Professional Documents
Culture Documents
LOKASI
TAHUN
:
:
No
1
A
LANTAI 1
I
II
PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
Rp
Rp
16,342,980.60
22,647,320.83
III
IV
PEKERJAAN PONDASI
PEKERJAAN DINDING
Rp
Rp
80,476,822.51
33,328,302.98
V
VI
PEKERJAAN PLESTERAN
PEKERJAAN BETON
Rp
Rp
37,608,678.57
109,032,301.44
VII
VIII
IX
Rp
Rp
Rp
50,845,840.82
5,369,625.88
10,684,102.32
PEKERJAAN SANITASI
Rp
Rp
25,374,909.00
391,710,884.95
Uraian Pekerjaan
2
Jumlah
3
JUMLAH LANTAI 1
B
LANTAI 2
I
II
PEKERJAAN BETON
PEKERJAAN DINDING
Rp
Rp
192,582,816.65
52,979,321.80
III
IV
PEKERJAAN PLESTERAN
PEKERJAAN PENUTUP LANTAI & DINDING
Rp
Rp
69,562,400.00
55,041,837.76
V
VI
PEKERJAAN LANGIT-LANGIT
PEKERJAAN PENGECATAN
Rp
Rp
16,200,135.13
17,068,372.83
VII
VIII
PEKERJAAN SANITASI
PEKERJAAN PENUTUP ATAP
Rp
Rp
25,778,728.47
50,882,829.55
Rp
480,096,442.19
JUMLAH LANTAI 2
C
I
LAIN-LAIN
PEKERJAAN TANGGA
Rp
3,393,855.48
II
III
Rp
Rp
8,178,923.82
2,623,288.15
IV
PEKERJAAN LANDSCAPE
Rp
Rp
20,191,149.54
34,387,216.98
JUMLAH
Rp
906,194,544.12
JUMLAH TOTAL
DIBULATKAN
Rp
Rp
906,194,544.12
906,100,000.00
JUMLAH LAIN-LAIN
Rp
2,323,333.33
Semarang, April 2013
Estimator
FARIZ HADAFI
Sat.
3
Volume
4
Harga Satuan
5
Jumlah Harga
6
LANTAI 1
PEKERJAAN PERSIAPAN
Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
Pengukuran dan Pemasangan Bouwplank
Pembuatan Gudang dan Kantor Sementara
Membersihkan Lapangan dan Perataan
Bongkaran Pondasi Batu Kali
m'
m'
m2
m2
m3
24.00
32.00
6.00
275.00
6.84
250,350.00
105,600.00
686,444.00
4,200.00
245,865.00
PEKERJAAN PERSIAPAN
6,008,400.00
3,379,200.00
4,118,664.00
1,155,000.00
1,681,716.60
16,342,980.60
II
1
2
3
4
PEKERJAAN TANAH
Menggali Tanah untuk Pondasi Batu Kali
Menggali Tanah untuk Pondasi Footplat
Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)
Mengurug Sirtu Padat untuk Peninggian Lantai Bangunan
m3
m3
m3
m3
150.29
41.62
63.97
60.00
35,125.00
35,125.00
11,708.33
252,625.00
PEKERJAAN TANAH
5,278,936.25
1,461,902.50
748,982.08
15,157,500.00
22,647,320.83
III
1
2
3
4
5
6
7
8
PEKERJAAN PONDASI
Memasang Pondasi Batu Kali 1Pc : 5 PP
Pasang Pondasi Batu Kosong
Urugan Pasir Bawah Pondasi
Membuat Lantai Kerja untuk Footplat
Urugan Pasir Bawah Footplat
Membuat Pondasi Footplat
Pabrikasi Pembesian Footplat
Memasang Rollag Bata
m3
m3
m3
m2
m3
m3
kg
m2
57.11
28.86
7.13
2.45
2.45
13.40
2022.59
10.01
552,180.00
309,180.00
164,050.00
684,838.00
164,050.00
773,433.96
12,293.00
154,155.00
PEKERJAAN PONDASI
31,534,999.80
8,922,934.80
1,169,676.50
1,676,483.42
401,922.50
10,364,015.06
24,863,698.87
1,543,091.55
80,476,822.51
IV
1
2
3
4
PEKERJAAN DINDING
Memasang Dinding Bata Merah 1pc : 3pp
Memasang Dinding Bata Merah 1pc : 5pp
Memasang Rooster dan Glass Block
memasang Kolom Praktis 15x15cm
m2
m2
m2
m'
138.11
149.07
17.28
120.00
79,596.75
74,112.00
265,250.00
55,865.00
PEKERJAAN DINDING
10,993,107.14
11,047,875.84
4,583,520.00
6,703,800.00
33,328,302.98
V
1
2
3
PEKERJAAN PLESTERAN
Memasang Plesteran 1pc : 3pp tebal 20mm
Memasang Plesteran 1pc : 5pp tebal 20mm
Memasang Acian
m2
m2
m2
276.22
298.14
574.36
43,584.20
46,572.80
20,343.75
PEKERJAAN PLESTERAN
12,038,827.72
13,885,214.59
11,684,636.25
37,608,678.57
VI
1
2
3
4
5
6
PEKERJAAN BETON
Memasang Bekisting untuk Sloof
Pabrikasi Pembesian Sloof
Pengecoran Sloof mutu (K175)
Memasang Bekisting untuk Kolom Struktur
Pabrikasi Pembesian Kolom Struktur
Pengecoran Kolom Struktur mutu (K175)
m2
kg
m3
m2
kg
m3
103.54
1284.28
7.76
161.00
1802.37
16.42
96,970.00
12,293.00
773,433.96
263,010.00
12,293.00
773,433.96
PEKERJAAN BETON
10,040,273.80
15,787,654.04
6,001,847.53
42,344,610.00
22,156,583.58
12,701,332.49
109,032,301.44
VII
1
2
3
5
6
7
8
m2
m2
m'
m2
m2
m'
m'
155.00
152,950.00
20.00
146,382.00
101.66
29,005.25
42.30
161,901.50
72.31
161,901.50
51.02
29,005.00
42.30
29,005.00
PEKERJAAN PENUTUP LANTAI & DINDING
23,707,250.00
2,927,640.00
2,948,673.31
6,848,433.45
11,707,097.47
1,479,835.10
1,226,911.50
50,845,840.82
VIII
1
2
PEKERJAAN LANGIT-LANGIT
Memasang Plafond Kalsiboard
Finishing Exposed Beton
m2
m2
20.50
174.50
88,763.00
20,343.75
PEKERJAAN LANGIT-LANGIT
1,819,641.50
