You are on page 1of 5

SREENATH.

Transportation & installation Engineer

Areas of Expertise

Project Management

Health & Safety Management


IT Skills

Oil & Gas Industry


SKILLS

AUTO CAD

SACS 5.5 V8i (Offshore Structural


& Hull Modeller)
Micro Station

Personal Skills

Commercial acumen
Enthusiastic

Attention to detail

Personal Objective

To undertake a challenging career in Oil & Gas industry, where I can utilize my
broad skills and training acquired over past 7 years across in Oil & Gas industry
in key roles. Multi skilled and diligent team member, I posses strong technical
and problem solving skills with the ability to work in challenging conditions.
Confident I would make a great addition to your team. I offer my 100% flexibility
to work with a proven track record of achievement consistently.
Education
Course
B-Tech (Mechanical
engineering)
HSC
SSLC

School/college
M.E.S College of
Engineering
Holy Family Higher
Secondary School
Holy Family Higher
Secondary School

Year
2004-08
2003
2001

Personal Details
Sreenath. S
Karthika

Kuruppamkulangara P.O.
Cherthala

Alappuzha (Dist)
Kerala -688539

Mobile: - 0091-9920761865

E-mailsreenathskurup1985@gmail.com
DOB: 26th March 1985

Marital Status: Married


Nationality: INDIAN

Passport No: G4918227

Key Skills and competencies

1. Extensive experience in project execution.

2.Providing technical support to project team.

3.Experience in monitioring fabrication of steel structures.

4. Knowledge on DNV- GL guidelines and other marine guidelines


5. Producing methodologies and procedures

6. Preparaing charter party agreement, various work orders and purchase


documents.

7.Evaluating vendor offers and providing recommendations.

8. Liasing with sub contractor, MWS, marine contratctors and client on a regular
basis to ensure successful completion of responsibilities.

Work Experience

AFCONS INFRASTRUCTURE LIMIED (Oil & Gas Division)


Engineer (Transportation & Installation) 26-12-2011 to till date
Ensuring that all Load out, transportation and installation in accordance with specification, statutory
requirements, laws, rules and regulation and other contractual requirements.
Projects:
HRD Process Platform Project
Client: ONGC
Project Description:
Installation of new process platform connected to existing facilities via bridge in Mumbai High Heera Field.
Particulars
Jacket
Configuration: Four Legged
Weight: 4689 MT
Piles: 8 no vertical skirt piles
Load Out: Skidded
Installation methodology: Launch & upend
Pile driving: Using under water hydro hammers (IHC- s280, s600, s900 & MHU-1200s)
Topside
HRD integrated topside
Dimensions: 75.0 m X 27.38 m X 41.65 m
Weight: 8262 MT
Load Out direction: Transverse
Load Out methodology: Skidded load out using quay support jacks.
Transportation: using self propelled semi submersible HTV
Installation Methodology: Float over method.
Duties

Providing necessary technical inputs in selection of transportation & Installation marine spread.
Reviewing various engineering documents such transportation stability analysis, jacket launch
analysis, jacket floatation and upending analysis, jacket on bottom stability analysis, pile
drivability analysis, lift analysis, float over installation methodology.

Obtaining inputs from various disciplines and agencies and drafting load out procedure.
Analysis various project related issues

Develop methodology for shifting subsea electrical cable for accommodating the proposed
process platform.

Develop Quay jack operating procedure for load out of integrated HRD topside using quay
support jacks.

Reviewing design of transportation and installations aids


2

Monitoring the fabrication of transportation and installation aids, such as DSF, Grillage,
Stability caissons etc.

Monitoring the outfitting of transportation vessel.


Developing load out methodology.

Review and provide necessary technical inputs for developing ballast plans for load out,

transportations and installation of both jacket and topside.


Obtaining necessary approvals from MWS.

Installation of jacket

Field engineer for installation of Jacket

Reviewed and provided the necessary technical inputs for jacket installation procedure
Monitored jacket launch.

Closely reviewed the jacket leg flooding sequence and provided necessary technical inputs.

Liaise with installation contractor, survey party and client representatives for successful pinning
down of HRD jacket within the allowed tolerance limits.

Reviewed the pile upending and driving sequence

Monitored the pile driving and ensured the same was done as per the approved sequence.

