BASIC SCHEDULE OF RATES (BSR)

MENU OF BSR
Goto Menu

Ctrl a

Goto Excavation and earthwork

Ctrl b

Goto Concrete Mixing

Ctrl c

Goto Concrete Placing

Ctrl d

Goto Formwork and Reinforcement

Ctrl e

Goto Masonry works

Ctrl f

Goto Ceramic Tiles

Ctrl g

Goto Roof work and Roof Plumbing

Ctrl h

Goto Ceiling

Ctrl I

Goto Doors and Windows

Ctrl j

Goto Ironmongery

Ctrl k

Goto Plaster works

Ctrl l

Goto Painting

Ctrl m

Goto Plumbing Installation

Ctrl n

Goto Sanitary fittings and Accessories

Ctrl o

Goto Down Pipes, Fittings and Miscellaneous

Ctrl p

BSR

Page 1

DESCRIPTION

Item No.

Basic rate

EXCAVATION
1

Removing top soil to a depth not exceeding 150 mm and depositing as


directed within site.
Per Sq.m.
Consider an area of 9.30 m2
ie. 1.35 m3 of excavation
01 day U/SK labourer
32.26

Basic rate per Sq.m.


2

Excavation over site to reduce level ,in any material except rock requiring
blasting including depositing and leveling as directed up to a distance not
exceeding 10 m away from excavation.
Per Cu.m.
0.50 day U/SK labourer
150.00

Basic rate per Cu.m.


3

Excavation trenches for walls / column pits in soft / loose soil from 0.25m
to 1.5 m deep and depositing excavated material to a distance not
exceeding 10 m away from excavation.
Per Cu.m.
0.353 day U/SK labourer
105.90

Basic rate per Cu.m.


4

Excavation trenches for walls / column pits in ordinary soil from upto 1.5 m
deep and depositing excavated material to a distance not exceeding 10 m
away from excavation.
Per Cu.m.
0.80 day U/SK labourer
240.00

Basic rate per Cu.m.


5

Excavation trenches for walls / column pits in hard dense soil from up to
1.5 m deep and depositing excavated material to a distance not exceeding
10 m away from excavation.
Per Cu.m.
1.25 day U/SK labourer
375.00

Basic rate per Cu.m.

BSR

Page 2

Item No.

DESCRIPTION

Excavation in trenches for walls / column pits in Mud /wet soil up to a depth
of 1.5 m and depositing excavated material to distance not exceeding 10
m away from excavation.
(Earthwork & dewatering paid for separately)

Basic rate

Per Cu.m.
1.00 day U/SK labourer
300.00

Basic rate per Cu.m


7

Excavation in trenches for walls / column pits in soft disintegrated rock


(not requiring blasting) up to a depth of 1.0 m and depositing excavated
material to a distance not exceeding 10.0 m away from excavation
Per Cu.m.
7 hrs. U/Sk labourer
262.50

Basic rate per Cu.m


8

Excavation in trenches for walls column pits in Hard rock requiring blasting
up to a depth of 1.0m and depositing excavated material to a distance not
exceeding 10 m from excavations
Per 2.83 Cu.m

Materials
0.34 Kg blasting powder
3 m fuse
0.45 Kg jumper steel
Fuel & forge - 20% of materials cost

224.40
255.00
48.60
105.60

labour
1 day SK Labourer
2days U / SK labourer

350.00
600.00

Basic rate per Cu.m

559.58

Benching rock in foundation in 75mm. - 150mm. steps.


(Blasting prohibited)
Per Sq.m
Drilling, chipping & wedging
1/2 day SK labourer
Steel, fuel & forge - 25% of labour cost.

175.00
43.75

Collecting & Disposing


1 1/2 day U / SK labourer

450.00

Basic rate per sq.m

668.75

BSR

Page 3

DESCRIPTION

Item No.

Basic rate

ANTI - TERMITE TREATMENT


10

Anti termite treatment on excavated foundation and compacted soil under


floors.
Per 9.30 Sq.m
Materials
7.30 kg D.D.T. powder
90 liters of water

1,314.00

Labour
1/2 day U / SK labourer

150.00

Basic rate per Sq.m.

157.42

NOTE: - Alternative mixes


a) Copper Naphthenate (5% in 18 to 36 letters of fuel oil. )
b) Sodium Arsenate (10% in 54 to 90 letters of water)
c) Dieldrine (0.3% in 85 to of water) .
EARTHWORK
Earthwork - Backfilling & Compacting
11

Backfilling to trenches with selected earth available at site.


Per Cu.m
0.35 day U / Sk Labourer
105.00

Basic rate per Cu.m.


12

Backfilling to trenches with imported material


Per Cu.m.
1.0 m3 earth delivered at site
Allow 15% compaction
Filling & Compacting
3.6 Hrs. U / SK Labourer

190.00
28.50
135.00
353.50

Basic rate per Cu.m.


13

Filling under floors including leveling, watering & compacting thickness


not exceeding 150 mm. layers with available and selected earth at site.
Per Cu.m..
0.7 days U/SK Labourer
210.00

Basic rate per Cu.m

BSR

Page 4

DESCRIPTION

Item No.
14

Basic rate

Filling under floors including leveling, watering & compacting thickness


not exceeding 150 mm. layers with imported selected earth.
Per Cu.m
1.00 m3 earth delivered at site
Allow for 15% compaction
5.70 hr. U SK Labourer

190.00
28.50
210.00

Basic rate per Cu.m..

428.50

EARTHWORK SUPPORT
15

Earthwork support (open planking) in trenches up to a depth of 1.50 m.


Consider trench 4.50m long, 0.90 m wide and 1.50 m depth
Open planking to both faces.
Total area - 2/4.50 X 1.50
13.50 Sq.m.
Per 13.5 Sq.m.

16

Materials
0.5 Cu.m class II timber (Rubber ) (4 uses )
Add 5% on above for wedges

786.25
39.31

Labour
1 days carpenter
3 days U / SK Labourer

450.00
900.00

Total per 13.5 Sq.m.

2,175.56

Basic rate per Sq.m.

161.15

Earthwork support (close planking) in trenches up to depth 3.0 m.


Consider trench 4.5m long 0.90 m wide and 1.5m height of planking to both
faces.
Total area of planking
2 / 4.50 X 1.50 ie 13.50 sq.m.
Per 13.50 Sq.m.
Materials
0.85 Cu.m. class II timber (Rubber) (4 uses )
Add 5% on above for wedges.

1,336.63
66.83

Labour
2 days carpenter
6 days U / SK Labourer

900.00
1,800.00

Total per 13.50 Sq.m.

4,103.46

Basic rate per Sq.m.

303.96
BSR

Page 5

DESCRIPTION

Item No.
17

Basic rate

Earthwork support (close planking) in deep excavation in trenches up to


4.50m depth
Consider trench of length of 4.50 m.
Width 1.50m. at top
Width 1.0m. at bottom
Then area supported is 2/4.5 X 1.5m.
ie 13.50 sq.m.
Per 13.50 sq.m.
Materials
2.83 cu.m class II timber (Rubber)
(4 uses)
Add 5% on above for wedges

4,450.18
222.51

Labour
8 days carpenter
20 days U / SK Labourer

3,600.00
6,000.00

Total per13.5 sq.m.

14,272.68

Basic rate per Sq.m.

1,057.24

CONCRETE WORK
MIXING
Note:
a) Water available at site
b) If, water is not available allowances should be made for transport of water.
c) Sand - includes 15% for bulking.
A

Mixing concrete 1:3:6 (40 mm)


Per Cu.m
Materials
4.6 bag (50 Kg bags) cement
0.53 m3 sand
0.92 m3 40mm. metal
0.125 day hire of mixer
Water (500 liters)

1,587.00
410.75
1,104.00
93.75

Labour
0.35 day skilled labourer
2.125 days U / Sk labourer

122.50
637.50
3,955.50

Basic rate per Cu.m

BSR

Page 6

DESCRIPTION

Item No.
B

Basic rate

Mixing concrete 1:2:4 ( 20 mm)


Per Cu.m
Materials
6.40 bag cement (50 Kg bags) cement
0.50 m3 sand
0.88 m3 20 mm metal
0.125 day hire of mixer
Water - (546 liters)

2,208.00
387.50
1,276.00
93.75

Labour
0.35 day skilled labourer
2.125 days U / SK Labourer

122.50
637.50
4,725.25

Basic rate per Cu.m


C

Mixing concrete 1:1 1/2:3 (20 mm)


Per Cu.m
Materials
8.5 bags cement (50 Kg )
0.42 cu.m sand
0.82 cu.m 20mm metal
0.125 day hire of mixer
water 682.0 liters

2,932.50
325.50
1,189.00
93.75

Labour
0.35 day skilled labourer
2.125 days U / SK Labourer

122.50
637.50
5,300.75

Basic rate per Cu.m


D

Mixing concrete 1:1:2 (20 mm)


Per Cu.m
Materials
11 bags cement (50 Kg )
0.38 m3 sand
0.76 m3 20mm metal
0.125 day hire of mixer
water 910 liters

3,795.00
294.50
1,102.00
93.75

Labour
0.35 day skilled labourer
2.125 days U / SK Labourer

122.50
637.50
6,045.25

Basic rate per Cu.m

BSR

Page 7

DESCRIPTION

Item No.

Basic rate

PLACING
18

50mm thick cement concrete screed in foundation at depths not exceeding


1.00m (grade 15)
Per 10 Sq.m.
Materials
0.50 cu.m concrete
10% for wastage

1,977.75
197.78

Labour
1/8 day skilled labourer
1/2 days U / SK Labourer

43.75
150.00

Basic rate per Cu.m.


Note
For laying concrete at depths more than 1.5m. Add 1/6 day unskilled labourer for
each additional 1.5 or part there of per 10 square.
19

75 mm thick cement concrete screed in foundation at depths not exceeding


1.00m (grade 15)
Per 10 Sq.m
Materials
0.75 m3 concrete
add
10% for wastage

2,966.63
296.66

Labour
1/8 day skilled labourer
3/4 days U / SK Labourer

43.75
225.00

Basic rate per Cu.m.


Note
For laying concrete at depths more than 1.5m. Add 1/4 day unskilled labourer for
each additional 1.5 or part there of per 10 square.
20A

4,738.55

4,709.38

150 mm thick cement concrete screed in foundation at depths not


exceeding 1.00m (mass concrete grade 15)
Per 10 Sq.m
Materials
1.50 m3 concrete
add
10% for wastage
water 1000 liters

5,933.25
593.33

Labour
1/2 day skilled labourer
1 1/4 days U / SK Labourer

175.00
375.00
4,717.72

Basic rate per Cu.m.

BSR

Page 8

DESCRIPTION

Item No.
20B

Basic rate per Cu.m. (Grade 20)


Ditto - for grade 20 concrete in foundation
Materials
1.50 m3 concrete
add
10% for wastage
0.375 day vibrator

7,087.88
708.79
345.00

labour
3/4 day skilled labourer
1-3/4 days U / SK Labourer
3/4 day mason
3/4day carpenter

262.50
525.00
337.50
337.50

Curing
Jute Hessian 3.0 m2
Water 250 liters
1 days U / Sk labourer

78.00
300.00
6,654.78

Basic rate per Cu.m.


20C

Basic rate

Ditto - for grade 25 concrete in pool.


Materials
1.50 m3 concrete
add
10% for wastage
0.375 day vibrator

7,951.13
795.11
345.00

labour
3/4 day skilled labourer
13/4 days U / SK Labourer
3/4 day mason
3/4day carpenter

262.50
525.00
337.50
337.50

Curing
Jute Hessian 3.0 m2
Water 250 liters
1 1/2 days U / Sk labourer

78.00
300.00
7,287.83

Basic rate per Cu.m.

BSR

Page 9

DESCRIPTION

Item No.
21

Basic rate

Cement concrete in 150 x 150 mm columns in ground floor (grade 20)


Consider 19 Nr. Columns 150 x 150 mm each 3.00 m high .
Per 1.28 Cu.m.
Materials
1.28 m3 concrete (1:2:4)
add
10% for wastage
1 day hire of vibrator

6,048.32
604.83
920.00

Labour
1 day skilled labourer
3 days U / SK Labourer
1 day mason
1day carpenter

350.00
900.00
450.00
450.00

Curing
Jute Hessian - 7.5 m2
water 280 liters
11/2 days U / SK labourer

195.00
450.00
10,368.15

Total for 1.28 Cu.m.


Basic rate per Cu.m. of column (Ground floor)
Basic rate per Cu.m. of column ( 1st floor)
Basic rate per Cu.m. of column ( 2nd floor)

8,100.12
8,343.12
8,505.12

Note:
1) For columns in 1st floor add. 3% to ground floor rate.
2) For columns in 2nd floor add. 5% to ground floor rate.

22

Cement concrete in 225 x 225 mm columns in ground floor (grade 20)


Consider 8.5 Nr. Columns 225 x 225 mm each 3.00 m high
Per 1.28 Cu.m
Materials
1.28 m3 concrete
add
10% for wastage
1 day hire of vibrator

6,048.32
604.83
920.00

Labour
1 day skilled labourer
3 days U / SK Labourer
1 day mason
1day carpenter

350.00
900.00
450.00
450.00

BSR

Page 10

DESCRIPTION

Item No.
Curing
Jute Hessian - 5.6 m2
water 300 liters
11/2 days U / SK labourer

Basic rate

145.60
450.00
10,318.75

Total for 1.28 cu.m.


Basic rate per Cu.m. of column (Ground floor)
Basic rate per Cu.m. of column ( 1st floor)
Basic rate per Cu.m. of column ( 2nd floor)

8,061.53
8,303.37
8,464.60

Note:
1) For columns in 1st floor add. 3% to ground floor rate.
2) For columns in 2nd floor add. 5% to ground floor rate.

23

Cement concrete in 300 x 300 mm columns in ground floor (grade 20)


Consider 5 Nr. Columns 300 x 300 mm each 3.00 m high

Per 1.35 m3
Materials
1.35 m3 concrete
Add 10% for wastage
3.72 m2 - Jute Hessian
1 day hire or vibrator
Water (280 liters)

6,379.09
637.91
96.72
920.00

labour
1 day mason
1 day carpenter
3 day U / Sk labourer
1 day SK labourer
11/2 days U / Sk labourer (curing)

450.00
450.00
900.00
350.00
450.00
10,633.72

Total per 1.35 cu.m. or 15 l.m. of column


Basic rate per Cu.m. of column (Ground floor)
Basic rate per Cu.m. of column ( 1st floor)
Basic rate per Cu.m. of column ( 2nd floor)

7,876.83
8,113.13
8,270.67

Note:
1) For columns in 1st floor add. 3% to ground floor rate.
2) For columns in 2nd floor add. 5% to ground floor rate.

BSR

Page 11

DESCRIPTION

Item No.
24

Basic rate

Cement concrete in 225 X 150 beam upto 1st floor level (grade 20)
Consider 38.0m 225 X 150 mm
Per 1.28 m3
Materials
1.28 m3 concrete
Add 10% of wastage
1 day hire of vibrator

6,048.32
604.83
920.00

Labour
1 Days Sk Labourer (vibrator)
4 Days U / Sk labourer
1day mason
1day carpenter

350.00
1,200.00
450.00
450.00

Curing
Jute Hessian 7.0 m2

182.00

1.5 days U / Sk labourer

450.00
10,655.15

Total per 1.28 m3

25

Basic rate per Cu.m. of beam upto 1st floor level.

8,324.34

Basic rate per Cu.m. of beam upto 2nd floor level.