3,549,984.38
5,369,625.88
IX
1
2
PEKERJAAN PENGECATAN
Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup)
Pengecatan Plafond Exposed dan Kalsiboard
m2
m2
574.36
195.00
13,887.00
13,887.00
PEKERJAAN PENGECATAN
7,976,137.32
2,707,965.00
10,684,102.32
X
1
2
3
4
5
6
7
PEKERJAAN SANITASI
Memasang Closet Duduk/ Mono Blok
Memasang Pipa PVC type AW 1/2"
Memasang Pipa PVC type AW 2"
Memasang Pipa PVC type AW 4"
Memasang Bak Cuci Piring Stainles Steel
Memasang Kran " atau "
Memasang Floor Drain
Unit
m'
m'
m'
Buah
Buah
Buah
10.00
93.00
61.90
44.00
1.00
11.00
10.00
1,760,365.00
15,396.50
33,880.16
75,230.00
361,382.50
22,450.00
32,375.00
PEKERJAAN SANITASI
17,603,650.00
1,431,874.50
2,097,182.00
3,310,120.00
361,382.50
246,950.00
323,750.00
25,374,909.00
JUMLAH LANTAI 1
391,710,884.95
B
I
1
2
3
4
5
6
7
8
LANTAI 2
PEKERJAAN BETON
Memasang Bekisting Balok dan Plat Lantai
Pabrikasi Pembesian Balok
Pabrikasi Pembesian Plat
Pengecoran Balok dan Plat Lantai mutu (K175)
Memasang Bekisting untuk Kolom Struktur
Pabrikasi Pembesian Kolom Struktur
Pengecoran Kolom Struktur mutu (K175)
Pengecoran Dudukan Railing
m2
kg
kg
m3
m2
kg
m3
Unit
292.66
1546.75
2959.00
32.40
0.80
599.02
5.01
20.00
343,010.00
12,293.00
12,293.00
773,433.96
263,010.00
12,293.00
773,433.96
15,000.00
PEKERJAAN BETON
100,385,306.60
19,014,197.75
36,374,987.00
25,059,260.30
210,408.00
7,363,752.86
3,874,904.14
300,000.00
192,582,816.65
II
1
2
3
4
5
PEKERJAAN DINDING
Memasang Dinding Bata Merah 1pc : 3pp
Memasang Dinding Bata Merah 1pc : 5pp
Memasang Rooster dan Glass Block
Memasang Kolom Praktis 15x15cm
Memasang Tanggulan Bata untuk Slasar
m2
m2
m2
m'
m2
78.82
444.47
31.68
85.05
7.67
79,596.75
74,112.00
265,250.00
55,865.00
79,596.75
PEKERJAAN DINDING
6,273,815.84
32,940,560.64
8,403,120.00
4,751,318.25
610,507.07
52,979,321.80
III
1
2
3
PEKERJAAN PLESTERAN
Memasang Plesteran 1pc : 3pp tebal 20mm
Memasang Plesteran 1pc : 5pp tebal 20mm
Memasang Acian
m2
m2
m2
157.64
888.94
1046.58
43,584.20
46,572.80
20,343.75
PEKERJAAN PLESTERAN
6,870,613.29
41,400,424.83
21,291,361.88
69,562,400.00
IV
1
2
3
5
m2
m2
m'
m2
160.23
22.28
126.60
48.42
152,950.00
146,382.00
29,005.25
161,901.50
24,507,178.50
3,261,390.96
3,672,064.14
7,839,270.63
6
7
8
m2
m'
m'
78.82
161,901.50
55.04
29,005.00
48.42
29,005.00
PEKERJAAN PENUTUP LANTAI & DINDING
12,761,076.23
1,596,435.20
1,404,422.10
55,041,837.76
V
1
PEKERJAAN LANGIT-LANGIT
Memasang Plafond Kalsiboard Rangka Hollow 40x40mm
m2
182.51
88,763.00
PEKERJAAN LANGIT-LANGIT
16,200,135.13
16,200,135.13
VI
1
2
PEKERJAAN PENGECATAN
Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup)
Pengecatan Plafond Exposed dan Kalsiboard
m2
m2
1046.58
182.51
13,887.00
13,887.00
PEKERJAAN PENGECATAN
14,533,856.46
2,534,516.37
17,068,372.83
VII
1
2
3
4
5
6
7
8
PEKERJAAN SANITASI
Memasang Closet Duduk/ Mono Blok
Memasang Pipa PVC type AW 1/2"
Memasang Pipa PVC type AW 2"
Memasang Pipa PVC type AW 4"
Memasang Kran " atau "
Memasang Floor Drain
Memasang Roof Drain
Memasang Water Torn
Unit
m'
m'
m'
Buah
Buah
Bauh
Buah
11.00
60.50
26.10
26.10
11.00
11.00
1.00
2.00
1,760,365.00
15,396.50
33,880.16
75,230.00
22,450.00
32,375.00
32,375.00
1,000,000.00
PEKERJAAN SANITASI
19,364,015.00
931,488.25
884,272.22
1,963,503.00
246,950.00
356,125.00
32,375.00
2,000,000.00
25,778,728.47
VIII
1
2
3
4
5
6
7
8
9
m2
m2
m2
kg
m3
m'
unit
m'
m2
276.00
276.00
90.48
818.36
5.22
227.07
12.00
30.00
10.00
C
I
1
2
3
4
5
6
LAIN-LAIN
PEKERJAAN TANGGA
Memasang Bekisting untuk Pondasi Tangga
Pabrikasi Pembesian Pondasi Taangga
Pengecoran Pondasi Tangga mutu (K175)
Memasang Rollag Bata
Pengecoran Dudukan Railing
Memasang Tanggulan Bata untuk Slasar
m2
kg
m3
m2
Unit
m2
5.60
100.00
0.61
0.90
6.00
0.20
II
1
2
3
4
5
6
7
8
9
m3
m3
kg
m3
m'
m2
m2
m2
m3
III
1
2
3
4
5
6
PEKERJAAN GROUNDTANK
Menggali Tanah Untuk Graundtank
Urugan Pasir Bawah Lantai
Pabrikasi Pembesian
Pengecoran Plat Lantai dan Dinding Mutu (K175)
Memasang Acian
Memasang Waterproofing
m3
m3
kg
m3
m2
m2
5.49
3.23
66.10
1.30
14.57
14.57
31,250.00
144,500.00
11,467.00
735,158.00
18,622.00
120,000.00
PEKERJAAN GROUNDTANK
171,593.75
466,735.00
