You are on page 1of 1

Tel : +91 - 7104 - 237770

Fax : +91 - 7104 - 232633

Home

About Us

Contact Us
New Era

Profile
Products
Clients
Quality
Infrastructure

Testing and Inspection


Testing and Inspection
Testing and Inspection is carried out at each and every stage of the manufacturing process and is a continuous activity at New Era
Conveyors.
All the NEC idlers are 100% checked for their dimensional accuracy as per specification and relevant standards during the
manufacturing process as well as after assembly.

Applications

For the purpose of understanding, some of our standard inspection and testing procedures on the finished product are given
below.

Downloads

The rollers, once manufactured are subjected to following tests.

Photo Gallery
NEWS & EVENTS

1. Free Rotation Test:


This is required to check :
i. Free rotation of idlers.
ii. Proper setting of internal components.
iii. To know any rise in temperature in the bearing seating area.
2. Out of Run Test:
The maximum allowable run-out for NEC idlers is 0.8 mm, which is much lesser than the limit provided by IS: 8598. The run
out test is carried out on a special fixture with a run out dial indicator.
3. Dust Ingress Test:
This is one of the most important tests required to check any ingress of dust in the rollers bearings. Most of the idler rollers
are used in an atmosphere with high contamination of dust particles. We, at NEC, ensure that all the rollers are perfectly
sealed at bearing assembly to avoid any dust ingress while in use.
This is achieved by performing dust ingress test, where a roller is rotated at a specific RPM in a closed chamber having a
continuous cloud of dust which is maintained for a particular time period. At the end of the test, the bearing assembly is
removed to check any ingress of dust inside the bearing assembly.
4. Water Ingress Test:
This is similar to dust ingress test where the efficiency of sealing arrangement is tested against the ingress of water. The
roller is rotated in a special fixture having water showers impinging water on to the roller housings at a particular pressure.
At the end of the test, the bearing assembly is removed to check any ingress of water droplets inside the bearing assembly.
5. Friction Factor Test:
The friction factor is an important parameter of a roller design and directly affects the efficiency and power requirement of a
conveyor system. It also indirectly affects the life of the bearings.
All the NEC brand Idlers are tested for friction factor less than 0.015 which conforms to IS-8598.
The friction factor test is carried out dynamically under load on a special designed machine with a digital tachometer, which
gives digital output of the dynamic friction factor.
6. Weld Quality Test:
This is done to ensure a good quality of weld at the end discs.This in either done visually or by Die Penetration Test as per
agreed QAP with the customer.
7. Paint Thickness Test:
To ensure a minimum thickness of red-oxide and paint enamel over the roller shell.
These are some of the standard tests performed on the finished products. Apart from this, NEC also conducts random test for the
pipe thickness by using ultrasonic thickness testing machines.

Simultaneous Double End Welding - MIG

You might also like