Professional Documents
Culture Documents
KIT DETAILS
1
Students are free choose to kit supplier as long as it satisfy rulebook conditions
Part
Number
SP9100038
SP9340030
SP9420130
9210021
4120089
9270021
9020057
9370025
9090009
9400111
11
SK14757
12
13
14
15
16
17
18
19
20
21
22
9260011
9090126
9390109
4140130
4140120
9140011
9430160
9430105
9550004
9550008
9680025
Sr. No.
Part Description
BATTERY PACK LION TS - LC
CHARGER 48V LI-ION - TS
CONTROLLER - AC MOTOR 48V - LI TS - LC
TRACTION MOTOR 48V
TRANSMISSION ASSEMBLY -10.83 RATIO(R)
W/H PACK & TEMP SENSE LI-ION 48V TS - LC
BATTERY DISCON CONTACTOR - BI STABLE
CABLE ASSY CHARGING WITH INLINE RCD
CHARGE PORT CABLE ASSY - MALE
CURRENTSHUNT, MAIN
E BAJA KIT WIRING HARNESS [Specially
made for kit)
HARNESS - SENSOR FOR PACK & TEMP
HEAT SINK COMPOUND
HEAT SINK CONTROLLER
HUB FLEXI COUPLING
HYTREL SPIDER
IEMS ASSY - 16 CHANNEL
KEY RELAY, 48V COIL, 12V CONTACT 30A
MAIN CONTACTOR (ALBRIGHT)
POTENTIOMETER ASSY - ACCL.
POTENTIOMETER ASSY - BRAKE
SWITCH ASSY ,FENR
Total
Discount
Final cost
Qty. per
kit
1
1
1
1
1
1
1
1
1
1
Kit 1
Kit 1
Kit 1
Kit 1
Kit 1
Kit 1
Kit 1
Kit 1
Kit 1
Kit 1
Compulsory
Compulsory
Compulsory
Compulsory
Compulsory
Compulsory
Compulsory
Compulsory
Compulsory
Compulsory
Kit 1
Compulsory
16
20
1
1
1
1
1
1
1
1
1
Kit 1
Kit 1
Kit 1
Kit 1
Kit 1
Kit 1
Kit 1
Kit 1
Kit 1
Kit 1
Kit 1
Compulsory
Compulsory
Compulsory
Compulsory
Compulsory
Compulsory
Compulsory
Compulsory
Compulsory
Compulsory
Compulsory
Kit No.
Category
Amt. Rs.
347,046
62346
409,392
10000
399,392
Part
Part Description
Number
9120052 BATTERY CABLE SET POWER PACK LI-ION TS
9120073 CABLE ASSY - CHARGER 48V TO BI STABLE RELAY
9120089 CABLE ASSY - CHARGER BI STABLE RELAY TO MAIN CONTACTOR
4111104 DRIVE SHAFT LH
8430004 IP CLUSTER
4111014 REAR AXLE WELDMENT NON ABS - LH [small]
Total
Qty. per
kit
1
1
1
2
1
2
Optional
Optional
Optional
Optional
Optional
Optional
Amt. Rs.
4305
717
561
3115
3231
4526
16455
subsidiary for kits are in progress shown cost is without that. Expected subsidiary
from government will be 1.25 (Aprox). Subjected to approval of government of
India.
Teams Have to attend this workshop as its totally related to Kit & EV making
15/10/2015
OPTION 2 :
In this option all the kit components will be delivered with the battery as a
single package
Transportation cost to be bared by participating teams.
In this option , components can be taken by teams only as a single pack after
Diwali