757,968.70
955,705.40
271,285.30
1,748,160.00
2,623,288.15
IV
1
2
3
4
5
5
5
PEKERJAAN LANDSCAPE
Menggali Tanah Untuk Saluran Air
Urugan Pasir Bawah Saluran
Pabrikasi Pembesian U-ditch
Pasang Bekisting U-ditch
Pengecoran U-ditch Mutu (K175)
Urugan Pasir Bawah Rabat Beton
Pengecoran Rabat Beton untuk Halaman
m3
m3
kg
m2
m3
m3
m3
5.41
0.90
150.45
39.66
4.69
6.44
6.44
31,250.00
144,500.00
11,467.00
228,380.00
735,158.00
144,500.00
735,158.00
PEKERJAAN LANDSCAPE
168,984.38
130,230.63
1,725,210.15
9,056,408.90
3,445,317.97
930,580.00
4,734,417.52
20,191,149.54
JUMLAH LAIN-LAIN
34,387,216.98
JUMLAH
906,194,544.12
120,000.00
PEKERJAAN PENUTUP ATAP
4,549,860.00
31,035,544.80
10,060,099.48
4,037,325.27
1,200,000.00
50,882,829.55
JUMLAH LANTAI 2
480,096,442.19
228,380.00
11,467.00
735,158.00
71,533.00
73,515.80
71,533.00
PEKERJAAN TANGGA
1,278,928.00
1,146,700.00
448,446.38
64,379.70
441,094.80
14,306.60
3,393,855.48
6.75
31,250.00
4.50
144,500.00
180.00
11,467.00
0.54
735,158.00
24.00
51,995.00
18.00
71,533.00
36.00
39,800.00
36.00
18,622.00
1.90
114,750.00
PEKERJAAN SEPTICKTANK (2 UNIT)
210,937.50
650,250.00
2,064,060.00
396,985.32
1,247,880.00
1,287,594.00
1,432,800.00
670,392.00
218,025.00
8,178,923.82
16,485.00
343,010.00
12,293.00
773,433.96
FARIZ HADAFI
BILL OF QUANTITY
( BQ )
PEKERJAAN
LOKASI
TAHUN
2013
NO
PEKERJAAN
A LANTAI 1
I PEKERJAAN PERSIAPAN
1 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
2 Pengukuran dan Pemasangan Bouwplank
3 Pembuatan Gudang dan Kantor Sementara
4 Membersihkan Lapangan dan Perataan
5 Bongkaran Pondasi Batu Kali
II PEKERJAAN TANAH
1 Menggali Tanah untuk Pondasi Batu Kali
2 Menggali Tanah untuk Pondasi Footplat
3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)
VOLUME
SATUAN
24.00
32.00
m'
m'
6.00
275.00
m2
m2
6.84
m3
150.29
m3
41.62
m3
m3
63.97
60.00
57.11
m3
28.86
7.13
m3
m3
2.45
2.45
m3
m3
13.40
2022.59
m3
kg
10.01
m2
IV PEKERJAAN DINDING
1 Memasang Dinding Bata Merah 1pc : 3pp
2 Memasang Dinding Bata Merah 1pc : 5pp
138.11
149.07
m2
m2
17.28
120.00
m2
m'
V PEKERJAAN PLESTERAN
1 Memasang Plesteran 1pc : 3pp tebal 20mm
2 Memasang Plesteran 1pc : 5pp tebal 20mm
276.22
298.14
m2
m2
3 Memasang Acian
574.36
m2
VI PEKERJAAN BETON
1 Memasang Bekisting untuk Sloof
103.54
m2
1284.28
7.76
kg
m3
161.00
1802.37
m2
kg
m3
16.42
m3
155.00
20.00
m2
m2
101.66
42.30
m'
m2
72.31
51.02
m2
m'
42.30
m'
20.50
174.50
m2
m2
IX PEKERJAAN PENGECATAN
1 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup)
2 Pengecatan Plafond Exposed dan Kalsiboard
574.36
195.00
m2
m2
X PEKERJAAN SANITASI
1 Memasang Closet Duduk/ Mono Blok
2 Memasang Pipa PVC type AW 1/2"
10.00
93.00
Unit
m'
61.90
44.00
m'
m'
1.00
11.00
Buah
Buah
10.00
Buah
LANTAI 2
PEKERJAAN BETON
I
1 Memasang Bekisting Balok dan Plat Lantai
2 Pabrikasi Pembesian Balok
292.66
1546.75
m2
kg
2959.00
32.40
0.80
kg
m3
m2
599.02
5.01
kg
m3
20.00
Unit
II PEKERJAAN DINDING
1 Memasang Dinding Bata Merah 1pc : 3pp
78.82
m2
444.47
31.68
m2
m2
85.05
7.67
m'
m2
157.64
888.94
m2
m2
3 Memasang Acian
1046.58
m2
160.23
22.28
m2
m2
126.60
48.42
m'
m2
78.82
55.04
m2
m'
48.42
m'
182.51
m2
1046.58
m2
182.51
m2
11.00
Unit
60.50
26.10
m'
m'
26.10
11.00
m'
Buah
11.00
1.00
Buah
Bauh
2.00
Buah
V PEKERJAAN LANGIT-LANGIT
1 Memasang Plafond Kalsiboard Rangka Hollow 40x40mm
VI PEKERJAAN PENGECATAN
1 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup)
2 Pengecatan Plafond Exposed dan Kalsiboard
276.00
m2
276.00
90.48
m2
m2
818.36
5.22
kg
m3
227.07
12.00
m'
unit
30.00
10.00
m'
m2
5.60
100.00
m2
kg
0.61
0.90
m3
m2
6.00
0.20
Unit
m2
6.75
4.50
m3
m3
180.00
0.54
kg
m3
24.00
18.00
m'
m2
36.00
36.00
m2
m2
1.90
m3
5.49
3.23
m3
m3
3 Pabrikasi Pembesian
4 Pengecoran Plat Lantai dan Dinding Mutu (K175)
66.10
1.30
kg
m3
5 Memasang Acian
6 Memasang Waterproofing
14.57
14.57
m2
m2
5.41
0.90
m3
m3
150.45
39.66
kg
m2
4.69
6.44
m3
m3
6.44
m3
LAIN-LAIN
I PEKERJAAN TANGGA
1 Memasang Bekisting untuk Pondasi Tangga
2 Pabrikasi Pembesian Pondasi Taangga
IV PEKERJAAN LANDSCAPE
1 Menggali Tanah Untuk Saluran Air
2 Urugan Pasir Bawah Saluran
3 Pabrikasi Pembesian U-ditch
4 Pasang Bekisting U-ditch
NO.
