You are on page 1of 19

09PIR-P01 Page 2

1.

SCOPE OF APPLICATION
This checking instruction applies only to documents prepared on the basis of the Technical Instructions
09PIR-F02.

2.

AIM
This checking instruction serves as in internal basis for the engineering of piping in chemical and industrial
plant. It contains special stipulations about the substantive execution of checking documents. General and
organisational stipulations for the checking and approval of documents are set down in QA Instruction QA
0100-A03.
In case the checker is of the opinion that the checking should be more than specified in this document he must
do so and also keep Engineering Manager / HOD-PI informed.

3.

DEFINITIONS
For definitions refer QA 0100-A02.

4.

DEALING WITH DEVIATIONS AND CORRECTIVE ACTIONS

4.1

General
If any data in the documents do not tally with the basic checking data, these will be corrected by the checker
and given back to the staff member in charge for correction work and re-submission for checking.
The results of the checking are to be documented in master copies. After carrying in all corrections into the
original, there follows the approval as described in QAI QA 0100-A03.

4.2

Piping model
All errors, as well as missing components or text, will be recorded. After correction by the person in charge
and the model builder the model will be checked again . Revisions, which become necessary arising out of
client requests or through design and process engineering deviations to the basic data, must be authorised.
Only after authorisation are the revisions carried out and the model once more checked and approved.

4.3

CAD-Isometrics (if applicable)


If any data in isometrics such as dimensions, coordinates, code Nos., etc. do not coincide with the basic
checking data, these isometrics will be corrected by the checker and returned to the coder for processing. If
process engineering errors are found, if the isometric is incomplete for e.g. without supports, the checker shall
return the isometric to the "person in charge" for correction work, who will re-submit the isometric for
checking after correction.

5.

EXECUTION OF CHECKING
The scope of checking described in the following sections, can possibly be reduced, if the feed through of
information can be assured by the use of EDP application systems. (Avoidance of multiple checking).
Under column "Basic data for checking" the stipulations shall never be treated as exhaustive , Whatever
additional basic data are required for checking ,the checker is authorised to refer additional data to achieve the
desired results.

CHI: Checking of Documents

Rev. 3

09PIR-P01 Page 3

5.1.1

Piping specification (WS No.03)

Checking

The department nominated specialist engineer (DSE-PI) - Design; checks


(complete 100%) on the basis of this Checking Instruction.

Co-checking

./.

Approval
Basic data
for checking

Department Nominated Approving Authority (Specialist function), DM-SE

1. General engineering specification, piping.


2. P & I diagrams
3. PE data for list of process fluids
4. PE data for piping specification (material, valves)
5. Calculation/rating documents (wall thkns., branches)/computer file
6. Specification for special parts
7. Technical Instruction 09PIR-F02 "Preparation of Piping (PIR)
Documents"
8. Basic piping specification supplied by process licensor.

Scope of checking

Basic data for checking

Part 1 General:
-

All specified requirements

Part 2 List of process fluids:


-

PE-data
Allocation of pipe classes to process fluids
Consideration of requirements from legal
regulations as e.g. classification of flow
medium according to ANSI/ASME, IBR regulations etc.

3
2,4,3,8.

As per regulations

Part 3 Wall thickness, branches:


-

All dimensions and data

Part 4 Pipe classes:


-

All items

Part 5 : Insulation Tables

- Annexures, if any

CHI: Checking of Documents

1,4,6,8
1,2,3,4,8

All

Rev. 3

09PIR-P01 Page 4

5.1.2

Technical specifications (WS.No.03)

Checking

DSE-PI checks all technical specifications completely (100%).


DSE-PI also checks technical specifications of special parts which are
governed by layouts.

Co-checking

L-PI co-checks tech. Spec. of special parts which are governed by layouts.

Approval

Department Nominated Approving Authority (DM-SE) approves all


technical specifications as well as the technical specifications of special
parts which are governed by layouts.

