B-84567-SB-MM1-DSR-ST-60-0011 - Rev.2
Page 2 of 7
Revision Sheet
ConocoPhillips (Grissik) Ltd.
REVISION
DATE
DESCRIPTION OF CHANGE
1A
22-Apr-15
First Issuance
1B
29-May-15
29-Jun-15
1C
7-Jul-15
Designation
Signature
Date
DOC. NO
B-84567-SB-MM1-DSR-ST-60-0011
(60NAF - 301A/B)
Page : 3 of 7
Rev.:
GENERAL INFORMATION
1
2
Applicable to
Location
Manufacturer
Equipment name
Model no.
Item no.
60NAF - 301A/B
No. of unit
2 Unit
Proposal
Purchase
As built
EXTENT OF PACKAGE
6
7
Fuel Gas / Seal Gas Mercury Removal Unit shall be consist of but not liminted to:
10
11
12
13
14
15
16
OPERATING CASE
Description
(Note 25
17
18
Fluid
19
psig
o
Case 1
Case 2
Case 3
Case 4
Case 5
HC Gas
HC Gas
HC Gas
HC Gas
HC Gas
1225
1045
1290
1293
1293
207.0
207.0
207.0
207.0
207.0
22.4
19.4
21.4
7.9
0.1
20
21
Gas Rate
F
MMscfd
22
Mass Flow
lb/hr
47230
41059
42746
15730
200
23
Gas Density @ P, T
lb/cuft
3.641
3.093
3.614
3.624
3.625
24
Gas Viscosity
cP
0.0158
0.0154
0.0157
0.0157
0.0157
25
Gas Compressibility
0.9155
0.9236
0.9190
0.9189
0.9189
26
19.24
19.29
18.23
18.23
18.23
27
g/Nm3
750
750
750
750
750
28
29
30
g/Nm3
< 1 (*)
31
32
33
No. of Unit
34
Type of Adsorbent
35
Design Pressure
36
37
38
2 (two) units
*
psig
FV / 1400
-20 / 250
F
psi
max 15 (*)
Years
3 (*)
39
40
Vessel
41
Orientation
42
Material of Construction
43
Corrosion Allowance
60NAF - 301A/B
Vertical
Carbon Steel (*) + 0.125" SS 316L clad (See Page 5 of 7)
inch
Note 26
44
ABSORBENT DATA
45
46
Number of Beds
47
Absorbent type
Above Absorbent:
48
49
50
51
Flow direction
52
53
Downflow
Insulation
Yes
54
55
0.1 - 2 (*)
56
Channeling effect
57
58
59
Below Absorbent
DOC. NO
(60NAF - 301A/B)
B-84567-SB-MM1-DSR-ST-60-0011
Page :
4 of 7
Rev.:
FEED COMPOSITION
1
2
3
4
5
6
Mole Fraction
Case 2
Case 3
Back-Up Case
Case-4
Start-up case
Case-5
Minimum Case
0.00181
0.00180
0.00187
0.00187
0.00187
10
Nitrogen
CO2
0.05740
0.05731
0.03482
0.03482
0.03482
11
Methane
0.88127
0.87997
0.91051
0.91051
0.91051
12
Ethane
0.03397
0.03397
0.03447
0.03447
0.03447
13
Propane
0.00998
0.00999
0.00970
0.00970
0.00970
14
i-Butane
0.00297
0.00299
0.00269
0.00269
0.00269
15
n-Butane
0.00296
0.00298
0.00254
0.00254
0.00254
16
i-Pentane
0.00164
0.00166
0.00119
0.00119
0.00119
17
n-Pentane
0.00105
0.00107
0.00069
0.00069
0.00069
18
n-Hexane
0.00167
0.00175
0.00069
0.00069
0.00069
19
Mcyclopentan
0.00017
0.00018
0.00007
0.00007
0.00007
20
Benzene
0.00061
0.00065
0.00021
0.00021
0.00021
21
Cyclohexane
0.00017
0.00018
0.00006
0.00006
0.00006
22
n-Heptane
0.00080
0.00089
0.00018
0.00018
0.00018
23
Mcyclohexane
0.00022
0.00025
0.00005
0.00005
0.00005
24
Toluene
0.00042
0.00048
0.00007
0.00007
0.00007
25
n-Octane
0.00050
0.00061
0.00006
0.00006
0.00006
26
m-Xylene
0.00009
0.00011
0.00001
0.00001
0.00001
27
p-Xylene
0.00009
0.00011
0.00001
0.00001
0.00001
28
o-Xylene
0.00004
0.00005
0.00000
0.00000
0.00000
29
n-Nonane
0.00020
0.00025
0.00001
0.00001
0.00001
30
124-MBenzene
0.00002
0.00003
0.00000
0.00000
0.00000
31
n-Decane
0.00008