SNI
KODE
03-2835-2002
6
6.2
6.4
6.6
6.8
6.13
6.14
PEKERJAAN PERSIAPAN
Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
Pengukuran dan Pemasangan Bouwplank
Pembuatan Gudang dan Kantor Sementara
Membersihkan Lapangan dan Perataan
Bongkaran Pondasi Batu Kali
Bongkaran Dinding Tembok Batu Bata
m'
m'
m2
m2
m3
m3
250,350.00
105,600.00
686,444.00
4,200.00
245,865.00
301,830.00
6
6.1
6.9
6.10
6.11
6.15
PEKERJAAN TANAH
Menggali Tanah Biasa Sedalam 1 m
Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)
Pemadatan Tanah (per 20 cm)
Urugan Pasir
Mengurug Sirtu Padat untuk Peninggian Lantai Bangunan
m3
m3
m3
m3
m3
35,125.00
11,708.33
19,750.00
164,050.00
252,625.00
6
6.3
6.9
PEKERJAAN PONDASI
Memasang Pondasi Batu Kali 1Pc : 5 PP
Pasang Pondasi Batu Kosong
m3
m3
552,180.00
309,180.00
6
6.8
6.1
PEKERJAAN DINDING
Memasang Dinding Bata Merah Ukuran (5x11x22)cm
Memasang Dinding Bata Merah Ukuran (5x11x22)cm
m2
m2
79,596.75
74,112.00
6
6.14
6.27
PEKERJAAN PLESTERAN
Memasang Plesteran 1Pc : 3Pp tebal 20mm
Memasang Acian
m2
m2
43,584.20
20,343.75
6
6.5
6.21
6.22
6.23
6.24
PEKERJAAN BETON
Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275),
Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)
Memasang Beksting untuk Kolom
Memasang Bakisting untuk Balok
Memasang Bekostong untuk Lantai
m3
m3
M3
M2
M2
773,433.96
96,970.00
263,010.00
279,210.00
343,010.00
6
6.3
6.42
m2
m2
92,180.00
17,970.00
6
6.5
PEKERJAAN LANGIT-LANGIT
Memasang Langit-langit Tripleks uk(120x240)
m2
32,485.00
6
6.1
6.25
6.29
6.33
6.35
6.36
PEKERJAAN SANITASI
Memasang Closet Duduk/ Mono Blok
Memasang Pipa PVC type AW 1/2"
Memasang Pipa PVC type AW 2"
Memasang Bak Cuci Piring Stainles Steel
Memasang Kran " atau "
Memasang Floor Drain
II
III
IV
VI
VII
VIII
IX
03-2835-2008
03-2836-2008
03-6897-2008
03-2837-2008
03-7394-2008
03-3436-2002
03-2839-2008
URAIAN PEKERJAAN
SAT
Unit
m'
m'
Buah
Buah
Buah
Harga (Rp)
1,760,365.00
15,396.50
33,880.16
361,382.50
22,450.00
32,375.00
NO.
SNI
XI
XII
03-7395-2008
03-24
KODE
URAIAN PEKERJAAN
6
6.5
6.7
6.9
6.11
6.17
6
6.35
6.36
6.40
6.54
6
6.14
PEKERJAAN PENGECATAN
Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar
2 lap. Cat Penutup)
SAT
Harga (Rp)
Buah
Buah
Buah
Buah
m2
20,062.50
30,750.00
25,691.25
24,255.00
90,441.25
M2
m2
M2
m2
152,950.00
146,382.00
29,005.25
161,901.50
m2
13,887.00
No.
SNI
KODE
KOEF
SAT.
03-2835-2002
6.2
6.2.1
m'
1.25
2.5
1.2
0.005
0.009
0.072
0.06
0.45
Btg
Kg
Lbr
m3
m3
m3
Kg
Kg
0.2
0.4
0.02
0.02
OH
OH
OH
OH
Tenaga
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
m'
0.012
0.02
0.007
m3
Kg
m3
0.1
0.1
0.01
0.005
OH
OH
OH
OH
Tenaga
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
m2
1.7
0.21
0.3
10.5
0.03
0.05
1.5
Btg
m3
Kg
Kg
m3
m3
Lbr
2
1
0.2
0.05
OH
OH
OH
OH
Tenaga
Tukang Kayu
Pekerja
Kepala Tukang
Mandor
m2
0.1
0.05
OH
OH
6.4.2
6.6
6.6.1
6.6.2
6.8
6.8.2
HARGA BAHAN
/ UPAH
JUMLAH
PEKERJAAN PERSIAPAN
6.2.2
6.4
6.4.1
URAIAN PEKERJAAN
20,000.00
1,275.00
67,000.00
210,000.00
135,000.00
5,200,000.00
14,500.00
20,000.00
527,522.50
495,122.50
25,000.00
3,187.50
80,400.00
1,050.00
1,215.00
374,400.00
870.00
9,000.00
60,000.00
45,000.00
65,000.00
55,000.00
32,400.00
12,000.00
18,000.00
1,300.00
1,100.00
5,200,000.00
14,500.00
5,400,000.00
111,915.00
100,490.00
62,400.00
290.00
37,800.00
60,000.00
45,000.00
65,000.00
55,000.00
11,425.00
6,000.00
4,500.00
650.00
275.00
20,000.00
1,900,000.00
14,500.00
1,275.00
150,000.00
135,000.00
67,000.00
743,237.50
562,487.50
34,000.00
399,000.00
4,350.00
13,387.50
4,500.00
6,750.00
100,500.00
60,000.00
45,000.00
65,000.00
55,000.00
180,750.00
120,000.00
45,000.00
13,000.00
2,750.00
45,000.00
55,000.00
7,250.00
7,250.00
4,500.00
2,750.00
No.
SNI
KODE
6.13
6.13.2
6.14
6.14.2
II
KOEF
SAT.
m3
6.667
0.333
OH
OH
m3
6.667
0.033
OH
OH
03-2835 - 2008
6.1
6.1.2
6.9
6.10
6.10.2
6.11
6.11.1
m3
0.750
0.025
OH
OH
m3
m3
0.5
0.05
OH
OH
m3
1.2
m3
Urugan Pasir
Bahan
Pasir Urug
0.3
0.01
OH
OH
Tenaga
Pekerja
Mandor
m3
1.2
m3
0.25
0.025
OH
OH
Tenaga
Pekerja
Mandor
03-2835 - 2008
6.3
6.3.1
6.9.2
.