Basic data
for checking

1.
2.
3.
4.
5.

General engineering specification, piping.


Piping specifications.
National & International Stds.
Technical Instructions 09 PIR-F02 "Preparation of Piping (PIR)
Documents"
Clients requirements, Licensors requirements & Process requirements.

Scope of checking

Basic data for checking

Construction features, materials, Test and Inspection Stds.


Test pressure, Rating, Code No.

1,2,3,

Special features & Addl. features

1, 5 & as per piping layout


requirements.

CHI: Checking of Documents

Rev. 3

09PIR-P01 Page 5

5.2

P&I diagrams for utility stations and distribution systems (WS No.08)

Checking

The Lead Piping engineer checks the distribution systems Part (a) & (c) completely
(100%) & others as spotcheck on the basis of this Checking Instruction.
(Utility station by PE not covered here)

Co-Checking :

L-PE ; checks /comments for process engineering information including Part -b.

Approval

EM / PMR - approves the P&I.

Basic data
for checking :

1.
2.
3.
4.
5.
6.
7.

P&I diagrams for process and utility plants


P&I diagrams for interconnecting piping
Data for P&I diagrams for utilities and distribution systems
Piping list
Unit plot plans
Piping specification
Technical Instruction 09 PIR-F02 "Preparation of Piping (PIR) Documents"

Scope of checking
a)

Information content

- Battery limits, matchpoints,


headers and branch arrangements

b)

Process engineering information:

- Direction of flow line sizes,


instrumentation, safety arrangements,
pressure release points, sample points,
special facilities for commissioning
c)

Basic data for checking

1,2,3.

Piping and valves :

- Piping designation, special parts code No., data for


insulation and heating

CHI: Checking of Documents

4,6

Rev. 3

09PIR-P01 Page 6

5.3

Pipe supports (WS No.14)

Checking

The Departments Nominated Specialist Engineer (DSE-PI); checks Sl. No. (a), (b), (d)
completely (100%) on the basis of this Checking Instruction.

Co-Checking :

----------

Approval

The Lead Piping Engineer approves the Support Specification, Standard Support drawings
and non-stress category special supports.
The Department Nominated Approving Authority (DM-SE) approves the stress-category
special supports.

Basic data
for checking :

1.
2.
3.
4.
5.
6.
7.
8.
9.

General engineering specification piping


Piping specification
Technical Instruction 09PIR F02 "Preparation of Piping (PIR) Documents
Uhde Standard pipe supports
Support specification for project
Stress analysis of pipes
Overall plan for steel structure
Civil engineering design drawing
Piping arrangement drawing.

Scope of checking

a)

Support specification Part 1 General:

- All specified requirements


b)

Basic data for checking

Support specification Part 2 Support classes:

- Allocation of support class to each combination


of pipe class and fluid class

- Selection of each sub-assembly for support specs.

1,4

c)

Supports specification Part 3 Sub assemblies, main dimensions:

- Completeness of data in regard to engineering


d)

Standard engineering requirements

Special support sketches

- Design of special support sketch

6,7,8,9

- Checking of the date in the drawing and parts list

- Completeness of the data in regard to


fabrication in the workshop or on the job site

Standard engineering requirements

CHI: Checking of Documents

Rev. 3

09PIR-P01 Page 7

5.4

Detail drawings for underground piping (WS-No.15)

Checking

The Nominated Specialist Engineer (NSE-PI); checks completely (100%) on the basis of
this Checking Instruction.

Co-Checking :

----------

Approval

The Lead Piping Engineer approves the drawings

for checking :

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.

Overall plot plan and unit plot plan


Piping specifications
P&I diagrams
Piping list
Underground coordination plan
General engineering specifications
Specification for coating/wrapping of underground piping
Civil engineering design drawing.
Specification for fire fighting.
Specification for cathodic protection.