8,574.07

Cement concrete in 225 X 225 beam upto 1st floor level (grade 20)
Consider 25.0m length of 225 X 225 mm
beam I.e. Cubes
Per 1.28 m3
Materials
1.28 m3 concrete
Add 10% of wastage

6,048.32
604.83

Plant
1 day hire of vibrator

920.00

Labour
1 day mason
1 day carpenter
1 day Sk Labourer (vibrator)
4 days U / Sk labourer

450.00
450.00
350.00
1,200.00

BSR

Page 12

DESCRIPTION

Item No.
Curing
Jute Hessian 5.6 m2
Water 300 liters
1.5 day U / Sk labourer

145.60
450.00

10,618.75

Total per 1.28 m3

26

Basic rate

Basic rate per Cu.m. of beam ( upto 1st floor level)

8,295.90

Basic rate per Cu.m. of beam ( upto 2nd floor level)

8,544.78

125 mm thick R.C.C. floor slab in 1st Floor (grade 20)


Consider 125 mm thick slab 3.0 x 3.8m
Volume of concrete 1.42 m3
Per 1.42 Cu.m.
Materials
1.42 m3 concrete
Add 10% for wastage
1 day hire of vibrator

6,709.86
670.99
920.00

Labour
1 days Sk labourer (vibrator)
4 days U / Sk labourer
1 day mason
1 day carpenter

350.00
1,200.00
450.00
450.00

Curing
Jute Hessian 3.0 m2
Water 250 liters
1 1/2 days U / Sk labourer

78.00
450.00
11,278.84

Total per 1.42 m3

Basic rate per Cu.m. of slab ( at 1st floor level)

7,942.85

Basic rate per Cu.m. of slab ( at 2nd floor level)

8,181.13

BSR

Page 13

DESCRIPTION

Item No.
27

Basic rate

150 mm R.C.C. floor slab in 1st floor (grade 20)


Consider 3.15 X 3.0 m panel = 1.42 m3
Materials
1.42 m3 concrete
Add 10% for wastage
1 day hire of vibrator

6,709.86
670.99
920.00

Labour
1 day mason
1 day carpenter
1 days Sk labourer (vibrator)
4 days U / Sk labourer

450.00
450.00
350.00
1,200.00

Curing
Jute Hessian 2.4 m2
Water 250 liters
1.5days U / Sk labourer

62.40
450.00
11,263.24

Per 1.42 m3 or 10.0 m2

28

Basic rate per Cu.m. of slab. ( at 1st floor level)

7,931.86

Basic rate per Cu.m. of slab. ( at 2nd floor level)

8,169.82

Cement concrete in 112.5 X 150 mm lintels in ground floor (grade 20)


Consider 75.5 l.m.
Materials
1.28 m3 concrete
Add 10% for wastage
1 day hire of vibrator

6,048.32
604.83
920.00

Labour
1 day Sk labourer (vibrator)
4 days U / Sk labourer
1 day mason
1 day carpenter

350.00
1,200.00
450.00
450.00

Curing
Jute Hessian 1.0 m2
Water 130 liters
11/2 days U / Sk labourer
per 1.28 m3 or 75.5 l.m of lintel.

26.00
450.00
10,499.15

Rate per Cu.m. of lintels in Ground floor.

8,202.46

Rate per Cu.m. of lintels in first floor.

8,448.54

BSR

Page 14

DESCRIPTION

Item No.

29

Basic rate

Cement concrete in 225 X 300 lintel in ground floor (grade 20)


Consider length 19.0 m of lintel in ground floor = 1.28 Cu.m.
Materials
1.28 m3 concrete
Add 10% for wastage
1 day hire of vibrator

6,048.32
604.83
920.00

Labour
1 days Sk labourer (vibrator)
4 days U/Sk labourer
1 days mason
1 day carpenter

350.00
1,200.00
450.00
450.00

Curing
Jute Hessian 5.10 m2
Water 250 liters
1.5 days U/Sk labourer

132.60
450.00
10,605.75

Per 1.28 m3 or 19.0 l.m. of lintel


Rate per Cu.m. of lintels in Ground floor

8,285.74

Rate per Cu.m. of lintels in first floor

8,534.32

FORM WORK
30

Sawn timber formwork to 225 X 225 cement concrete column in ground


floor.
Per Sq.m.
Consider column length of 1.50m.
Contact area - 135 Sq.m.
(a) MAKING MOULD
(1) Materials
1.63 Sq.m. 20 mm. thick class II timber (Rubber)
5.20 L.m. 50 X 50 class II timber in yokes. (Rubber)
4.90 L.m 50X25 class II (Rubber) timber battens
0.68 Kg. wire nails

230.65
187.20
88.20
48.96

Fabricating
1 /2 day carpenter
1/2 U / Sk labourer

225.00
150.00

Total Cost of mould per use Allowing 4 uses cost

930.01
232.50

BSR

Page 15

DESCRIPTION

Item No.

(b) Assembling (Per use)


Materials
12 Nos. 16 mm 450 mm. long bolts (20 uses)
1/2 liter mould oil
10.6 l.m 100 X 50 mm. props (10 uses)
Labour
1/4 day carpenter
1/2 day U / Sk labourer

112.50
75.00
187.50

Cost of dismantling per use


Total cost per use
(For 1.35 sq.m.) I.e (a+b+c)
Basic cost per Sq.m.

785.40
581.78

Sawn timber formwork to sides of foundation beams and the like. Average
height 225mm.
Contact area - 135 Sq.m.
(a) Making Mould as above
(b) Assembling (Per use)
Materials
1/2 liter mould oil
10.6 l.m 100 X 50 mm. props (10 uses)

32

24.00
10.00
68.90

112.50
150.00
365.40

c) Dismantling cleaning & repairing (per use)


1/4 day carpenter
1/4 day U / Sk labourer

31

Basic rate

232.50

10.00
68.90

Labour
1/4 day carpenter
1/2 day U / Sk labourer

112.50
150.00

c) Dismantling cleaning & repairing (per use)


As above
(For 1.35 sq.m.) I.e (a+b+c)

187.50
761.40

Basic cost per Sq.m.

564.00

Sawn timber formwork for concrete beams in ground floor.


Consider 225 X 300 mm beam of 4.8 m long. Contact area 5.00 Sq.m.
A) Making the mould
(a) 5.80 Sq.m 20mm.timber planks.
(b) 7.30l.m 50 X 25 mm. Battens.
(c) 13.70 l.m 50 X 50 mm. Ledgers.
(d) 9.15 l.m 100 X 50 mm. bearers at bottom of mould.
(e) 0.90 Kg. wire nails.

820.70
131.40
493.20
890.50
64.80

Labour
(a) 1/2 day carpenter
(b) 2 day U / Sk labourers

225.00
600.00

BSR

Page 16

DESCRIPTION

Item No.

Basic rate
3,225.60
806.40
80.64
887.04

Total cost of mould


Assuming 4 uses - cost per use
Add 10% for repairs
Cost per use
(B) Assembling
Materials
(a) 33.50 l.m 100 X 50 m vertical props (10 uses)
(b) 24.40 l.m 50 X 50 m. bracing to mould to and props.
(c)15.25 l.m 50 X 50 bracing to a set of props.
(d) 0.56 sq.m 25 mm timber base plate to props.
(e) 22 Nos wedges
Cost of materials for assembling
Assuming an average of 6 uses
Cost of materials for uses

491.53

Add 10% of cost of materials for repairs


Total cost of materials per use

540.68

(C') Labour & Sundries


Labour
a) 1 day carpenter
b) 2 days U / Sk labourer
c) 2.275 lit. mould oil
d) 0.45 Kg. nails

450.00
600.00
45.50
32.40
1,127.90

Cost per use


(D) Dismantling and Cleaning
Labour
a) 1/2 day carpenter
b) 2 days U / Sk labourer

225.00
600.00

Cost of labour for dismantling per use

825.00

Total cost for ,making the mould assembling aligning dismantling and cleaning
for 55(A
ft. +per
use
B +use
C + D)

3,380.62
676.12

Cost of form work for Square meter.


33

1,306.50
878.40
549.00
105.28
110.00
2,949.18

Sawn timber formwork for underside of first floor slab


Consider a slab of dimension 6100mm X 3050mm
Contact area - 18.6 Sq.m
A) Making panels
1) Materials
a) 20.5 Sq.m 25mm thick tongue
and grooved timber planks
b) 36.3m 100 x 50 mm runners at 600 mm. centers
c) 1.82 kg wire nails

BSR

4,060.80
2,359.50
131.04

Page 17

DESCRIPTION

Item No.

Basic rate

2) Labour
a) 3 days carpenter
b) 3 days U / Sk labourer

1,350.00
900.00

Total cost of making panels

8,801.34

Assuming 4 uses cost per use

2,200.34

Add 20% for repairs


Total cost of per use

2,640.40

B) Assembling
Materials
a) 210 m 100 x 50 mm vertical timber props (10 uses)
b) 19.80 m - 50 x 50 mm bracing for props.
c) 122 Nr. Wedges
d) 3.07 Sq.m 25 mm base plates for props.

8,190.00
712.80
610.00
577.16
10,089.96

Cost of materials for assembling


Assuming 6 uses cost of materials for assembling per use

1,681.66

Add 20% of above for repairs total cost of material for assembling per use

2,017.99

C) Labour and sundries for assembling


a) 1 day carpenter
b) 4 days U / Sk labourer
c) 4.5 liters oil for assembling
d) 0.9 Kg wire nails.
Total cost for use for assembling

450.00
1,200.00
90.00
64.80
1,804.80

D) Dismantling & Cleaning


Labour
a) 1/2 day carpenter
b) 2 days U / Sk labourer

225.00
600.00

Total cost for dismantling per use

825.00

Total cost for assembling per use 18.60 Sq.m (A+B+C+D)

7,288.19
391.84

Basic cost of formwork per Sq.m

BSR

Page 18

Item No.

DESCRIPTION

34

STEEL (TOR)
Tor steel reinforcement to lintels slab beams or columns bent to shape laid
in position and tied with G.I wire as directed.
Materials
1 Mt / Tor steel rods including transport to site
(Allow for wastage 15%)
13.6 Kg 16 BWG binding wire
Add 1.5% of steel cost for spacers or chairs
Labour
20 days blacksmith
20 days U / Sk labourer
Basic rate per M.ton.

816.00
586.50

57.80

STEEL (MILD)
Mild steel reinforcement to lintels slab beams or columns bent to shape
laid in position and tied with G.I wire as directed. (6 mm. diameter)
Materials
1 Mt / Tor steel rods including transport to site
(Allow for wastage 15%)
17 Kg 16 BWG binding wire
Add 1.5% of steel cost for spacers or chairs
Labour
20 days blacksmith
20 days U / Sk labourer
Basic rate per M.ton.

34,000.00
5,100.00
1,020.00
586.50

9,000.00
6,000.00
55,706.50
55.71

Basic rate per Kg.


35B

36,000.00
5,400.00

9,000.00
6,000.00
57,802.50

Basic rate per Kg.

35A

Basic rate

Mild steel reinforcement to lintels slab beams or columns bent to shape


laid in position and tied with G.I wire as directed. (10 - 12 mm. diameter)
Materials
1 Mt / Tor steel rods including transport to site
(Allow for wastage 15%)
13.6Kg 16 BWG binding wire
Add 1.5% of steel cost for spacers or chairs
Labour
20 days blacksmith
20 days U / Sk labourer
Basic rate per M.ton.

34,000.00
5,100.00
816.00
586.50

9,000.00
6,000.00
55,502.50
55.50

Basic rate per Kg.

BSR

Page 19

DESCRIPTION

Item No.

36

Basic rate

BRICK WORK
Brickwork in cement and sand 1:5 in 115mm thick walls in ground floor
Per Sq.m
Materials
60 bricks
Add 5% for wastage
0.14 Bag cement (50 Kg bags)
0.03 m3 sand
Water 21 liters

210.00
10.50
48.30
23.25

Labour
0.16 days mason
0.22 days U / Sk Labourer

72.00
66.00
6.90

Scaffolding - Add 5%

436.95

Basic rate per Mt.


37

225 mm thick brick wall cement sand 1:5 in ground floor


Per Sq.m.
Materials
120 bricks
Add 5% for wastage
0.33 Bag cement (50 Kg bags)
0.06 m3 sand
Water 42 liters

420.00
21.00
113.85
46.50

labour
0.24 days mason
0.28 days U / Sk labourer

108.00
84.00
5.76

Scaffolding - Add 3%

799.11

Basic rate per Sq.m.


38

Brickwork 340 thick in cement sand 1:5 in superstructure in ground floor.


Per Sq.m.
Materials
176 bricks
Add 5% for wastage
0.50 cement (50 Kg. Bags)
0.09 m3 sand
Water 83 liters
Labour
0.33 days mason
0.51 days U/SK labour
Scaffolding - Add 2%

616.00
30.80
172.50
69.75

148.50
153.00
6.03
1,196.58

Basic rate per Sq.m.


BSR

Page 20

DESCRIPTION

Item No.
39

Basic rate

Steps 300mm x 150mm in brick in cement and sand 1:5 with 12 mm thick
cement and sand 1:2 rendering including necessary excavation.
Per 3.0 L.m.
Materials
120 bricks
Add 5% for wastage
0.50 Bag cement
0.14 m3 sand
Water 60 liters

40

420.00
21.00
172.50
108.50

Labour
1/2 day mason
1/2 day U / Sk labourer

225.00
150.00

Basic rate per m

365.67

Bricks drains in cement and sand 1:5 225 mm. wide and 150 - 225 mm
average depth including cement rendering 12 mm thick 1:2 to exposed
faces with and including necessary excavation.
Per 3.05 m
Materials
140 bricks
Add 5% for wastage
0.80 Bag cement
0.15 m3 sand
Water 91 liters
Labour
1 1/4 days mason
1 1/4 days U / Sk labourer
Basic Rate per 3.05 m

562.50
375.00
1,844.25
604.67

Basic rate per L.m.

41

490.00
24.50
276.00
116.25

BLOCK WORK
150 mm thick hollow blockwork in cement and sand mortar 1:5 in ground
floor (cavities unfilled)
Per Sq.m
size of each block 400 x 200 x 150 mm
Materials
12. Nr. hollow cement block
Allow 5% for wastage
0.08 Bag cement (50 Kg bags)
0.012 m3 sand

408.00
20.40
27.60
9.30

Labour
0.16 days mason
0.27 days U / Sk labourer
Scaffolding - Add 3%

72.00
81.00
4.59
622.89

Basic rate per Sq.m


BSR

Page 21

DESCRIPTION

Item No.
42

100 mm thick Hollow block masonry in cement and sand mortar 1:5 with
cavities unfilled.
Per Sq.m
size of each block 400 x 200 x 100
Materials
12 Hollow cement blocks
Allow 5% for wastage
0.04 Bag cement (50 Kg bags)
0.008 m3 sand

336.00
16.80
13.80
6.20

Labour
0.11 day mason
0.22 days U / Sk labourer
Scaffolding - Add 5%

49.50
66.00
5.78
494.08

Basic rate per Sq.m


43

Basic rate

Random rubble masonry in cement mortar 1:5 in foundation (average


width 350 mm )
Per Cu.m
Materials
1.30 m3 150-225 mm rubble
1.80 bag cement (50 kg)
0.30 m3 sand
water ( 455 lit)

1,300.00
621.00
232.50

Labour
1.40 day masons
2.12 day U /SK Labourer

630.00
636.00
3,419.50

Basic Rate per Cu.m.

44

Random rubble masonry in cement mortar 1:5 in superstructure (average


width 350 mm. )
Per Cu.m
Materials
1.30 m3 150 - 225 mm rubble
1.80 Bag cement
(50 Kg bags)
0.30 m3 sand
Water 455 liters

1,300.00
621.00
232.50

Labour
1.6 days mason
2.5 days U / Sk labourer
Scaffolding - Add 3%

720.00
750.00
44.10
3,667.60

Basic Rate per Cu.m.

BSR

Page 22

DESCRIPTION

Item No.

45

Basic rate

CERAMIC TILING
200 x 200 mm. Ceramic floor tiles bedded in 20 mm cement mortar 1:3 and
pointing with grouting in ground floor.
Per 9.3 Square meter
Materials
225 Ceramic tiles 200 X 200
Add 5% for wastage
2.50 bag cement wastage (50 Kgs bags)
0.18 m3 sand
100 g wax polish
2.25 kg. tile grout
500 g cotton waste

6,750.00
337.50
862.50
139.50
22.50
180.00
17.00

Labour
4 days mason
4 days U / Sk labourer
1/2 day U / Sk labourer for polishing

1,800.00
1,200.00
150.00

Total without tiles

4,371.50

A.

Basic rate per Square Meter (normal)

1,232.15

B.

Basic rate per Square Meter (moderate)

1,155.94

C.

Basic rate per Square Meter (luxury)

1,333.76

46

300 x 300 mm. Ceramic floor tiles bedded in 20 mm cement mortar 1:3 and
pointing joints with grouting in ground floor.
Per 9.3 Square meter
Materials
100 Ceramic tiles 300 X 300
Add 5% for wastage
2.50 bag cement wastage (50 Kgs bags)
0.18 m3 sand
100 g wax polish
2.25 kg. tile grout
500 g cotton waste

4,800.00
240.00
862.50
139.50
22.50
180.00
17.00

Labour
As above item

3,150.00

Total without tiles

4,371.50

A.