IV
m3
1.2
136
0.544
m3
Kg
m3
1.5
0.750
0.075
0.075
OH
OH
OH
OH
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
m3
1.2
0.432
m3
m3
0.78
0.39
0.039
0.039
OH
OH
OH
OH
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
03-6897 - 2008
6.8
JUMLAH
45,000.00
55,000.00
318,330.00
318,330.00
300,015.00
18,315.00
45,000.00
55,000.00
301,830.00
301,830.00
300,015.00
1,815.00
45,000.00
55,000.00
35,125.00
35,125.00
33,750.00
1,375.00
35,000.00
45,000.00
19,750.00
19,750.00
17,500.00
2,250.00
125,000.00
164,050.00
150,000.00
150,000.00
45,000.00
55,000.00
14,050.00
13,500.00
550.00
200,000.00
252,625.00
240,000.00
240,000.00
45,000.00
55,000.00
12,625.00
11,250.00
1,375.00
160,000.00
1,275.00
120,000.00
552,180.00
430,680.00
192,000.00
173,400.00
65,280.00
45,000.00
60,000.00
65,000.00
55,000.00
121,500.00
67,500.00
45,000.00
4,875.00
4,125.00
160,000.00
125,000.00
309,180.00
246,000.00
192,000.00
54,000.00
45,000.00
60,000.00
65,000.00
55,000.00
63,180.00
35,100.00
23,400.00
2,535.00
2,145.00
PEKERJAAN PONDASI
6.3.2
6.9
6.9.1
6.15.2
III
HARGA BAHAN
/ UPAH
PEKERJAAN TANAH
6.11.2
6.15
6.15.1
URAIAN PEKERJAAN
PEKERJAAN DINDING
1
m2
6.8.1
70
14.37
0.04
Buah
Kg
m3
0.30
0.1
0.01
0.015
OH
OH
OH
OH
6.8.2
79,596.75
490.00
1,275.00
150,000.00
58,621.75
34,300.00
18,321.75
6,000.00
45,000.00
60,000.00
65,000.00
55,000.00
20,975.00
13,500.00
6,000.00
650.00
825.00
No.
SNI
KODE
KOEF
6.10
6.10.1
SAT.
m2
70
9.48
0.045
Buah
Kg
m3
0.30
0.1
0.01
0.015
OH
OH
OH
OH
6.10.2
03-2837 - 2008
HARGA BAHAN
/ UPAH
JUMLAH
74,112.00
490.00
1,275.00
150,000.00
53,137.00
34,300.00
12,087.00
6,750.00
45,000.00
60,000.00
65,000.00
55,000.00
20,975.00
13,500.00
6,000.00
650.00
825.00
1,275.00
150,000.00
43,584.20
17,869.20
13,219.20
4,650.00
45,000.00
60,000.00
65,000.00
55,000.00
25,715.00
11,700.00
12,000.00
1,300.00
715.00
1,275.00
150,000.00
46,572.80
14,062.80
8,812.80
5,250.00
45,000.00
60,000.00
65,000.00
55,000.00
32,510.00
18,000.00
12,000.00
1,300.00
1,210.00
1,275.00
20,343.75
4,143.75
4,143.75
45,000.00
60,000.00
65,000.00
55,000.00
16,200.00
9,000.00
6,000.00
650.00
550.00
PEKERJAAN PLESTERAN
6.14
6.14.1
m2
10.368
0.031
Kg
m3
0.3
0.20
0.020
0.013
OH
OH
OH
OH
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
M2
6.912
0.035
Kg
M3
0.400
0.200
0.020
0.022
OH
OH
OH
OH
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
m2
3.25
Kg
Memasang Acian
Bahan
Portland Semen
0.20
0.10
0.010
0.010
OH
OH
OH
OH
Tenaga
Pekerja
Tukang batu
Kepala Tukang
Mandor
6.5.2
6.16
6.16.0
6,.16.2
6.27
6.27.1
6.27.2
VI
URAIAN PEKERJAAN
03-7394 - 2008
PEKERJAAN
6.5
BETON
m3
326
760
1029
215
Kg
kg
kg
ltr
1.65
0.275
0.028
0.083
OH
OH
OH
OH
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
m3
0.0
0.3
0.1
m3
Kg
Ltr
0.5
0.26
0.026
0.026
OH
OH
OH
OH
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
M3
0.040
0.4
0.200
0.015
0.350
2.000
M3
Kg
Ltr
M3
Lbr
Btg
OH
OH
OH
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
6,5,1
6,5,2
6.21
6.21.1
6.21.2
6.22
6,22,1
6,22,2
0.66
0.33
0.033
773,433.96
1,275.00
150.00
140.74
8.50
676,298.96
415,650.00
114,000.00
144,821.46
1,827.50
45,000.00
60,000.00
65,000.00
55,000.00
97,135.00
74,250.00
16,500.00
1,820.00
4,565.00
1,100,000.00
14,500.00
10,000.00
96,970.00
54,850.00
49,500.00
4,350.00
1,000.00
45,000.00
60,000.00
65,000.00
55,000.00
42,120.00
23,400.00
15,600.00
1,690.00
1,430.00
1,100,000.00
14,500.00
10,000.00
5,400,000.00
105,000.00
20,000.00
263,010.00
209,550.00
44,000.00
5,800.00
2,000.00
81,000.00
36,750.00
40,000.00
45,000.00
60,000.00
65,000.00
53,460.00
29,700.00
19,800.00
2,145.00
No.
SNI
KODE
6.23
KOEF
SAT.
0.033
OH
Mandor
M2
0.04
0.4
0.2
0.018
0.35
2
M3
Kg
Ltr
M3
Lbr
Btg
0.66
0.33
0.033
0.033
OH
OH
OH
OH
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
M2
6,23,1
6,23,2
6.24
M3
Kg
Ltr
M3
Lbr
Btg
OH
OH
OH
OH
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
6,24,1
0.040
0.4
0.200
0.015
0.350
6.000
6,24,2
0.66
0.33
0.033
0.033
VII
HARGA BAHAN
/ UPAH
JUMLAH
55,000.00
1,815.00
1,100,000.00
14,500.00
10,000.00
5,400,000.00
105,000.00
20,000.00
279,210.00
225,750.00
44,000.00
5,800.00
2,000.00
97,200.00
36,750.00
40,000.00
45,000.00
60,000.00
65,000.00
55,000.00
53,460.00
29,700.00
19,800.00
2,145.00
1,815.00
1,100,000.00
14,500.00
10,000.00
5,400,000.00
105,000.00
20,000.00
343,010.00
289,550.00
44,000.00
5,800.00
2,000.00
81,000.00
36,750.00
120,000.00
45,000.00
60,000.00
65,000.00
55,000.00
53,460.00
29,700.00
19,800.00
2,145.00
1,815.00
4,500.00
92,180.00
81,000.00
81,000.00
45,000.00
60,000.00
65,000.00
55,000.00
11,180.00
6,750.00
3,600.00
390.00
440.00
03-3436-2002
6.3
3/6/2001
URAIAN PEKERJAAN
1
18
m2
Buah
3/6/2002
0.15
0.060
0.006
0.008
OH
OH
OH
OH
No.
