You are on page 1of 26

1 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk

Michelle Wheeler
Logbook
Hospitality Design
Product Design
1303158
6aa019 Major Project

2 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
BDes Product Design
Weekly Logbook
Name
Weekly Date
Week
Course
Stage
Project Name
Hours spent on Major
Project
Work achieved this week

Michelle Wheeler
1-2-2016 6-2-2016
1
Product Design
Stage 1Research
Hotel Furniture
44.5
1-2-2016 2-2-2016
I produced a range of sketches of a desk for
a hotel bedroom. I started producing a Time
Sheet to keep up with how much time I
have been spending each day on the work
and what work I have been producing each
day. I have researched various hotel desk
designs and writing information such as
form, function, user requirements, materials
and cost with sustainability. I have created a
design presentation that will have to been
presented on 15th February 2015. I have
researched hotel desk with Eco-Friendly
materials such as bamboo, plywood
laminate, aluminium and stainless steel. I
also produced a Gantt Chart with what tasks
I will be doing.
2-2-2016
I was completing the design presentation by
adding research and also finding
information about LED lighting and the
target audience, sustainability and sketches
added.
3-3-2016
Lecturers checked my design presentation
and research for improvements with ideas
on what more research I can do and what
sketched I can do to improve the design and
to make it different.
4-4-2016

3 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
I drew a few sketches of hotel desk designs
with laptops, plug socket for mobile phones
and iPads, drawer units, shelves, light and
mirror to be included on the design.
5-5-2016
I started doing research on the
Environmental Aspects of Stainless Steel,
Aluminium and Stainless Steel. I also started
the questionnaire to give to the target
audience for their feedback and their
requirements for the hotel furniture desk. I
also created a questionnaire for the Target
Audience.

Problems encountered

Work planned for next week

Project plan status

6-6-2016
I was at work.
Adding enough information and
sketches to the design presentation.
Producing an accurate and detailed
Gantt chart.
Design work review.
Research review.
To make sure all the research is
accurate and detailed.
Hotel furniture desk Adding
renderings and information.
Correct information about hotel
furniture for example desks.
Ongoing

4 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
BDes Product Design
Weekly Logbook
Name
Weekly Date
Week
Course
Stage

Project Name
Hours spent on Major
Project
Work achieved this week

Michelle Wheeler
7-2-2016 13-2-2016
2
Product Design
Stage 1 Research
Stage 2 Design Brief
Stage 3 Design Concepts Sketch
Development
Hotel Furniture
60
7-7-2016
I was finding research on the Environmental
aspects on Stainless Steel, Aluminium and
Stainless steel, eZee iMenu Digital Menu
and Ziosk for the iPad software and I also
started doing research on the Holiday Inn
Hotel with branding and cost with all the
materials use and the cost of the furniture.
8-2-2016
I had feedback from the lecturer about my
progress with the research and he was
giving me feedback on what research
materials I can use and where I can find the
research. I also started typing up my
research.
9-2-2016
I was typing up the research in to a
Publisher file and drawing up a few hotel
furniture desk designs.
10-2-2016
I had feedback from my lecturer and he was
trying to persuade my to change my project
to do a sofa bed instead of a desk but doing
a sofa bed is irrelevant to what I want to
and I also cannot use Eco-Friendly materials
with it. I am going to continue with the desk
design with the Eco-Friendly materials. I

5 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
also completed typing up the research to be
ready for the pin up and presentation for
the 15th February 2016.
11-2-2016
I had feedback from the lecturer helping me
with titles for my Major Project. I was also
reading through the design presentation to
be prepared for the 15th February 2016.
12-2-2016
I had to re-do the Gantt chart and logbook
due to I accidently deleted it but I managed
to remember all the Coursework I have
done on a daily basis.

Problems encountered
Work planned for next week

Project plan status

13-2-2016
I did a few more sketches and improving the
Gantt chart by adding more assignments
and doing the times more evenly.
Starting the presentation boards.
Making the hotel furniture designs.
By making the designs different.
Design Pin Up
Research Concept Ideas
Design PowerPoint Presentations
Complete concept design concept
Complete Research
Complete Gantt Chart
Progress On Logbook
Questionnaires
Ongoing

6 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
BDes Product Design
Weekly Logbook
Name
Weekly Date
Week
Course
Stage

