Generation and Reservoirs Statistics

October 14, 2016

PUBLIC UTILITIES COMMISSION OF SRI LANKA

Daily Generation Mix in MWh


360
6,640

5,309
CEB Hydro
8,900

CEB Thermal Oil


CEB Coal
IPP Thermal

19,320

SPP Wind

Total Generation
40,528 MWh
Note: Generation from other SPPs (Mini Hydro, Solar and Biomass) is not included

Cumulative Dispatch -January 1 to October 14, 2016


For Current Month
Category
CEB Hydro
CEB Thermal Oil
CEB Coal
IPP Thermal
SPP Wind
Total

Dispatch (MWh)
80,649.0
97,350.0
238,950.0
113,802.0
17,708.5
548,459.5

14.70%
17.75%
43.57%
20.75%
3.23%

Dispatch (GWh)
2,917
1,652
4,166
1,522
837
11,094

26.29%
14.89%
37.56%
13.72%
7.54%

For Current Year


Category
CEB Hydro
CEB Thermal Oil
CEB Coal
IPP Thermal
Renewable
Total

Wimalasurendra
Old Laxapana
Canyon
New Laxapana
Polpitiya
Kotmale
Victoria
Randenigala
Rantambe
Ukuwela
Bowatenna
Upper Kotmale
Samanalawewa
Kukule
Inginiyagala
Udawalawe
Nilambe
Puttalam Coal I
Puttalam Coal II
Puttalam Coal III
Uthura Janani
Sapugaskanda B
Sapugaskanda A
Barge CEB
Asia Power
KCCP
Northern Power
Westcoast
Sojitz - Kelanitissa
ACE Embilipitiya
KPS GT 7
KPS Small GTs
Wimalasurendra
Old Laxapana
Canyon
New Laxapana
Polpitiya
Kotmale
Victoria
Randenigala
Rantambe
Ukuwela
Bowatenna
Upper Kotmale
Samanalawewa
Kukule
Inginiyagala
Udawalawe
Nilambe
Puttalam Coal I
Puttalam Coal II
Puttalam Coal III
Uthura Janani
Sapugaskanda B
Sapugaskanda A
Barge CEB
Asia Power
KCCP
Northern Power
Westcoast
Sojitz - Kelanitissa
ACE Embilipitiya
KPS GT 7
KPS Small GTs

Plant Dispatch on
October 14, 2016

MWh
8000

7000

6000

5000

4000

3000

2000

1000

Rated Generation Capacity

Plant Loading at Night Peak on

Installed Capacity
Available Generation

Available Capacity
Actual generation

October 14, 2016

MW
300

250

200

150

100

50

Night Peak Load

Contribution to the Night Peak in MW


7.8
390.2

558.9
CEB Hydro
CEB Thermal Oil
CEB Coal
476.8

818

IPP Thermal
SPP Wind

Night Peak
Day Peak
Minimum Demand

2,251.7 MW
2,006.1 MW
1,151.8 MW

Note: Contribution from other SPPs (Mini Hydro, Solar and Biomass) is not included

Reservoir Levels -

as at 06.00 Hr on October 15, 2016

100%

250

90%
80%
70%

64%

169.6

60%

61%

62%

150

62%

50%

45%

40%

88.7

30%
20%

200

198.9

100
81.8
21%

60.5

50
35.5

10%
0%

0
Castlereigh

Maussakelle
Kotmale
% of Total Capacity

Total Reservoir Level(GWh) 655.1


% of Total capacity
50.47%

Victoria
Randenigala Samanalawewa
Reservoir level (GWh)

Comparison of Total Reservoir Storage Levels with Past Years


GWh
1400.0
1200.0
1000.0
800.0
600.0
400.0
200.0
0.0
1-Jan

1-Feb

1-Mar

1-Apr
2012

1-May
2013

1-Jun
2014

1-Jul
2015

1-Aug

1-Sep

1-Oct

2016

Variation of Major Hydro Reservoir Levels in GWh- 2016


GWh
500.0
450.0
400.0
350.0
300.0
250.0
200.0
150.0
100.0
50.0
0.0
1-Jan

1-Feb
Castlereigh

1-Mar

1-Apr

Maussakelle

1-May
Kotmale

1-Jun
Victoria

1-Jul

1-Aug

Randenigala

1-Sep

1-Oct

Samanalawewa

Variation of Demand 2016


MW
3000.0

2500.0

2000.0

1500.0

1000.0

500.0

0.0
1-Jan

1-Feb

1-Mar

1-Apr

Nigh Peak

1-May

1-Jun

Day Peak

1-Jul

1-Aug

1-Sep

1-Oct

Minimum Demand

Comparison of Cumulative Dispatch from January 1 - October 14, 2016


GWh
12,000
251

10,000

8,000

1,522

292

237

1,193

2,525
4,166

3,736

6,000
2,488
4,000

957

1,652

3,347

2,917

2015

2016

1,630
2,000
2,258
2014
CEB Hydro

CEB Thermal Oil

CEB Coal

IPP Thermal

Wind

Daily Load Curve -

October 13, 2016

2500

2000

1500

1000

500

CEB Coal

CEB Thermal Oil

IPP Thermal

CEB Hydro

Power Station

Capacity (MW)

Primary Fuel

CEB Hydro
Victoria
Ukuwela
Kotmale

Randenigala
Rantambe
Bowatenna
Nilambe
Upper Kotmale
Old Laxapana
New Laxapana
Polpitiya
Wimalasurendra
Canyon
Samanalawewa
Kukuleganga
Inginiyagala
Udawalawe

210
40
201
122
49
40
3.2
150
50
115
75
50
60
120
75
10
6

CEB Thermal
Sapugaskanda 1
72
Sapugaskanda 2
72
Kelanitissa Small Gas Turbines
68
GT 7 - Kelanitissa
115
Kelanitissa CCY
165
Lakvijaya (Puttalam Coal)
285
Lakvijaya (Puttalam Coal) Stage II 285
Lakvijaya (Puttalam Coal) Stage III285
Uthuru Janani
24
Barge CEB
60
Private Thermal (IPPs)
Asia Power
Sojitz - Kelanitissa
West Coast
Northern Power
ACE Embilipitiya

51
163
270
27
100

Heavy Fuel
Heavy Fuel
Auto Diesel
Auto Diesel
Naptha & Diesel
Coal
Coal
Coal
Heavy Fuel
Furnace Oil

Heavy Fuel
Auto Diesel
Low Sulphur Furnace oil
Auto Diesel
Furnace Oil

You might also like