You are on page 1of 27

DATE

10.06.13

REPORT

At 9.40am, GT back charged after LAVT side PT terminal voltage check


Generator excitor opened and diodes were checked
Generator NGTR side bus bar was connected
Trip logic are checked for TSP_& Generator

EPORT

T terminal voltage checked.


ked

DATE
02.07.13
03.07.13
04.07.13
10.07.13
12.07.13
12.07.13
23.07.13
27.07.13

NATURE OF WORK

At 9.15am,Plant tripped due to DT-2 transformer Oil leakage in top side and bus duct
At 12.35pm, TG breaker manually opened due to WTP Transformer HV winding Temperature Ala
At 10.45pm, Plant tripped due to 6.6kv WTP Breaker tripped by ABB service engineer for testing
In switchyard, Line-1 breaker SF6 gas topup work done upto 7kg/cm2 from 5.3kg/cm2
In 625KVA DG , Engine oil and filter changed
At 10.55am, Plant tripped due to PA fan to Wind box duct air leakage.
At 4.45pm, Plant tripped manually due to Gen. Transformer oil leakage
ACW-1 motor feeder changed from WTP MCC to ACC MCC in 3.5meter

DATE
01.08.13
05.08.13
06.08.13
11.08.13
12.08.13
17.08.13
20.08.13
20.08.13
22.08.13
26.08.13

NA

FHS buscoupler breaker tripped due to Earth fault.Then FHS incomer 2 was taken in line
In CHP MCC, Incomer-1 breaker trippd due to (IP>0) in MICOM relay. Then MICOM Relay byp

In bunker side,DE-4 motor power cable damaged.then checked and rejoined


At 1.50pm,Plant tripped due to Drum level low. ACW discharge pressure low. so that BFP-1 tripp
At 6.00pm Plant tripped due to drum level low.After 20mins GT breaker closed , at the same time

At 4.30am, Plant tripped due to all DCF tripped frequently.Plant Shutdown from 17.08.13 to 20.0
In switchyard, Battery charger found charger failed.Then checked and lighting transformer neutra
DT-3 oil temperature gauge was replaced by the supplier
At 12.00pm, Plant tripped due to EB failure.At 3.35pm plant synchronised with grid.Then UAT tr
In CHP, BC-2 tripped continuously.Checked and found as OLR problem.Then replaced with OLR

DATE
01.09.13
02.09.13
11.09.13
12.09.13
14.09.13
27.09.14

NATURE OF WORK
At 10.56am, Plant tripped due to BFP-2 discharge gasket failure.After 5second line breaker trippe
due to Over load power acted in REF670 relay.Then Setting changed from 3.8MW, 5sec to 4.28M
At 4.50pm, Plant tripped due to ID fan-2 earth fault tripped.Then meggar value checked.Y phase
Then Y-Phase cable removed in feeder side and motor side
At 1.15pm, Plant tripped manually due to ID fan-1 tripped with field bus communication error
At 12.23am ID fan-1,SA-1,SA-2 tripped due to DC under voltage
At 12.25am, GT breaker opened manually
At 4.22am, ID-1,SA fan-1 was tripped due to DC under voltage
At 4.30am, GT breaker opened manually
At 8.40pm, Plant blocked out due to EB failure

DATE
02.10.13
08.10.13
16.10.13
22.10.13
22.10.13

NATURE OF WO

At2.00pm plant tripped due to EB failure


At 11.00 am 89T, 89B isolator closed from switchyard for transfer bus synchronising
At 2.20pm, Plant tripped due to ID fan 2 winding temperature - RTD was opened
At 9.00am plant blocked out due to EB disturbance. 25MVA breaker operated withou
CHS - 1 incomer control transformer 1 burned so it was replaced from unit - II side I

NATURE OF WORK

ransfer bus synchronising - For testing purpose.


ure - RTD was opened
A breaker operated without condition.
placed from unit - II side Incomer.