Scope of checking

Basic data for checking

Pipe runs:
-

Piping designation, piping components, branch


points, flow direction, safety devices, total number of lines drawn.

3,4

Pipe routing drawings:


- Correct positional representation with
respect to plant north, position of
foundations, plant coordinates, structure
grid, elevations

1,5,6,7,8,9,10

Piping components :
- Substantive correct arrangement of valves,
instrumentation, control elements, special
components, drains, vents, etc.
- Sequence of assembly and dimensions

CHI: Checking of Documents

6,7,9,10 and
Standard Engineering requirements
2,3

Rev. 3

09PIR-P01 Page 8

5.5.1

Piping study and layout drawings (including pipe rack) (WS-No.17 and 25) (For Non-Model areas)

Checking

The Nominated Specialist Engineers (NSE-PI):checks completely (100%) on the basis of


this Checking Instruction.

Approval

L-PI approves piping study and layout drawings (WS No.17 & 25).

Basic data
for checking :

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12
13.
14.
15.
16.
17.

Piping specification
Support specification
Line list
P & I diagrams
Overall plot plan (for pipe rack drawings)
Unit plot plan
Overall plans for steel structures
Civil engineering design drawings
Equipment specifications
Manufacturer's data (fabrication drawing)
Stress analysis of pipelines
IC data list for individual devices
Vessel nozzles data sheet
Technical Instruction 09PIR-F01 "Design Instructions for above-ground piping"
Technical Instruction 09PIR-F02 "Preparation of Piping (PIR) Documents"
UR 9253-21 Part 1 "Pressure and leak testing of piping"
General Engineering Specification.

Scope of checking
a)

Pipe runs:

- Piping designation, branches, sample points,


direction of flow, slope data, insulation and
heating data, total numbers of lines drawn

b)

5,6,7,8
4

Piping components:

- Substantive correct arrangement of valves


instrumentation, control elements, special components
process drains, vents, etc.
- Dimensions of piping arrangements

d)

3,4

Pipe routing drawings:

- Position of piping in relation to equipment/buildings structure


coordinates, or structure grid and plant north, level of piping
and elevations
- Position and designation of connecting piping

c)

Basic data for checking

4,14
1,12

Pipe supports:

- Arrangement, designation and locations

CHI: Checking of Documents

2,11,7,8,9

Rev. 3

09PIR-P01 Page 9

5.5.1

Piping study and layout drawings (WS-No.17 and 25)(For Non-Model Areas)

Scope of checking
e)

Basic data for checking

Equipment:

- Eqpt. shape and designation, nozzle number & size

9,10

- Reference dimensions from structure


- Nozzle orientation and elevation
- Battery limits

6
9,13
4,10

f)
Consideration of required free space for escape ways,
operating, maintenance, erection/disassembly of
equipment and piping

7,8,6,9.

g)
Consideration of requirements for cleaning, pressure and
leak test

16

h)

Consideration of prevention of accidents and work safety rules

17 & Standard Engineering


requirements

i)

Compliance to engineering safety and plant operation requirements

17 & Standard Engineering


requirements.

CHI: Checking of Documents

Rev. 3

09PIR-P01 Page 10

5.5.2

Piping study and layout drawings (including pipe rack) (WS-No.17 and 25) (For areas covered by
plastic model)

Checking

The Nominated Specialist Engineers (NSE-PI):checks completely (100%) Sl. Nos. a, c, f,


g, h,i. The rest are to be spot checked on the basis of this Checking Instructions.

Approval

L-PI approves piping study and layout drawings (WS No.17 & 25).

Basic data
for checking :

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12
13.
14.
15.
16.
17.

Piping specification
Support specification
Line list
P & I diagrams
Overall plot plan (for pipe rack drawings)
Unit plot plan
Overall plans for steel structures
Civil engineering design drawings
Equipment specifications
Manufacturer's data (fabrication drawing)
Stress analysis of pipelines
IC data list for individual devices
Vessel nozzles data sheet
Technical Instruction 09PIR-F01 "Design Instructions for above-ground piping"
Technical Instruction 09PIR-F02 "Preparation of Piping (PIR) Documents"
UR 9253-21 Part 1 "Pressure and leak testing of piping"
General Engineering Specification.

