1.

A client approached Architect Ivy in order to help him find a suitable lot to
situate a few branch of his food industry business. They agreed and made an
agreement. What type of service will Ar. Ivy deliver? SPP 201 - 2.4
a. Site Selection and Analysis
b. Consultation
c. Research and Programming
d. Feasibility Studies
2. Ar. Rocel was tasked to create flyers, miniature model and presentation for the
Proposed Condominium Project in order to generate funds for its Construction.
As per SPP Document what type of service is he providing? SPP 201 - 2.12
a. Value Management
b. Promotional Services
c. Additional Services
d. Fund Raising Services
3. The Architect as the ________ is directly responsible to the Owner on all aspects
of Construction work: programming, coordination, quality and cost control and
time management. SPP 204-B - 2.0
a. Project Manager
b. Consultant
c. Construction Manager
d. Construction Adviser
4. As per SPP Document 204-B indicates that Construction Manager could either
be, except. SPP 201 5.2 QUALIFICATIONS
a. A member hired by the Contractor
b. A member of the staff of the owner
c. An independent individual
d. A firm hired by the Owner to manage the construction of the particular
project.
5. As described functions and Descriptions of Task. The following are the
responsibilities of Construction Manager (CM) including the function of the
Construction Supervision Group (CSG).(reference Doc.204-A and Architects
Guidelines).
a. Keeping all Records
b. All of the Above
c. Coordination and Supervision
d. Quality Control of Work
6. The Construction Supervision Group (CSG) is responsible to the Owner in what
type services? SPP 204-A 6 LEGAL RESPONSIBILITY
a. Technical
b. Administrative
c. None of the Above
d. A&B
7. Does the Construction Supervision Group can make a decision on matter that
are sole responsibility of the Architect of Records (AOR)? SPP 204-A 6.2 LEGAL
RESPONSIBILITY
a. Yes
b. No
c. Maybe
d. I Dont know

8. Under SPP Doc 203 Specialized Architectural Services. Item Number 17 (203.17)
The Architect in this area of Practice must have much more than the basic
knowledge of Specification Writing, Estimation and Quantity Survey,
Architectural Production, Architectural software, Architectural support services
and contract document review. SPP Doc 203 Specialized Architectural Services.
Item Number 17 (203.17)
a. Contract Documentation and Review Services
b. Post design services (Including Construction services)
c. Preliminary Services
d. None of the Above
9. Under Spp 203 (203.14)It is defined as an act or process of estimating value.
The Consulting Architect in this area of practice places value on the
building/structure condition and defects, and on its repair and maintenance,
including the required improvement. Spp 203 (203.14)
a. Forensic Architecture
b. Building Testing & Commissioning
c. Building Appraisal
d. Facilities Maintenance Support
10.The Building environment rating system under SPP 203 is needed to evaluate
the performance of a building to encourage market migration towards
sustainable design. The rating system must meet the criteria below in order
have the certification. SPP 203 203.12
a. Flexible, such that projects need not meet identical requirements to qualify.
b. All of the above
c. Credit based, allowing projects to earn points for environment-friendly use of
the building/ structure and actions taken during planning, design,
construction and occupancy.
d. Consensus-based and market driven in order to accelerate the development
and implementation of green building practices.
11.In this area of practice, the Architect recommends the systematic process of
ensuring that a building / structures array of systems is planned, designed,
installed and tested to perform according to the design intent and the buildings
operational needs. If the building materials, equipment and system are not
installed properly or are not operating as intended, the effectiveness, efficiency,
productivity and other benefits of high performance plans/designs will not be
achieved. SPP 203 203.12
a. Facilities Maintenance support
b. Building testing & Commissioning
c. Building System Design
d. Security Evaluation and Planning
12.The Consulting Architect in this area of Practice arranges to formulate methods
of rating and ascertaining the value of structures or facilities which may be fully
secured, kept safe, protected, assured, guaranteed and provided sufficient
safeguards for the conduct of any work or activity.
a. Security Evaluation and Planning SPP 203 203.8