DATE
11.11.13
16.11.13
19.11.13
22.11.13

24.11.13
29.11.13

NATURE OF WORK

At 2.30pm plant tripped due to drum level low


At 7.25pm plant tripped due to instrument air pressure low
At 8.40pm plant tripped due to Relay REG 670(87GT - 1) acted as backup impedanc
At 1.40pm plant tripped due to UAT was taken to line
At 2.40pm,UAT Transformer taken in line.At the same time Tie breaker off automati
At4.35pm,line breaker opened manually for home load withstand and then UAT cam
At 4.40pm, Generator & turbine triped due to Generator Under voltage
At 5.25pm, Synched with grid And 5.28PM line breaker opened to check home load
At 6.30pm,Generator & turbine tripped because it reached 1hour.Line breaker sync i
625KVA DG set 1no. Of battery 12v failed,so it was replaced from JCB Battery
In 635 KVA DG,2no's of 12v batteries replaced with new.Due to old batteries abnor

ATURE OF WORK

acted as backup impedance protection operated

e Tie breaker off automatically


hstand and then UAT came inline
nder voltage
ened to check home load.Process succeed
1hour.Line breaker sync is not success with DCS
ed from JCB Battery
Due to old batteries abnormal condition

DATE
02.12.13
24.12.13
25.12.13
26.12.13

NATURE OF W
At 7.00pm, Plant tripped manually due to warm up vent valve stucks.
At 1.25am Occurance draught disturbance because of both PA,SA fan tripped Autom
opened manually at 1.30am due to drum level lowAt 1.45am,Plant tripped due to bo
DT-1,DT-2 & DT-3 tap position changed from 3 to 1 and Oil topup work done
Switchyard buscoupler's isolater was checked due to not operated in SOS mode

NATURE OF WORK
lve stucks.
PA,SA fan tripped Automatically & then GT breaker
m,Plant tripped due to boiler puncture
il topup work done
perated in SOS mode

breaker

DATE
01.01.14
05.01.14
19.01.14
21.01.14
25.01.14
27.01.14
29.01.14

NATURE OF W
LRSB-1 feeder was isolated and motor decoupled due to shaft problem
BFP-1 breaker test position was coming continuously,then spare feeder breaker repla
At 8.30pm plant tripped manually due to PA fan-1 suddenly turned off,then found tem
At 11.30am to 12.15pm,Plant tripped manually due to drum level low
At 9.50am,BFP-2 motor drive end bearing damaged
BFP-2 motor replaced with BFP-3.then trail was taken with out load - 27 / 26 / 26 A
BFP-2 coupled with pump and trail was taken

NATURE OF WORK
haft problem
spare feeder breaker replaced to BFP-1
y turned off,then found temperature scanner problem
m level low

h out load - 27 / 26 / 26 Amps.

oblem

DATE
03.02.14
05.02.14

05.02.14
07.02.14
08.02.14
27.02.14

NATURE OF W

BFP-2 motor Drive End & Non Drive End side grease applied
At 11.25am, UAT breaker closed but continuous command not taken.that the breaker
At 11.29am,line breaker opened manually to check home load,PA fan O/C tripped.
At 11.30am,plant tripped due to turbine performance test
PA fan-1 Motor DE & NDE side grease applied
At 12.25pm Service Engineer testing - ON / OFF Status of AVR when TG breaker tr
At 12.40pm, TG synced with grid that time AVR off.PA1&2,SA 1&2 Automaticaaly
At 10.34am,Plant blocked out due to EB failure
In ACW-3 Main contactor & OLR changed from spare feeder

NATURE OF WORK

ied
not taken.that the breaker suddenly ON & OFF
oad,PA fan O/C tripped.

AVR when TG breaker try to open manually - Test failure.


2,SA 1&2 Automaticaaly off(due to furnace temp. variation)

der

Test failure.
mp. variation)

DATE
03.03.14
06.03.14
10.03.14
18.03.14
19.03.14
20.03.14
21.03.14
24.03.14
28.03.14

NATURE OF W
In 25MVA, 12MVA, DT-1, DT-2, DT-3, GT, UAT, WTP Transformer Break down vo
CEP -2 motor DE side bearing over heated and load 205A.then found bearing damag
After that Motor's DE & NDE bearing changed
At 2.10pm to 2.50pm Plant blocked out due to EB failure, At the same time, UAT tap
At 5.45am, Plant tripped due to station Incomer U/V trip
In Station Incomer, U/V setting changed.
At 1.15pm, Plant tripped due to boiler puncture
BFP-2 relay card replaced from BFP-3
GT oil filteration work was done
In Switchyard, Total isolators, PT,CT & Transformer maintenance work done
In CHP, Crusher house burned.So all motor's running only from MCC panel

NATURE OF WORK
ansformer Break down voltage test was taken
hen found bearing damaged.

At the same time, UAT tap position changed from 3 to 2

enance work done


from MCC panel

om 3 to 2