BILL OF MATERIALS

PROJECT TITLE: PROPOSED BRANCH BANK & COMMERCIAL UNIT


LOCATION: CANDELARIA, QUEZON
OWNER: ARCH. CID LAIGO
DESCRIPTION
A. EARTHWORKS
a. Excavation
b. Backfilling and Compaction

B. CONCRETE WORKS
a. Footing
1. Cement CLASS "B"
2. Sand
3. Gravel
4. Rebar 16mm
5. Tie Wire #16
b. Wall footing
1. Cement CLASS "B"
2. Sand
3. Gravel
4. Rebar 16mm
5. Tie Wire #16
c. Columns
1. Cement CLASS "A"
2. Sand
3. Gravel
4. Rebar 16mm
5. Lateral Tie 10mm
6. Tie Wire #16
d. Slab on Fill
1. Cement CLASS "B"
2. Sand
3. Gravel
4. Rebar 10mm
5. Tie Wire #16
e. Suspended Slab
1. Cement "CLASS A"
2. Sand
3. Gravel
4. Rebar 16mm
5. Tie Wire #16
f. Beams
1. Cement CLASS "A"
2. Sand
3. Gravel
4. Rebar 16mm
5. Stirrups 10mm
6. Tie Wire #16
g. Walls
1. Exterior
1.1 CHB
2. Interior
2.1 CHB
3. Mortar
3. 1. Exterior
3.1.1. Cement CLASS "B"

QTY

UNIT

UNIT COST

124.08
97.152

cum.
cum.

472
715

70
9.3
4.65
52
5

bags
cum.
cum.
pcs.
kgs.

230
468
1375
270
58

84
11.184
6
62
5

bags
cum.
cum.
pcs.
kgs.

230
468
1375
153
58

89
10
5
218
180
29

bags
cum.
cum.
pcs.
pcs.
kgs.

230
468
1375
270
106
58

52
20.5
41

bags
cum.
cum.
pcs.
kgs.

230
468
1375
106
58

156
20.508
10.879

bags
cum.
cum.
pcs.
kgs.

230
468
1375
270
58

244
117
58.5
287
325
73

bags
cum.
cum.
pcs.
pcs.
kgs.

230
468
1375
270
106
58

4593

pcs.

15

2374

pcs.

15

552

bags

230

3.1.2. Sand
3.2 Interior
3.2.1. Cement CLASS "B"
3.2.2 Sand
4. Plaster
4.1 Exterior
4.1.1. Cement CLASS "B"
4.1.2. Sand
4.2 Interior
4.2.1. Cement CLASS "B"
4.2.2. Sand
5. Reinforcement
5.1. Exterior
5.1.1. Rebar 10mm
5.1.2. Tie Wire #16
5.2. Interior
5.2.1. Rebar 10mm
5.2.2. Tie Wire #16

C. CARPENTRY
a. Ceiling Joists
1. Lumber 2" x 2"
b. Ceiling Boards
1. Plywood 1/4" x 4' x 8'
c. Door Jambs
1. Lumber 3" x 6"
d. Panel Door
e. Flush Door
f. PVC Door

367.39

cum.

468

285
189.87

bags
cum.

230
468

552
37.974

bags
cum.

230
468

285
73.478

bags
cum.

230
468

pcs.
kgs.

153
58

pcs.
kgs.

153
58

3238.74

bd. Ft.

35

57

pcs.

380

8
3
4

bd. Ft.
pcs.
pcs.
pcs.

3000
5000
2500
1600

pcs.
bd. Ft.

390
35

pcs.
bd. Ft.

390
35

bd. Ft.

35

bd. Ft.

35

bd. Ft.

35

bd. Ft.

35

bd. Ft.

35

bd. Ft.

35

pcs.

390

sets

7000

D. FORMWORK AND SCAFFOLDING


a. Plywood Form (columns)
1. Plywood 1/4" x 4' x 8'
2. Coco Lumber 2" x 2"
b. Plywood Form (Beams)
1. Plywood 1/4" x 4' x 8'
2. Coco Lumber 2" x 2"
c. Scaffolding
1. Columns
1.1. Vertical Support
1.1.1. Coco Lumber 2" x 2"
1.2 HorizontalSupport
1.1.2. Coco Lumber 2" x 2"
1.3. Dioagonal Braces
1.3.1. Coco Lumber 2" x 2"
2. Beams
2.1. Vertical Support
2.1.1. Coco Lumber 2" x 2"
2.2. HorizontalSupport
2.2.1. Coco Lumber 2" x 2"
3. Concrete Slab
3.1. Support
4. Floor Slab Forms
4.1. Plywood 1/4" x 4' x 8'

F. PRE-FABRICATED MATERIALS
a. Windows
1. Awning Window

2. Fixed Window

57

sets

3000

3
11
55

sets
sets
sets
sets

700
700
700
85

124

pcs.

