Erection to check Sl.No.e(ii).
-civil to check sl. No. d (iii), d(iv). d(v), d(vi)
-Mechnical to check Sl. No. d(I), d(ii), d(iv)
CHI: Checking of Documents
Rev. 3
09PIR-P01 Page 13
5.6
e)
i)
ii)
1,2
1,2,7
f)
11
g)
h)
Rev. 3
09PIR-P01 Page 14
5.7
Isometrics sketches (WS-No. 20)[Hand-drawn if ISOMET is not used in the Project, otherwise thru'
ISOMET]
Checking
Approval
Lead Piping Engineer (L-PI) certifies / approves the isometric sketches before they are
released for further work.
Basic data
for checking :
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
Piping layout/study for plant sections including design for pipe supports
P & I diagrams
Piping list - Line list.
Piping specification
Pipe support specification
Stress analysis and results.
IC data list for individual devices
Equipment specifications.
Manufacturer's data (fabrication drawings)
Vessel nozzles data sheets.
Unit plot plan drawings
Piping model
Technical Instruction 09 PIR-F02"Design Instructions for above ground piping"
Technical Instruction 09 PIR-F02 "Preparation of Piping (PIR) Documents"
Scope of checking
a)
b)
c)
d)
Pipe runs:
i) Piping designation, branches, instrument tapping,
direction of flow, data for insulation and
heating, change of pipe class rating, total number
of isometrics to be made.
Pipe supports:
i) Arrangement, designation and locations
2,3
1,11,12
2
13,
1,2,4,7,12
1,5,6
Rev. 3
09PIR-P01 Page 15
5.7
Scope of checking
e)
Equipment:
i) Equipment designation, nozzle size, number
and pressure rating 8,9.
ii)Reference dimensions to structure
1,11
iii)Nozzle protection and elevation
10,8
iv) Battery limits
2,9
f)
1,2,3,7
10,8
Rev. 3
09PIR-P01 Page 16
5.8
Checking
Nominated specialist Engineer Piping (NSE-PI) checks completely (100%) as per this
checking instruction.
Co-Checking :
-------------
Approval
Lead Piping Engineer (L-PI) approves the final isometrics after spot checking as per the
checking instructions for isometrics sketches. (W.S No.20). L-PI shall take care of latest
P&ID changes.
Basic data
for checking :
1.
2.
Scope of checking
Complete comparison of the final isometric and B.O.M.
(printed on Isometric)with the isometric sketches
1, 2
Rev. 3
09PIR-P01 Page 17
5.9
Checking
The Department Nominated Specialist Engineer (DSE-PI) checks completely (100%) for
requirements as per Sl.Nos.c, d & others as spot checks on the basis of this Checking
Instruction.
Co-Checking :
Approval
Basic data
for checking :
1.
2.
3.
4.
5.
Piping specification.
Pipe support specification.
Technical Instruction 09 PIR-F02 "Preparation of Piping (PIR) Documents".
Requirements for spare quantities
Line list
Scope of checking
a)
3,4
b)
Parts description
1,2
c)
d)
Rev. 3
09PIR-P01 Page 18
6.
For the following working steps the checking of the documents is according to the internal departmental procedures.
01
02
05
06
07
09
10
11
12
13
16
17
18
19
20
21
22
26
28
29
30
31
32
33
6.
WI 0100-A03
WI 09PIR-A02
TI 09PIR-F01
TI 09PIR-F02
TI 09PIR-F06
TI 09PE-P07
TI 09PE-P08
TI 09PE-P18
UN 9300-01
Rev. 3
Page
Clause No.
01.
OM-PI is replaced by EM
02.
03.
5.1.1
04.
5.1.2
05.
5.2
06.
5.3
07.
5.4
NSE-PI added
Changes