Liaise with survey party and installation contractors and ensured that the jacket is level and cutoff elevation is as per approved documents within the tolerance limits.

Monitored pile grouting

Reviewed boat landing and barge bumper installation procedure.


Monitored the installation of boat landing and barge bumper.
As built preparation

Topside installation (Float Over)

Field engineer for installation of HRD topside

Reviewed Metocean data and weather forecast and provided the necessary inputs in finalizing
the appropriate installation window.

Reviewed the float over installation methodology and provided necessary technical inputs and
assistance.

Reviewed the standoff and installation ballast plan.

Liaised with MWS and obtained necessary approvals.


Monitored the mating.

Project: Revamping of 26 Well Platform Project.


Client: Oil & Natural Gas Corporation Limited (ONGC)
Contractor: Sarku Engineering Services SDN BHD.
Role: Execution Engineer (Offshore Activities)
Description: The project involves revamping of 26 well head platforms including modification of piping and
installation of OCI system; IUG system and fire water sprinkler system.
Roles:

Continuous monitoring of the Project


Analyzing & evaluating the man hours for the project and hence checking the efficiency & productivity to
maintain cost effectiveness.
Preparation of project schedule for offshore installation activities.
Preparation of Daily Progress Report for offshore activities
Project Co-ordination with Client, Vendor & Contractors and conduct meetings.

Project: Offshore Grid Interconnectivity Project/Power to ESP.


Client: Oil & Natural Gas Corporation Limited (ONGC
Functional Area
: Production & Execution
Role
: Project Engineer
Employer
: DAS OFFSHORE ENGINEERING Pvt. Ltd.
Contractor
: NAFTOGAZ INDIA LTD
Tenure: August 2009 December 2010
Key Responsibilities:

Production & Planning (Onshore & Offshore)

Onshore and Offshore activities scheduling & sequencing of the project .Evaluating constrains of projects &
make sure that there is no Liquidated Damages or Delay.
Actively commissioned the activities of project and completed the project in stipulated scheduled time.
Preparation of documents like Material Take Off, Spool marking, joint history sheets of piping.
Preparation of Daily Progress Report for onshore activities, updating Fabrication Monitoring Chart on day
to day basis.
Efficiently conducted the planning process and provided the schedule to engineering team.
Maintained the cost control, quality control and quality maintenance.
Comparing actual progress with the baseline.
Updating the project progress, defining constraints & overcoming conflicts.
Effectively coordinated onshore production of prefabricated piping, structural work including HSSE and
QA/Qc.
Production & planning (offshore)
Oil and Gas Project handle mostly covers Topside Maintenance.

Structural Deck Extension.


Project planning, programming, quantity surveying, supervision and implementation for Clients/owners.
Monitoring day to day activities to catch daily work schedule.
Daily reporting to base using SSB radio.
Conducting periodical review meeting with agency for close monitoring of project Activities
Quality management system.
Implemented and developed the 5s activities pertaining to sorting, neatness, standardization and self
discipline
Methods for shop floor and offshore.
Imparting training sessions for supervisors, riggers and technicians on safety best practices to ensure safety
awareness
Co-ordinate in documentation for BSOHSAS18001 certification and conducted audits for ISO90012000.
Man management and Customer relationship management.
Forecasting manpower for offshore projects and coordinating with the HR.
Monitoring the labour activities pertaining to their performance and time management and evaluating them.
Handling customer grievances and providing resolution.

Other Projects:
Project: Neelam Heera Reconstruction Project.
Client: Oil & Natural Gas Corporation Limited (ONGC)
Contractor: Essar Offshore & Subsea Limited (EOSSL).
Role: Project Engineer (Offshore Shutdown Activities)
Roles:
Assembly of Produced Water Conditioning Skid.
Supervised the offshore activities which included topside Maintenance covering from Upgrade of Flow
lines, Riser Piping, Valve Change-out, deck extension, replacement of Produced Water Conditioning
Skid, reconditioning of Separators & replacement of existing high pressure flare line at HEERA
PROCESS COMPLEX.

Reference:
Mr. Srinivas Bhamidipati
AGM- Installation & Project Co-ordinator (HRD Process Platform Project)
Afcons Infrastructure Limited (Oil & Gas Division)
E-mail: srinivas.bhamidipati@afcons.com
Mob: +91-9930672690

You might also like