COSTO HORA - HOMBRE

PROYECTO:

MEJORAMIENTO Y AMPLIACION DEL SISTEMA INTEGRAL DE AGUA POTABLE Y ALCANTARILLADO


DE LAMPA, PROVINCIA DE LAMPA - PUNO

LUGAR:
FECHA:

LAMPA - PUNO - PUNO


ABRIL 2009.

DESCRIPCION
MONTO M.O. MERCADO ZONA
RENUMERACION BASICA (30/ monto)
DOMINICAL 16.67%
DAS FERIADOS 3.3% DE BASICA
SUB TOTAL (1)
LEYES SOCIALES 9%
SUB TOTAL (2)
AGUINALDOS
LIQUIDACION 1/6 de (1)
JORNAL DIARIO
HORA HOMBRE

CAPATAZ

CATEGORIA
OPERARIO
OFICIAL

PEON

1200.00
40.00
6.67
1.32
47.99
4.32
52.31
2.01
8.00

960.00
32.00
5.33
1.06
38.39
3.45
41.84
2.01
6.40

840.00
28.00
4.67
0.92
33.59
3.02
36.62
2.01
5.60

660.00
22.00
3.67
0.73
26.40
2.38
28.77
2.01
4.40

62.32
7.79

50.25
6.28

44.23
5.53

35.18
4.40