MV & LV NETWORK REFURBISHMENT OF EZIBELENI-PHASE 3

SUMMARY: BILL OF QUANTITIES:


PROJECT No : SCM 81/5/2016
Description

Bill
1

Preliminary and General

Excavations

Low Voltage Network

Low Voltage Stays & Transfomer Earthing

House connections and Cabling

Sub-Total
Add 5% Contingency amount
Sub-Total
Add 14% VAT
Tendered Amount Carried Forword to Page 4 (Summary for
Bid Opening Price

ZIBELENI-PHASE 3
TIES:
16
Total Amount
-

MV & LV NETWORK REFURBISHMENT OF EZIBELENI - PHASE 3


PRELIMINARY & GENERAL
Activity Description
PRELIMINARY AND GENERAL
FIXED CHARGE ITERMS
1.1

2.0

3.0
4.0
5.0
6.0

Unit

Qty

Site Establishment. Storage facilities for materials. Allow


for site office for site meetings with a clerk within the
construction area.

Sum

Site Security, Plant, Accomodation,PPE Clothing for all


casual Labourers per transformer area. Note: Different
casual labourers per txf areas

Sum

Provision of insurance's for the full value of materials


stored on site.
Provision of surety (10% of Conact Value)
Other fixed charges (specify)

Sum
Sum
Sum

1
1
1

Provision for MV & LV switching on irregular working hours


due to network that has to be de-energised and energised
on a daily basis.

Sum

Sum

Sum
Sum

1
1

Sum

3.0
Submit as built information per transformer area In arch
lever file with all the test results, sag & tension results,
house connection metering. (Excluding the documentation
submitted to Lukhanji Municipality on the required
metering info.)
3.2 Allowance for printing of 2 meter movement books
3.2.1 Provisional amount.

3.3

Appointment of CLO with asalary of R3500.00 per month


for the duration of contract.
TOTAL CARRIED FORWARD TO SUMMARY BILL 1

PHASE 3

Rate

Total

Item
1

MV & LV NETWORK REFURBISHMENT OF EZIBELENI - PHASE 3


EXCAVATIONS
BILL No 1
Description
Unit
Qty
Excavation,Backfiling,Compaction
Pole,Stay and earth trenching excavations to be
done in hard rock conditions.

Daily rates for excavations over and above the


1.1
qualities provided
1.1.1 Compressor comple with all equipment
1.1.2 Phneumatic drill comple with all equipment
MV & LV Transformer Crowfoot installation. 800mm
1.1.3 deep x 450 wide. "Earthing trench"

Day Rate
Day Rate

5
5

No
No
No
No

82
63
26
85
26

Supply
11m x 180 dia
11m x 160 dia
9m x 160 dia
7m x 100 dia
2.5m x-arms 120 -139 dia

ea
ea
ea
ea
ea

25
30
85
57
30

2.2 Install
2.2.1 11m x 180 dia
2.2.2. 11m x 160 dia
2.2.3 9m x 160 dia
2.2.4 7m x 100 dia
2.2.5 2.5m X-arms 120-139 dia

ea
ea
ea
ea
ea

15
20
76
57
30

11kKV MV cyclo cut out fuses with solids


mounted on a 2,5m X-arm complete unit with
all conductors, earth bonding, attachments
2.3
and
2.3.1 Supply
2.3.2 Install

ea
ea

2
2

2.5
Aircdac comcentric cable 10mm
2.5.1 Supply
2.5.2 Install

m
m

8000
8000

1.1.4
1.1.5
1.1.6
1.1.7

1,3 metre depth for stay. "Rod Length 1500mm"


1,7 metre depth for stay. "Rod Length 200mm"
1,5 metre depth for pole. "Length 900mm"
1,8m metre depth for pole."Length 11000mm"

Wooden Poles

Meter

Pole supplier to be approved supplier as per Eskom


Southern region specifications. Alternative suppliers will not
be considered.

2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.1.5

Amount Carried Forward to Summary Bill No 1

BELENI - PHASE 3

Rate

Total

MV & LV NETWORK REFURBISHMENT OF EZIBELENI - PHASE 3


LOW VOLTAGE NETWORK
BILL No 2
Item Description

Three phase Hare conductor network.

