KK MAYA LIKAS

ATTACHMENT A2

A2-4

PROJECT: MAYA LIKAS


SERVICES: FIRE PROTECTION SERVICES
REVISION : REV 00
Date: 19 NOVEMBER 2015
No

Pump

Level

Description

Type

Electric /

Flow

Estimated

Speed

Estimated

Control

Elec

Diesel Engine

Rate

Pump Head

(RPM)

Power Input

Panel

Char

Driven

(l/min)

(m)

Hose Reel Pump - Vertical In- Electric Driven


Stage 1 (Duty)
Line

120

130

2900

5.50

CP-HRP-1

415/3/50

Hose Reel Pump - Vertical In- Electric Driven


Stage 1 (Standby)
Line

120

130

2900

5.50

CP-HRP-1

415/3/50

Designation
A
1

Hose Reel Pumps


Upper Ground
HRP-1
Level
HRP-2

Upper Ground
Level

(kW)

Design Parameter & Criteria


A. Calculation of Pump Flow Rate
1. The flow rate of the hose reel pump is based on the four numbers of hose reel operating at any one time.
2. The minimum flow rate across one hose reel is 30 l/min. Therefore, total flow rate based on four numbers of hose reel will give us 120 l/min
or 26.4 igpm.
3. Jockey pump is not required for the hose reel system.
B. Calculation of Pump Head
1. The pump head consists of three components namely friction head, static head and pressure required at the hose reel outlet.
2. The friction head comprises measured length (straight pipe losses) and equivalent length (fittings losses).
3. The pipe friction loss used in the calculation of friction head is calculated using the Hazen-William Formula. The formula is presented as follows:
hf
L

10.666 x
D 4.87

Q
C

1.85

(V/Ph/Hz)

Remarks

KK MAYA LIKAS

ATTACHMENT A2

PROJECT: MAYA LIKAS


SERVICES: FIRE PROTECTION SERVICES
REVISION : REV 00
where

hf
L
Q
C
D

=
=
=
=
=

Pipe friction loss (m)


Pipe length (m)
Water flow rate (l/min)
Coefficient of pipe
Pipe diameter (m)

4. The static head is measured from the pump level to the top most (& furthest) hose reel for that particular stage.
5. The pressure required at the hose reel outlet is set at approximately 20m.
6. A 5% safety factor is added to the calculated pump head to cater to adjustments being carried out to suit site conditions later.

A2-4

AEROPOD (PHASE 2A)

ATTACHMENT A3

A3-4

PROJECT: MAYA LIKAS


SERVICES: FIRE PROTECTION SERVICES
REVISION : REV 00
Date: 19 NOVEMBER 2015
HRP-1 & HRP-2
1.1

Design Data
a)

Reference

MS 1489 : Part 1

b)

Static height from pump at UGF to Lower Roof Level (Tower A)

88.5

c)

Horizontal pipe length from pump to furthest landing valve in stage

200

d)

Design Flow Rate

26.4

e)

Pressure at Hose Reel Outlet

20

m-head

hf

Pipe friction loss

Pipe length (m)

=
=

288.5 meter
Water flow rate

120

=
=

Coefficient of pipe
120
(Galvanized Steel)

Pipe diameter (m)

0.05

1.2

Hose Reel Pump Calculation

Using Hazen-William Formula:


Where

hf

hf

L
hf

10.666 x L x

D 4.87

10.666 x

D 4.87

10.666 x
0.05

L
=

4.87

0.033

1.85

1.85

0.002 1.85
120

OR

l/min

120 l/min

or

0.002

m3/s

meter

m-head per meter run

50mm Diameter G. I. 'C' pipe


a) Friction Loss (m) per meter
b)

igpm

0.033

m-head

Equivalent Length at Fitting Loss (Refer to Attachment C1-1)


Qty
ft / fitting
3 nos of 50mm Dia. Gate Valve
=
3
x
2.3
1 no of 50mm Dia. Check Valve
=
1
x
20.0
1 no of 50mm Dia. Strainer
=
1
x
14.0
9 nos of 50mm Dia. Elbows
=
9
x
5.0
5 nos of 50mm Dia. Tees (flow thru)
=
5
x
10.0
31 no of 50mm Dia. Tees (straight thru)
=
31
x
3.3
Total fittings equivalent length
or

=
=
=
=
=
=
=

6.9
20.0
14.0
45.0
50.0
102.3
238.20

ft

72.7

AEROPOD (PHASE 2A)

ATTACHMENT A3

A3-4

PROJECT: MAYA LIKAS


SERVICES: FIRE PROTECTION SERVICES
REVISION : REV 00
Date: 19 NOVEMBER 2015

c)

Straight Pipe Length

289

d)

Total Friction Loss due to


straight pipe & fittings

=
=

289
12.08

+
m-head

e)

Static Head
(from HR pump on LG to hose reel on L8)

88.50

m-head

f)

Pressure at Hose Reel Outlet

20

m-head

Total

=
=
=

(d) + (e) + (f)


12.08
+
88.50
120.58 m-head

g)

Safety Factor of 5%

6.03

h)

Estimated Pump Head

126.61

m-head

130

m-head

say

73

0.033

20

m-head/m run

AEROPOD (PHASE 2A)


PROJECT: MAYA LIKAS
SERVICES: FIRE PROTECTION SERVICES
REVISION : REV 00
Date: 19 NOVEMBER 2015

ATTACHMENT A3

A3-4