Project Name
Hours spent on Major
Project
Work achieved this week

Michelle Wheeler
14-2-2016 20-2-2016
3
Product Design
Stage 1 Research
Stage 2 Design Brief
Stage 3 Design Concepts Sketch
Development
Hotel Furniture
56
14-2-2016
I had to re-do the Gantt chart by writing the
tasks as stages such as Stage 1 Research. I
also included the task number, Task E.G
What I will be doing, Resources E.G What
will help me produce the coursework, start
date and end date, duration in days, %
complete and I added the dates of every
month until the hand in in May 2016. My
aim is to get the Gantt chart completed by
the end of the week with the information
required and by going through all the
stages.
I also did sketches of the hotel furniture
desks to add to my portfolio.
I also read through the Design Presentation
PowerPoint to present on the 15th February
2016.
15-2-2016
I drew a few sketches of the hotel furniture
desks and I have added a few renders.
I have also been keeping the Logbook
updated by adding the weekly progress of
assignments on what I have been doing.
I have also been completing the Gantt
Chart.
16-2-2016
I completed the Gantt Chart and I also

7 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
started to plan out what I need to do for the
Presentation Boards.
17-2-2016
I drew a few sketches with developments of
the hotel furniture desk and starting to add
renders to the designs. I also started the
Technical Book for the Major Project by
adding health and safety.
18-2-2016
I was drawing designs of the hotel furniture
desk as well as getting all the coursework
organised for the Assessment 1 hand in for
22nd February 2016. I was also adding
renders to the drawings and adding a bit of
information about the design of the hotel
furniture desk for example advantages and
disadvantages.
19-2-2016
I was doing developments of the hotel
furniture desk such as I changed the shape
to make it easier and accessible for
individuals, I put the mirror at an angle, a
foot rest, hotel safe, plug socket and iPad so
that it will also connect to the reception. It
will also be made from eco-friendly
materials.

Problems encountered
Work planned for next week

20-2-2016
I drew out a final design of the hotel
furniture design with added renders and
information such as what can be improved
to the design. I also completed the Gantt
Chart from Semester 2 1st February 2016
until June 2016 for when the Degree Show
is.
Behind in creating the sketch models.
21st February 2016
Formative Assessment Hand In
Chosen concept solution Presentation
th
24 February 2016

8 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk

Project plan status

Diagrams, Space Planning and


Ergonomics Related Issues
Ongoing

9 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
BDes Product Design
Weekly Logbook
Name
Weekly Date
Week
Course
Stage

Project Name
Hours spent on Major
Project
Work achieved this week

Michelle Wheeler
21-2-2016 27-2-2016
4
Product Design
Stage 1 Research
Stage 2 Design Brief
Stage 3 Design Concepts Sketch
Development
Hotel Furniture
42
21-2-2016
I added renders to all the other hotel
furniture design desks and with added
information. I have drawn a final design on
Solidworks to show what it will look like and
to add to the research portfolio. I also went
to visit a Holiday Inn back in Gloucester
where my hometown is to get primary
research. We met up with the Manager who
let me see a bedroom and to take any
primary research that was nesseccarily
needed. I also noticed that the desk in that
current bedroom was small with a big flat
screen TV with two drawer units with plug
sockets and light switch against the wall.
22-2-2016
I was keeping the Logbook updated and to
organise the page layout as well as making
sure the English was correct. I also started
the technical book for the Major Project
which involved health and safety.
23-2-2016
I started the technical book that is for the
Major Project. I also updated the Logbook
and I have organised the layout with the
pages for example each Week by having its
own page.

10 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
24-2-2016
I started the 3 A3 Presentation Sheets and
A2 Presentation Sheet.
25-2-2016
I was drawing my final design as well as
added information.

Problems encountered

Work planned for next week

Project plan status

26-2-2016
I finished all the developments of the
concept designs.
Making enough models to show
different designs of the Hotel
Furniture Designs.
Completing the A3 and A2
presentation boards with research
By adding enough research and
concept designs as well as models.
Design Review
Modelling preparation progress to
date.
Stage 2 Complete
Design Development
Ongoing

11 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
BDes Product Design
Weekly Logbook
Name
Weekly Date
Week
Course
Stage

Project Name
Hours spent on Major
Project
Work achieved this week

Michelle Wheeler
28-2-2016 5-3-2016
5
Product Design
Stage 1 Research
Stage 2 Design Brief
Stage 3 Design Concepts Sketch
Development
Hotel Furniture
45
28-2-2016
I was organising all the folder work on what
will have to be included such as all the
concept drawings, SolidWorks, Gantt Chart
and Logbook.
29-2-2016
I was doing research on the type of plug
sockets that will be used. I drew 3
SolidWorks for developments that will go on
the 3 A3 Concept Presentation Boards as
well as completing the Final Design for the
A2 Presentation Board.
1-3-2016
I made models of the designs that will go on
the 3 A3 Presentation Boards as part of the
developments. I also did more research of
the types of materials that can be used and
the types of finishes that will also be used
for making the desk.
2-3-2016
I started the A3 Presentation Boards and A2
Presentation Board. I added more colour to
the concept designs and I have taken
pictures of the models that will also be
included in the Presentation Board as well
as researching mood images.

