JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
II B.Tech. II Sem., I Mid-Term Examinations, February 2015
POWER SYSTEMS-I
Objective Exam
Name: ______________________________ Hall Ticket No.
A
Answer All Questions. All Questions Carry Equal Marks. Time: 20 Min. Marks: 10.

1.

Choose the correct alternative:

.IN

In India largest thermal power station is located at


A) Chandrapura
B) Kota
C) Neyveli

D) Sarni

In a steam power plant which component needs maximum maintenance


A) Condenser
B) Boiler
C) Turbine
D) None of the above

3.

Rankine Cycle efficiency of a steam power plant is in the range of


A) 20-30%
B) 30-45%
C) 45-60%
D) 60-80%

4.

The main function of Economizer of a boiler plant is to


A) Increase steam production
B) Reduce fuel consumption
C) Increase steam pressure
D) Increase life of the boiler

5.

Heavy water is used in Nuclear power plant as


A) Fuel
B) Coolant
C) Moderator

TU
PO

6.

RT
AL

2.

Tarapur atomic power station has


A) Candu type reactors
C) Pressurized water reactors

D) Both B&C

B) Boiling water reactors


D) Gas cooled reactors

A 3phase,4-wire system is commonly used for


A) Primary distribution
B) Secondary Distribution
C) Primary transmission
D) Secondary transmission

8.

Transmission and distribution of electric power by under ground system is superior to overhead system
n respect of
[
]
A) Appearance and Public safety
B) Maintenance cost
C) Frequency of faults ,power failure and accidents
D) All of the above

9.

The under ground system cant be operated above


A) 220KV
B) 66KV
C) 33KV

10.

JN

7.

In the following which substation is most reliable


A) Gas insulated substation
C) Both A&B

D) 11KV

B) Air Insulated substation


D) None of the above
Cont2

Code No: 114AD

:2:

Set No. 1

Fill in the blanks:

11.

Pulverized fuel is used for -------------------------

12.

The Nuclear energy is measured in ---------------

13.

Mostly the high voltage transmission is carried out by overhead system due to --------------

14.

A gas turbine power plant generally suits for -----------Load station

15.

Overhead system can be designed for operation up to----------KV

16.

Pipes carrying steam are generally of ------------------

17.

Gas turbine is widely used in---------------------------

18.

The efficiency Thermal power station is --------------

19.

The operation and maintenance costs of a GIS are ----------------

20.

In Gas Insulated substation the Insulating Medium is ------------

RT
AL

.IN

II

JN

TU
PO

-oOo-

Code No: 114AD


Set No. 2
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
II B.Tech. II Sem., I Mid-Term Examinations, February 2015
POWER SYSTEMS-I
Objective Exam
Name: ______________________________ Hall Ticket No.
A
Answer All Questions. All Questions Carry Equal Marks. Time: 20 Min. Marks: 10.
Choose the correct alternative:

.IN

The main function of Economizer of a boiler plant is to


A) Increase steam production
B) Reduce fuel consumption
C) Increase steam pressure
D) Increase life of the boiler

2.

Heavy water is used in Nuclear power plant as


A) Fuel
B) Coolant
C) Moderator

3.

Tarapur atomic power station has


A) Candu type reactors
C) Pressurized water reactors

RT
AL

1.

D) Both B&C

B) Boiling water reactors


D) Gas cooled reactors

A 3phase,4-wire system is commonly used for


A) Primary distribution
B) Secondary Distribution
C) Primary transmission
D) Secondary transmission

5.

Transmission and distribution of electric power by under ground system is superior to overhead system
n respect of
[
]
A) Appearance and Public safety
B) Maintenance cost
C) Frequency of faults ,power failure and accidents
D) All of the above

6.

The under ground system cant be operated above


A) 220KV
B) 66KV
C) 33KV

8.

In the following which substation is most reliable


A) Gas insulated substation
C) Both A&B

JN

7.

TU
PO

4.

In India largest thermal power station is located at


A) Chandrapura
B) Kota
C) Neyveli

D) 11KV

B) Air Insulated substation


D) None of the above

D) Sarni

9.

In a steam power plant which component needs maximum maintenance


A) Condenser
B) Boiler
C) Turbine
D) None of the above

10.

Rankine Cycle efficiency of a steam power plant is in the range of


A) 20-30%
B) 30-45%
C) 45-60%
D) 60-80%

Cont2

Code No: 114AD

:2:

Set No. 2

Fill in the blanks:

11.

A gas turbine power plant generally suits for -----------Load station

12.

Overhead system can be designed for operation up to----------KV

13.

Pipes carrying steam are generally of ------------------

14.

Gas turbine is widely used in---------------------------

15.

The efficiency Thermal power station is --------------

16.

The operation and maintenance costs of a GIS are ----------------

17.

In Gas Insulated substation the Insulating Medium is ------------

18.

Pulverized fuel is used for -------------------------

19.

The Nuclear energy is measured in ---------------

20.