SNI
KODE
6.42
6.42.1
KOEF
SAT.
m2
1.05
m2
0.15
0.05
0.005
0.008
OH
OH
OH
OH
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
6.42.2
VIII
03-2839 - 2008
6.5
URAIAN PEKERJAAN
HARGA BAHAN
/ UPAH
JUMLAH
7,100.00
17,970.00
7,455.00
7,455.00
45,000.00
60,000.00
65,000.00
55,000.00
10,515.00
6,750.00
3,000.00
325.00
440.00
m2
Lbr
Kg
0.375
0.03
55,000.00
14,500.00
21,060.00
20,625.00
435.00
0.10
0.10
0.01
0.005
OH
OH
OH
OH
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
45,000.00
60,000.00
65,000.00
55,000.00
11,425.00
4,500.00
6,000.00
650.00
275.00
1,450,000.00
1,450,000.00
1,760,365.00
1,537,000.00
1,450,000.00
87,000.00
45,000.00
60,000.00
65,000.00
55,000.00
223,365.00
148,500.00
66,000.00
65.00
8,800.00
6,5,1
6,5,2
IX
32,485.00
PEKERJAAN SANITASI
6.1
6.1.1
1 Unit
1
0.06
Buah
3
1.1
0.0
0.16
OH
OH
OH
OH
6.1.2
No.
SNI
KODE
6.25
KOEF
SAT.
1 m'
6.25.1
1.2
0.35
m'
0.036
0.06
0.006
0.0018
OH
OH
OH
OH
6.25.2
6.29
1 m'
6.29.1
1.2
0.35
m'
0.054
0.090
0.009
0.0027
OH
OH
OH
OH
6.29.2
6.33
6.33.1
1 Buah
1
1
Buah
Set
6.33.2
0.03
0.3
0.03
0.0015
6.35
6.35.1
OH
OH
OH
OH
1 Buah
1
0.025
Buah
Set
0.01
0.1
0.01
0.005
OH
OH
OH
OH
6.35.2
6.36
6.36.1
1 Buah
1
Buah
6.36.2
0.01
0.1
0.01
0.005
OH
OH
OH
OH
URAIAN PEKERJAAN
HARGA BAHAN
/ UPAH
JUMLAH
6,250.00
6,250.00
15,396.50
9,687.50
7,500.00
2,187.50
45,000.00
60,000.00
65,000.00
55,000.00
5,709.00
1,620.00
3,600.00
390.00
99.00
16,333.33
16,333.33
33,880.16
25,316.66
19,600.00
5,716.67
Tenaga
Pekerja
Tukang Ledeng
Kepala Tukang
Mandor
45,000.00
60,000.00
65,000.00
55,000.00
8,563.50
2,430.00
5,400.00
585.00
148.50
170,000.00
170,000.00
361,382.50
340,000.00
170,000.00
170,000.00
Tenaga
Pekerja
Tukang Ledeng
Kepala Tukang
Mandor
45,000.00
60,000.00
65,000.00
55,000.00
21,382.50
1,350.00
18,000.00
1,950.00
82.50
15,000.00
3,000.00
22,450.00
15,075.00
15,000.00
75.00
Tenaga
Pekerja
Tukang Ledeng
Kepala Tukang
Mandor
45,000.00
60,000.00
65,000.00
55,000.00
7,375.00
450.00
6,000.00
650.00
275.00
25,000.00
32,375.00
25,000.00
25,000.00
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
45,000.00
60,000.00
65,000.00
55,000.00
7,375.00
450.00
6,000.00
650.00
275.00
9,000.00
20,062.50
9,000.00
9,000.00
45,000.00
60,000.00
65,000.00
55,000.00
11,062.50
675.00
9,000.00
975.00
412.50
16,000.00
30,750.00
16,000.00
16,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
45,000.00
60,000.00
65,000.00
55,000.00
14,750.00
900.00
12,000.00
1,300.00
550.00
15,000.00
25,691.25
15,000.00
15,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
45,000.00
60,000.00
65,000.00
55,000.00
10,691.25
675.00
9,000.00
975.00
41.25
Tenaga
Pekerja
Tukang Ledeng
Kepala Tukang
Mandor
Buah
Buah
6.5.2
0.015
0.15
0.015
0.0075
6.7
6,7,1
Buah
Buah
0.02
0.2
0.02
0.01
6.9
6.9.1
OH
OH
OH
OH
OH
OH
OH
OH
Buah
Buah
6.9.2
0.015
0.15
0.015
0.00075
6.11
6.11.1
OH
OH
OH
OH
Buah
Pasang Grendel
Bahan
24,255.00
10,000.00
No.
SNI
KODE
KOEF
SAT.
Buah
6.11.2
6.17
6.17.1
URAIAN PEKERJAAN
JUMLAH
Kunci Selot
10,000.00
10,000.00
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
45,000.00
60,000.00
65,000.00
55,000.00
14,255.00
900.00
12,000.00
1,300.00
55.00
72,500.00
90,441.25
79,750.00
79,750.00
45,000.00
60,000.00
65,000.00
55,000.00
10,691.25
675.00
9,000.00
975.00
41.25
0.02
0.2
0.02
0.001
OH
OH
OH
OH
m2
1.1
m2
0.015
0.15
0.015
0.00075
OH
OH
OH
OH
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
6.17.2
HARGA BAHAN
/ UPAH
No.
XI
SNI
KODE
KOEF
SAT.