12 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
3-3-2016
I was completing the presentation boards
and scanning designs.
4-3-2016
I was completing presentation boards.

Problems encountered

Work planned for next week

Project plan status

5-3-2016
All presentation boards are complete.
Making sure I have all the correct
detail information for the Presentation
Boards.
Subject Related Issues
Tutorials Progress to Date for Stage
3 Complete
7-2-2016 - Deadline for Assessment 1
40%
Ongoing

13 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
BDes Product Design
Weekly Logbook
Name
Weekly Date
Week
Course
Stage

Project Name
Hours spent on Major
Project
Work achieved this week

Michelle Wheeler
6-3-2016 12-3-2016
6
Product Design
Stage 1 Research
Stage 2 Design Brief
Stage 3 Design Concepts Sketch
Development
Hotel Furniture
50
Completing Assessment 1 40%
6-3-2016
All assessment 1 on CD and printed.
7-2-2016
Assessment 1 hand in.
8-3-2016
Started Assessment 2 60%
9-3-2016
I have started the Technical Book for the
Major Project.
10-3-2016
Developments of final design.
11-3-2016
Developments of final design.

Problems encountered
Work planned for next week
Project plan status

12-3-2016
Developments of final design.
Photoshop was difficult.
7-3-2016
Assessment 1 hand in
Ongoing

14 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
BDes Product Design
Weekly Logbook
Name
Weekly Date
Week
Course
Stage

Project Name
Hours spent on Major
Project
Work achieved this week

Michelle Wheeler
13-3-2016 19-3-2016
7
Product Design
Stage 1 Research
Stage 2 Design Brief
Stage 3 Design Concepts Sketch
Development
Stage 4 Developments
Hotel Furniture

13-3-2016
I was doing developments of the final
design and doing the technical book.
14-2-2016
I was doing developments of the final
design and I was doing the technical book.
15-3-2016
I was doing the technical book.
16-3-2016
I was doing developments of the final
design and I was doing the technical book.
17-3-2016
I was doing the technical book.
18-3-2016
I was doing the technical book.

Problems encountered
Work planned for next week

19-3-2016
I was doing the technical book.
Drawing the final design full size.
Formative Pin Up
Prototype Models
Final models
Stage 5
Stage 6

15 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
Project plan status
BDes Product Design
Weekly Logbook
Name
Weekly Date
Week
Course
Stage

Project Name
Hours spent on Major
Project
Work achieved this week

Ongoing

Michelle Wheeler
13-3-2016 19-3-2016
Product Design
Stage 1 Research
Stage 2 Design Brief
Stage 3 Design Concepts Sketch
Development
Stage 4 Developments
Hotel Furniture

20-3-2016
I was working on the final design by design
sketches and research as well as doing the
technical book.
21-2-2016
I was doing the technical book.
22-3-2016
I drew my final design full size to get an
accurate idea on what it will look like as full
size and for all the dimensions to be
accurate.
23-3-2016
I was doing the technical book.
24-3-2016
I was doing the technical book.
25-3-2016
I was doing the technical book.
26-3-2016
I was doing the technical book.

16 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
Problems encountered
Work planned for next week
Project plan status

Ongoing

17 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
BDes Product Design
Weekly Logbook
Name
Weekly Date
Week
Course
Stage

Project Name
Hours spent on Major
Project
Work achieved this week

Michelle Wheeler
13-3-2016 19-3-2016
8
Product Design
Stage 1 Research
Stage 2 Design Brief
Stage 3 Design Concepts Sketch
Development
Stage 4 Developments
Hotel Furniture
50
27-3-2016
I was working on the final design by design
sketches and research as well as doing the
technical book.
28-2-2016
I started to draw the final design on
SolidWorks as well as doing the technical
book.
29-3-2016
I was doing the Final Design on SolidWorks
and doing the technical book.
30-3-2016
I was doing the Final Design on SolidWorks
and doing the technical book.
31-3-2016
I was doing the Final Design on SolidWorks
and doing the technical book.
1-4-2016
I completed the final design on Solidworks
and adding renderings to the design.
2-4-2016
I was doing the technical book.