Basic rate per Square Meter (normal)

1,011.99

B.

Basic rate per Square Meter (moderate)

1,203.92

C.

Basic rate per Square Meter (luxury)

1,599.09

D.

Basic rate per Square Meter (luxury design tiles)

3,010.38

E.

Basic rate per Square Meter (luxury Rustic tiles to terrace & varandaha)
BSR

1,373.28
Page 23

DESCRIPTION

Item No.

47

Basic rate

Glazed tiles fixed to walls including 20 thick bedding in cement motor 1:3
and pointing joints with grouting in ground floor. (specials measured
separately)
Per 9.3 Square meter
Materials
400 glazed tiles 150 X 150mm
Add for wastage on cutting 5%
2 1/2 bag cement (50 Kgs bags)
0.18 m3 sand
500.0 g white cement
3.0 Kg tile grout
500 g cotton waste
Labour
4 days mason
4 days U/Sk labourer
1/4 days U / Sk labourer for cleaning

4,000.00
200.00
862.50
139.50
14.00
240.00
17.00
1,800.00
1,200.00
75.00
4,348.00

Total without tiles


A.

Basic rate per Square Meter (normal)

919.14

B.

Basic rate per Square Meter (moderate)

941.72

C.

Basic rate per Square Meter (luxury)

Glazed border tiles 150 x 75 mm. fixed to walls including 20 thick bedding
in cement motor 1:3 and pointing joints with grouting in ground floor.
Per 10 meter

1,226.24

Materials
68 glazed boder tiles 150 x 75mm
Add for wastage on cutting 5%
0.25 bag cement (50 Kgs bags)
0.01 m3 sand
50.0 g white cement
0.3 Kg tile grout
100 g cotton waste

1,496.00
74.80
86.25
7.75
1.40
24.00
3.40

Labour
0.5days mason
0.5 days U/Sk labourer

225.00
150.00
2,068.60

Total

206.86

Basic rate per Linear Meter (luxury)

BSR

Page 24

DESCRIPTION

Item No.
48A

Basic rate

Granite Flooring on 25mm. cement and sand 1:2 bedding in ground floor
Per 9.0 Square meter
Materials
25 Nr 600 X 600 mm Granite Slabs
Add 5% for wastage on cutting
3 bags cement (50 Kgs bags)
0.2 m3 cubes sand
1.5 Kg white cement
100 g wax polish
500 g cotton waste

53,000.00
2,650.00
1,035.00
155.00
2,100.00
22.50
17.00

Labour
5 days mason
4.5 days U /Sk labourer
1/2 day U / Sk labourer (polishing)

2,250.00
1,350.00
150.00

Basic rate per Square Meter

6,969.94

Ditto but with Imported Granite. Rate per Square Meter.

8,136.61

49

Terra Cotta tile paving to floor bedded in 20 mm cement mortar 1:3 and
pointing in neat cement in ground floor
Per 9.3 Square meter
Materials
225 Ceramic tiles 200 X 200
Add 5% for wastage
2.50 bag cement wastage (50 Kgs bags)
0.18 m3 sand
100 g wax polish
100 g. Coloured figment
500 g cotton waste

2,925.00
146.25
862.50
139.50
22.50
30.00
17.00

Labour
4 days mason
4 days U / Sk labourer
1/2 day U / Sk labourer for polishing

1,800.00
1,200.00
150.00

Total

7,292.75
784.17

Basic rate per Square Meter

BSR

Page 25

DESCRIPTION

Item No.

Basic rate

TIMBER FRAME WORK FOR ROOFS


50

Timber framework for calicut pattern tile hip roof in single storey building
consisting of wall plate, beam, ridge plate, rafters etc. (wood preservative
to be measured separately)
Per 54.0 Square meter

51

Materials
1.00 m3 timber
Add 10% for wastage
200 l.m. 50 X 25 reapers
Add 10% for wastage
3.60 Kg wire nails 150mm long
0.90 Kg wire nails 50 mm long

35,000.00
3,500.00
9,000.00
900.00
259.20
64.80

Labour
7 days carpenter
8 days U / Sk labourer
Total per 54.0 square meters

3,150.00
2,400.00
54,274.00

Basic rate per Sq.m.

1,005.07

Basic rate per Sq.m. (two storied building)

1,035.23

Roof covering with calicut pattern clay tiles in single storied building
(Timber frame work & ridge covering measured separately)
Per 55.70 Square meter
Materials
750 Tiles

9,000.00

Labour
3 days carpenter
3 days U / Sk labourer
Per 54.0 square meter

1,350.00
900.00
11,250.00

Basic rate per Square Meter

201.97

Basic rate per Square Meter (two storied building)

208.03

BSR

Page 26

DESCRIPTION

Item No.
52

53

54

Basic rate

Timber framework for corrugated asbestos sheet roof in single storied


building
Per 33.5 Square meter
Materials
0.37 m3 timber
Add 10% for wastage
1.8 Kg Wire Nails

12,950.00
1,295.00
129.60

Labour
2.5 days carpenter
3 days U / Sk labourer
Total per 33.5 Square meter

1,125.00
900.00
16,399.60

Basic rate per Sq.m.

489.54

Basic rate per Sq.m. (two storied building)

504.23

Timber framework for corrugated asbestos sheet roof in single storied


building ( Rafters at 2' 6'' centers )
Per 33.5 Square meter
Materials
0.55 m3 timber
Add 10% for wastage
1.8 Kg Wire Nails

19,250.00
1,925.00
129.60

Labour
4.5 days carpenter
6 days U / Sk labourer
Total per 33.5 Square meter

2,025.00
1,800.00
25,129.60

Basic rate per Sq.m.

750.14

Basic rate per Sq.m. (two storied building)

772.64

Roof covering with corrugated asbestos sheets (timber framework and


ridge covering measured separately)
Per 33.5 square meter
Materials
39.0 m2 asbestos corrugated sheets
72 Nos. roofing screws and washers
Labour
1 day carpenter
2 days U / Sk labourer
Per 33.5 square meter

9,672.00
388.80

450.00
600.00
11,110.80

Basic rate per Sq.m.

331.67

Basic rate per Sq.m. (two storied building)

341.62

BSR

Page 27

DESCRIPTION

Item No.
55

56

57

Exposed Timber framework for corrugated asbestos sheet roof (purling at


1'-6'' c/c) in single storied building
Per 33.5 square meter
Materials
0.90 m3 timber
Add 10% for wastage
3.60 Kg wire nails 150mm long
0.90 Kg wire nails 50 mm long

31,500.00
3,150.00
259.20
64.80

Labour
7 days carpenter
8 days U / Sk labourer
Total per 54.0 square meters

3,150.00
2,400.00
40,524.00

Basic rate per Sq.m.

1,209.67

Basic rate per Sq.m. (two storied building)

1,245.96

Additional cost for planning four side of rafters per square meter.
Planning cost per 1.0 L.m. of rafter.
Cost per I.0 m2 of exposed rafter roof (14.0 L.m. rafters per 1.0 m 2 )

7.00
98.00

Additional cost for four side planning per square meter - say

97.00

One layer half round clay tiles over corrugated asbestos roof covering
Per 9.0 Square meter
Materials
650 half round clay tiles

2,860.00

Labour
2 days U / Sk labourer
Basic rate per 9.0 Square Meter

600.00
3,460.00
384.44

Basic rate per Sq.m.


58

Basic rate

Asbestos close fittings ridging fixed complete with roofing screws and
washers.
Per 4.0 m length
Materials
4 pairs ridges 1.12m long
16 roofing screws and washers.

900.00
86.40

Labour
1/4 day carpenter
1/4 day U / Sk labourer
Per 4.0 m ridging

112.50
75.00
1,173.90
293.48

Basic rate per L.m.

BSR

Page 28

DESCRIPTION

Item No.
59

60

Basic rate

Ridging covering with calicut pattern ridge tiles bedded in cement lime
mortar 1:1:4
Per 4.0 m ridging
Materials
10 ridge tiles
1/3 bag cement (50 Kgs)
0.06 m3 sand
6.75 Kg slaked lime
0.25 Kg colouring powder

185.00
115.00
46.50
40.50
75.00

Labour
1/4 day mason
1/4 day U / Sk labour

112.50
75.00

Basic rate per L.m.

162.38

20 X 225mm high valance board fixed with brass screws to ends of rafters
(for tile roofing)
Per 10.0 L.m
Materials
2.25 m2 25 mm planks
Add 5% for wastage
32 Nos. 40mm brass screws
Labour
1 day carpenter
1 days U / Sk labourer
Scaffolding - Add 5%
Total per 10.0 L. meter

630.00
31.50
124.80
450.00
300.00
37.50
1,573.80
157.38

Basic rate per L.m.


61

Ditto - but 20x175 valance board cut to profile of corrugation.


Per 10.0 L.m
Materials
1.75 m2 20 mm planks
Add 5% for wastage
23 Nos. 40mm brass screws

490.00
24.50
93.60

Labour
2 day carpenter
1.5 days U / Sk labourer
Scaffolding - Add 5%
Total per 10.0 L. meter

900.00
450.00
67.50
2,025.60
202.56

Basic rate per L.m.

BSR

Page 29

DESCRIPTION

Item No.
62

20 X 225 high barge board fixed with brass screws at 600 mm centers to
sides of rafters
Per 10.0 m2
Materials
2.25 m2 25 mm. Planks
add 5% for wastage
16 nos. of 38 mm. Brass screws
Labour
1 day carpenter
1 days U / Sk labourer
Scaffolding - Add 5%

630.00
31.50
62.40
450.00
300.00
37.50
1,511.40

Total per 10.0 L. meter

63

64A

Basic rate

Rate per Lm.

151.14

Ridging covering with large half round ridge tiles bedded in cement lime
mortar 1:1:4
Per 4.0 m ridging
Materials
10 ridge tiles
1/3 bag cement (50 Kgs)
0.06 m3 sand
6.75Kg slaked lime

80.00
113.85
46.50
40.50

Labour
1/4 day mason
1/4 day U / Sk labour

112.50
75.00

Basic rate per L.m.

117.09

Laying of 25 mm. thick glass wool insulation and one layer of Aluminium
foil to roof with BRC fabrics.
Per 10 m2
Materials
10 m2 Aluminium foil with 25mm thick glass wool layer
10 m2 75 x 75 mm. Square BRC net.
5% for waste and laps
1 Kg 25 mm. Wire nails.
Labour
1/4 day carpenter
1/2 day U/Sk. Labour

1,600.00
600.00
110.00
72.00

112.50
150.00
2,644.50

Total

264.45

Basic rate per Sq.m.

BSR

Page 30

DESCRIPTION

Item No.
64B

Laying of 25 mm. thick glass wool insulation and one layer of Aluminium
foil to roof without BRC fabrics.
Materials
10 m2 Aluminium foil with 25mm thick glass wool layer
5% for waste and laps
100 g of 19 mm. Panel pins
Labour
1/4 day carpenter
1/4 day U/Sk. Labour

1,600.00
80.00
36.00

90.00
60.00
1,866.00

Total

186.60

Basic rate per Sq.m.


65

Basic rate

Laying of Aluminium foil on rake ceiling.


Per 10 m2
Materials
10 m2 Aluminium foil with 25mm thick glass wool layer
5% for waste and laps
100 g of 19 mm. Panel pins
Labour
1/4 day carpenter
1/4 day U/Sk. Labour

750.00
37.50
36.00

90.00
60.00
973.50

Total

97.35

Basic rate per Sq.m.


Roof Plumbing
66

18 B.W.C. (1.2mm) galvanized iron sheet valley gutter 0.90m girth overall
once bent with end laps not less than 225 mm width including 20mm
tongued and grooved planks (Balau) laid to slope and profile on timber
members
Consider 4.50m
Materials
2 G.I. Sheet (2.4 x1.2 m)
1.0 lit. wood preservative
0.10 Bag cement (50 Kg)
2.5 Kg. slaked lime
0.03 cu.m sand
4.25 m2 19mm thick planks
0.90 Kg 40mm wire nails

4,400.64
60.00
34.50
15.00
23.25
4,505.00
64.80

BSR

Page 31

DESCRIPTION

Item No.

Labour
a) Fixing boarding and applying wood preservative
1 day carpenter
1 day U / Sk labourer
b) Making and Fixing G.I sheets
1/2 day tinker
1/2 day U / Sk labourer
c) Building sides
1/4 day mason
1/2 day U / Sk labourer

450.00
300.00
225.00
150.00
112.50
150.00
10,490.69

Total per 4.50 L. meter

2,331.26

Basic rate per L.m.


67

Basic rate

18 B.W.C. (1.2 mm) galvanized iron flashing 450mm girth overall 3 times
bent with end laps not less than 150mm, lead soldered, turned 150mm into
chase cut in wall and pointed in cement mortar 1:2 lower end dressed over
roof covering not less than 300 mm wide
Consider 4.50m
2,200.32
17.25
23.25
90.00

1 G.I. Sheet (2.4 x1.2 m)


0.05 Bag cement (50 Kg)
0.03 m3 Sand
0.40 Kg soldering lead
Labour
Cutting, bending, soldering & fixing 1/2 day tinker
1/8 day mason (caulking)
3/4 day U / Sk labourer

225.00
56.25
225.00

Total per 4.50 L. meter

2837.07

Basic rate per L.m.

630.46

BSR

Page 32

DESCRIPTION

Item No.

Basic rate

CEILING
68

Timber framework for 1200 X 1200 mm flat asbestos ceiling (sheet


measured separately)
Comprising of 100 x 50 joists and 50 x 50 bearers in class I timber
Per 18.0 Sq.m.
Materials
0.23 m3 timber class I
0.50 Kg. 50 mm. Nails
26 Nos. fiber/plastic plugs
0.25 Bags cement (50 Kg)
0.06 m3 sand
50mm brush - 1/4 use
1.50 lit tarnap / wood preservative

8,050.00
36.00
442.00
86.25
46.50
25.00
90.00

Labour
2 1/2 days carpenter
1/2 day mason
1 1/2 days U / Sk labourer
Scaffolding Add 3%

1,125.00
225.00
450.00
54.00
10,629.75

Total per 18.0 Square meter

590.54

Basic rate per Sq.m.


69A

Horizontal ceiling lining using 1200 X 1200 mm flat asbestos cement sheets
fixed with and including beading and cove moulding on timber framework.
(timber framework & painting measured separately)
Per 18.0 Sq.m
Materials
20.0 m2 flat asbestos sheets
18.0 m, 50 x 50 mm halmilla cove mouldings
38.0 halmilla beadings
100g 25 mm clout nails
96 Nos. 40 mm brass screws

2,920.00
1,044.00
750.50
36.00
374.40

Labour
1 1/2 days carpenter
2 days U / Sk labourer
Scaffolding - Add 3%
Total

675.00
600.00
38.25
6,438.15

Basic rate per Sq. m.

357.68

BSR

Page 33

Item No.

DESCRIPTION

Horizontal ceiling lining using 1200 X 1200 mm flat asbestos cement sheets
fixed on timber framework without beading and cove moulding . (timber
framework & painting measured separately)

Basic rate

Per 18.0 Sq.m


Materials
20.0 m2 flat asbestos sheets
100g 25 mm clout nails

2,920.00
36.00

Labour
1 1/4 days carpenter
1.5days U / Sk labourer
Scaffolding - Add 3%
Total

562.50
450.00
30.38
3,998.88
222.16

Basic rate per Sq. m.


C

Flat asbestos cement ceiling sheets fixed to underside of roof rafters with
necessary timber battens with beading and cove moulding . (painting
measured separately)
Per 18.0 Sq.m
Materials
25.0 m2 flat asbestos sheets (40% wastage)
18.0 m, 50 x 50 mm halmilla cove mouldings
38.0 halmilla beadings
100g 25 mm clout nails
96 Nos. 40 mm brass screws
18.0 m. 50 x 50 mm class I timber battens
12.0 m, 50 x 6 mm timber strips (for leveling)

2,920.00
1,044.00
750.50
36.00
374.40
1,764.00
159.00

Labour
2.5 days carpenter
2 days U / Sk labourer
Scaffolding - Add 3%
Total

1,125.00
600.00
38.25
8,811.15

Basic rate per Sq. m.