Scope of checking
a)
-

b)

Pipe runs:
Piping designation, branches, measurement points,
direction of flow, slope data, insulation and
heating data, total numbers of lines drawn

5,6,7,8
4

Piping components:

- Substantive correct arrangement of valves


instrumentation, control elements, special components
drains, vents, etc.
- Dimensions of piping arrangements

d)

3,4

Pipe routing drawings:

- Position of piping in relation to equipment/building/structure coordinates,


or structure grid and plant north, level of piping and elevations
- Position and designation of connecting piping

c)

Basic data for checking

4,14
1,12,

Pipe supports:

- Arrangements designation and locations

CHI: Checking of Documents

2,11,7,8,9

Rev. 3

09PIR-P01 Page 11

5.5.2

Piping study and layout drawings (WS-No.17 and 25)(For areas covered by plastic model)

Scope of checking
e)
-

Basic data for checking

Equipment:
Equipment shape, designation, nozzle number and size
Reference dimensions from structure
Nozzle orientation and elevation
Battery limits

9,10
6
9,13
4,10

f)
Consideration of required free space for escape ways,
operating, maintenance, erection/disassembly of
equipment and piping

7,8,6,9

g)
Consideration of requirements for cleaning, pressure and
leak test

16

h)

Consideration of prevention of accidents and work safety rules

17 & Standard Engineering


requirements

i)

Compliance to engineering safety and plant operation requirements

17 & Standard Engineering


requirements.

CHI: Checking of Documents

Rev. 3

09PIR-P01 Page 12

5.6

Piping model (WS-No.23)

Checking

Co-Checking:

Approval

The Nominated Specialist Engineer (NSE-PI):checks on the basis of this Checking


Instructions, as per scope given in NOTE-1
By Lead Piping, Mechanical, Civil Process, Electrical & Instrument & Erection engineer as
per details given in NOTE: 1.

Basic data
for checking :

EM / PMR approves the piping model.

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.

Civil engineering design drawings.


Unit plot plan and overall plot plan
P & I diagrams
Piping studies incl. design for pipe supports
Piping sketches
Isometric sketches or Isometrics
Equipment drawings or fabricators data.
Cable routing diagrams
Uhde-Standard UN 9300-01 Piping model.
Technical Instruction 09 PIR-F01 "Design Instructions for above ground piping"
UR 9253-21 Part 1 "Pressure and leak testing of piping".
General Engineering Specifications.
Line list.

Scope of checking
a)
-

b)

Basic data for checking

Pipe runs:
Piping designation, branches, measurement points,
direction of flow, data, insulation and
heating, lines to be shown on model

3,4,5,6,13.

Pipe routing drawings:

- Position of piping and connecting piping, sequence of assembly


and dimensions.
c)
Piping components:

2,3,4,6

i) - Correct arrangement of valves, sampling systems


special components, process drains, vents, etc.
3,4,6,8,9,10.
ii) - Cable trays for electrical and instruments, junction boxes, lighting pads
iii)- Instrumentations, control elements, measuring points etc.
d)
-

Equipment and structure:


Dimensions and designation
1,2,4,7
Eqpt. nozzle location. orientation & level and size, cleats for support
Eqpt. foundation size & height, anchor bolt orientation
Eqpt. supported platform and its arrangement, cleats for platform support bracket
Independent technological structure and its arrangement
Building structure and its arrangement

NOTE-1
-Piping to check Sl.Nos.a, b, d, e, f, g, h
-Process to check Sl.Nos. c(i), c(iii), f, g, h
-Instrumentation to check Sl.Nos. c(ii) & c(iii)
-Electrical to check Sl.No. c(ii)
-Erection to check Sl.No.e(ii).
-civil to check sl. No. d (iii), d(iv). d(v), d(vi)
-Mechnical to check Sl. No. d(I), d(ii), d(iv)
CHI: Checking of Documents

Rev. 3

09PIR-P01 Page 13
5.6

Piping model (WS-No.23)


Scope of checking

e)
i)

Basic data for checking

ii)

Consideration of required free space for escape ways,


operating, maintenance.
Erection /re-erection /dismantling of equipment & piping.