Problems encountered

18 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
Work planned for next week
Project plan status
BDes Product Design
Weekly Logbook
Name
Weekly Date
Week
Course
Stage

Project Name
Hours spent on Major
Project
Work achieved this week

Ongoing

Michelle Wheeler
13-3-2016 19-3-2016
9
Product Design
Stage 1 Research
Stage 2 Design Brief
Stage 3 Design Concepts Sketch
Development
Stage 4 Developments
Hotel Furniture
55
3-4-2016
I have added the construction of the hotel
desk to the technical book to demonstrate
the order in how the hotel desk is made and
manufactured.
4-4-2016
I was doing the technical book by adding
the initial designs, developments and final
design and a description on what is it
showing.
5-4-2016
I was working on the technical book.
6-4-2016
I was adding more work to the chapters in
the technical book and making all organised
with the correct information and layout.
7-4-2016
I was drawing the final development on
SolidWorks.
8-4-2016

19 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
I was drawing the final development on
SolidWorks.
9-4-2016
I was drawing the final development on
SolidWorks.
Problems encountered
Work planned for next week
Project plan status

Final design keeps changing.


Design Review Draft Boards
Ongoing

20 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
BDes Product Design
Weekly Logbook
Name
Weekly Date
Week
Course
Stage

Project Name
Hours spent on Major
Project
Work achieved this week

Michelle Wheeler
13-3-2016 19-3-2016
10
Product Design
Stage 1 Research
Stage 2 Design Brief
Stage 3 Design Concepts Sketch
Development
Stage 4 Developments
Hotel Furniture
52
10-4-2016
I was drawing the final development on
SolidWorks.
11-4-2016
I was drawing the final development on
SolidWorks.
12-4-2016
I was drawing the final development on
SolidWorks. I was also doing the Technical
Book.
13-4-2016
I was drawing the final development on
SolidWorks. I was also doing the Technical
Book.
14-4-2016
I was drawing the final development on
SolidWorks. I was also doing the Technical
Book.
15-4-2016
I was drawing the final development on
SolidWorks. I was also doing the Technical
Book.
16-4-2016

21 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk

Problems encountered
Work planned for next week
Project plan status

I was drawing the final development on


SolidWorks. I was also doing the Technical
Book.
Making the model.
Project Specification Workshop
Activities
Ongoing

22 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
BDes Product Design
Weekly Logbook
Name
Weekly Date
Week
Course
Stage

Project Name
Hours spent on Major
Project
Work achieved this week

Michelle Wheeler
13-3-2016 19-3-2016
11
Product Design
Stage 1 Research
Stage 2 Design Brief
Stage 3 Design Concepts Sketch
Development
Stage 4 Developments
Hotel Furniture
60
17-4-2016
I was drawing the final development on
SolidWorks. I was also doing the Technical
Book.
18-4-2016
I was drawing the final development on
SolidWorks. I was also doing the Technical
Book.
19-4-2016
I was also doing the Technical Book.
20-4-2016
I was also doing the Technical Book.
21-4-2016
I was also doing the Technical Book.
22-4-2016
I was drawing the final development on
SolidWorks. I was also doing the Technical
Book.
23-4-2016
I was drawing the final development on
SolidWorks. I was also doing the Technical
Book.

23 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
Problems encountered
Work planned for next week
Project plan status

Finishing the design Developments.


Project Specification Workshop
Activities
Ongoing

24 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
BDes Product Design
Weekly Logbook
Name
Weekly Date
Week
Course
Stage

Project Name
Hours spent on Major
Project
Work achieved this week

Michelle Wheeler
13-3-2016 19-3-2016
12
Product Design
Stage 1 Research
Stage 2 Design Brief
Stage 3 Design Concepts Sketch
Development
Stage 4 Developments
Hotel Furniture
65
24-4-2016
Completed a final design.
25-4-2016
Adding joints to the final design and
technical book.
26-4-2016
Adding joints to the final design and
technical book.
27-4-2016
Adding how the joints work and materials
used.
28-4-2016
Adding how the joints work and materials
used.
29-4-2016
Exploded view of the final design.
30-4-2016
Exploded view of the final design.

Problems encountered
Work planned for next week

Getting the exploded view of the


design in a drawing.
Project Specification Workshop
Activities

25 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
Project plan status

Ongoing

26 Michelle Wheeler

6AA019 Major Project


Eco-Friendly Hotel Guest Desk
BDes Product Design
Weekly Logbook
Name
Weekly Date
Week
Course
Stage

Project Name
Hours spent on Major
Project
Work achieved this week

Michelle Wheeler
13-3-2016 19-3-2016
13
Product Design
Stage 1 Research
Stage 2 Design Brief
Stage 3 Design Concepts Sketch
Development
Stage 4 Developments
Hotel Furniture
65
1-5-2016
Designed a new final design.
2-5-2016
Drawn on SolidWorks.
3-5-2016
Drawn technical drawings.
4-5-2016
Adding all work to technical Book.
5-5-2016
Presentation Boards
6-5-2016
Presentation Boards
7-5-2016
Technical Book

Problems encountered
Work planned for next week
Project plan status

Had to change the final design.


Hand in for 13th May 2016
Ongoing