Mostly the high voltage transmission is carried out by overhead system due to --------------

RT
AL

.IN

II

JN

TU
PO

-oOo-

Code No: 114AD


Set No. 3
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
II B.Tech. II Sem., I Mid-Term Examinations, February 2015
POWER SYSTEMS-I
Objective Exam
Name: ______________________________ Hall Ticket No.
A
Answer All Questions. All Questions Carry Equal Marks. Time: 20 Min. Marks: 10.

1.

Choose the correct alternative:


Tarapur atomic power station has
A) Candu type reactors
C) Pressurized water reactors

.IN

B) Boiling water reactors


D) Gas cooled reactors

A 3phase,4-wire system is commonly used for


A) Primary distribution
B) Secondary Distribution
C) Primary transmission
D) Secondary transmission

3.

Transmission and distribution of electric power by under ground system is superior to overhead system
n respect of
[
]
A) Appearance and Public safety
B) Maintenance cost
C) Frequency of faults ,power failure and accidents
D) All of the above

4.

The under ground system cant be operated above


A) 220KV
B) 66KV
C) 33KV

RT
AL

2.

In the following which substation is most reliable


A) Gas insulated substation
B) Air Insulated substation
C) Both A&B
D) None of the above
In India largest thermal power station is located at
A) Chandrapura
B) Kota
C) Neyveli
D) Sarni

7.

In a steam power plant which component needs maximum maintenance


A) Condenser
B) Boiler
C) Turbine
D) None of the above

8.

Rankine Cycle efficiency of a steam power plant is in the range of


A) 20-30%
B) 30-45%
C) 45-60%
D) 60-80%

9.

The main function of Economizer of a boiler plant is to


A) Increase steam production
B) Reduce fuel consumption
C) Increase steam pressure
D) Increase life of the boiler

10.

Heavy water is used in Nuclear power plant as


A) Fuel
B) Coolant
C) Moderator

6.

D) 11KV

JN

5.

TU
PO

D) Both B&C
Cont2

Code No: 114AD

:2:

Set No. 3

Fill in the blanks:

11.

Pipes carrying steam are generally of ------------------

12.

Gas turbine is widely used in---------------------------

13.

The efficiency Thermal power station is --------------

14.

The operation and maintenance costs of a GIS are ----------------

15.

In Gas Insulated substation the Insulating Medium is ------------

16.

Pulverized fuel is used for -------------------------

17.

The Nuclear energy is measured in ---------------

18.

Mostly the high voltage transmission is carried out by overhead system due to --------------

19.

A gas turbine power plant generally suits for -----------Load station

20.

Overhead system can be designed for operation up to----------KV

RT
AL

.IN

II

JN

TU
PO

-oOo-

Code No: 114AD


Set No. 4
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
II B.Tech. II Sem., I Mid-Term Examinations, February 2015
POWER SYSTEMS-I
Objective Exam
Name: ______________________________ Hall Ticket No.
A
Answer All Questions. All Questions Carry Equal Marks. Time: 20 Min. Marks: 10.
Choose the correct alternative:

.IN

Transmission and distribution of electric power by under ground system is superior to overhead system
n respect of
[
]
A) Appearance and Public safety
B) Maintenance cost
C) Frequency of faults ,power failure and accidents
D) All of the above

2.

The under ground system cant be operated above


A) 220KV
B) 66KV
C) 33KV

4.

In the following which substation is most reliable


A) Gas insulated substation
C) Both A&B

D) 11KV

B) Air Insulated substation


D) None of the above

In India largest thermal power station is located at


A) Chandrapura
B) Kota
C) Neyveli

TU
PO

3.

RT
AL

1.

D) Sarni

In a steam power plant which component needs maximum maintenance


A) Condenser
B) Boiler
C) Turbine
D) None of the above

6.

Rankine Cycle efficiency of a steam power plant is in the range of


A) 20-30%
B) 30-45%
C) 45-60%
D) 60-80%

7.

The main function of Economizer of a boiler plant is to


A) Increase steam production
B) Reduce fuel consumption
C) Increase steam pressure
D) Increase life of the boiler

8.

Heavy water is used in Nuclear power plant as


A) Fuel
B) Coolant
C) Moderator

9.

10.

JN

5.

Tarapur atomic power station has


A) Candu type reactors
C) Pressurized water reactors

D) Both B&C

B) Boiling water reactors


D) Gas cooled reactors

A 3phase,4-wire system is commonly used for


A) Primary distribution
B) Secondary Distribution
C) Primary transmission
D) Secondary transmission

Cont2

Code No: 114AD

:2:

Set No. 4

Fill in the blanks:

11.

The efficiency Thermal power station is --------------

12.

The operation and maintenance costs of a GIS are ----------------

13.

In Gas Insulated substation the Insulating Medium is ------------

14.

Pulverized fuel is used for -------------------------

15.

The Nuclear energy is measured in ---------------

16.

Mostly the high voltage transmission is carried out by overhead system due to --------------

17.

A gas turbine power plant generally suits for -----------Load station

18.

Overhead system can be designed for operation up to----------KV

19.

Pipes carrying steam are generally of ------------------

20.

Gas turbine is widely used in---------------------------