0.00010
0.00000
0.00000
0.00000
32
n-C11
0.00003
0.00003
0.00000
0.00000
0.00000
33
n-C12
0.00001
0.00001
0.00000
0.00000
0.00000
34
n-C13
0.00000
0.00000
0.00000
0.00000
0.00000
35
n-C14
0.00000
0.00000
0.00000
0.00000
0.00000
36
n-C15
0.00000
0.00000
0.00000
0.00000
0.00000
37
n-C16
0.00000
0.00000
0.00000
0.00000
0.00000
38
n-C17
0.00000
0.00000
0.00000
0.00000
0.00000
39
n-C18
0.00000
0.00000
0.00000
0.00000
0.00000
40
n-C19
0.00000
0.00000
0.00000
0.00000
0.00000
41
0.00000
0.00000
0.00000
0.00000
0.00000
42
n-C20
H2 O
0.00180
0.00253
0.00008
0.00008
0.00008
43
H2 S
40 ppm
40 ppm
3-4 ppm
3-4 ppm
3-4 ppm
44
Mercury
750 g/Nm3
750 g/Nm3
750 g/Nm3
750 g/Nm3
750 g/Nm3
8
9
45
46
47
48
49
50
51
52
53
54
55
DOC. NO. :
B-84567-SB-MM1-DSR-ST-60-0011
(60NAF - 301A/B)
Page: 5 of 7
Rev.:
GENERAL INFORMATION
1
2
Applicable to
Proposal
Purchase
As Built
Location
Manufacturer
Equipment Name
Serial No.
Item No.
60NAF-301A/B
No. of Unit
2 (two)
OPERATING CONDITIONS
6
7
Operating Temperature
(min / max)
207 / 225.0
Operating Pressure
(min / max)
1,045 / 1,293
10
11
12
13
MATERIALS
F
Shell
Heads
ft - in
Reinforcing Pad
: -
ft - in
ft - in
ft - in
Nozzle Flanges
ft - in
Fittings
External Bolts
(Note 4)
(Note 4)
psig
DESIGN DATA
14
(Note 8)
(Note 23)
15
Code Standard
External Nuts
16
Latest Edition
Gasket
: (Note 5)
17
Diameter
(*)
in
Internal (Removable)
: SS 316L
18
Length (T/T)
(*)
ft - in
Internal Pipe
: N/A
19
-20 / 250
: SS 316
20
1400
psig
: N/A
21
Full Vacuum
psig
Support Skirt
: SA 36 / SA 283 Gr.C
22
Vacuum Design
Yes
Name Plate
: SS 316
23
N/A
Earthing Boss
: SS 316
24
1.0 / 1.0
Anchor Bolts
25
(*)
in
Insulation
: (*)
26
(*)
in
27
Wind Speed
80
Km/hr
28
Seismic Zone
(Note 26)
in
Davit Manways
: A 53 Gr. B
FABRICATION
29
(Note 6)
30
(*)
psig
Personnel Protection
Yes
No
31
Hydrotest Pressure
psig
Yes
No
32
(*)
Yes
No
33
Orientation
Vertical
Yes
No
34
Support Type
Skirt (*)
Insulation Supports
Yes
No
35
Insulation Thickness
2.5 (*)
Lifting Lugs
Yes
No
36
Head Type
Hemisperical (*)
Earthing Boss
Yes
No
Hinged
w/ Davit
(Note 21)
in
37
38
39
40
Yes
No
41
Yes
No
42
43
Yes
No
Radiography
Full
Spot
Yes
No
Yes
No
Witness
Non Witness
44
45
46
47
10. ID-N-BU-CC0-STS-GN-00-0001, Std Spec for General Civil and Structural Design
Observe
48
Impact Test
49
Radiography
Magnetic Particle
50
PROTECTIVE COATING
51
52
External Coating
Yes
53
Internal Coating
No
Dye Penetrant
(Note 7)
Ultrasonic
Hydrotest
54
55
56
Empty
(*)
lb
57
Operating (NLL)
(*)
lb
58
Hydrotest
(*)
lb
59
Shipping
(*)
lb
Shear
Moment
Wind
Note 22
Note 22
Seismic
Note 22
Note 22
MECHANICAL DATASHEET
DOC. NO. :
B-84567-SB-MM1-DSR-ST-60-0011
(60NAF - 301A/B)
Proposal
Purchase
Page:
Applicable to
Location
Manufacturer
Equipment Name
Serial No.
Item No.
60NAF-301A/B
No. of Unit
2 (two)
6 of 7
Rev.:
As Built
SKETCH DRAWING
Note :
a) Min elevation +3000. Adequate area for
vessel maintenance shall be provided
b) This sketch is Simplified and indicative, it
will be finalized during EPC Stage.
