You are on page 1of 7

Swap Parameter Mapping Tool

Guide
R1.3
LEGAL INFORMATION
By accepting this certain document of ZTE CORPORATION you agree to the following
terms. If you do not agree to the following terms, please notice that you are not
allowed to use this document.
Copyright 2016 ZTE CORPORATION. Any rights not expressly granted herein are
reserved. This document contains proprietary information of ZTE CORPORATION. Any
reproduction, transfer, distribution, use or disclosure of this document or any portion of
this document, in any form by any means, without the prior written consent of ZTE
CORPORATION is prohibited.
and

are registered trademarks of ZTE CORPORATION. ZTEs company

name, logo and product names referenced herein are either trademarks or registered
trademarks of ZTE CORPORATION. Other product and company names mentioned
herein may be trademarks or trade names of their respective owners. Without the prior
written consent of ZTE CORPORATION or the third party owner thereof, anyones
access to this document should not be construed as granting, by implication, estopped
or otherwise, any license or right to use any marks appearing in the document.
The design of this product complies with requirements of environmental protection and
personal security. This product shall be stored, used or discarded in accordance with
product manual, relevant contract or laws and regulations in relevant country
(countries).
This document is provided as is and as available. Information contained in this
document is subject to continuous update without further notice due to improvement
and update of ZTE CORPORATIONs products and technologies.

ZTE CORPORATION
Addres
s:

NO. 55
Hi-tech Road South
ShenZhen
P.R.China

Product Type Technical Proposal

518057
Websit
e:
Email:

http://support.zte.com.cn
800@zte.com.cn

ZTE Confidential Proprietary

2012 ZTE Corporation. All rights reserved.

1(7)

Product Type Technical Proposal

Revision History
Product Version

Document Version

Serial Number

Reason for Revision

R2.1

R1.0

First published

R2.1.3

R1.1

Section 4.2 is added.

R2.1.4

R1.2

Section 3.4 is added.

R1.3

The contents relevant to the


mapping logic are modified and the
Chinese figures are replaced by the
English figures for the convenience
of the English version development.

R2.1.5

Author
Date

Document Version

Prepared by

Reviewed by

Approved by

2011-1-18

R1.0

Dang Hailiang

Wu Yuanjiang, Ma Wei,
and Zhen Hao

Wang Zhenhai

2011-2-22

R1.1

Dang Hailiang

Wu Yuanjiang, Ma Wei,
and Zheng Hao

Wang Zhenhai

2011-11-24

R1.2

Dang Hailiang

Wu Yuanjiang, Ma Wei,
and Zheng Hao

Wang Zhenhai

2011-03-12

R1.3

Dang Hailiang

Wu Yuanjiang, Ma Wei,
and Zheng Hao

Wang Zhenhai

Intended audience: GSM and UMTS network planning and optimization engineers

ZTE Confidential Proprietary

2012 ZTE Corporation. All rights reserved.

2(7)

Product Type Technical Proposal

About This Document


Summary
Chapter

Description

1 Overview

Describes the general condition of this tool.

2 Main Operation Flow


of the Tool

Describes the main operation flow of this tool.

3 Points for Attention

Describes some points for attention.

4 Operation Procedures
of Different Scenarios

Describes the operation procedures of different scenarios.

ZTE Confidential Proprietary

2012 ZTE Corporation. All rights reserved.

3(7)

Product Type Technical Proposal

TABLE OF CONTENT

1
1.1
1.2
1.3
1.4
1.5

Overview........................................................................................................... 1
Functions and Features.....................................................................................1
Tool Acquisition..................................................................................................2
System Requirements........................................................................................2
Stages With This Tool Used During the Swap....................................................2
Feedback Method..............................................................................................3

Main Operation Flow of the Tool.....................................................................4

3
3.1
3.2
3.3
3.4

Points for Attention..........................................................................................5


Data Preparation................................................................................................5
Parameter Mapping Rules.................................................................................5
Parameters Which Does not Support Mapping..................................................7
How to Use the Parameter Mapping Rule Templates Released With the Tool. . .8

4
4.1
4.1.1
4.1.2
4.1.3

Operation Procedures of Different Scenarios.............................................10


Operation Procedure of Swap From BSC V2 to iBSC V3.................................10
Data Preparation..............................................................................................10
Function Selection............................................................................................11
Importing the Radio Parameter Tables of the Vendor Whose Sites Are to be
Swapped.......................................................................................................... 11
Importing the ZTE Radio Parameter Table.......................................................13
Setting the Parameter Mapping Rules.............................................................15
Exporting the List of Sites to be Swapped........................................................18
Outputting the Execution Result.......................................................................19
Operation Procedure of the Swap From Ericsson V5.6 to ZTE UMTS V4.09.200.1
20
Data Preparation..............................................................................................20
Function Selection...........................................................................................21
Importing the Radio Parameter Table of the Vendor Whose Sites Are to Be
Swapped......................................................................................................... 22
Importing ZTE Radio Parameter Table.............................................................24
Defining the Parameter Mapping Rule.............................................................26
Importing the List of Sites to Be Swapped.......................................................29
Outputting the Execution Result.......................................................................30
Operations of Other Scenarios.........................................................................31

