NGL Recovery Unit

M N Gopinath
Dear Sir,
Following reports are required to proceed with the simulation study. This is an
exhaustive list, so that the no. of iterations with the client shall be minimal.
1.
2.
3.
4.
5.

PFD
P&ID
Process Design Package/ Detailed Process Description
Heat & Material Balances / Steady State Simulation Outputs
Operations Manual/ Start-up Shutdown procedure/ Expected responses for
any malfunctions (if available)
6. Process Datasheets
7. Instrument Datasheets
8. Mechanical Datasheets
9. Piping Isometrics
10.Compressor/ Expander Performance Curves, Operating manual
11.Antisurge Control Valves Datasheet
12.Control Valves Datasheet
13.Process Control Philosophy, Control Narratives, Complex Loop Config
Details
14.ESD Details
15.All Cause and Effect Charts
16.Logic Diagrams for ESD Automatic Sequences
17. DCS Historical Trends
18.DCS Screen Shots of Operating Plant
19.Composition Analysis / Lab Reports