I did my internship with Minconsult from 15/05/2016 till 28/09/2016
in the Power Plant and Renewable Energy (PPRE) department
under the watchful eyes of Mr. Raja Harris and Achugovind Kumar.
Table of Contents
Contents
Introduction _________________________________________________________________1
Foreword___________________________________________________________________2
Summary of subject learnt______________________________________________________3
Work done during the period____________________________________________________5
References__________________________________________________________________6
Conclusion__________________________________________________________________7
Pg. 1
Make the best
from the
opportunity given
and not wait for
the perfect
opportunity to
come
ConclusionConclusion
Introduction
Personal Details
I am a 1st year Mechanical Engineering student at University of Southampton Malaysia
Campus. This internship was done during my summer break. It is my personal initiative and not
a part of the university requirement.
What I gained
Besides learning technical stuff about power plant, I was also exposure to the office
environment and situation help me to improve my interpersonal skill and become a better team
player. Acknowledging the real situation, now I have to admit that communication and team
spirit plays a vital part in our career in the office alongside the technical knowledge.
Though I did not have the opportunity to delve deep into a project, mainly due to my limited
knowledge and background in the subject, I managed to touch quite a few projects mainly the
Khulna Feasibility Studies, Kedah Coal Fired Power Plant and also Pulau Indah Combined
Cycle Power Plant.
Future Planning
I look forward to come back here and hope to be able to do more works alongside the
engineers.
Pg. 2
ConclusionConclusion
Foreword
I would like to than my father for giving me the big help in landing this internship. I would have
been near impossible to get an internship spot as a 1st year student but it did not deter my spirit
to learn and discover. Keen on learning more about the power plant field, I decide to invest my
time during the 4 months summer break at the biggest consultant company in Malaysia,
Minconsult. It was one of the most beneficial investment I could have done as the experience
gained outweigh the time spent there.
Never the less, there are times where things are a bit tough but with the help of other engineers
and managers, I managed to muscle through the internship and achieve my goals. I received a
lot of help and assistance in solving and understanding key concept in a combined cycle power
plants and coal fired power plants.
Pg. 3
ConclusionConclusion
Pg. 4
ConclusionConclusion
Second month
Dig deeper into each part and learn the governing principle behind it
Know the individual small parts that make the big part. Example, turbine blade, stator
blades, lubricating system and many more that makes a single gas turbine
Learn the multiple designs available and their advantages as well as limitations e.g.
classes of GT
Identify the usage of each design for example jockey pump usage is different from a
centrifugal pump and so on
Learn the factors influencing the performance of the part
Learn the design parameters to be keep into consideration before choosing a suitable
model for a particular job e.g. NPSH, flow rate, power consumption etc.
Learn the others consideration needed to be satisfied before a power plant is made
Learn the importance of doing and environmental assessment test, geological study,
sociological impact, economical feasibility and so on
Steps taken before a plant can be approved from the proposal stage to feasibility
studies, approval from the authority, tender agreement and so on till the
commissioning
Learn the basic operation principle of a power plant for base or intermediate or peaking
load
How the varying load affect plant life time of a plant
Which plant type is suitable for each purpose considering the capital cost, operation
cost, build time and so on
Third month
Learn the operation and maintenance of power plant
Pg. 5
ConclusionConclusion
Side dish
The job scope of consultant
Pg. 6
ConclusionConclusion
Pg. 7
ConclusionConclusion
Calculations
Learn how to estimate the amount of fuel needed to achieve the needed power output for
Khulna Combined Cycle Power Plant.
Site Layout
Brainstorm on the design of jetty at Kedah Coal Fired Power Plant.
Meetings Report
I have learnt how to handle a meeting in order to quickly resolve a work. Then I was tasked to
make a report from a meeting from a vendor.
Internal Audit
I helped to prepare the documents and files for auditing.
Filing System
Helped the secretary in updating the files and checking the data to make sure they are in order.
Pg. 8
ConclusionConclusion
References
1.1 Combined Cycle Technology, Proven and Efficiency for Power Generation (IEM Library)
1.2 Gas Turbine Handbook (IEM Library)
1.3 Coal Power Plant (IEM Library)
1.4 Modern Power Station Practice (Minconsult Library)
1.5 Siemens website to learn the design and details of gas turbine
1.6 Wikipedia.com (general)
1.7 Emerson Energy for flow diagram of power plant and plant operation
1.8 Youtube.com for animated operation of power plant
1.9 Statement of Capability (PPRE)
1.10 Power Plant Handbook, for new staff and trainee (PPRE)
Pg. 9
ConclusionConclusion
Conclusion
In short, I am very grateful for the chance given. Even if I am a 1 st year student and lacks a lot
of knowledge, the PPRE staff was supporting and cooperative. They helped me to get
understand the subject matter at hand and more. Although not given so much opportunity to do
engineering works and the like, I have to admit that my knowledge still needs to be improved
before I can get my hands into real jobs. It opened my horizon on the vast work surrounding
the consultancy field and help me make a sound decision for my future career.