03-7395 - 2008
1
M2
11.87
10
0.045
1.5
Buah
Kg
m3
Kg
0.70
0.35
0.035
0.035
OH
OH
OH
OH
6,35,2
6.36
6.36.1
m2
26.5
10.40
0.045
1.62
Buah
Kg
m3
Kg
0.70
0.35
0.035
0.035
OH
OH
OH
OH
6.36.2
M2
10.6
1.14
0.003
0.05
Buah
Kg
m3
Kg
0.09
0.09
0.009
0.005
OH
OH
OH
OH
m2
6,40,2
6.54
6.54.1
26.5
9.3
0.018
1.94
Buah
Kg
m3
Kg
0.9
0.45
0.045
0.045
OH
OH
OH
OH
6.54.2
XII
03-
HARGA BAHAN
/ UPAH
JUMLAH
6.35
6,35,1
6.40
6,40,1
URAIAN PEKERJAAN
-2002
5,000.00
1,275.00
150,000.00
11,600.00
152,950.00
96,250.00
59,350.00
12,750.00
6,750.00
17,400.00
45,000.00
60,000.00
65,000.00
55,000.00
56,700.00
31,500.00
21,000.00
2,275.00
1,925.00
1,920.00
1,275.00
150,000.00
11,600.00
146,382.00
89,682.00
50,880.00
13,260.00
6,750.00
18,792.00
45,000.00
60,000.00
65,000.00
55,000.00
56,700.00
31,500.00
21,000.00
2,275.00
1,925.00
1,529.41
1,275.00
150,000.00
11,600.00
29,005.25
18,695.25
16,211.75
1,453.50
450.00
580.00
45,000.00
60,000.00
65,000.00
55,000.00
10,310.00
4,050.00
5,400.00
585.00
275.00
1,960.00
1,275.00
150,000.00
11,600.00
161,901.50
89,001.50
51,940.00
11,857.50
2,700.00
22,504.00
45,000.00
60,000.00
65,000.00
55,000.00
72,900.00
40,500.00
27,000.00
2,925.00
2,475.00
12,000.00
20,000.00
21,000.00
13,887.00
8,660.00
1,200.00
2,000.00
5,460.00
45,000.00
60,000.00
65,000.00
55,000.00
5,227.00
900.00
3,780.00
409.50
137.50
PEKERJAAN PENGECATAN
6.14
m2
0.1
0.1
0.26
Kg
Kg
Kg
0.02
0.063
0.0063
0.0025
OH
OH
OH
OH
Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
6.14.1
6.14.2
HARGA
NO.
J E N I S
B A H A N
SATUAN
BAHAN
(Rp)
BAHAN
DASAR
1 BATU KALI
2 KERIKIL
Bulat Utuh
m3
Bulat Belah
m3
Pecah
10/15
m3
Pecah
5/7
m3
Pecah
3/5
m3
Timbun
m3
Sawur / Koral
m3
Beton
0,5/1
m3
Beton
,1/2
m3
Beton
,2/3
m3
Biasa
m3
Tras Giling
m3
3 BATU BATA
ex lokal
bh
4 PASIR
Urug
m3
Pasang
m3
Beton
m3
Padas
m3
Liat
m3
Pasang
m3
Semen Merah
m3
Holcim 40 kg
zak
Holcim 50 kg
zak
Cibinong 40 kg
zak
Cibinong 50 kg
zak
Semen Putih 40 kg
zak
Semen Putih 50 kg
zak
Semen warna
kg
5 TANAH
6 KAPUR
115,000
137,500
140,000
150,000
155,000
85,000
115,000
185,000
180,000
180,000
115,000
#REF!
450
70,000
170,000
190,000
50,000
#REF!
#REF!
#REF!
7 PORTLAND CEMENT
II
BAHAN
45,000
55,000
46,000
55,000
70,000
85,000
9,000
PE NUTUP ATAP
bh
Kodok
bh
Kodok Glasur
bh
bh
bh
bh
bh
1,050
1,300
2,500
3,100
6,500
2,800
6,750
HARGA
NO.
J E N I S
B A H A N
SATUAN
BAHAN
(Rp)
III . B A H A N K A Y U
1 JATI
2 KAMPER
3 KRUING
4 MERANTI
5 LANAN
6 BENGKIRAI
7 DOLKEN
Papan
m3
Balok/pesagen
m3
Papan
m3
Balok/pesagen
m3
Papan
m3
Balok/pesagen
m3
Papan
m3
Balok/pesagen
m3
Papan
m3
Balok/pesagen
m3
Papan
m3
Balok/pesagen
m3
Sedang 8 x 10 x 400 cm
bt
Kecil 6 x 7 x 400 cm
bt
Besar 10 x 12 x 400 cm
bt
Kayu cetakan
m3
Kayu bakar
m3
Bambu
bt
21,000,000
18,500,000
7,300,000
6,700,000
5,200,000
4,700,000
4,700,000
4,400,000
1,850,000
1,250,000
8,700,000
7,400,000
17,000
12,000
23,000
550,000
135,000
10,000
m2
40 x 40 cm
m2
20 X 20 cm
m2
33 x 33 cm
m2
25 x 25 cm
m2
15 x 20 cm
m2
34,000
45,000
35,000
#REF!
#REF!
#REF!
U 30 cm - 100 cm
bh
#REF!
20 X 20 cm
bh
15 X 30 cm
bh
#REF!
#REF!
1 Keramik
V . BAHAN C E TAK
1 BUIS BETON
VI . B A H A N B E S I
1 BESI BETON
kg
kg
kg
10,000
15,500
11,000
HARGA
NO.
J E N I S
B A H A N
SATUAN
BAHAN
(Rp)
2 BESI PLAT
Besi Strip
kg
13,000
3 BESI PROFIL
Besi Profil
kg
13,500
14,000
14,000
5 BESI SIKU
Diameter
4 - 15
kg
Diameter
6 - 15
kg
40 X 40 X 4
btg
L 50 X 50 X 5
btg
L 60 X 60 X 6
btg
kg
- Harmonika 12 X 45 mm
m2
- Harmonika 12 X 24 mm
m2
- Harmonika 14 X 30 mm
m2
- Harmonika 14 X 35 mm
m2
m2
- Kawat Kasa
m2
- Saringan pasir
m2
- Kawat loket
m2
- Kawat duri
rol
- Kawat bronjong
kg
130,000
202,500
292,500
16,000
20,000
22,000
19,000
17,500
9,000
12,000
13,500
10,500
65,000
16,000
VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( " ) AW JIS
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
#REF!
#REF!
27,500
48,000
76,400
122,500
150,000
325,000
590,000
1,010,000
1,380,000
VIII . B A H A N L A N G I T - L A N G I T
1 SOFT BOARD uk 4' x 8'
gypsum tebal 9mm
2 HARD BOARD uk 4'x 8'
lbr
45,000
lbr
60,000
HARGA
NO.