1,2
1,2,7

f)

Consideration of requirements for cleaning, pressure and leak test

11

g)

Consideration of prevention of accidents and work safety rules

12, Standard Engineering requirements

h)

Compliance to engineering safety and plant operation requirements

12, standard Engineering requirements.

CHI: Checking of Documents

Rev. 3

09PIR-P01 Page 14

5.7

Isometrics sketches (WS-No. 20)[Hand-drawn if ISOMET is not used in the Project, otherwise thru'
ISOMET]

Checking

The Nominated Specialist Engineer (NSE-PI):checks completely (100%) on the basis of


this Checking Instruction.

Approval

Lead Piping Engineer (L-PI) certifies / approves the isometric sketches before they are
released for further work.

Basic data
for checking :

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.

Piping layout/study for plant sections including design for pipe supports
P & I diagrams
Piping list - Line list.
Piping specification
Pipe support specification
Stress analysis and results.
IC data list for individual devices
Equipment specifications.
Manufacturer's data (fabrication drawings)
Vessel nozzles data sheets.
Unit plot plan drawings
Piping model
Technical Instruction 09 PIR-F02"Design Instructions for above ground piping"
Technical Instruction 09 PIR-F02 "Preparation of Piping (PIR) Documents"

Scope of checking
a)

b)

c)

d)

Pipe runs:
i) Piping designation, branches, instrument tapping,
direction of flow, data for insulation and
heating, change of pipe class rating, total number
of isometrics to be made.

Pipe routing drawings:


i) Piping layout w.r.t. plant coordinates, structures,
foundations, north directions, piping slopes and
elevations
ii)Match line and designation of connecting
piping

Piping components and piping dimensions:


i) Correct arrangement of valves,
instrumentation, control elements, special components
drains, vents, weld points, etc.
ii)Sequence of piping and instrument items
designation, dimensions and coordinates
resulting from piping arrangements

Pipe supports:
i) Arrangement, designation and locations

CHI: Checking of Documents

Basic data for checking

2,3

1,11,12
2

13,

1,2,4,7,12

1,5,6

Rev. 3

09PIR-P01 Page 15

5.7

Isometrics sketches (WS-No.20)

Scope of checking
e)

Basic data for checking

Equipment:
i) Equipment designation, nozzle size, number
and pressure rating 8,9.
ii)Reference dimensions to structure
1,11
iii)Nozzle protection and elevation
10,8
iv) Battery limits
2,9

f)

This part of the check requirement is to be carried


out before sending isometric sketches to PE & IC for
obtaining their comments.
i) Piping designation, branches, valves, special components
instruments, direction of flows, slopes, change of pipe
class rating, elevations and main layout dimensions,
designation of connecting piping

1,2,3,7

ii) Equipment designation, nozzle number

10,8

CHI: Checking of Documents

Rev. 3

09PIR-P01 Page 16

5.8

Isometrics (WS No.24) (extracted from Isomet ' PDMS)

Checking

Nominated specialist Engineer Piping (NSE-PI) checks completely (100%) as per this
checking instruction.

Co-Checking :

-------------

Approval

Lead Piping Engineer (L-PI) approves the final isometrics after spot checking as per the
checking instructions for isometrics sketches. (W.S No.20). L-PI shall take care of latest
P&ID changes.

Basic data
for checking :

1.
2.