890

pcs.
pcs.
pcs.
kilos

680
740
280
90

pcs.
pcs.
1000pcs.
kgs.
pcs.
kgs.

295
295
300
100
224
100

sets
sets
sets
sets

3000
2500
200
700

pcs.

300

pcs.

150

pcs.

150

pcs.

350

K. PLUMBING
a. 1/2" GI Pipe
b. 4" PVC Pipe
c. 3" PVC Pipe
d. 1/2" GI Elbow
e. 1/2" GI Tee
f. 4" PVC Elbow
g. 4" PVC Wye
h. 3" PVC Elbow

pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.
pcs.

360
480
380
35
35
70
70
70

L. ELECTRICAL
a. 14/7 THWN Wire

rolls

2800

F. HARDWARE
a. Doors
1. Handle Set
2. Lever Set
3. Knob Set
4. Hinges
G. ROOF FRAMING
a. Top & Bottom Chords
1. Angle Bars 1/4" x 2 x 6
b. Web Members
1. Angle Bars
c. Purlins 2" x 6" x 6
d. Sag Rod 12mm
e. Welding Rod

48

H. ROOFING MATERIALS
a. Corrugated GI Sheet
1. 32" x 12"
2. 32" x 9"
b. Rivets
c. GI Washer
d. Plain GI Strap
e. Lead Washers

I. PLUMBING FIXTURES
a. Water Closet
b. Lavatory
g. Floor Drain
i. Faucet

J. TILEWORKS
a. Floors .30x.30
1. Kent Homogeneous Bisque Thru-Chip-Tile
b. T*B Flooring 30 x 30
1. Unglazed Ceramic Tiles
c. Tiles 20 x 20
1. Glazed Ceramic Tiles
d. Floors .30 x 30
Alabaster Homogeneous Vinyl Tile

5
3
3
3

76

b. 1/2" PVC Pipe


c. 1-Gang Switch
d. 2-Gang Switch
e. 3-Gang Switch
f. 2-Gang Outlet
g. Panel Board
M. PAINTING
a. Walls
1. Neutralizer
2. Acrylic Latex Paint Primer
3. Acrylic Gloss Latex Paint
b. Roof
1. Acrylic Roof Shield Paint
2. Second coating

N. MECHANICAL
a. Air-con Set (1.75 HP, Window-Type)

30
11

rolls
sets
sets
sets
sets
sets

85
200
275
350
275
1500

50
50
50

quarts
gal.
gal.

280
550
480

40
40

gal.
gal.

600
600

sets

22000

TOTAL CONSTRUCTION COST


10% CONTINGENCY
3% PERMITS
TOTAL PROJECT COST

IAL UNIT

TOTAL COST
58,565.76
69,463.68

16,100.00
4,352.40
6,393.75
14,040.00
290.00
19,320.00
5,234.11
8,250.00
9,486.00
290.00
20,470.00
4,680.00
6,875.00
58,860.00
19,080.00
1,682.00
11,960.00
9,594.00
56,375.00
0.00
0.00
35,880.00
9,597.74
14,958.63
0.00
0.00
56,120.00
54,756.00
80,437.50
77,490.00
34,450.00
4,234.00
68,895.00
35,610.00
126,960.00

171,938.52
65,550.00
88,859.16
126,960.00
17,771.83
65,550.00
34,387.70
0.00
0.00
0.00
0.00

113,355.90
21,660.00
0.00
40,000.00
7,500.00
6,400.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

63,000.00

171,000.00

2,100.00
0.00
7,700.00
4,675.00

110,360.00
0.00
35,520.00
0.00
0.00

0.00
0.00
300.00
0.00
0.00
0.00

15,000.00
7,500.00
600.00
2,100.00

0.00
11,400.00
0.00
350.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00
8,250.00
16,500.00

14,000.00
27,500.00
24,000.00
24,000.00
24,000.00

0.00

2,330,538.69
233,053.87
69,916.16
2,633,508.72