J E N I S
B A H A N
SATUAN
BAHAN
(Rp)
IX . B A H A N F I N I S H I N G
1 KAYU
Menie
kg
Dempul plamur
kg
Ambril/amplas
lbr
Batu Apung
kg
Cat dasar
kg
. Emco
kg
kg
. Deculux
kg
. Siralax
ons
. Spiritus
ltr
. Plitur jadi
ltr
11,000
11,000
3,200
5,000
13,000
39,000
39,000
42,000
7,500
8,000
29,000
2 TEMBOK
Kalkarium
kg
Kapur sirih
kg
Plamur
kg
Cat Tembok
kg
Sintex
5 kg
Danabride
5 kg
Catylac
5 kg
Mowilex
5 kg
4,000
4,500
900
12,500
60,000
70,500
7,500
125,000
3 BESI
Menie
kg
Cat mengkilat
kg
Cat
kg
Thinner A
ltr
Minyak cat
ltr
Thinner Super
ltr
Residu (teer/aspal)
drum
13,000
39,000
12,500
8,000
6,500
8,000
50,000
bh
bh
kg
625,000
1,080,000
32,000
X . BAHAN KACA
1 POLOS
2 ES KABUR
3 RAY BAND
53,000
62,000
3 mm
m2
5 mm
m2
3 mm
m2
5 mm
m2
70,000
80,000
3 mm
m2
60,000
HARGA
NO.
J E N I S
B A H A N
SATUAN
BAHAN
(Rp)
5 mm
m2
70,000
HARGA
NO.
J E N I S
B A H A N
SATUAN
BAHAN
(Rp)
1 X 1 1/2
mm2
m'
SPLN LMK
1 X 2 1/2
mm2
m'
1X4
mm2
m'
1X6
mm2
m'
NYY : .
2 X 1 1/2
mm2
m'
PRIMA
2 X 2 1/2
mm2
m'
2X4
mm2
m'
2X6
mm2
m'
3 X 1 1/2
mm2
m'
3 X 2 1/2
mm2
m'
3X4
mm2
m'
3X6
mm2
m'
NYM :.
2 X 1 1/2
mm2
m'
PRIMA
2 X 2 1/2
mm2
m'
2X4
mm2
m'
3 X 1 1/2
mm2
m'
3 X 2 1/2
mm2
m'
3X4
mm2
m'
3X6
mm2
m'
3,050
3,200
4,700
6,900
9,300
10,250
16,650
20,100
11,450
15,400
20,500
27,800
6,800
9,700
13,500
8,750
12,400
17,600
23,900
2 SKAKELAR
Out bauw .
.
In bauw .
.
Seri
bh
Engkel
bh
Seri
bh
Engkel
bh
15,000
12,000
11,500
9,500
bh
2 group
bh
3 group
bh
4 STEKER -
5 FITING
Biasa
bh
Arde
bh
T Biasa
bh
T dengan Arde
bh
Flaon
bh
Gantung
bh
Kap
bh
Kombinasi
bh
bh
bh
Arde IB
bh
Arde Putar
bh
20,000
20,000
50,000
9,500
14,000
11,000
15,000
2,500
2,250
9,250
8,700
7,000
4,500
10,000
31,000
HARGA
NO.
J E N I S
B A H A N
SATUAN
BAHAN
(Rp)
HARGA
NO.
J E N I S
B A H A N
SATUAN
BAHAN
(Rp)
Union :
Yale :
Kuda :
1 X slag
bh
2 X slag
bh
1 X slag
bh
2 X slag
bh
1 X slag
bh
2 X slag
bh
45,000
60,000
75,000
125,000
45,000
60,000
bh
Grendel biasa
bh
Kait Angin
bh
Door Stop
bh
15,000
2,250
5,000
30,000
7,500
7,500
5,000
250,000
1 KLOSET DUDUK
bh
900,000
2 KLOSET JONGKOK
bh
85,000
bh
275,000
Kran Air
bh
Seal tape
bh
Floor drain
bh
7,500
2,000
3,750
Engsel Angin
bh
Kupu-kupu biasa
bh
Nylon kupu-kupu
bh
Espagnoled -
dalam negeri
bh
12
LAIN - LAIN
kg
2 PAKU - payung
kg
3 PAKU - sekrup
doos
4 PAKU - beton
bh
kg
6 ANGKUR BAUT
bh
7 LEM KAYU
bh
8 Tali Ijuk
kg
14,000
18,000
13,500
18,000
14,000
12,800
18,000
4,500
X VI . POMPA AIR
2 POMPA AIR LISTRIK
Sanyo
100 watt
bh
750000
Fuji
250 watt
bh
1300000
Shimizu
100 watt
bh
350000
90 watt
bh
230000
125 watt
bh
250000
Dab
HARGA
NO.
J E N I S
B A H A N
SATUAN
BAHAN
(Rp)
175 watt
bh
320000
HARGA
NO.
J E N I S
B A H A N
SATUAN
BAHAN
(Rp)
X VI . PAVING BLOCK
1 HOLLAND
Abu-abu
m2
Merah/hitam
m2
13 KANSTEEN
m'
35,000
39,000
22,500
XVII. L A I N - L A I N
5 Awning Almunium
m2
m'
40,000
185,000
10,000
325,000
325,000
75,000
68,000
btg
1,300,000
1 KREI 25 MM
m2
2 Sliding Pintu J4
bh
bh
m2
m2
Dark Grey 5 mm
m2
m2
m2
#REF!
#REF!
#REF!
13. LAIN-LAIN
Minyak Beton & bekisting
ltr
m2
Sunscreen Allumunim
m2
Allumunium Foil
m2
Soda api
kg
Sabun
kg
Air
m3
Koas Alang-alang
ikat
Solar (Industri)
ltr
Premium (Industri)
ltr
Pelumas
ltr
8,000
350,000
265,000
6,500
12,000
11,000
8,000
1,250
11,250
8,900
29,000
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
URAIAN
SATUAN
Pekerja
Mandor
Tukang Listrik
Tukang Kayu
Kep. Tk. Kayu
Tukang Batu
Kep. Tk. Batu
Tukang Besi
Kep. Tk. Besi
Tukang Cat
Kep. Tk. Cat
Tukang Plitur
Tukang Jalan
Tukang Gali
Tukang masak aspal
Tukang Ledeng
Masinis
Pemb. Masinis
Penjaga Api
Penjaga Malam
Sopir
Pembantu Sopir
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
18
HARGA SATUAN
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
45,000.00
55,000.00
60,000.00
60,000.00
65,000.00
60,000.00
65,000.00
60,000.00
65,000.00
60,000.00
65,000.00
60,000.00
45,000.00
45,000.00
45,000.00
60,000.00
125,000.00
50,000.00
50,000.00
45,000.00
70,000.00
45,000.00