489.51

BSR

Page 34

DESCRIPTION

Item No.
70

Basic rate

Horizontal ceiling lining using 1200 X 1200 mm flat gypsum plaster board
sheets fixed with and including pointing and cove moulding on timber
framework. (timber framework & painting measured separately)
Per 18.2 Sq.m
Materials
20.0m2 flat plaster board sheets
51.2 m pasting tape
136 Nos. 38 mm brass screws

4,080.00
345.60
530.40

Labour
1 1/2 days carpenter
2 days U / Sk labourer
Scaffolding - Add 3%
Total

675.00
600.00
38.25
6,269.25
344.46

Basic rate per Sq.m.


71A

20mm thick tongued and grooved Lunumidella ceiling boards fixed


horizontal on 100 x 50 class I timber joists at 600.00 mm centers with 38mm
brass nails
Per 18 Sq.m

1.3560

Materials
36.0 m. 100 x 50mm timber joists
20.0 m2, 150 x 19 mm Lunumidella ceiling planks
10.0 kg. Cement
0.12 m2 sand
4 Kg 38mm brass nails
Labour
Making holes, fixing joists and making good
1 day mason
1 day carpenter
3 days U / Sk labourer
Fixing ceiling boards
3 days carpenter
3.5 days U / Sk labourer
Scaffolding - Add 3%
Total

450.00
450.00
900.00

1,350.00
1,050.00
126.00
19,168.00
1,064.89

Rate per Sq.m.


B

6,660.00
6,500.00
69.00
93.00
1,520.00

20mm thick tongued and grooved Lunumidella ceiling boards fixed


horizontal on 100 x 50 class I timber joists at 600.00 mm centers with 38mm
brass nails including periphery timber moulding.
Materils.
As above
18.0 m, 50 x 50 mm halmilla cove mouldings
96 Nos. 40 mm brass screws
BSR

14,842.00
1,044.00
374.40
Page 35

DESCRIPTION

Item No.

Labour
For Making holes, fixing joists and making goodas above.
Fixing ceiling boards
3 days carpenter
4 days U / Sk labourer
Scaffolding - Add 3%
Total

1,800.00

1,575.00
1,200.00
137.25
20,972.65
1,165.15

Rate per Sq.m.


72

Basic rate

19 mm x 150 mm wide tongued and grooved lunumidella ceiling boards


fixed to underside of roof rafters, (existing) with 38 mm brass nails
including leveling with timber strips where necessary
Per 18.0 Sq.m.
Materials
22.0 m2 ceiling planks
12.0 m, 50 x 6 mm timber strips (for leveling)
2.00 Kg 19 mm nails
4.00 Kg 38 mm brass nails

7,150.00
159.00
144.00
1,520.00

Labour
3 days carpenter
6 days U / Sk labourer
Scaffolding - Add 3%

1,350.00
1,800.00
94.50
12,217.50

Total per 18.0 Sq.m.

678.75

Basic rate per Sq. Meter


Note: wastage 20%
73

19 mm x 150 mm wide tongued and grooved lunumidella ceiling boards


fixed on top of the roof rafters, (existing) with 38mm brass nails.
Per 18.0 Sq.m.
Materials (Note: wastage 20%)
22.0 m2 ceiling planks
4.00 Kg 38 mm brass nails

7,150.00
1,520.00

Labour
2 days carpenter
4 days U / Sk labourer
Scaffolding - Add 3%

900.00
1,200.00
63.00

Total per 18.0 Sq.m.

10,833.00

Basic rate per Sq.m.

601.83

BSR

Page 36

DESCRIPTION

Item No.

74A

DOORS AND WINDOWS


Door single hung 1.0 X 2.10 m high overall with frame having 38mm thick
Mahogany timber sash and 94 X 69 mm timber frame. (glazing,
ironmongery and painting measured separately)
Per 2.10 Sq.m
Materials
a) Frame 0.04 m3, 100 X 75 mm timber
2 No. Spur stones
6 No. fiber / plastic plugs with 100 mm long brass screws
2 No. 12 mm. mild steel dowels 100 mm long
b) Sash 1.90 m2 38 mm planks

1,400.00
44.00
102.00
40.00
4,497.30

Labour
5 days carpenter
1 1/2 days U / Sk labourer
1/4 day mason
1/4 day U / Sk labourer (fixing, frame)
Total per 2.10 Sq.m.

2,250.00
450.00
112.50
75.00
8,970.80

Basic rate per Sq.m.

4,271.81

Door single hung 1.0 X 2.10 m high overall with frame having 38mm thick
Yellow Balau timber sash and 94 X 69 mm timber frame. (glazing,
ironmongery and painting measured separately)
Materials
For Frame as above item 71 A
Sash
1.90 m2 38 mm planks

75A

Basic rate

1,586.00
2,527.00

Labour
As above item 70 A

2,887.50

Total per 2.10 Sq.m.

7,000.50

Basic rate per Sq.m.

3,333.57

Door single hung 1.0 X 2.10 m high overall with frame having 32 mm thick
Mahogany timber sash and 94 X 69 mm timber frame. (glazing,
ironmongery and painting measured separately)
Materials
For Frame as above item 71 A
Sash
1.90 m2 32 mm planks

1,586.00
3,752.50

Labour
As above item 70 A

2,887.50

Total per 2.10 Sq.m.

8,226.00

Basic rate per Sq.m.

3,917.14
BSR

Page 37

DESCRIPTION

Item No.
B

Door single hung 1.0 X 2.10 m high overall with frame having 32 mm thick
Yellow Balau timber sash and 94 X 69 mm timber frame. (glazing,
ironmongery and painting measured separately)
Materials
For Frame as above item 71 A
Sash
1.90 m2 32 mm planks

C.

1,586.00
1,900.00

Labour
As above item 71 A

2,887.50

Total per 2.10 Sq.m.

6,373.50

Basic rate per Sq.m.

3,035.00

Door single hung 1.0 X 2.10 m high overall with frame having 25 mm thick
Yellow Balau timber sash and 94 X 69 mm timber frame. (glazing,
ironmongery and painting measured separately)
Materials
For Frame as above item 71 A
Sash
1.90 m2 25 mm planks

76A

Basic rate

1,586.00
1,567.50

Labour
As above item 71 A

2,887.50

Total per 2.10 Sq.m.

6,041.00

Basic rate per Sq.m.

2,876.67

Door glazed and paneled double hung 1200 x 2100 mm high overall with
frame including 38 mm thick Mahogany timber sash and 94 x 69 mm frame.
(glazing, iron ironmongery and painting measured separately )
per 2.52 sq.m
Materials
a) Frame
0.05 Cu.m 100 x75 mm timber
2 Nr. Spur stones
6 Nr. Fiber / plastic plug with 100 mm long screws
2 Nr.12mm 12 mm dia mild steel dowels 100 mm long

1,750.00
44.00
102.00
40.00

b) Sashes
1.52 Sq.m 38mm thick planks

3,597.84

BSR

Page 38

DESCRIPTION

Item No.

Labour
6 days carpenter
2 days U / Sk labour
1/4 day mason
1/4 day U / Sk labourer (fixing, frame)

2,700.00
600.00
112.50
75.00

Total for 2.52 Sq.m

9,021.34

Basic rate per Sq.m

3,579.90

Door glazed and paneled double hung 1200 x 2100 mm high overall with
frame including 38 mm thick Yellow Balau timber sash and 94 x 69 mm
frame. (glazing, iron ironmongery and painting measured separately )
Materials
For Frame as above item 73 A
b) Sashes
1.52 Sq.m 38mm thick planks
Labour
As above item 73 A

77A

Basic rate

1,936.00
2,021.60
3,487.50

Total per 2.52 Sq.m.

7,445.10

Basic rate per Sq.m.

2,954.40

Door glazed and paneled double hung 1200 x 2100 mm high overall with
frame including 32 mm thick Mahogany sash and 94 x 69 mm frame.
(glazing, iron ironmongery and painting measured separately )
Materials
For Frame as above item 73 A

1,936.00

b) Sashes
1.52 Sq.m 32mm thick planks

3,002.00

Labour
As above item 73 A

3,487.50

Total per 2.52 Sq.m.

8,425.50

Basic rate per Sq.m.

3,343.45

Door glazed and paneled double hung 1200 x 2100 mm high overall with
frame including 32 mm thick Yellow Balau timber sash and 94 x 69 mm
frame. (glazing, iron ironmongery and painting measured separately )
Materials
For Frame as above item 73 A
b) Sashes
1.52 Sq.m 32mm thick planks
Labour
As above item 73 A

1,936.00
1,520.00
3,487.50
6,943.50

Total per 2.52 Sq.m.

2,755.36

Basic rate per Sq.m.


BSR

Page 39

DESCRIPTION

Item No.

Door glazed and paneled double hung 1200 x 2100 mm high overall with
frame including 25 mm thick Yellow Balau sash and 94 x 69 mm frame.
(glazing, iron ironmongery and painting measured separately )
Materials
For Frame as above item 73 A
b) Sashes
1.52 Sq.m 32mm thick planks
Labour
As above item 73 A

78A1

1,936.00
1,254.00
3,487.50

Total per 2.52 Sq.m.

6,677.50

Basic rate per Sq.m.

2,649.80

Ordinary Plywood door single hung 0.95 X 2.10 overall with frame having
32mm thick sash and 94 X 69 frame. (Iron-mongery and painting measured
separately)
Per 2.00 Sq.m (0.95 X 2.100)
Materials
a) Frame 0.05 m3 100 X 75 timber
2 Nr. Spur stones
6 Nr fiber/plastic plugs with 100 mm. long brass screws.

1,750.00
44.00
102.00

b) Sash 1 Nr 2.00 X 0.85 plywood sash

2,100.00

Labour
3/4 day carpenter
3/8 day U / Sk labourer
1/4 day mason
1/4 day U / Sk labourer (fixing, frame)

A2

Basic rate

337.50
112.50
112.50
75.00

Basic rate per 2.00 Sq.m

4,633.50

Basic rate per Sq.m

2,316.75

Ordinary Plywood decorative door single hung 0.95 X 2.10 overall with
frame having 32mm thick sash and 94 X 69 frame. (Iron-mongery and
painting measured separately)
Per 2.00 Sq.m (0.95 X 2.100)
Materials
For Frame as above item 75 A
b) Sash 1 Nr 2.00 X 0.85 plywood sash
Labour
As above item 75 A

1,896.00
2,470.00
637.50

Basic rate per 2.00 Sq.m

5,003.50

Basic rate per Sq.m.

2,501.75
BSR

Page 40

Item No.

DESCRIPTION

B1.

Marine Plywood door single hung 0.95 X 2.10 overall with frame having
32mm thick sash and 94 X 69 frame. (Iron-mongery and painting measured
separately)
Per 2.00 Sq.m (0.95 X 2.100)
Materials
a) Frame 0.05 m3 100 X 75 timber
2 Nr. Spur stones
6 Nr fiber/plastic plugs with 100 mm. long brass screws.

1,750.00
44.00
102.00

b) Sash 1 Nr 2.00 X 0.85 marine plywood sash

1,790.00

Labour
3/4 day carpenter
3/8 day U / Sk labourer
1/4 day mason
1/4 day U / Sk labourer (fixing, frame)

B2.

Basic rate

337.50
112.50
112.50
75.00

Basic rate per 2.00 Sq.m

4,323.50

Basic rate per Sq.m

2,161.75

Marine Plywood decorative door single hung 0.95 X 2.10 overall with frame
having 32mm thick sash and 94 X 69 frame. (Iron-mongery and painting
measured separately)
Per 2.00 Sq.m (0.95 X 2.100)
Materials
For Frame as above item 76 A

1,896.00

b) Sash 1 Nr 2.00 X 0.85 plywood sash

2,660.00

Labour
As above item 76 A

637.50

Basic rate per 2.00 Sq.m

5,193.50

Basic rate per Sq.m.

2,596.75

BSR

Page 41

DESCRIPTION

Item No.
79

Basic rate

Door ledged, braced and battened single hung 0.76 X 2.0 m. overall with
frame having 19 mm thick tongued & grooved planks and 94 X 69 mm.
frame. (Ironomongery and painting measured separately)
Per 1.52 m2

80A

Materials
a) Frame
0.04 m3 100 X 75 Timber
2 Nr. Spur stones
6 Nr. Fiber/plastic plugs with 100mm long brass screws
2 Nr 12mm mild steel dowels 100mm long

1,400.00
44.00
102.00
40.00

b) Sash 1.90m2 25mm thick planks


36 Nr. 38mm long brass screws.

2,660.00
140.40

Labour
2 1/4 days carpenter
1 day U / Sk labourer
1/4 day mason (fixing frame)
1 /4 day U / Sk labourer (-do-)

1,012.50
300.00
112.50
75.00

Total per 1.52 m2

5,886.40

Basic rate per Sq.m

3,872.63

Window, glazed 2100 x1200 mm high overall with frame comprising 3 Nr.
Openable 32 mm. Mahogany sashes and 94 x 69 mm frame and mullions.
(Glazing, iron mongery and painting measured separately)
I.e. Per 2.52 m2
Materials
a) Frame
0.09 m3 100 X 75 Timber
4 Nr. Fiber/plastic plugs with 100mm long brass screws

3,150.00
68.00

b) Sash 0.90 sq.m 75 x 32 mm timber

1,777.50

Labour
6 days carpenter
2 1/2 day U / Sk labourer
1/2 day mason (fixing frame)
1 /2 day U / Sk labourer (-do-)

2,700.00
750.00
225.00
150.00

Total per 2.52 sq.m

8,820.50

basic rate per Sq.m

3,500.20

BSR

Page 42

DESCRIPTION

Item No.
B

Window, glazed 2100 x1200 mm high overall with frame comprising 3 Nr.
Openable 32 mm. Yellow Balau sashes and 94 x 69 mm frame and
mullions.(Glazing, iron mongery and painting measured separately)
Materials
For Frame as above item 77 A
b) Sashes
0.90 sq.m 75 x 32 mm timber

81A

Basic rate

3,218.00
900.00

Labour
As above item 77A

3,825.00

Total per 2.52 Sq.m.

7,943.00

Basic rate per Sq.m.

3,151.98

Window, glazed 2100 x1200 mm high overall with frame comprising 3 Nr.
Openable 25 mm. Mahogany sashes and 94 x 69 mm frame and
mullions.(Glazing, iron mongery and painting measured separately)
Materials
For Frame as above item 77 A

3,218.00

b) Sashes
0.90 sq.m 75 x 25 mm timber

1,260.00

Labour
As above item 77A

3,825.00

Total per 2.52 Sq.m.

8,303.00

Basic rate per Sq.m.

3,294.84

Window, glazed 2100 x1200 mm high overall with frame comprising 3 Nr.
Openable 25 mm. Yellow Balau sashes and 94 x 69 mm frame and
mullions.(Glazing, iron mongery and painting measured separately)
Materials
For Frame as above item 77 A

3,218.00

b) Sashes
0.90 sq.m 75 x 25 mm timber

742.50

Labour
As above item 77 A

3,825.00

Total per 2.52 Sq.m.

7,785.50

Basic rate per Sq.m.

3,089.48

BSR

Page 43

DESCRIPTION

Item No.
C

Window, glazed 2100 x1200 mm high overall with frame comprising 3 Nr.
Openable 19 mm. Yellow Balau sashes and 94 x 69 mm frame and
mullions.(Glazing, iron mongery and painting measured separately)
Materials
For Frame as above item 77 A
b) Sashes
0.90 sq.m 75 x 19 mm timber

82A

Basic rate

3,218.00
558.00

Labour
5 days carpenter
2 day U / Sk labourer
1/2 day mason (fixing frame)
1 /2 day U / Sk labourer (-do-)

2,250.00
600.00
225.00
150.00

Total per 2.52 Sq.m.

7,001.00

Basic rate per Sq.m.

2,778.17

3mm clear sheet glass pans exceeding 0.15 m2 but not exceeding 4m2 cut
and fixed with timber beadings to doors and windows.
Consider sash 0.9 X 1.2m high with 75 X 32 mm style and 8 Nrs. Glass panes.
Per 0.80 m2

Materials
0.80 m2 glass panes
9.0 l.m. 12 X 12 mm beading
50 Nos. brass panel pins

212.00
78.75
20.00

Labour
1/2 day Carpenter
1/2 day U / Sk labourer

225.00
150.00

Total per 0.80 m2

685.75

Basic rate per Sq.m.

857.19

5mm clear sheet glass pans exceeding 0.15 m2 but not exceeding 4m2 cut
and fixed with timber beadings to doors and windows.
Consider sash 0.9 X 1.2m high with 75 X 32 mm style and 8 Nrs. Glass panes.
Materials
0.80 m2 glass panes
9.0 l.m. 12 X 12 mm beading
50 Nos. brass panel pins

299.20
78.75
20.00

Labour
1/2 day Carpenter
1/2 day U / Sk labourer

225.00
150.00

Total per 0.80 m2

772.95
966.19

Basic rate per Sq.m.