NOZZLE SCHEDULE
PROJECTION
MARK
QTY
SIZE (IN)
RATING
FACE
TYPE
(FROM OUTSIDE
SURFACE) (IN)
SERVICE
N1
6 (*)
900#
RF
WN
10
Gas Inlet
N2
6 (*)
900#
RF
WN
10
Gas Outlet
N3
900#
RF
WN
Pressure Indicator
N4
900#
RF
WN
Vent
N5
3 (HOLD)
900#
RF
WN
PSV
N6
900#
RF
WN
Purging Connection
N7
900#
RF
WN
Thermowell Connection
N8
900#
RF
WN
N9
900#
RF
WN
N10
900#
RF
WN
N11
900#
RF
WN
10
Unloading Catayst
M1 / M2
24
900#
RF
WN
16
Manhole
SV
Skirt Vent
SO
12
Skirt Opening
AH
20
Access Hole
REMARKS
(Note 29)
DOC. NO. :
(60NAF - 301A/B)
B-84567-SB-MM1-DSR-ST-60-0011
Page : 7 of 7
Rev.:
NOTES
1.
2.
Shell and head thickness are propose value. Vendor shall check and guarantee them on strength.
The actual thickness of the pressure vessel and its associated part shall be determined using the applicable worst combination of loads
3.
Vendor shall responsible for detailed engineering of the vessel. Vendor to confirm that fabrication, inspection and testing shall follow the referenced Codes,
Standards and Project Specifications.
4.
External stud bolt and nuts shall be B7M & 2HM and Hot Dip spun Galvanized.
5.
Gasket shall be 0.175 thick, spiral wound, 316 SS Windings Flexible graphite filler SS inner & outer ASME B16.20.
6.
All internals shall be sectionalised to pass through manway for installation and removal. All internals shall be removable and bolted
to supports welded to the vessel. The max. weight shall be 55 lbs (25 kg). All internals assembly shall be completed with double nut.
7.
Painting specification for steel shall refer to project specification ID-G-BU-DD3-STS-GN-98-0002, Coating Specification for Offshore and Onshore Facilities.
8.
9.
This data sheet shall be read together with B-84567-SB-PP0-PID-ST-60-0010 and Process datasheet B-84567-SB-PP0-DSR-ST-60-0007.
10. Deleted
11. Vendor to provide all required data for MIGAS and ASME "U" Stamp certification.
12. Inspection and testing shall refer to ID-G-BU-YA1-PRO-GN-00-0003, Inspection and Testing Requirements for Equipment and Material
13. All metallic material shall be provided with inspection certificate in accordance with BS EN 10204 latest edition, pressure parts and non pressure part
shall be a minimum type 3.1 certificate.
14. All external nozzles locallized stress analysis to be performed by Vendor as per WRC 107, 297 & 537 Bulletin. The allowable nozzle load shall be as per
B-84567-SB-LLO-SPC-ST-00-0002, Specification Pipe Stress Analysis.
15. Nozzles location and orientation shall be verified by Vendor and EPCI Contractor prior to fabrication.
16. Requirement of impact test material as per Code ASME VIII. Div. 1, UCS-66
17. All pressure parts and parts directly exposed to the fluid shall comply with NACE MR0175.
18. Manway c/ w davit, cover, gasket, stud bolts and nuts to be supplied by Vendor.
19. Vendor to provide the performance guarantee of the MRU guard beds.
21. Insulation Specification shall to project specification ID-N-BU-MM0-STS-GN-00-0002 Standard Specification Vessel and Piping Insulation.
22. Vendor shall inform and verify actual weight, shear & moment data information and by calculation.
23.
Vessel shall be internally clad with 3 mm (min) SS 316L. Nozzle, flange and fitting shall be minimum weld overlay, if weld overlay cannot be applied for
nozzle, flange and fitting with size 3' and below then solid SS might be used with approval from company.
24. Vendor to provide typical P&ID complete with design requirement for proper start - up, normal operation & upset condition of the package.
25. Flowrate already includes 10% design margin. Vendor to consider minimum owrate of 0.1MMscfd which is the condition of seal gas supply
for one compressor train running.
26. Corrosion allowance 1/16" (1.6 mm) shall be provided on backing material for nozzles with an alloy clad or overlay.
27. Minimum 2 inch radius semi circular drain hole 180 o apart shall be located at bottom vessel skirt to base ring. This drain hole to avoid water ponding inside skirt.
28. Vendor Shall provide anchor bolt template for construction purpose.
29. Size of PSV nozzle will be finalized during EPC Stage.
30. Vendor to check and advice the possibility whether the chemical reaction at the catalyst may produces sulphuric compound. Vendor to select mercury guard bed
material that would minimize that possibility of producing sulphuric compound that could enter the process gas stream.