Professional Documents
Culture Documents
Agenda
Avanceon
Global Capacity
GCC Flagship
Partners & Clients
Engineering Process
Rail Industry & TVS
Safety Design
Considerations
Selection of Control
System Platform)
Project
Scope
TVS &
SCADA
Solution
Project
Scope
TVS
ECS
Dubai
Metro
TVS & ECS
Lusail
City
TVS &
SCADA
COMPANYS SNAPSHOT
Global Capabilities & MENA Presence
Avanceon - TVS & ECS Solutions
Worldwide Headquarters
North America
Regional Operations Center
Exton, PA, USA
+200 employees
9 offices, 3 operating centers
+10 industrial segments served
+70% Control System Engineers
Middle East and Africa
Regional Operations Center
Dubai, UAE
Southeast Asia
Regional Operations Center
Lahore, Pakistan
Lusail City
Projects
Dubai Metro
Systems
OMV, Shell,
FO, Santos,
Safer
Saudi
Aramco
Projects
Dammam, KSA
Doha, Qatar
Dubai, UAE
Abu Dhabi, UAE
4 locations in 3 Countries
8 MEA Countries served including GCC, Yemen, Nigeria
+4 industrial segments served
+100 mid to large sized projects
+10 years presence
Pharma &
Life
sciences
Printing &
Packaging
Metals &
Mining
Food &
Beverages
Chemicals
& PetroChemicals
Transport
& Infra
Projects
Power &
District
Cooling
Water &
Waste
Water
Cement
Public
Utilities
Fertilizers
6/18/2014
Real-time Traceability
URS to SAT
Site Acceptance
Tests (SAT)
User
Requirements
Review (URS)
FRS to FAT
DDS to FAT
Detailed Design Review (CDRs)
DDS
6/18/2014
Filling
the GAP
Contractor
Standards
3rd Party
OEM Standards
Integrators, PEs,
Consultants . . .
Standards
Tier 2
Standards
National Standards
Base Line
Standards
Global Standards
Rockwell, Cisco..
Industry Standards
PFH (power)
0.00001-0.000001
105 - 106
100,000-1,000,000
0.000001-0.0000001
106 - 107
1,000,000-10,000,000
0.0000001-0.00000001
107 - 108
10,000,000-100,000,000
0.00000001-0.000000001
108 - 109
100,000,0001,000,000,000
Implement Risk mitigation strategies for Life Safety and for Mission Criticality
Implement Redundant Modbus TCP/IP Links with Main Train SCADA
6/18/2014
Project Background
End-User RTA
1. Guinness World Record longest driverless rail
2. 75 km with 49 stations
3. Red and Green Lines / First in the GCC
In Numbers
1. 72 redundant PLC systems (cabinets)
Health
Care
Abu Baker
Palm
Deira
Al
Ghubaiba
Abu Hail
Stadium
Airport
Freezone
Al Qusais
2
Jaddaf 1
Oud
Metha
Saeediya
Al Ras
Beniyas
Salah Al
Din
Al
Qiyadah
Al Nahda
Al Qusais
1
Annex-1
Al-Rigga
City Centre
Union Square
Burjuman
Saeediya
Annex-2
Annex-4
Al-Ghubaiba
Al-Ghubaiba
Annex-3
Al-Ras
Annex-6
Palm Deira
Annex-7
Baniyas
Union Square
Salah Al Din
2 Core Signal
Cable with
single wire
Drain LSF for
Field
Instruments
Supplied by Others
Temperature
Sump Pit
Transmitter
Level
for Tunnel
Sensors
Differential
Pressure Switch
across Ventilation
Fan
Air Flow
Meter for
Cross
Tunnels
Motorized Smoke
Fire Dampers
Lighting Control
Inside Tunnel
Hardware added for RL-GL integration includes ControlNET communication modules in the existing Redline and
Greenline Hardware
1. These module act as communication bridge between the two lines.
2. In normal condition both Redline and Greenline operate normally as per their respective mode tables
3. In emergency condition we can have two scenarios
Emergency in Greenline,
40 Modes
Emergency in Redline,
30 Modes
4. When emergency condition is removed both the lines return to their previous state (Normal Mode)
Project Background
Marina District Utilities Tunnel
Accommodating utilities for Misc. 400 Buildings
Satellite View
Sky Map
Scope of Work
Design, engineering, supply, configuration, installation, field and panels side termination, testing and commissioning of
below scope
SCADA HMI
Ethernet Network,
including switches and cabling
INTEGRATED FACTORY ACCEPTANCE TESTING LUSAIL CP1 SCADA PROJECT NOV 2012
Generator
Fuel Oil
System
FM 200
CCT V
System
Status
Direct Expansion Split Unit
Foam Fire Suppression System Operated By Fire
Indicator Panel
Supplied By Others
Fans
[04 for Dry]
Fans
[04 for Dry]
Fans
[04 for Dry]
Fans
[04 for Dry]
Fans
[04 for Dry]
Fans
[04 for Dry]
Hardware Selection
Exact Application Fit
Speed important
Precise control
React to system upsets
To passionately grow to
become the leader of
automation solutions
through the inspired
development of our teams
whilst building value to our
customers
Creativity
Quality
Teamwork
Integrity
Sustainability
Thank You
Avanceon
MEA Headquarters
Office FZS1BD04
Jebel Ali Free Zone
PO Box 18590
Dubai, UAE
+974 (0)4 408 5213
End