BSR

Page 44

DESCRIPTION

Item No.

83A

Basic rate

Timber louver panel 94 x69 mm frame and 19mm. thick louvers fixed at
40mm c/c on door and window frames (luxury)
Consider 1.2 x0.45 m

a) Frame
0.024 m3 100 X 75 Timber
2 Nr. Fiber/plastic plugs with 100mm long brass screws
0.75 sq.m 100 x 25 mm timber

840.00
34.00
1,050.00

Labour
2.5 days carpenter
1 day U / Sk labourer

1,350.00
300.00

basic rate per 0.54 sq.m

3,574.00

basic rate per Sq.m

6,618.52

Timber louver panel 94 x69 mm frame and 19mm. thick louvers fixed at
40mm c/c on door and window frames. ( moderate)
Consider 1.2 x0.45 m
a) Frame
0.024 m3 100 X 75 Timber
2 Nr. Fiber/plastic plugs with 100mm long brass screws
1.0 sq.m 100 x 19 mm timber
Labour
2. days carpenter
3/4 day U / Sk labourer

840.00
34.00
1,060.00

900.00
225.00

basic rate per 0.54 sq.m

3,059.00

basic rate per Sq.m

5,664.81

Timber louver panel 94 x69 mm frame and 19mm. thick louvers fixed at
40mm c/c on door and window frames. (normal)
Consider 1.2 x0.45 m
a) Frame
0.02 m3 100 X 75 Timber
2 Nr. Fiber/plastic plugs with 100mm long brass screws
.46 sq.m 50 x 19 mm timber

700.00
34.00
795.00

Labour
1.5 days carpenter
1/2 day U / Sk labourer

675.00
150.00

basic rate per 0.54 sq.m

2,354.00

basic rate per Sq.m

4,359.26
BSR

Page 45

DESCRIPTION

Item No.
84

IRONMONGERY

Butt hinges 125 X 100 mm (L)


Materials
11/2 pairs butt hinges
24 Nrs. 19mm brass screws

1,230.00
44.40

Labour
1/4 day carpenter
1/4 day U / Sk labourer

112.50
75.00

Per 1 1/2 pairs

Basic rate

1,461.90

Basic Rate per pair

974.60

Butt hinges 125 X 100 mm (M)


Materials
11/2 pairs butt hinges
24 Nrs. 19mm brass screws

585.00
44.40

Labour
1/4 day carpenter
1/4 day U / Sk labourer

112.50
75.00

Per 1 1/2 pairs

816.90

Basic Rate per pair

544.60

Butt hinges 125 X 100 mm (N)


Materials
11/2 pairs butt hinges
24 Nrs. 19mm brass screws

225.00
44.40

Labour
1/4 day carpenter
1/4 day U / Sk labourer

112.50
75.00

Per 1 1/2 pairs

456.90

Basic Rate per pair

304.60

Butt hinges 100X 75 mm (L)


Materials
11/2 pairs butt hinges
24 Nrs. 19mm brass screws

825.00
44.40

Labour
1/4 day carpenter
1/4 day U / Sk labourer

112.50
75.00

Per 1 1/2 pairs

1,056.90

Basic Rate per pair

704.60

BSR

Page 46

DESCRIPTION

Item No.
E

Basic rate

Butt hinges 100 X 75 mm (M)


Materials
11/2 pairs butt hinges
24 Nrs. 19mm brass screws

330.00
44.40

Labour
1/4 day carpenter
1/4 day U / Sk labourer

112.50
75.00

Per 1 1/2 pairs

561.90

Basic Rate per pair

374.60

Butt hinges 100 x 75 mm (N)


Materials
11/2 pairs butt hinges
24 Nrs. 19mm brass screws

142.50
44.40

Labour
1/4 day carpenter
1/4 day U / Sk labourer

112.50
75.00

Per 1 1/2 pairs

374.40

Basic Rate per pair

249.60

Butt hinges 100 X 50 mm (L)


Materials
11/2 pairs butt hinges
24 Nrs. 19mm brass screws

525.00
44.40

Labour
1/4 day carpenter
1/4 day U / Sk labourer

112.50
75.00

Per 1 1/2 pairs

756.90

Basic Rate per pair

504.60

Butt hinges 100 X 50 mm (M)


Materials
11/2 pairs butt hinges
24 Nrs. 19mm brass screws

187.50
44.40

Labour
1/4 day carpenter
1/4 day U / Sk labourer

112.50
75.00

Per 1 1/2 pairs

419.40

Basic Rate per pair

279.60
BSR

Page 47

DESCRIPTION

Item No.

85

86A

Butt hinges 100 X 50 mm (N)


Materials
11/2 pairs butt hinges
24 Nrs. 19mm brass screws

112.50
44.40

Labour
1/4 day carpenter
1/4 day U / Sk labourer

112.50
75.00

Per 1 1/2 pairs

344.40

Basic Rate per pair

229.60

Tee hinges 150 X 250 mm


Materials
1 pair Tee hinges
18 Nr. 19 mm iron screws

60.00
10.80

Labour
2 hrs carpenter
2hrs U / Sk labourer

112.50
75.00

Basic Rate per pair

258.30

External door lock (N)


Materials
1 Mortise lock with screws

1,200.00

Labour
4 hrs carpenter
4 hrs U /Sk labourer

225.00
150.00

Basic Rate per Nr.

1,575.00

External door lock (M)


Materials
1 Mortise lock with screws

1,900.00

Labour
4 hrs carpenter
4 hrs U /Sk labourer

Basic rate

225.00
150.00

Basic Rate per Nr.

2,275.00

External door lock (L)


Materials
1 Mortise lock with screws

4,300.00

Labour
5 hrs carpenter
5 hrs U /Sk labourer

281.25
187.50
4,768.75

Basic Rate per Nr.


BSR

Page 48

DESCRIPTION

Item No.
87
A

Internal door lock (N)


Materials
1 Rim lock with screws

225.00

Labour
2 hrs carpenter
2 hrs U /Sk labourer

112.50
75.00

Basic Rate per Nr.

412.50

Internal door lock( M )


Materials
1 Rim lock with screws

775.00

Labour
2 hrs carpenter
2 hrs U /Sk labourer

112.50
75.00

Basic Rate per Nr.

962.50

Internal door lock( L )


Materials
1 Rim lock with screws

1,200.00

Labour
3 hrs carpenter
2 hrs U /Sk labourer

168.75
75.00
1,443.75

Basic Rate per Nr.


88
A

Casement stays (N)


Materials
4 casement stays
16 Nr. 12 mm brass screws

160.00
15.20

Labour
2 hrs carpenter
2 hrs U /Sk labourer

112.50
75.00

Total for 4 Nr.

362.70
90.68

Basic Rate per Nr.


B

Basic rate

Casement stays (M)


Materials
4 casement stays
16 Nr. 12 mm brass screws

260.00
15.20

Labour
2 hrs carpenter
2 hrs U /Sk labourer

112.50
75.00

Total for 4 Nr.

462.70

Basic Rate per Nr.


Casement stays (L)

115.68
BSR

Page 49

DESCRIPTION

Item No.

89

Materials
4 casement stays
16 Nr. 12 mm brass screws

380.00
15.20

Labour
2 hrs carpenter
2 hrs U /Sk labourer

112.50
75.00

Total for 4 Nr.

582.70

Basic Rate per Nr.

145.68

Tower / Skeleton brass bolts


Materials
1 Tower / Skeleton bolt
10 Nr, 12 mm brass screws

98.00
9.50

Labour
1/2 hr. carpenter
1/2 hr. U/Sk labourer

28.13
18.75
154.38

Basic Rate per Nr.


90
A

Barrel bolt 150 mm (N)


Materials
1 Nr. Barrel bolt
8 Nr. 12 mm Brass screws

49.00
7.60

Labour
1/2 hr. carpenter
1/2 hr. U / SK labourer

28.13
18.75
103.48

Basic Rate per Nr.


B

Barrel bolt 150 mm (M)


Materials
1 Nr. Barrel bolt
8 Nr. 12 mm Brass screws

78.00
7.60

Labour
1/2 hr. carpenter
1/2 hr. U / SK labourer

28.13
18.75
132.48

Basic Rate per Nr.


C

Basic rate

Barrel bolt 150 mm (L)


Materials
1 Nr. Barrel bolt
8 Nr. 12 mm Brass screws

93.00
7.60

Labour
1/2 hr. carpenter
1/2 hr. U / SK labourer

28.13
18.75
147.48

Basic Rate per Nr.


BSR

Page 50

DESCRIPTION

Item No.

Basic rate

91

Barrel bolt 100 mm (N)

Materials
1 Nr. Barrel bolt
8 Nr. 12 mm Brass screws

38.00
7.60

Labour
1/2 hr. carpenter
1/2 hr. U / SK labourer

28.13
18.75

Basic Rate per Nr.

92.48

Barrel bolt 100 mm (M)


Materials
1 Nr. Barrel bolt
8 Nr. 12 mm Brass screws

58.00
7.60

Labour
1/2 hr. carpenter
1/2 hr. U / SK labourer

28.13
18.75
112.48

Basic Rate per Nr.


C

Barrel bolt 100 mm (L)


Materials
1 Nr. Barrel bolt
8 Nr. 12 mm Brass screws

75.00
7.60

Labour
1/2 hr. carpenter
1/2 hr. U / SK labourer

28.13
18.75
129.48

Basic Rate per Nr.


92

Casement fasteners (N)

Materials
6 Nr. Casement fasteners
24 Nr. 12 mm brass screws

210.00
22.80

labour
1/2 day carpenter
1/2 day U / SK labourer

225.00
150.00

total per 6 Nr.

607.80

Basic rate per Nr.

101.30

BSR

Page 51

DESCRIPTION

Item No.
B

Basic rate

Casement fasteners(M)
Materials
6 Nr. Casement fasteners
24 Nr. 12 mm brass screws

360.00
22.80

labour
1/2 day carpenter
1/2 day U / SK labourer

225.00
150.00

total per 6 Nr.

757.80

Basic rate per Nr.

126.30

Casement fasteners (L)


Materials
6 Nr. Casement fasteners
24 Nr. 12 mm brass screws

540.00
22.80

labour
1/2 day carpenter
1/2 day U / SK labourer

225.00
150.00

total per 6 Nr.

937.80

Basic rate per Nr.

156.30

93

Spring loaded fanlight catches (N)

Materials
6 brass fanlight catches
24 Nr. 12 brass screws

210.00
22.80

labour
1/2 day carpenter
1/2 day U / SK labourer

225.00
150.00

total per 6 Nr.

607.80

Basic rate per Nr.

101.30

Spring loaded fanlight catches (M)


Materials
6 brass fanlight catches
24 Nr. 12 brass screws

480.00
22.80

labour
1/2 day carpenter
1/2 day U / SK labourer

225.00
150.00

total per 6 Nr.

877.80

Basic rate per Nr.


Spring loaded fanlight catches (L)

146.30
BSR

Page 52

DESCRIPTION

Item No.

Basic rate

Materials
6 brass fanlight catches
24 Nr. 12 brass screws

780.00
22.80

labour
1/2 day carpenter
1/2 day U / SK labourer

225.00
150.00
1,177.80

total per 6 Nr.

196.30

Basic rate per Nr.


94

Draw rings (N)

Materials
6 draw rings
12 Nr. 12 brass screws

90.00
11.40

Labour
1 hr. carpenter
1 hr. U Sk labourer

56.25
37.50
195.15

Total for 6 Nr.

32.53

Basic rate per Nr.


B

Draw rings (M)


Materials
6 draw rings
12 Nr. 12 brass screws

174.00
11.40

Labour
1 hr. carpenter
1 hr. U Sk labourer

56.25
37.50
279.15

Total for 6 Nr.

46.53

Basic rate per Nr.


C

Draw rings (L)


Materials
6 draw rings
12 Nr. 12 brass screws

246.00
11.40

Labour
1 hr. carpenter
1 hr. U Sk labourer

56.25
37.50
351.15

Total for 6 Nr.

58.53

Basic rate per Nr.


BSR

Page 53

DESCRIPTION

Item No.

Basic rate

PLASTERING
95

20mm thick DPC, in cement sand 1:2 finished with 2 coats hot tar and
blinded with sand
Per 9.30 Sq.m
Materials
2.25 Bag cement (50Kg)
0.31 m3 sand
6.0 liters DPC tar
Firewood (4.5Kg)
Water 40 liters

96

776.25
240.25
168.00
22.50

Labour
1 1/4 days mason
2 1/2 days U / Sk labourer

562.50
750.00

Basic rate per Sq.m.

270.91

16 mm thick plastering to wall in cement sand 1:3 including cement floating


Per 9.30 Sq.m
Materials
1.40 Bag cement (50 Kg bags)
0.16 m3 sand
Water 40 liters

97

483.00
124.00

Labour
1 day mason
1 1/2 days U / Sk labourer
Scaffolding - Add 3%

450.00
450.00
27.00

Basic rate per Sq.m.

164.95

16 mm thick plastering to soffit of slab in cement and sand 1:1:5 including


floating with lime putty
Per 9.30 sq.m
Materials
0.80 bag cement (50 kg)
30.00 kg slaked lime
0.2 cu.m sand
Water 23 liters

276.00
180.00
155.00

Labour
2 1/2 days mason
2 1/2 days U / SK labourer
Scaffolding - Add 3%

1,125.00
750.00
56.25
273.36

Basic rate per Sq.m.

BSR

Page 54

DESCRIPTION

Item No.
98

16 mm thick plastering to sides and soffit of beams in cement and sand


mortar 1:1:5 including floating with lime putty
Per 9.30 sq.m
Materials
0.80 bag cement (50 kg)
30.00 kg slaked lime
0.20 cu.m sand
water 23 liters

276.00
180.00
155.00

Labour
2 days mason
2 days U / Sk laboures

99

100

900.00
600.00

Scaffolding - Add 3%

45.00

Basic rate per Sq.m.

231.83

16 mm thick external plaster to walls in cement, lime and sand mortar 1:1:5
finished semi-rough with wooden float
Per 9.30 sq.m
Materials
0.80 bag cement (50 kg)
20.00 kg slaked lime
0.20 cu.m sand
water 45 liters
Material cost.
Labour
1 days mason
1 1/4 days U / Sk laboures

276.00
120.00
155.00
551.00
450.00
375.00

Scaffolding - Add 3%

24.75

Basic rate per Sq.m.

150.62

Ditto for reveals and rounded angles.


Per L.m.
Material cost .0075 M2 of mortar.

4.44
56.25
1.69
62.38

labour - 1 hrs. of mason


Scaffolding - Add 3%
Basic rate per L.m.
101

Basic rate

16 mm thick internal plaster to walls in cement, lime and sand mortar 1:1:5
finished smooth with lime putty and floating.
Per 9.30 sq.m

Materials
0.80 bag cement (50 kg)
30.00 kg slaked lime
0.20 cu.m sand
water 45 liters
Material cost.

276.00
180.00
155.00
611.00
BSR

Page 55

DESCRIPTION

Item No.
Labour
1 1/2 days mason
1 1/2 days U / Sk laboures

102

675.00
450.00

Scaffolding - Add 3%

33.75

Basic rate per Sq.m.

190.30

Ditto for reveals and rounded angles.


Per L.m.
Material cost .0075 M2 of mortar.

4.93
72.00
2.16
79.09

labour - 1.25 hour of mason


Scaffolding - Add 3%
Rate per L.m.
103

Basic rate

12 mm thick rendering in cement and sand mortar 1:3 finished smooth with
(Trowel finished).
Per 9.30 sq.m
Materials
1.40 bag cement (50 kg)
0.15 cu.m sand
water 45 liters

483.00
116.25
599.25

104

Labour
7/8 days mason
1 1/2 days U / Sk laboures
1/4 days U / Sk laboures (curing)

393.75
450.00
75.00

Basic rate per Sq.m.

163.23

12 mm thick rendering in cement and sand mortar 1:2 in floors, finished


smooth with gray cement float.
Per 9.30 sq.m
Materials
1.80 bag cement (50 kg)
0.15 cu.m sand
water 45 liters

621.00
116.25

Labour
1 days mason
1 1/2 days U / Sk labourer
1/4 days U / Sk laboures (curing)

450.00
450.00
75.00

Basic rate per Sq.m.