b. Building Appraisal
c. Building testing & commissioning
d. Historic and Heritage Conservation and Planning
13.Stadia will fall under what Group of Project Classification? SPP 202 4.2
PROJECT CLASSIFICATION
a. Group 2
b. Group 3
c. Group 4
d. Group 1
14.SPPCC acronym stands for? SPP 202 2.2 schematic design phase
a. Statement of the Probable Project Construction Cost
b. Statement of the Probable Project Consultancy Cost
c. Statement of the Probable Project Construction Concept
d. Statement of the Probable Project Construction Code
15.This method of Compensation is applied to government projects, since they
entail more paper work and time consuming efforts. SPP 202 5.4
a. Multiple Direct Personal Expense
b. Per Diem, Honorarium Plus Reimbursable expenses
c. Lump Sum Fixed fee
d. Professional fee plus Expense
16.The total cost of all equipment, utilities and other items which were either
designed, specified or procured by the Architect and his Consultants for the
Owner, that were used or installed in the project. SPP 203 4.3
A. cost of the work
B. extra cost
C. construction cost
D. basic cost
17.The person or organization that undertakes or promotes an ADC with the
primary objective of obtaining excellence in design for a project or for a
development concept. SPP-208 2.1
A. jury
B. architect
C. owner
D. Professional Advisor
18.Most expensive and time-consuming method of selecting the Architect. 3.
METHOD OF SELECTION 3.3.2 DISADVANTAGES
A. comparative selection
B. design competition
C. mixed method
D. direct selection
19.An Architect nominated by the Owner and approved by the IAPoA to organize
the ADC on behalf of the Owner. SPP-208 2.3
A. jury
B. architect
C. owner

D. Professional Advisor
20.Specialist personnel who may be consulted by the Jurors during the conduct
of the ADC to permit them to obtain all necessary relevant information. SPP
208 2.4
A. jury
B. architect
C. Technical Advisors
D. Professional Advisor
21.The body formed by the Owner and approved by the Professional Advisor, to
assist the Professional Advisor and the Jury in the administrative conduct of
the ADC SPP 208 2.5
A. Competition Secretariat
B. Competitor Secretariat
C. Competition Secretary
D. Jury
22.Is the person/firm or corporation who provides the guarantee for the
contractor's bond UAP DOC 301 1.08
A.
B.
C.
D.

Security
Surety
Principal
Guarantor

23.Which of the ff. services is not performed by the Architect under the designbuild service by administration? SPP 207 2 SCOPE OF DESIGN BUILD BY
ADMIN
A. Prepares schedule of work, construction program, construction estimate, bill
of matls, etc
B. Keeps records and books of accounts
C. points construction superintendent, purchasing agent, timekeeper, property
clerks, etc.
D. Advances funding for payment of expenditures connected with work
24.In a typical owner-architect agreement, which of the following is generally
NOT included?
A. Design and placement of signs
B. Ownership of documents
C. Labor contingencies
D. Arbitration
25.Which of the following activities is NOT within the scope of project
management? SPP 206 8.3
A. Provides planning, programming, monitoring, advising activities on material
costs/construction methods
B. Economic analysis/project feasibility
C. Segments, supplements, compliments functions of Architects, Engineers,
and Contractors

D. Provides overall control of construction activities


26.Which of the following services are expected from the architect serving as
building/ground administrator? SPP 205 1.1.3
A. Building maintenance
B. Post-construction evaluation
C. Equipment maintenance
D. Billing of tenants for rentals/utilities
27.Under the Civil Code, under what condition can the Architect or Engineer be
held liable for damages within fifteen years after project completion?
A. Due to violation of terms of contract
B. Structure collapse due to faulty construction
C. Structure collapse due to defects in plans/specification
D. Structure collapse due to defective materials
28.What is the role of the project Manager during the Pre-Construction phase of
the project? SPP-206 9.2
A. Recommends early purchase of equipment/materials requiring a long lead
for procurement and delivery for expediency
B. Observes work in progress to assure compliance with drawings/specification
C. Manages general coordination and scheduling of work
D. Revise and refines estimates as construction proceeds
29.Which of the following does NOT constitute the post-construction services of
the architect? SPP 205
A. Real property evaluation
B. Post-construction evaluation
C. Building/ground administration
D. Building/equipment maintenance
30.Within how many days from the date a change is ordered shall any claim for
adjustment involving questions of facts be asserted?
A. 5 days
B. 10 days
C. 15 days
D. 30 days