MATRIX OF RESPONSIBILITY
REMARKS
PRE-DESIGN PHASE
1.0
2.0
Selection of Consultants
4.0
Utilities
3.2
Transporation
3.3
Cost
3.4
Land Use
*
*
*
*
*
*
*
*
*
*
*
*
Socio Economic
4.2
Market Study
4.3
Financial Options
4.4
Budget Estimate
*
*
*
*
*
*
*
5.0
Topographic Survey
6.0
Soil Investigation
7.0
8.0
*
*
*
*
*
*
*
*
Legend :
Primary Responsibility
ATMCI-F-OPN-03/03
Revision 00
Page 1 of 10
9.0
CONTRACTOR
QUANTITY
SURVEYOR
OTHER
CONSULTANT
PROJ. MGR.
REMARKS
9.2
Zoning Requirements
9.3
Height Restrictions
9.4
9.5
9.6
9.7
DESIGN ENGR.
FUNCTIONS
ARCHITECT
OWNER
MATRIX OF RESPONSIBILITY
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
B.
1.0
2.0
Budgetary Estimate
3.0
Cash Flow
4.0
Feasibility Study
5.0
6.0
Market Planning
7.0
*
*
*
*
*
*
*
*
*
Legend :
ATMCI-F-OPN-03/03
Revision 00
Page 2 of 10
CONTRACTOR
QUANTITY
SURVEYOR
OTHER
CONSULTANT
PROJ. MGR.
DESIGN ENGR.
FUNCTIONS
ARCHITECT
OWNER
MATRIX OF RESPONSIBILITY
REMARKS
Primary Responsibility
ATMCI-F-OPN-03/03
Revision 00
Page 3 of 10
C.
CONTRACTOR
QUANTITY
SURVEYOR
OTHER
CONSULTANT
PROJ. MGR.
REMARKS
1.0
2.0
Preliminary Design
1.1
1.2
Outline Specifications
1.3
*
*
*
*
*
*
Working Drawings
2.2
Specifications
2.3
General Conditions
3.0
Value Engineering
4.0
5.0
6.0
5.1
5.2
Subdivision Permit
5.3
5.4
Building Permit
*
*
*
*
*
*
*
*
*
*
Phase Activities
D.
DESIGN ENGR.
FUNCTIONS
ARCHITECT
OWNER
MATRIX OF RESPONSIBILITY
1.0
Legend :
Primary Responsibility
ATMCI-F-OPN-03/03
Revision 00
Page 4 of 10
2.0
CONTRACTOR
QUANTITY
SURVEYOR
OTHER
CONSULTANT
REMARKS
*
*
*
*
3.0
4.0
5.0
6.0
7.0
8.0
9.0
*
*
*
*
*
*
*
*
*
PROJ. MGR.
DESIGN ENGR.
FUNCTIONS
ARCHITECT
OWNER
MATRIX OF RESPONSIBILITY
Evaluation of Bid
*
*
*
*
*
*
*
*
E.
CONSTRUCTION PHASE
1.0
2.0
3.0
*
*
*
*
*
Legend :
Primary Responsibility
ATMCI-F-OPN-03/03
Revision 00
Page 5 of 10
4.0
5.0
6.0
7.0
CONTRACTOR
QUANTITY
SURVEYOR
OTHER
CONSULTANT
PROJ. MGR.
DESIGN ENGR.
FUNCTIONS
ARCHITECT
OWNER
MATRIX OF RESPONSIBILITY
REMARKS
Preparation
4.2
Review
4.3
Approval
*
*
*
Change Orders
5.1
5.2
5.3
5.4
*
*
*
*
*
*
*
*
*
*
*
*
*
Progress Payments
6.1
6.2
Quality Control
7.1
7.2
*
*
7.3
7.4
*
*
*
*
*
*
7.6
7.7
*
*
*
*
Contractor / Owner
Legend :
Primary Responsibility
ATMCI-F-OPN-03/03
Revision 00
Page 6 of 10
8.0
9.0
CONTRACTOR
QUANTITY
SURVEYOR
OTHER
CONSULTANT
PROJ. MGR.
DESIGN ENGR.
FUNCTIONS
ARCHITECT
OWNER
MATRIX OF RESPONSIBILITY
REMARKS
Value Engineering
8.1
8.2
Review of Recommenfations
8.3
Approval
*
*
*
*
*
*
*
*
*
Value Engineering
9.1
9.2
9.3
*
*
*
*
*
b.
*
*
Management Meetings
c.2
Site Meetings
*
*
Legend :
Primary Responsibility
ATMCI-F-OPN-03/03
Revision 00
Page 7 of 10
CONTRACTOR
QUANTITY
SURVEYOR
OTHER
CONSULTANT
PROJ. MGR.
DESIGN ENGR.
FUNCTIONS
ARCHITECT
OWNER
MATRIX OF RESPONSIBILITY
REMARKS
*
*
Contractor / Owner
10.7 Prepare work progress reports
10.8 Keep Field Records :
a.
Jobsite Logbook
b.
Change Orders
c.
Payments
d.
Shop Drawings
e.
Contract Documents
f.
Minutes of Meetings
g.
Test Results
h.
As-Built Information
i.
Correspondences
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
11.2
Implementation
11.3
Inspection
*
*
Legend :
Primary Responsibility
ATMCI-F-OPN-03/03
Revision 00
Page 8 of 10
CONTRACTOR
QUANTITY
SURVEYOR
OTHER
CONSULTANT
PROJ. MGR.
DESIGN ENGR.
FUNCTIONS
ARCHITECT
OWNER
MATRIX OF RESPONSIBILITY
REMARKS
12.1 Preparation
12.2 Review and Approval
Preparation
b.
Verification
*
*
guideline
Secure Certification from Government Agencies
a.
b.
Occupancy Permit
*
*
Legend :
Primary Responsibility
ATMCI-F-OPN-03/03
Revision 00
Page 9 of 10
CONTRACTOR
QUANTITY
SURVEYOR
OTHER
CONSULTANT
PROJ. MGR.
DESIGN ENGR.
FUNCTIONS
ARCHITECT
OWNER
MATRIX OF RESPONSIBILITY
REMARKS
Warranty Certificates
b.
c.
Final Acceptance
d.
*
*
F.
1.0
Inspection
b.
Implementation
c.
Acceptance
*
*
3.0
4.0
Final Report
*
*
*
Legend :
Primary Responsibility
ATMCI-F-OPN-03/03
Revision 00
Page 10 of 10