You are on page 1of 1

Pumping_Cooper-Jacob-Pozo-Lampa

WELL ID: Prueba Bombeo Agua Potable Lampa


Local ID: Costado rio Lampa, Caisson
Date: ########
Time: 12:50

INPUT
Construction:
Casing dia. (dc)

2 Meter

Annulus dia. (dw)

2 Meter

Screen Length (L)


Depths to:
water level (DTW)
Top of Aquifer
Base of Aquifer

7 Meter

COMPUTED
Aquifer thickness =

1.78 Meter
1.8 Meter
24 Meter

Slope =

22 Meter
0.089094 Meter/log10

Input is consistent.
Annular Fill:
across screen -- Grava
above screen -- Cemento
K =
29 Meter/Day
Aquifer Material -- Depsito Terraza de Rio, Fort Worth, Texas
T (59
= values)650 Meter/Day

FLOW RATE

12 liters/s

1.4

DRAWDOWN, IN METER

1.2

0.8

0.6

0.4

0.2

Pendiente de linea ajustada para estimar T


0
0:00:09

0:01:26

0:14:24

2:24:00

24:00:00

TIME, Hour:Minute:Second

REMARKS:

Cooper-Jacob analysis of single-well aquifer test

Prueba de Bombeo, Pozo de captacion para Sistema de Agua Potable Lampa.


Municipalidad Provincial de Lampa.
Procesado Por : Ing. Roberto Alfaro A.