184.11

BSR

Page 56

DESCRIPTION

Item No.
105

Basic rate

20 mm thick rendering in cement and sand mortar 1:3 in floors, finished


smooth (Trowel finished).
Per 9.30 sq.m
Materials
1.75 bag cement (50 kg)
0.18 cu.m sand
water 45 liters

106

603.75
139.50

Labour
1 days mason
2 days U / Sk labourer
1/4 days U / Sk laboures (curing)

450.00
600.00
75.00

Basic rate per Sq.m.

200.89

20 mm thick rendering in cement and sand mortar 1:3 in floors, finished


smooth with gray cement float.
Per 9.30 sq.m
Materials
2.25 bag cement (50 kg)
0.18 cu.m sand
water 45 liters

107

776.25
139.50

Labour
1.25 days mason
2 days U / Sk labourer
1/4 days U / Sk laboures (curing)

562.50
600.00
75.00

Basic rate per Sq.m.

231.53

20 mm thick rendering in cement and sand mortar 1:3 finished smooth


with gray coloured cement float.
Per 9.30 sq.m
Materials
2.25 bag cement (50 kg)
0.25 cu.m sand
2.27 kg powdered pigment
water 45 liters

776.25
193.75
681.00

Labour
1 1/4 days mason
2 days U / Sk labourer
1/4 days U / Sk laboures (curing)

562.50
600.00
75.00

Basic rate per Sq.m.

310.59

BSR

Page 57

Item No.

DESCRIPTION

108

12 mm x 100 mm skirting in cement and sand 1:3 projected or flush to walls


finished with floating including forming groove

Basic rate

Per 3.05 L.m.


Materials
0.10 bag cement (50 kg)
0.01 cu.m sand
100 gram powdered pigment

34.50
7.75
30.00

Labour
3/8 days mason
5/16 days U / SK labourer

112.50
110.25
96.72

Basic rate per Sq.m.

109

Average 20 mm coping with cement and sand 1:3 and finished


with floating coloured cement
Consider 10 L.m. of 215 mm wide wall
Materials
0.60 bag cement (50 kg)
0.07 cu.m sand
600 gram powdered pigment

207.00
54.25
180.00

Labour
13/8 days mason
1/2 days U / SK labourer

618.75
150.00

Basic rate per L.m.

121.00

BSR

Page 58

DESCRIPTION

Item No.

Basic rate

PAINTING
110

Prepare and apply one coat of preservative (oil type) to structural timber
including touching up cut ends etc. after fixing.
Per 9.3 Sq.m
Materials
2.75 ltr. Wood preservative (oil type)
75 mm brush (1/10 use)

165.00
17.60

Labour
3/4 painter
1/2 day U / Sk labourer

337.50
150.00
72.05

Basic rate per Sq.m.


111

Prepare and apply two coat of colourless wood preservative to structural


timber including touching up cut ends etc. after fixing. (for calicut tile roof)
Per 9.3 Sq.m
Materials
2.5 ltr. Wood preservative.
75 mm brush (1/5 use)

255.00
35.20

Labour
1.0 painter
1/2 day U / Sk labourer

450.00
150.00
95.72

Basic rate per Sq.m.


112

Prepare surface of steel truss and apply two coats of anti corrosive primer.
Consider 9.3 Sq.m
Materials
2 1/4 ltr. Anti-corrosive primer
0.15 ltr. Mineral turpentine
1 wire brush
50 mm brush (1/8 use)

855.00
14.25
18.00
12.50

Labour
1 1/2 Painter
1 1/2 day U / Sk labourer

675.00
450.00

Basic rate per Sq.m.

217.72

BSR

Page 59

DESCRIPTION

Item No.
113

Apply one coat of anti-corrosive primer and two coats enamel paint on
already shop primed and erected steel roof truss
Consider 9.3 Sq.m
Materials
0.20 ltr. Ant-corrosive primer
1 1/3 ltr. Enamel paint
0.20 ltr. Mineral turpentine or thinner
50 mm brush ( 1/5 use)
Labour
2 1/2 days painter
1 day U / Sk labourer
Scaffolding - Add 3%

114

115

76.00
485.45
19.00
20.00

1,125.00
300.00
42.75

Basic rate per Sq.m.

222.39

Prepare and apply two coats primer and finishing coat of enamel paint to
mild steel (angle / flat) gate.
Consider 4.5 Sq.m
Materials
1 1/2 ltr. Anti-corrosive primer
2/3 ltr. Enamel paint
0.20 ltr. Mineral turpentine or thinner
1/2 wire brush
50 mm brush ( 1/5 use )

570.00
240.90
19.00
9.00
20.00

labourer
1/2 day painter
3/4 day U / Sk labourer

225.00
225.00

Total per 4.5 Sq. m.

1,308.90

Basic rate per Sq.m.

290.87

Painting steel on new work with 2 coats of anti-corrosive paint


Per 9.3 Sq.m
Materials
2/3 ltr. Anti-corrosive paint
50mm brush (1/5 use)

135.30
20.00

Labour
1 1/2 days painter

675.00
89.28

Basic rate per Sq.m.


116

Basic rate

Painting new timber work with two coats of wood preservative


Per 9.3 Sq.m
Materials
2.25 liters wood preservative
50 mm brush (1/5 use)
2 sand papers.

229.50
20.00
28.00

Labour
1/2 day painter
1/2 day U/Sk labourer

225.00
150.00

Rate per 9.3 sq.m

652.50

Basic rate per Sq.m.

BSR

70.16

Page 60

DESCRIPTION

Item No.
117

Applying of two coats of sanding sealer to timber surfaces.


Per 9.3 Sq.m
Materials
2.25 liters sanding sealer
50 mm brush (1/5 use)
1 sand papers.
Labour
1/2 day painter
1/4 day U/Sk labourer
Rate per 9.3 sq.m

119

900.00
20.00
14.00

225.00
75.00
1,234.00
132.69

Basic rate per Sq.m.


118

Basic rate

Preparing and painting wood work with primer and 2 coats enamel paint
Per 9.3 Sq.m
Materials
3/4 ltr. Primer
2.50 ltr. Enamel paint (2 coats)
50mm brush (1/10 use)
2 sand papers

270.00
912.50
10.00
28.00

Labour
1 1/2 days painter
1/2 day U/Sk labourer

675.00
150.00

Basic rate per Sq.m.

219.95

White or colour washing two coats in single storey


Per 107.5 Sq.m
Materials
25Kg. boiled lime
0.9 Kg salt
225g yellow ochre
50g blue
150mm brush (1/3 use)
Water 40 liters

212.50
6.30
23.63
17.75
11.55

Labour
2 1/2 days painter
2 1/2 day U / Sk labourers

1,125.00
750.00
56.25

Scaffolding - Add 3%

2,202.98

Total per 107.60 Sq.m

20.49

Basic rate per Sq.m.

BSR

Page 61

DESCRIPTION

Item No.
120

121

White or colour washing in two storied building


Per 107.6 Sq.m
(As per above)
Add 1/2 day painter
1/2 day U / Sk Labourers

Basic rate

2,202.98
225.00
150.00

Scaffolding - Add 3%

11.25

Basic rate per Sq.m.


Prepare and apply one coat of Alkali resistant primer and two coats of
emulsion paint to walls (internal)

24.06

Per 9.3 Sq.m


Materials
Primer 0.90 ltr. Primer
1.40 ltr. Emulsion paint
Water 0.40 liters
150mm brush (1/10 use)
2 sand papers

351.00
403.20
33.80
28.00

Labour
1 1/4 day painter

122

562.50

Scaffolding - Add 3%

16.88

Basic rate per Sq.m.

150.04

Prepare and apply one coat of Alkali resistant primer and two coats of
emulsion paint to walls (external)
Per 9.3 Sq.m
Materials
Primer 0.90 ltr. Primer
1.40 ltr. Emulsion paint
Water 0.40 liters
150 mm brush (1/10 use)
2 sand papers

351.00
525.00
33.80
28.00

Labour
1 1/4 day painter

123

562.50

Scaffolding - Add 3%

16.88

Basic rate per Sq.m.

163.14

Cement washing to walls of single storied building 2 coats


Per 107.6 Sq.m
Materials
5/8 Bag cement
150mm coir brush
Water 20 liters

215.63
35.00

BSR

Page 62

DESCRIPTION

Item No.
Labour
2 days painter
2 days U / Sk labourer
Scaffolding - Add 3%

124

900.00
600.00
45.00

Total per 107.6 sqrs.

1,795.63

Basic rate per Sq.m.

16.69

Painting walls with emulsion paint (2 coats)


Per 9.3 Sq.m
201.60
172.80
33.80

1st coat - 0.7 liters emulsion paint


2nd coat -0.6 liters emulsion paint
150 mm brush - (1/10 use)
0.40 liters water

125

126

Basic rate

Labour
3/4 day painter
Scaffolding - Add 3%

337.50
10.13

Basic rate per Sq.m.

81.27

Prepare and apply one coat alkali resistant primer and two coats of
emulsion paint to soffit of slabs
Consider 9.0 m2
Materials
0.90 ltr. Primer
1.50 ltr. Emulsion paint
150mm brush (1/10 use)

351.00
432.00
33.80

Labour
1 3/4 days painter
Scaffolding - Add 3%

787.50
23.63

Basic rate per Sq.m.

175.05

Varnishing two coats with polyurethane varnish after sand papering


Per 9.3 Sq.m
1.80 ltr. Varnish
75mm brush (1/3 use)

734.40
58.08

Labour
1/2 day painter
1/2 day U / Sk Labourer

225.00
150.00

Basic rate per Sq.m.

125.54

BSR

Page 63

Item No.

DESCRIPTION

127

Prepare timber surface and apply two coats of wood preservative and two
coats of sanding sealer to timber ceiling.
Per 9.3 Sq.m
Materials
As per item No. 112
As per item No. 113

277.50
934.00

Labour
1.125 day Painter
1.125 day U / Sk labourer
Scaffolding - Add 3%

506.25
337.50
10.36

Basic rate per Sq.m.

222.11

128

Basic rate

PLUMBING
PLUMBING - PVC PIPES
20 mm diameter PVC pipes fixed to walls (specials paid separately)

129

Per 3.0 m
Materials
3.9 m pipes
3 clips and nails
2 grms solvent gum

81.90
19.50
1.39

Labour
1 hr. plumber
1 hr. U / Sk labourer

56.25
37.50

Total per 3.0 meters

196.54

Basic rate per L.m.

65.51

25 mm diameter PVC pipes to walls (specials paid separately)


Per 3.0 m
37.95
126.75
19.50
2.09

Materials
3.9 m pipes
3 clips and nails
3 grms. Solvent cement
Labour
1 hr. Plumber
1 hr. U / Sk labourer

56.25
37.50
242.09

Total per 3.0 m

80.70

Basic rate per L.m.

BSR

Page 64

DESCRIPTION

Item No.
130

32mm dia meter PVC pipes fixed to walls (specials paid separately)
Per 30.0 m.
Materials
30.0 m pipes
Add 5% for wastage
8 Nr. - 32mm dia sockets
32 grms. Solvent cement
35 clips and nails

1,650.00
82.50
68.00
22.24
227.50

Labour
1/2 day plumber
1/2 day U / Sk labourer

225.00
150.00
2,425.24

Total per 30.0m

80.84

Basic rate per L.m.


131

40mm dia meter PVC fixed to walls (specials paid separately)


Per 30.0m
Materials
30.0m pipes
Add 5% for wastage
8 Nr - 40mm dia sockets
48 grms. Solvent cement
35 clips and nails

2,610.00
130.50
102.40
33.36
332.50

Labour
3/4 day plumber
3/4 day U/Sk labourer

337.50
150.00
3,696.26

Total per 30.0 m

123.21

Basic rate per L.m.


132

Basic rate

50 mm dia meter PVC pipes laid to walls (specials paid separately)


Per 30.0 m
Materials
30.0 pipes
Add 5% for wastage
8 Nr. - 50mm dia sockets
64 grms solvent cement
35 clips and nails

3,877.50
193.88
148.00
44.48
332.50

Labour
3/4 day plumber
3/4 day U/Sk labourer

337.50
150.00
5,083.86

Total per 30.0 m

169.46

Basic rate per L.m.


BSR

Page 65

DESCRIPTION

Item No.
133

63 mm dia meter PVC pipes laid to walls (specials paid separately)


Per 30.0 m
Materials
30 m pipes
Add 5% for wastage
8 Nr. - 62 mm dia sockets
35 clips and nails
112 grms solvent cement

6,450.00
322.50
222.40
332.50
77.84

Labour
3/4 day plumber
3/4 day U/Sk labourer

337.50
150.00
7,892.74

Total per 30.0 m

263.09

Basic rate per L.m.


134

75 mm dia meter PVC pipes laid to walls (specials paid separately)


Per 30.0 m
Materials
30 m pipes
Add 5% for wastage
8 Nr. - 75 mm dia sockets
35 clips and nails
112 grms solvent cement

11,367.00
568.35
792.40
980.00
77.84

Labour
3/4 day plumber
3/4 day U/Sk labourer

337.50
150.00
14,273.09

Total per 30.0 m

475.77

Basic rate per L.m.


135

Basic rate

90 mm dia meter PVC pipes fixed to walls Type 600 (specials paid
separately)
Per 30.0 m
Materials
30.0 m pipe
Add 5% for wastage
8 Nr. - 90mm sockets
200 grms. Solvent cement
35 clips and screws

9,678.00
483.90
1,426.00
139.00
980.00

Labour
1 day plumber
1 day U / Sk labourer

450.00
300.00
13,456.90

total per 30.0m

448.56

Basic rate per L.m.


BSR

Page 66

DESCRIPTION

Item No.
136

Basic rate

Excavation for laying 20 -90 mm dia meter PVC pipes in ground not less
than 450mm deep, back filling & compacting
Per 30.0 m
Labour
2 1/4 days U / Sk labourer

675.00

Total per 30.0 m


22.50

Basic rate per L.m.


137

Chasing brickwork for laying 20mm to 50mm dia PVC pipes and making
good average depth 50 mm (pipes and specials paid separately)
Per 30.0m
Materials
0.20 Bag cement (50 Kg Bag)
0.04 m3 sand

69.00
31.00

Labour
3 days mason
3 days U / Sk labourer

1,350.00
900.00

Total per 30.0 m

2,350.00
78.33

Basic rate per L.m.


138

20 mm dia PVC Specials viz.-elbows/bends/sockets


Per 10 specials
Materials
10 Nr. - 20mm elbow/bends/socket
20 grms solvent cement

58.00
13.90

Labour
2 hrs. plumber
Total per 10 nr.

112.50
184.40
18.44

Basic rate per Nr.


139

0.03

25 mm dia PVC specials viz.-elbows/bends/sockets


Per 10 specials
Materials
10 Nr. - 25mm dia elbows/bends/sockets
30 grms solvent cement

87.00
20.85

Labour
2 hrs. plumber
Total per 10 nr.

112.50
220.35
22.04

Basic rate per Nr.

BSR

Page 67

DESCRIPTION

Item No.
140

32mm dia PVC specials viz.-elbows/bends/sockets


Per 10 specials
Materials
10 Nr. - 32 mm dia elbow/bends/sockets
40 grms solvent cement

145.00
27.80

Labour
2 hrs. plumber

112.50
28.53

Basic rate per Nr.


141

Basic rate

40 mm dia PVC specials viz.-elbows/bends/sockets


Per 10 specials
Materials
10 Nr. 40mm dia elbow/bends/sockets
60 grms solvent cement

213.50
41.70

Labour
2 hrs. plumber

112.50
36.77

Basic rate per Nr.


142

50mm dia PVC specials viz.-elbows/bends/sockets


Per 10 specials
Materials
10 Nr. - 50mm dia elbows/bends/sockets
80 grms solvent cement

427.50
55.60

Labour
2 hrs. plumber

112.50
59.56

Basic rate per Nr.


143

63 mm dia PVC specials viz. elbows/bends/sockets


Per 10 specials
Materials
10 Nr. - 63mm dia elbows/bends/sockets
140 grms solvent cement

661.50
97.30

Labour
1/2 day plumber

225.00

Total for 10 Nr. Specials

983.80
98.38

Basic rate per Nr.

BSR

Page 68

DESCRIPTION

Item No.
144

75 mm dia PVC specials viz. elbows/bends/sockets


Per 10 specials
Materials
10 Nr. - 25mm dia elbows/bends/sockets
200 grms solvent cement

1,210.00
139.00

Labour
1/2 day plumber

225.00
1,574.00

Total for 10 Nr. Specials

157.40

Basic rate per Nr.