4.1.4
4.1.5
4.1.6
4.1.7
4.2
4.2.1
4.2.2
4.2.3
4.2.4
4.2.5
4.2.6
4.2.7
4.3

ZTE Confidential Proprietary

2012 ZTE Corporation. All rights reserved.

4(7)

Product Type Technical Proposal

FIGURES
Figure 1-1 GU Network Swap Parameter Mapping Tool Function...........................................1
Figure 1-2 GU Network Swap Flow........................................................................................3
Figure 2-1 Main Operation Flow of the Tool............................................................................4
Figure 3-1 Interface of Parameter Mapping Rule Setting........................................................6
Figure 3-2 Parameter Mapping Setting Method 1 (For the Parameters Whose Values Are
Irrelevant to the Original Vendor).............................................................................................6
Figure 3-3 Parameter Mapping Setting Method 2 (For the Parameters Whose Values Are the
Same With Those of the Original Vendor)................................................................................7
Figure 3-4 Parameter Mapping Setting Method 3 (For the Parameters Whose Values
Correspond to Those of the Original Vendor)...........................................................................7
Figure 3-5 Mapping Rule Setting Interface.............................................................................8
Figure 4-1 Operation Interface of GUSwapMappingTools.exe..............................................11
Figure 4-2 ZTE GSM/UMTS Network Swap Wizard V2.1.5..................................................11
Figure 4-3 Function List........................................................................................................11
Figure 4-4 Importing the Radio Parameter Tables of the Vendor Whose Sites Are to Be
Swapped............................................................................................................................... 12
Figure 4-5 Mapping the Fields of the Imported Tables..........................................................12
Figure 4-6 Location of the Mapping Result...........................................................................13
Figure 4-7 Importing the ZTE Radio Parameter Tables.........................................................14
Figure 4-8 Mapping the Fields of Imported Tables................................................................14
Figure 4-9 Location of the Mapping Result...........................................................................15
Figure 4-10 Mapping Rule Setting 1.....................................................................................16
Figure 4-11 Mapping Rule Setting 2......................................................................................16
Figure 4-12 Mapping Rule Setting 3.....................................................................................17
Figure 4-13 Mapping Rule Setting 3.....................................................................................17
Figure 4-14 Mapping Rule Setting 4.....................................................................................18
Figure 4-15 Importing the List of Sites to Be Swapped.........................................................18
Figure 4-16 Parameter Mapping Progress............................................................................19
Figure 4-17 Output File Path.................................................................................................19
Figure 4-18 Source Folder and Target Folder.......................................................................19
Figure 4-19 BSC V2 Adjustment Recommendation Table.....................................................19
Figure 4-20 iBSC V3 Adjustment Recommendation Table....................................................20

ZTE Confidential Proprietary

2012 ZTE Corporation. All rights reserved.

5(7)

Product Type Technical Proposal

Figure 4-21 GUSwapMappingTools.exe...............................................................................22


Figure 4-22 ZTE GSM/UMTS Network Swap Wizard...........................................................22
Figure 4-23 Function List......................................................................................................22
Figure 4-24 Importing the Radio Parameter Table of the Vendor Whose Sites Are to Be
Swapped............................................................................................................................... 23
Figure 4-25 Mapping the Fields of the Imported Table..........................................................23
Figure 4-26 Location of the Mapping Result.........................................................................24
Figure 4-27 ZTE Radio Parameter Table..............................................................................25
Figure 4-28 Mapping of the Fields of the Imported Table......................................................25
Figure 4-29 Location of the Mapping Result.........................................................................26
Figure 4-30 Mapping Rule Setting 1.....................................................................................27
Figure 4-31 Mapping Rule Setting 2.....................................................................................27
Figure 4-32 Mapping Rule Setting 3.....................................................................................28
Figure 4-33 Mapping Rule Setting 4.....................................................................................28
Figure 4-34 Mapping Rule Setting 5.....................................................................................29
Figure 4-35 Importing the List of Sites to Be Swapped.........................................................30
Figure 4-36 Parameter Mapping Progress............................................................................30
Figure 4-37 Output File Path.................................................................................................30
Figure 4-38 Source Folder and Target Folder.......................................................................31
Figure 4-39 Ericsson V5.6 Adjustment Recommendation Table............................................31
Figure 4-40 ZTE V4.09.200.1 Adjustment Recommendation Table.......................................31

TABLES
Table 4-1 Scenarios to be Supplemented.............................................................................31

ZTE Confidential Proprietary

2012 ZTE Corporation. All rights reserved.

6(7)

You might also like