for dewatering purposes. Piezometers and settlement markers should be installed to measure the
changes and the effects of the water table levels.
No GWTUplift can be ignored
GWT 5m belowUplift can be ignored
Differences in ground level?
YesRetaining wall should be used for the steps to accommodate for foundation level changes in
order to increase resistance to surcharge and water loads
Ground level with slopes?
Yes-Retaining walls should be constructed along the building perimeter in order to resist
surcharge, soil, and water loads.
Consideration for uneven uplift forces should be used when some sections of basements are at or
near the water table.
Open cut with 30 degrees
YesOpen cut can be used when there are no adjacent structures.
Open cut should be used because its is easy and inexpensive since no temporary support are
required.
Note: When geological conditions are unknown, more GIs must be implemented and a trial
pile should be constructed to find the sites bearing capacity for initial design.