Greenbro Pole Top box. Type Polyethyle split meter enclosure for 8 weays with landis +
Gyr meters. Stainless steel p[ole mount brackets , 2 rows dinb rail, 8 x 63 amp QF1- 26
curve 1 CBI type CB's, circuit breaker copper bridges, Separate linked earth and
neutral bar, Staineless anti- vandaLl lock M10 LH thread 4 x 2.5 meter(from bottom of
2.1 enclosure) 25mmuPVC tails. ALL
Supply

2.1.1 8-ways Greenbor Pole Top Box with Anti-Vandalism Lock as specified.
2.1.1.1Transformer: 007 - 008
Install

2.1.2 8-ways Greenbor Pole Top Box with Anti- Vandalism Lock as specified.
2.1.2.1Transformer: 007 - 008

Greenbro Pole Top box. Type Polyethyle split meter enclosure for 8 weays with landis +
Gyr meters. Stainless steel pole mount brackets , 2 rows din rail, 4x 63 amp QF1- 26
curve 1 CBI type CB's, circuit breaker copper bridges, Separate linked earth and
neutral bar, staineless anti-vandal lock M10 LH thread and4 x 2.5 meter(from bottom of
2.2 enclosure) 25mmuPVC tails. ALL
Supply
2.2.1 4-ways Greenbor Pole Top Box with Anti- Vandalism Lock as specified.
1.1.1 Transformer: 007 -008
Install
2.2.2 4-ways Greenbor Pole Top Box with Anti- Vandalism Lock as specified.
1.1.1 Transformer: 007 -008

Greenbro Pole Top box. Type Polyethyle split meter enclosure for 8 weays with landis +
Gyr meters. Stainless steel pole mount brackets , 2 rows din rail, 2x 63 amp QF1- 26
curve 1 CBI type CB's, circuit breaker copper bridges, Separate linked earth and
neutral bar, staineless anti-vandal lock M10 LH thread and 3 x 2.5 meter(from bottom of
enclosure) 25mmuPVC tails. ALL pole mounting attachments,PVC cable glands, ties,
PG clamps connectors per phase connection.
Supply
2.2.1 2-ways Greenbor Pole Top Box with Anti- Vandalism Lock as specified.
1.1.1 Transformer: 007-008
Install
2.2.2 2-ways Greenbor Pole Top Box with Anti- Vandalism Lock as specified.
1.1.1 Transformer: 007-008

Amount carried forward to next page

OF EZIBELENI - PHASE 3
WORK
Unit

Qty

Rate

Total

Sum

27

Sum

27

Sum

37

Sum

40

sum

20

sum

20

Item

2.3

MV & LV NETWORK REFURBISHMENT OF EZIBELENI - PHASE 3


LOW VOLTAGE NETWORK
BILL No 2
Description
Unit
Qty
Amount brought forward from previous page
Install,Re-tensioning of MV 3 Phase Hare Open wire
conductors.Retention MV & LV conductors between
poles and structures, alumminium bindings and
conductor deadends. Retantion with new deadends
and new alumi nium bindings. All terminations,
midspan joints and tee joints must be crimped.
MV Route: Supply and Install

2.3.1

Supply and Retention 3 Phase Hare Open wire


network,including crimped mindspan joints and jumper
connections,Including all related required materials Complete.

2.3.2
2.3.2.2
2.3.2.3
2.3.2.4
2.3.2.5

Reinstate 3 Phase Hare Open wire MV structeres. As per MV


structure drawings as attached. All joints and t - off must be
crimped. Including
Intermidate 0-30
Terminations
Strains
MV Midair crossings

2.4

2.4.1

5500

Struct
Struct
Struct
Units

18
2
2
2

17000

Struct
Struct
Struct
Struct
Struct
Struct

56
3
10
25
5
2

Struct
Struct
Struct

6
4
1

Struct
Struct
Struct

21
6
2

LV Route: Supply and Install


Supply and Retention 3 Phase Hare Open wire
network,including crimped mindspan joints and jumper
connections,Including all related required materials Complete.

Reinstate 3 Phase Hare Open wire MV structeres. As per MV


structure drawings as attached. All joints and t - off must be
2.4.2
crimped. Including
2.4.2.1 Code A: 0-30
2.4.2.2 Code C: 0-60
2.4.2.3 Code D: 60-90
2.4.2.4 Code E: Terminal
2.4.2.5 Code H: Cross
2.4.2.6 Code F: T - Offs
2.5 MV and ANCHORS
Supply and Install, including all relavant materials
2.5.1
MV Anchors (Retention and Make -off)
2.5.1.1 Code A: Single anchor
2.5.1.2 Code B: Dual anchor
2.5.1.3 Code C: Fliying anchor
2.5.2
LV Anchors(Retention and Make-off)
Supply and Install, including all relavant materials
2.5.2.1 Code A: Single anchor
2.5.2.2 Code B: Dual anchor
2.5.2.3 Struct, 11m