145

90 mm dia PVC specials viz. elbows/bends/sockets


Per 10 specials
Materials
10 Nr. - 90mm dia elbows/bends/sockets
240 grms solvent cement

2,093.00
166.80

Labour
1/2 day plumber

225.00
2,484.80

Total for 10 Nr. Specials

248.48

Basic rate per Nr.


146

20mm dia PVC specials viz.Tees


Per 10 Tees
Materials
10 Nr. - 20mm tees
30 grms solvent cement

147

Basic rate

69.50
20.85

Labour
1/2 day plumber

225.00

Total for 10 Nr. Tees

315.35
31.54

Basic rate per Nr.


25 mm dia PVC specials viz.Tees
Per 10 Tees
Materials
10 Nr. 25mm dia tee
45 grms solvent cement

117.00
31.28

Labour
1/2 day plumber

225.00

Total for 10 Nr. Tee

373.28
37.33

Basic rate per Nr.


BSR

Page 69

DESCRIPTION

Item No.
148

32 mm dia PVC specials viz.Tees


Per 10 Tees
Materials
10 Nr. -30 mm dia tees
60 grms solvent cement

197.50
41.70

Labour
1/2 day plumber

225.00

Total for 10 Nr. Tee

464.20
46.42

Basic rate per Nr.


149

40mm dia PVC specials viz. Tees


Per 10 Tees
Materials
10 Nr. - 40mm dia Tees
90 grms solvent cement

290.50
62.55

Labour
1/2 day plumber

225.00

Total for 10 Nr. Tees

578.05
57.81

Basic rate per Nr.


150

50mm dia PVC specials viz. Tees


Per 10 Tees
Materials
10 Nr. - 50mm dia Tees
120 grms solvent cement

509.00
83.40

Labour
1 day plumber

450.00
1,042.40

Total for 10 Nr. Tees

104.24

Basic rate per Nr.


151

Basic rate

63mm dia PVC specials viz. Tees


Per 10 Tees
Materials
10 Nr. - 63mm dia Tees
210 grms solvent cement

774.00
145.95

Labour
1 day plumber

450.00
1,369.95

Total for 10 Nr. Tees

137.00

Basic rate per Nr.


BSR

Page 70

DESCRIPTION

Item No.

152

75mm dia PVC specials viz. Tees


Per 10 Tees
Materials
10 Nr.- 75mm dia Tees
300 grms solvent cement

1,650.00
208.50

Labour
1 1/2 day plumber

225.00
2,083.50

Total for 10 Nr. Tees

208.35

Basic rate per Nr.


153

90mm dia PVC specials viz. Tees


Per 10 Tees
Materials
10 Nr. - 90mm dia Tees
360 grms solvent cement

3,696.00
250.20

Labour
1 1/2 day plumber

675.00
4,621.20

Total for 10 Nr. Tees

462.12

Basic rate per Nr.


154

110 mm dia meter PVC pipes fixed to walls (specials paid separately)
grade 400
Materials - per 30. L.m.
30.0 m pipe
Add 5% for wastage
8 Nr. - 110 mm sockets
260 grms. Solvent cement
35 clips and screws
Labour
1 day plumber
1 day U / Sk labourer

7,440.00
372.00
1,706.80
180.70
1,820.00

450.00
300.00
12,269.50

total per 30.0m

408.98

Basic rate per L.m


155

Basic rate

110mm dia PVC specials viz. Tees


Per 10 Tees
Materials
10 Nr. - 110mm dia Tees
400 grms solvent cement

6,410.00
278.00

BSR

Page 71

DESCRIPTION

Item No.
Labour
1 1/2 day plumber

675.00
7,363.00

Total for 10 Nr. Tees

736.30

Basic rate per Nr.


156

110 mm dia PVC specials viz. elbows/bends/sockets


Per 10 specials
Materials
10 Nr. - 110mm dia elbows/bends/sockets
285 grms solvent cement
Labour
1/2 hrs. plumber

2,133.50
198.08

225.00
2,556.58

Total for 10 Nr. Specials

255.66

Basic rate per Nr.


157

Basic rate

Excavation for laying 110 - 90 mm dia meter PVC pipes in ground depth not
exceeding 1.0 m back filling & compacting and concrete haunching.
Per 30.m
Materials
0.072 m3 1:3:6 concrete
13.75 m3 excavation
13.75 m3 Backfilling
30.0 m pipe
Add 5% for wastage
8 Nr. - 110 mm sockets
200 grms. Solvent cement

339.68
3,300.00
1,443.75
14,175.00
708.75
1,706.80
139.00

Labour
1 day plumber
1 day U / Sk labourer

450.00
300.00
22,562.98

total per 30.0m

752.10

Basic rate per L.m

BSR

Page 72

DESCRIPTION

Item No.

158A

Basic rate

MANHOLE & GULLIES


110 mm dia PVC gully with 150 x 150 x 150 mm gully box including
excavation, 4" cement concrete 1:2:4 (20mm) base, surrounded by 4 1/2"
thick cement and sand 1:5 extended 150mm above top of gully box
including making connection 12.5 mm cement and sand 1:2 rendering
internally and exposed faces finished smooth with neat cement floating
and providing PVC grating on top of gully
Per Nr.
Materials
110 mm dia P.V.C. gully - 1 Nr.
0.10 m3 excavation
0.50 m2 102.5 mm brickwork
0.02 m3 cement concrete 1:2:4 (20mm)
0.10 m2 12.5 mm thick cement rendering 1:2
1 Nr. - PVC grating suit to 110 mm. Gully box

197.50
10.59
218.48
158.86
16.49
55.00

Labour
1/2 day mason
1/2 day U/Sk labourer

225.00
150.00
1,031.92

Basic rate per Nr.


B

110 mm dia PVC gully with 150 x 150 x 150 mm gully box including
excavation, 4" cement concrete 1:2:4 (20mm) base, surrounded by 4 1/2"
thick cement and sand 1:5 extended 150mm above top of gully box
including making connection 12.5 mm cement and sand 1:2 rendering
internally and exposed faces finished smooth with neat cement floating
and providing Stainless Steel grating on top of gully
Per Nr.
Materials
110 mm dia P.V.C. gully - 1 Nr.
0.10 m3 excavation
0.50 m2 102.5 mm brickwork
0.02 m3 cement concrete 1:2:4 (20mm)
0.10 m2 12.5 mm thick cement rendering 1:2
1 Nr. - stainless steel grating suit to 110 mm. Gully box

197.50
10.59
218.48
158.86
16.49
185.00

Labour
1/2 day mason
1/2 day U/Sk labourer

225.00
150.00
1,161.92

Basic rate per Nr.

BSR

Page 73

Item No.

DESCRIPTION

159

Manhole 600 x 600 mm internally with invert depth not exceeding 600mm
including excavation, backfilling 150 mm cement concrete 1:2:4 (20mm)
base with 10 mm dia meter mild steel rods at 100mm centers bothways,
forming channels and benching in similar concrete, 115 mm walls in brick
in cement 1:5, 12.5 mm thick cement and sand 1:2 rendering internally and
exposed surfaces including channels, benching and 50 mm thick RCC
removable cover slab 675 x 675 mm inlet and outlet connection all
complete to working order.
Materials
1.0 m3 excavation
0.20 m3 cement concrete 1:2:4 (20 mm) in base & channels
3.0 m2 215 mm brickwork in cement 1:5
2.6 m2 12.5 mm cement rendering 1:2
1 - RCC cover slab
Labour
1 1/2 days mason
2 1/2 days U / Sk labourer

Basic rate

240.00
945.05
2,397.33
478.69
260.00

675.00
750.00
5,746.07

Basic rate per Nr.


SANITARY FITTINGS AND ACCESSORIES
160A

550 x 400 mm glazed Vitreous China wash basin with 20 mm dia Chromium
plated pillar/mixer tap, waste plug, Chromium plated waste chain and stay,
including fixing wash basin on brackets. (Water supply and waste water
connection measured separately) ( L)
Per Nr.
Materials
1 wash basin complete with waste plug and chain
1 - 20mm tap
" L " iron brackets. - 2 Nr.
4 wooden plug
6 - 38.5 mm brass screws
0.90 Kg cement
Labour
5/8 day plumber
1/2 day mason
1 day U / Sk labourer

9,450.00
6,500.00
276.00
80.00
23.40
6.90

281.25
225.00
300.00
17,142.55

Basic rate per Nr.

BSR

Page 74

Item No.

DESCRIPTION

550 x 400 mm glazed Vitreous China wash basin with 20 mm dia Chromium
plated pillar/mixer tap, waste plug, Chromium plated waste chain and stay,
including fixing wash basin on brackets. (Water supply and waste water
connection measured separately) ( M)
Per Nr.
Materials
1 wash basin complete with waste plug and chain
1 - 20mm tap
" L " iron brackets. - 2 Nr.
4 wooden plug
6 - 38.5 mm brass screws
0.90 Kg cement
Labour
1/2 day plumber
1/2 day mason
1 day U / Sk labourer

12,106.30

550 x 400 mm glazed wash basin with 20 mm dia Chromium plated


pillar/mixer tap, waste plug, Chromium plated waste chain and stay,
including fixing wash basin on brackets. (Water supply and waste water
connection measured separately) ( N)
Per Nr.
Materials
1 wash basin complete with waste plug and chain
1 - 20mm tap
" L " iron brackets. - 2 Nr.
4 wooden plug
6 - 38.5 mm brass screws
0.90 Kg cement
Labour
3/8 day plumber
1/2 day mason
1 day U / Sk labourer

2,100.00
465.00
276.00
80.00
23.40
6.90

140.63
225.00
300.00
3,616.93

Basic rate per Nr.


161A

6,450.00
4,520.00
276.00
80.00
23.40
6.90

225.00
225.00
300.00

Basic rate per Nr.


C

Basic rate

900 x 450 mm Stainless steel sink with bottle trap, rubber plug and
Chromium plate chain waste carried on iron brackets painted and fixed to
walls. (Water supply and waste water connection measured separately)(N)
Materials Per Nr.
1 sink 900 x 450 mm
2 L iron brackets
1 bottle trap
0.90 Kg cement
4 wooden plug
6 - 38.5 mm brass screws

1,270.00
276.00
325.00
6.90
80.00
23.40

BSR

Page 75

DESCRIPTION

Item No.
Labour
3/8 day plumber
1/2 day mason
1/2 day U / Sk labourer

168.75
225.00
150.00

Basic rate per Nr.

2,525.05

900 x 450 mm Stainless steel sink with bottle trap, rubber plug and
Chromium plate chain waste carried on iron brackets painted and fixed to
walls. (Water supply and waste water connection measured separately)(M)
Materials - Per Nr.
1 sink 900 x 450 mm
2 L iron brackets
1 bottle trap
0.90 Kg cement
4 wooden plug
6 - 38.5 mm brass screws

1,780.00
276.00
980.00
6.90
80.00
23.40

Labour
1/2 day plumber
1/2 day mason
1/2 day U / Sk labourer

225.00
225.00
150.00

Basic rate per Nr.

3,746.30

900 x 450 mm Stainless steel sink with bottle trap, rubber plug and
Chromium plate chain waste carried on iron brackets painted and fixed to
walls. (Water supply and waste water connection measured separately)(L)
Per Nr.
Materials
1 sink 900 x 450 mm
2 L iron brackets
1 bottle trap
0.90 Kg cement
4 wooden plug
6 - 38.5 mm brass screws

3,200.00
276.00
2,100.00
6.90
80.00
23.40

Labour
1/2 day plumber
1/2 day mason
1/2 day U / Sk labourer

162A

Basic rate

225.00
225.00
150.00

Basic rate per Nr.

6,286.30

Closet pedestal type with L/L flushing cistern, flush pipe double plastic
seat cover, 20 mm dia stop cock, trap supplied & fixed complete to working
order(N)
Per Nr.
Materials
1 low level suite complete
1Nr. - 20 mm dia angle valve.
0.90 Kg cement
0.008m3 sand
2 Nr. 38 mm brass screws

2,200.00
220.00
6.90
6.20
7.80

BSR

Page 76

DESCRIPTION

Item No.

Labour
1/4 day mason
1 day plumber
1 day U/Sk labourer

112.50
450.00
300.00
3,303.40

Basic rate per Nr.


B

Closet pedestal type with L/L flushing cistern, flush pipe double plastic
seat cover, 20 mm dia stop cock, trap supplied & fixed complete to working
order(M)
Per Nr.
Materials
1 low level suite complete
1 Nr. - 20 mm dia angle valve.
0.90 Kg cement
0.008m3 sand
2 Nr. 38 mm brass screws

7,200.00
530.00
6.90
6.20
7.80

Labour
1/4 day mason
1 day plumber
1 day U/Sk labourer

Basic rate

112.50
450.00
300.00

Basic rate per Nr.


Closet pedestal type with L/L flushing cistern, flush pipe double plastic
seat cover, 20 mm dia stop cock, trap supplied & fixed complete to working
order(L)
Per Nr.
Materials
1 low level suite complete
1Nr. - 20 mm dia angle valve.
0.90 Kg cement
0.008m3 sand
2 Nr. 38 mm brass screws

8,613.40

16,250.00
1,470.00
6.90
6.20
7.80

Labour
1/4 day mason
1 .25day plumber
1 day U/Sk labourer

112.50
562.50
300.00
18,715.90

Basic rate per Nr.

BSR

Page 77

DESCRIPTION

Item No.
163A

Closet squatting type with trap including high level cistern fixed complete
with flush pipe and 20 mm dia stop cock, all complete to work order (N)
Per Nr.
Materials
1 squatting pan with trap
80 liters plastic/ceramic cistern with flush
pipe, chain and overflow pipe
1 clip
4 wooden plug
4 Nr. 38.5 mm brass screws
1Nr. - 20 mm dia angle valve.
1/4 Bag cement (50 Kg)
0.015 m3 metal
0.008 m3 sand

565.00
380.00
9.50
80.00
15.60
220.00
86.25
21.75
6.20

Labour
1/2 day mason
1 day plumber
1 day U / Sk labourer

225.00
450.00
300.00
2,359.30

Basic rate per Nr.


B

Basic rate

Closet squatting type with trap including high level cistern fixed complete
with flush pipe and 20 mm dia stop cock, all complete to work order (m)
Per Nr.
Materials
1 squatting pan with trap
8 liters plastic/ceramic cistern with flush
pipe, chain and overflow pipe
1 clip
4 wooden plug
4 Nr. 38.5 mm brass screws
1 Nr. - 20 mm dia angle valve.
1/4 Bag cement (50 Kg)
0.015 m3 metal
0.008 m3 metal
Labour
1/2 day mason
1 day plumber
1 day U / Sk labourer

650.00
650.00
9.50
80.00
15.60
530.00
86.25
21.75
6.20

225.00
450.00
300.00
3,024.30

Basic rate per Nr.

BSR

Page 78

DESCRIPTION

Item No.
C

Closet squatting type with trap including high level cistern fixed complete
with flush pipe and 20 mm dia stop cock, all complete to work order (L)
Per Nr.
Materials
1 squatting pan with trap
80 liters plastic/ceramic cistern with flush
pipe, chain and overflow pipe
1 clip
4 wooden plug
4 Nr. 38.5 mm brass screws
1Nr. - 20 mm dia angle valve.
1/4 Bag cement (50 Kg)
0.015 m3 metal
0.008 m3 sand
Labour
1/2 day mason
1 day plumber
1 day U / Sk labourer

Vitreous China bidet suite fixed complete to working order (M)


Per Nr.

5,400.00
2,250.00
450.00
300.00
8,400.00

Basic rate per Nr.


Vitreous China bidet suite fixed complete to working order (L)
Per Nr.
Materials
1 bidet
1Nr. - 20 mm Spray tap
Labour
1.5 day plumber
1.5 day U / Sk labourer

165

9.50
80.00
15.60
1,470.00
86.25
21.75
6.20

5,314.30

Materials
1 bidet
1 Nr. - 20 mm Spray tap
Labour
1 day plumber
1 day U / Sk labourer

1,800.00
850.00

225.00
450.00
300.00

Basic rate per Nr.


164
A

Basic rate

8,500.00
6,500.00
675.00
450.00

Basic rate per Nr.