Isometrics sketches (WS No.20)


B.O.M. printed on isometric.

Scope of checking
Complete comparison of the final isometric and B.O.M.
(printed on Isometric)with the isometric sketches

CHI: Checking of Documents

Basic data for checking

1, 2

Rev. 3

09PIR-P01 Page 17

5.9

Bill of Material Summary (WS-No. 10 & 27)

Checking

The Department Nominated Specialist Engineer (DSE-PI) checks completely (100%) for
requirements as per Sl.Nos.c, d & others as spot checks on the basis of this Checking
Instruction.

Co-Checking :

Lead Engineer - Piping (L-PI)

Approval

DM-SE & EM approves the total bill of materials.

Basic data
for checking :

1.
2.
3.
4.
5.

Piping specification.
Pipe support specification.
Technical Instruction 09 PIR-F02 "Preparation of Piping (PIR) Documents".
Requirements for spare quantities
Line list

Scope of checking
a)

Basic data for checking

Material requirements for piping components and supports


(incl. spare quantities), designation and dimensions

3,4

b)

Parts description

1,2

c)

Ensure that BOM of all lines are considered

d)

Check correctness of bill of materials for critical items


i.e long delivery & high cost items.

CHI: Checking of Documents

Rev. 3

09PIR-P01 Page 18

6.

FURTHER WORKING STEPS (AS) ACC. TO WORKING INSTRUCTION 09PIR-A01

For the following working steps the checking of the documents is according to the internal departmental procedures.
01
02
05
06
07
09
10
11
12
13
16
17
18
19
20
21
22
26
28
29
30
31
32
33

6.

CITED STANDARDS AND INSTRUCTIONS

WI 0100-A03
WI 09PIR-A02
TI 09PIR-F01
TI 09PIR-F02
TI 09PIR-F06
TI 09PE-P07
TI 09PE-P08
TI 09PE-P18
UN 9300-01

Technical implementation principles


Organisational and administrative implementation principles
Piping lists
Data for P&I diagram for process plants and offsites
Data for P&I diagram for interconnecting pipelines
Data for underground piping coordination plan
Provision bill of materials
Technical bid comparison, selection of sub-contractors, order documents
Equipment related procedure
Installation instructions for piping
Piping study for pipe bridges, racks
Piping study and layout drawings for plant sections
Nozzle orientation for equipment
Civil engineering data
Isometric sketches
Info. required for pump data / electric tracing
Stress analysis for pipeline
Specification for special components
Erection data
Documentation
List of spares
As-built revision
Post mortem costing
Statutory approval procedures

Checking and approval of contract related documents


Preparation of documents, organisational requirements
Design Instructions for above ground piping
Preparation of documents, technical stipulations
CAD-Processing of Flow Sheets
Checking of Process Flow Sheets for Process & Utility plants and Basic Flow Sheet
Checking of Process Flow Sheets for connecting piping
Checking of P&I diagrams for Process and Utility plants and connecting piping
Piping Models

UHDE Standard Piping Supports

CHI: Checking of Documents

Rev. 3

09PIR-P01 R01 Page 1 of 1

LIST OF CHANGES MADE IN APPLICABLE REVISION


Applicable Revision No.: 3
Sl.No.

Page

Clause No.

01.

OM-PI is replaced by EM

02.

Verification / check by L-PI as well as NSE-PI


and L-PI as well as OM-PI is deleted

03.

5.1.1

L-PI replaced by DSE-PI


OM-SE replaced by DM-SE

04.

5.1.2

NSE-PI replaced by DSE-PI


OM-SE replaced by DM-SE
Co-checking by L-PI added

05.

5.2

OM-PI replaced by EM / PMR

06.

5.3

NSE-PI replaced by DSE-PI


Approval by L-PI revised
Approval by DM-SE added for stress category
Special supports

07.

5.4

NSE-PI added

CHI: Checking of Documents

Changes

You might also like