Amount carried forwad to Summary Bill No 2

HASE 3

Rate

Total

Item

3
3.1

MV & LV NETWORK REFURBISHMENT OF EZIBELENI - PHASE 3


LOW VOLTAGE STAYS AND TRANSFORMER EARTHING
BILL No 2
Description
Unit
Qty
Transformer Installation

Install a 4 pole transformer structure for 11kV/400V - 315kVA


TRANSFORMER,sabs 780, Copper windings, remove exosting H- pole
arrestors, galvaniseed channels and all terminations. Including all
related nuts, bolts, danger signs, TXVF number plate and bonding
with all cable terminations and attachment components.
Supply and Install
11vK/400V - 315K VA Transformer. SABS 780, Copper windings,
complete.

ea

units
units

2
2

3.3.1 MV Earthing, Comple and provide earth test results


3.3.1.1 Supply
3.3.1.2 Install

sum
sum

2
2

LV Earthing, Complete and provide earth test results.


3.3.1.1 Supply
3.3.1.2 Install

sum
sum

2
2

3.2

3.2.1
3.3.2
3.3

Transformer LV Pole Mountent Protection, MCCB/ MCB enclousures


with Lv feeders protection.

Provide Twao LV"polybox" Type APK/4 Pole Mount enslosure.


Stainless steel ant- vandal lock M10 Lh thtead. Three phase +N
shrouded busbars, nmounted onto two steel channels completely
wired with all MCCB's and PVC tails as per the detailed drawings.
Galvanised channels all cable glands, shorouds, , strapping,
termination ends,lugs,bolts and nuts, terminations to be covered with
heat shrink slevees as a unit. Cables measured elsewhere.
Supply
Install
MV % LV Transformer Erthing as per Eskom Specifications
Drw:MV/LV 0627 All relevant materials will be provided and installed.

Complete MV & LV earthing of a 315 KVA, H pole mounted


transformer. 600mm radiusm radius 16mm "crow foot " earth ,mat & x
1.2m earth electrodes per transformer. (16mm BCEW conductor &
four earth spikesw included)Bonded to all metal frames and
transformer bushings. Excavations measured elswhere.

Low Voltage(600 / 1000 v) PVC SWA cables. Cables to have stranded


copper conductors .installation rate to include for
termination,saddles,lugs,ferrols and all insulation materials with heat
shrink sleeves for terminations. LV cable termination lugs and PG
clamps/ piercing connectors for feeder lines, Complete
3.4.1 Supply
3.4.1.1 95mm x 4 core
3.4.2 Install
3.4.2.1 95mm x 4 core
Amount Carried Forward to Summary Bill No 3

120

120

PHASE 3
ING
Rate

Total

MV & LV NETWORK REFURBISHMENT OF EZIBELENI - PHASE 3


HOUSE CONNECTIONS
Bill No 4
Description
Unit
Qty

Item
4

House connections keypad installation and retentioning of 10mm


Airdac

4.1
4.1.1

Retention of 10mm airdac cabling from the pole top box to the house
meter. Install drip loop and apply cable ties .Seilling cable entry hole
to hopuse.
Retention per house conection

ea

339

4.2
4.2.1
4.2.3

Replace and reinstall 10mm Airdac Strain clamp


Supply
Install

ea
ea

200
200

4.31 Supply
4.3.1.1. Transformer: 007
4.3.1.2 Transformer: 008

sum
sum

130
209

4.3.2 Install
4.3.2.1 Transformer: 007
4.3.2.2 Transformer: 008

sum
sum

130
209

ea

339

4.3

4.4

Cashpower Power-rail PLC,Single phase keypad-based slip


prepayment meter in DIN rai-mount housing. Landis +Gyr Model PLC
CIU MK3,complete with slip metering unit .Setting at 60 Amp rating.
Install and Supply metring unit in thepole top box, mount the PLC
mk3 UNIT INTO A 4X 4 a surface mounted plug box connected to
the distribution board complete, including all termination and
attachment components.

Capture all material information and submit to Encho Mgjima


Municipality in the format as required by revenue management .

Capture meter information per house communication between the


meter outage office, info capturing of customers and re-loading of
actual customer metering units. Laise between all municipal
stakeholders and all the necessary meetings to be held during this
change over process, . No additional cost will be entertained by the
client for the contractor failin to communicate effectively between all
parties. Allow to work after hours and weekends.

Amount Carried Forward to Summary Bill No 4