16,125.00

Acrylic type bath tub with 102.5mm thick brick wall and complete to
working orders
Per Nr.
Materials
1Nr. Bath Tub
3 M2 102.5 mm thick walls
0.6 M3 of sand (including for fill hollow areas )
10 Kg. Cement

20,800.00
1,310.85
465.00
69.00

BSR

Page 79

DESCRIPTION

Item No.

Labour
1 day mason
1.5 day plumber
2 day U / Sk labourer

450.00
675.00
600.00
24,369.85

Basic rate per Nr.


166
A

Supply and fixing of basin pillar tap. (n)


Materials
1 Pillar tap
Sundry items ( Barrel nipple, Solvent cement, Rubber bush, Thread seal etc. )

465.00
35.00

Labour
1/4 day plumber

112.50

Basic rate per Nr.

612.50

Supply and fixing of basin pillar tap. (M)


Materials
1 Pillar tap
Sundry items ( Barrel nipple, Solvent cement, Rubber bush, Thread seal etc. )

940.00
60.00

Labour
1/4 day plumber

112.50

Basic rate per Nr.

1,112.50

Supply and fixing of basin pillar tap. (L)


Materials
1 Pillar tap
Sundry items ( Barrel nipple, Solvent cement, Rubber bush, Thread seal etc. )

1,450.00
80.00

Labour
3/8 day plumber

168.75
1,698.75

Basic rate per Nr.


167
A

Supply and fixing of bib tap. (n)


Materials
1 Bib tap
Sundry items ( Solvent cement, Rubber bush, Thread seal etc. )
Labour
1/8 day plumber

280.00
20.00

56.25
356.25

Basic rate per Nr.


B

Basic rate

Supply and fixing of bib tap. (m)


Materials
1 Bib tap
Sundry items ( Solvent cement, Rubber bush, Thread seal etc. )

BSR

960.00
30.00

Page 80

DESCRIPTION

Item No.
Labour
1/8 day plumber

56.25
1,046.25

Basic rate per Nr.


C

Supply and fixing of bib tap. (L)


Materials
1 Bib tap
Sundry items ( Solvent cement, Rubber bush, Thread seal etc. )

168
A

85.50

Basic rate per Nr.

1,685.50

Supply and fixing of shower mixer tap. (m)


Materials
1 Shower mixer tap
Sundry items ( Barrel nipple, Solvent cement, Rubber bush, Thread seal etc. )

3,035.00

Supply and fixing of shower mixer tap. (L)


Materials
1 Shower mixer tap
Sundry items ( Barrel nipple, Solvent cement, Rubber bush, Thread seal etc. )
Labour
5/8 day plumber

3,340.00
80.00

281.25
3,701.25

Basic rate per Nr.

2,750.00
60.00

225.00

Basic rate per Nr.

169

1,560.00
40.00

Labour
1.5/8 day plumber

Labour
1/2 day plumber

Basic rate

Supply and fixing of bath mixer tap. (M)


Materials
1 Bath mixer tap
Sundry items ( Barrel nipple, Solvent cement, Rubber bush, Thread seal etc. )
Labour
3/4 day plumber

4,750.00
75.00

337.50
5,162.50

Basic rate per Nr.

BSR

Page 81

DESCRIPTION

Item No.
B

Supply and fixing of bath mixer tap. (L)


Materials
1 Bath mixer tap
Sundry items ( Barrel nipple, Solvent cement, Rubber bush, Thread seal etc. )
Labour
1 day plumber

9,850.00

Supply and fixing of bidet spray. (n)


Materials
1 Bidet Spray
Sundry items ( Barrel nipple, Solvent cement, Rubber bush, Thread seal etc. )

525.00
35.00

Labour
2 Hr. plumber

112.50

Basic rate per Nr.

672.50

Supply and fixing of bidet spray. (M)


Materials
1 Bidet Spray
Sundry items ( Barrel nipple, Solvent cement, Rubber bush, Thread seal etc. )

675.00
50.00

Labour
2 Hr. plumber

112.50

Basic rate per Nr.

837.50

Supply and fixing of bidet spray. (L)


Materials
1 Bidet Spray
Sundry items ( Barrel nipple, Solvent cement, Rubber bush, Thread seal etc. )
Labour
2 Hr plumber

1,470.00
75.00

112.50
1,657.50

Basic rate per Nr.


171

9,300.00
100.00

450.00

Basic rate per Nr.


170

Basic rate

Supply and fixing of shower Rose. (n)


Materials
1 Shower Rose
Sundry items ( Solvent cement, Thread seal etc. )
Labour
1 Hr. plumber

125.00
20.00

56.25
201.25

Basic rate per Nr.


BSR

Page 82

DESCRIPTION

Item No.
B

Supply and fixing of shower Rose. (m)


Materials
1 Shower Rose
Sundry items ( Solvent cement, Rubber bush, Thread seal etc. )
Labour
1 Hr. plumber

Basic rate per Nr.

1,051.25

Supply and fixing of shower Rose. (L)


Materials
1 Shower Rose
Sundry items ( Solvent cement, Rubber bush, Thread seal etc. )

1,350.00
60.00

56.25
1,466.25

Basic rate per Nr.

Supply and fixing of Robe Hook. (N)


Materials
1 Robe hook with screw nails
2 Nr. Of Rawl plug.

138.00
6.00

Labour
1 Hr. plumber

56.25
200.25

Basic rate per Nr.


B

Supply and fixing of Robe Hook. (M)


Materials
1 Robe hook with screw nails
2 Nr. Of Rawl plug.

550.00
6.00

Labour
1 Hr. plumber

960.00
35.00

56.25

Labour
1.5 Hr. plumber

172

Basic rate

56.25
612.25

Basic rate per Nr.


Supply and fixing of Robe Hook. (L)
Materials
1 Robe hook with screw nails
2 Nr. Of Rawl plug.

760.00
6.00

Labour
1 Hr. plumber

56.25
822.25

Basic rate per Nr.

BSR

Page 83

DESCRIPTION

Item No.
173
A

Supply and fixing of Towel rail. (N)


Materials
1 Towel rail with screw nails
4 Nr. Of Rawl plug.

225.00
12.00

Labour
1 Hr. plumber

56.25
293.25

Basic rate per Nr.


B

Supply and fixing of Towel rail. (M)


Materials
1 Towel rail with screw nails
4 Nr. Of Rawl plug.

950.00
12.00

Labour
1 Hr. plumber

56.25
1,018.25

Basic rate per Nr.


C

Supply and fixing of Towel rail. (L)


Materials
1 Towel rail with screw nails
4 Nr. Of Rawl plug.

1,650.00
12.00

Labour
1 Hr. plumber

56.25
1,718.25

Basic rate per Nr.


174
A

Supply and fixing of Towel ring. (N)


Materials
1 Towel ring with screw nails
2 Nr. Of Rawl plug.

120.00
6.00

Labour
1 Hr. plumber

56.25
182.25

Basic rate per Nr.


B

Supply and fixing of Towel ring. (M)


Materials
1 Towel ring with screw nails
2 Nr. Of Rawl plug.

700.00
6.00

Labour
1 Hr. plumber

56.25
762.25

Basic rate per Nr.


C

Basic rate

Supply and fixing of Towel ring. (L)

BSR

Page 84

DESCRIPTION

Item No.
Materials
1 Towel ring with screw nails
2 Nr. Of Rawl plug.

1,120.00
6.00

Labour
1 Hr. plumber

56.25
1,182.25

Basic rate per Nr.


175
A

Supply and fixing of Soap tray. (N)


Materials
1Soap tray with screw nails
2 Nr. Of Rawl plug.

80.00
6.00

Labour
1 Hr. plumber

56.25
142.25

Basic rate per Nr.


B

Supply and fixing of Soap tray. (M)


Materials
1 Soap tray with screw nails
2 Nr. Of Rawl plug.

875.00
6.00

Labour
1 Hr. plumber

56.25
937.25

Basic rate per Nr.


C

Supply and fixing of Soap tray. (L)


Materials
1 Soap tray with screw nails
2 Nr. Of Rawl plug.

1,440.00
6.00

Labour
1 Hr. plumber

56.25
1,502.25

Basic rate per Nr.


176
A

Basic rate

Supply and fixing of Toilet paper holder. (n)


Materials
1 Toilet paper holder with screw nails
2 Nr. Of Rawl plug.

140.00
6.00

Labour
1 Hr. plumber

56.25
202.25

Basic rate per Nr.

BSR

Page 85

DESCRIPTION

Item No.
B

Supply and fixing of Toilet paper holder. (M)


Materials
1 Toilet paper holder with screw nails
2 Nr. Of Rawl plug.

980.00
6.00

Labour
1 Hr. plumber

56.25
1,042.25

Basic rate per Nr.


C

Supply and fixing of Toilet paper holder. (L)


Materials
1 Toilet paper holder with screw nails
2 Nr. Of Rawl plug.

1,340.00
6.00

Labour
1 Hr. plumber

56.25
1,402.25

Basic rate per Nr.


177

Supply and fixing of Mirror. (N)

Materials
1 Mirror with hanging screw nails
2 Nr. Of Rawl plug.

375.00
6.00

Labour
1/2 Hr. S. Labour

21.88

Basic rate per Nr.

402.88

Supply and fixing of Mirror. (M)


Materials
1 Mirror with hanging screw nails
2 Nr. Of Rawl plug.

1,600.00
6.00

Labour
1/2 Hr. skilled labour.

21.88
1,627.88

Basic rate per Nr.


C

Basic rate

Supply and fixing of Mirror. (L)


Materials
1 Mirror with hanging screw nails
2 Nr. Of Rawl plug.

2,215.00
6.00
43.75
218.75

Labour
1 Hr. skilled labour.

2,483.50

Basic rate per Nr.


BSR

Page 86

DESCRIPTION

Item No.
178
A

Supply and fixing of tooth brush holder (N)


Materials
1 Tooth brush holder with screw nails
2 Nr. Of Rawl plug.

230.00
6.00

Labour
1 Hr. skilled labour

43.75

Basic rate per Nr.

279.75

Supply and fixing of tooth brush holder (M)


Materials
1 Tooth brush holder with screw nails
2 Nr. Of Rawl plug.

640.00
6.00

Labour
1 Hr. skilled labour

43.75

Basic rate per Nr.

689.75

Supply and fixing of tooth brush holder (L)


Materials
1 Tooth brush holder with screw nails
2 Nr. Of Rawl plug.

1,250.00
6.00

Labour
1 Hr. skilled labour

43.75
1,299.75

Basic rate per Nr.


179
A

Supply and fixing of 20 mm. brass stop valve.


Materials
1 No. stop valve.
Sundry items ( Solvent cement, Rubber bush, Thread seal etc. )
Labour
1 Hr. plumber

195.00
35.00

56.25
286.25

Basic rate per Nr.


B

Basic rate

Supply and fixing of 25 mm. brass stop valve.


Materials
1 No. stop valve.
Sundry items ( Solvent cement, Rubber bush, Thread seal etc. )
Labour
1 Hr. plumber

265.00
35.00

56.25
356.25

Basic rate per Nr.

BSR

Page 87

DESCRIPTION

Item No.
C

Supply and fixing of 32 mm. brass stop valve.


Materials
1 No. stop valve.
Sundry items ( Solvent cement, Rubber bush, Thread seal etc. )
Labour
1 Hr. plumber

471.25

Supply and fixing of 40 mm. brass stop valve.


Materials
1 No. stop valve.
Sundry items ( Solvent cement, Rubber bush, Thread seal etc. )

625.00
50.00

Labour
1 .5Hr. plumber
Basic rate per Nr.

84.38
759.38

Supply and fixing of 50 mm. brass stop valve.


Materials
1 No. stop valve.
Sundry items ( Solvent cement, Rubber bush, Thread seal etc. )
Labour
1 .5Hr. plumber
Basic rate per Nr.

180
A

875.00
50.00

84.38
1,009.38

Supply and fixing of 20 mm. Angle valve. (N)


Materials
1 No. stop valve.
Sundry items ( Solvent cement, Rubber bush, Thread seal etc. )
Labour
1 Hr. plumber

220.00
20.00

56.25
296.25

Basic rate per Nr.


B

380.00
35.00

56.25

Basic rate per Nr.


D

Basic rate

Supply and fixing of 20 mm. Angle valve. (M)


Materials
1 No. stop valve.
Sundry items ( Solvent cement, Rubber bush, Thread seal etc. )
Labour
1 Hr. plumber

530.00
20.00

56.25
606.25

Basic rate per Nr.

BSR

Page 88

DESCRIPTION

Item No.
C

Supply and fixing 20 mm. Angle valve. (L)


Materials
1 No. stop valve.
Sundry items ( Solvent cement, Rubber bush, Thread seal etc. )
Labour
1 Hr. plumber

1,551.25

Supply and fixing of plastic flexible horse. (N)


Materials
Plastic flexible horse.

115.00

Labour
1 Hr. Plumber

56.25
171.25

Basic rate per Nr.


B

Supply and fixing of Chromium plated flexible horse. (M)


Materials
Chromium plated flexible horse.

160.00

Labour
1 Hr. Plumber

56.25
216.25

Basic rate per Nr.


C

1,470.00
25.00

56.25

Basic rate per Nr.


181

Basic rate

Supply and fixing of Chromium plated flexible horse. (L)


Materials
Chromium plated flexible horse.

240.00

Labour
1 Hr. Plumber

56.25
296.25

Basic rate per Nr.


GUTTERS AND DOWN PIPES
182

150 mm dia half round PVC eaves gutter fixed to timber valance board
including gutter joiner and brackets fixed at 450 mm centers. (Other
specials paid separately)
Consider 7.30m
Materials
7.30 m. - 150 mm dia. eaves gutter
1 joiner
17 gutter brackets
34 Nr. - 19mm brass screws
20 grams solvent cement

1,116.90
47.00
161.50
62.90
13.90
BSR

Page 89

DESCRIPTION

Item No.

Labour
1/2 day plumber
1/2 day U / Sk labourer

225.00
150.00
18.75

Scaffolding - Add 5%

1,795.95

Total per 7.30 m

246.02

Basic rate per L.m.


183

150 mm dia PVC gutter head


Consider 1 Nr. Gutter head
Materials
1 PVC gutter head
2 gutter joiners
2 gutter brackets
12 grms solvent cement
4Nr - 19 mm brass screws

85.00
94.00
19.00
8.34
7.40

Labour
1/8 day plumber
1/8 day U / Sk labourer

56.25
37.50
4.69

Scaffolding - Add 5%

312.18

Basic rate per Nr.

184

Basic rate

150 mm dia PVC mitres


Consider 1 Nr. Mitre
Materials
1 mitre head
2 gutter joiners
2 gutter brackets
12 grms solvent cement
4 Nr. 19 mm brass screws

75.00
94.00
19.00
8.34
7.40

Labour
1/8 day plumber
1/8 day U / Sk labourer

56.25
37.50
4.69

Scaffolding - Add 5%

302.18

Basic rate per Nr.

BSR

Page 90

DESCRIPTION

Item No.
185

Basic rate

150 mm dia. PVC end caps


Consider 1 Nr. End caps
Materials
1 Nr. End cap.
12 grms solvent cement

29.00
10.56

Labour
1 / 16 day plumber
1 / 16 day U / Sk labourer

28.13
18.75
2.34

Scaffolding - Add 5%

88.78

Basic rate per Nr.


186

90 mm dia PVC rain water down pipes fixed to brick wall with wooden
plugs buried in wall. (Specials measured separately)
Consider 7.30 m pipe length
Materials
7.30 m. - 90 mm dia down pipe
1 - 90 mm joiner
4 PVC straps
8 brass screws 25 mm
30 grms solvent cement

642.40
36.00
21.20
21.60
20.85

Labour
1/3 day plumber
1/3 day U / Sk labourer

148.50
99.00

Scaffolding - Add 5%

12.38

Total cost per 7.30 m

1,001.93
137.25

Basic rate per L.m.


187

90 mm dia PVC elbow


Materials
1 Nr. 600/800 elbow
32 grms solvent cement

62.00
22.24

Labour
1/16 day plumber
1/16 day U / Sk labourer

28.13
18.75
2.34

Scaffolding - Add 5%

133.46

Basic Rate per Nr.

BSR

Page 91

DESCRIPTION

Item No.
188

Basic rate

90 mm dia PVC shoe


Materials
1 Nr. 600/800 shoe
15 grms solvent cement

65.00
10.43

Labour
1/16 day plumber
1/16 day U / Sk labourer

28.13
18.75
122.30

Basic rate per Nr.

BSR

Page 92