Inspection Check List

Page 1 of 3

Fired Boiler Inspection

FIC

30/01

A
B
C
D

E
F
G

I
J
K

Drawing
QC Manual
Specification data sheet
Procedure ( WPS, Welding Qualification
Record, NDE Procedure, NDE Personnel
Qualification Record, Welding repair
procedure)
Heat treatment Procedure
Material Certificate/ test report
Material/ component Part Inspection
1. Tubes, Plate
2. Steam Drum & Head
3. Mud Drum, and Headers
4. Valves, Nozzles, and Piping
5. NDE & Other Specified Test
6. Preliminary Dimensional and Orientation
check Internal and External
Welding Inspection
1. Weld Material
2. Visual Inspection and Weld Identification
3. NDT
Heat Treatment and/ or Stress Relieving
certificate and Charts
Final dimensional inspection and Orientation
Testing
1. Test Procedure
2. Hydrostatic Test
3. Pneumatic Test
4. Reinforcing Pad Test
5. Hardness test/ other material test

/var/www/apps/conversion/tmp/scratch_1/336253185.doc

DOCUMENTSOBTAIN CERTIFICATION AND TEST

DESCRIPTION

REVIEW DOCUMENTATION

ITEM
NO

OBSERVE/ VERYFY BY INSPECTION

Equipment Name:
Tag No.:
Area/ System Description:
Drawing No's/ Rev.:
P & ID Dwg No:
General Remarks:
Observation, Verification, and inspection of the subject equipment shall refer as minimum
requirement to Contract Document, Santos Specifications, applicable Industrial Codes, and
standards.

ACCEPT
CRITERIA

COMMENTS

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DATE PRINTED: 8/11/2016

Inspection Check List

Page 2 of 3

Fired Boiler Inspection

L
M

6. Gage and recorders calibration


Flushing and cleaning
Painting/ Protective Coating
1. Surface Preparation
2. Type of Coating and Application
3. Mill Thickness
Name Plate and Code Stamping
1. Name Plate Rubbing
2. ASME Data Sheet
3. Manufacturer Data Report
Installation & Mechanical Completion Check:
1. Foundations complete
2. Heater and burner set, levelled and
aligned
3. HD bolts tested
4. Grouting complete
5. Stack and shell expansion provision
checked
6. Field welding and NDT complete
7. Nozzle locations, orientations & ratings
checked
8. Fire tubes & heated tubes guides,
supports and anchors complete and set
9. Tubes complete and tested
10. Burners & controls set, targeted &
operable
11. Pumps & Motors
12. Valves, Collector, and Filters
13. Blower and Fans
14. Insulation, Thermo protection, and
refractory.
15. Safety Equipments
16. Burner piping complete, tested & blown
clean
17. Pressure relieving devices tested and set
18. Access walkways, ladders, stairways
complete
19. Heater trims complete
20. Electrical, wiring & instrument control
complete
21. Nameplate installed
22. Dry out completed as specified
23. Final internal inspection complete
24. Flue stack complete & dampers operable
25. Painting complete
26. Insulation complete
27. Lifting devices, davits etc complete &
tested
28. Earthing complete
Flushing/ Cleaning

/var/www/apps/conversion/tmp/scratch_1/336253185.doc

FIC

30/01

X
X
X
X
X

X
X

X
X
X
X

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DATE PRINTED: 8/11/2016

Inspection Check List


Fired Boiler Inspection

Mechanical Completion Check

Complete to dwgs and specns:


FIC Accepted:

/var/www/apps/conversion/tmp/scratch_1/336253185.doc

Page 3 of 3
FIC

30/01

X
Contractor
Santos Superintendent

DATE PRINTED: 8/11/2016